CN215062775U - Bag air pipe, ventilation system and data center - Google Patents
Bag air pipe, ventilation system and data center Download PDFInfo
- Publication number
- CN215062775U CN215062775U CN202121465637.XU CN202121465637U CN215062775U CN 215062775 U CN215062775 U CN 215062775U CN 202121465637 U CN202121465637 U CN 202121465637U CN 215062775 U CN215062775 U CN 215062775U
- Authority
- CN
- China
- Prior art keywords
- ventilation pipe
- ventilation
- bonding layer
- wall
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ventilation (AREA)
Abstract
The application discloses sack tuber pipe, ventilation system and data center. The sack tuber pipe includes: the ventilation pipe comprises a plurality of ventilation pipes, the ventilation pipes are made of cloth materials and are sequentially connected, a first bonding layer extending towards the outer side of each ventilation pipe is arranged at the first end of each ventilation pipe, a second bonding layer corresponding to the first bonding layer is arranged at the second end of each ventilation pipe, the first end of each ventilation pipe is adjacent to the second end of each ventilation pipe and is connected through a zipper, the first bonding layer is bonded on the second bonding layer, and the first bonding layer covers the zipper, so that the zipper is sealed by the first bonding layer. The technical problem that the construction difficulty of the data center ventilation pipe is large due to flange connection in the related art is solved.
Description
Technical Field
The application relates to the technical field of ventilation, in particular to a cloth bag air pipe, a ventilation system and a data center.
Background
At present, data centers are more and more applied, an IT machine room of the data centers needs to perform efficient heat dissipation and air exhaust, and ventilation pipes of the data centers in related technologies all adopt galvanized iron air pipes.
In the course of carrying out the present application, the inventors found that the related art has at least the following problems:
when the sealing valve of the ventilation pipe has poor sealing effect, the temperature difference between indoor air and outdoor air is large, the risk of generating condensed water in the ventilation pipe exists, and the condensed water drops at an air opening, so that a data center has short circuit or other safety risks; moreover, the galvanized iron air pipe is heavy in material, the finished air pipe cannot be folded, the transportation is inconvenient, and the construction difficulty is high when flange connection is carried out due to the fact that the weight is high.
Aiming at the problem that the construction difficulty of the data center ventilation pipe using the flange is large in the related art, an effective solution is not provided at present.
SUMMERY OF THE UTILITY MODEL
The main aim at of this application provides a sack tuber pipe, ventilation system and data center to solve among the correlation technique the great problem of the flange joint construction degree of difficulty of data center ventilation pipe use.
In order to achieve the above object, in a first aspect, the present application provides a cloth bag air duct.
The sack tuber pipe according to this application includes: the ventilation pipe comprises a plurality of ventilation pipes, the ventilation pipes are made of cloth materials and are sequentially connected, a first bonding layer extending towards the outer side of each ventilation pipe is arranged at the first end of each ventilation pipe, a second bonding layer corresponding to the first bonding layer is arranged at the second end of each ventilation pipe, the first end of each ventilation pipe is adjacent to the second end of each ventilation pipe and is connected through a zipper, the first bonding layer is bonded on the second bonding layer, and the first bonding layer covers the zipper, so that the zipper is sealed by the first bonding layer.
Optionally, the first adhesive layer and the second adhesive layer are adhered by matching magic tapes.
Optionally, a plurality of resilient supports are also included;
the ventilation pipe comprises an outer wall and an inner wall attached to the outer wall;
the outer wall is made of a cloth material, and the inner wall is made of a sealing material, or the inner wall is made of a cloth material, and the outer wall is made of a sealing material;
the elastic support is positioned in the ventilation pipe and supported on the inner wall of the ventilation pipe, so that the ventilation pipe is cylindrical.
Optionally, the resilient support is annular in shape.
Optionally, the resilient support is a resilient plastic ring.
Optionally, the plurality of resilient supports are evenly distributed in the ventilation tube in an axial direction of the ventilation tube.
Optionally, the sealing material comprises glue or sealant.
Optionally, the lower end of the ventilation pipe is provided with a plurality of air openings communicated with a machine room of the data center.
Optionally, the edge of the tuyere is provided with a covered edge.
In a second aspect, the present application further provides a ventilation system, including the above cloth bag air pipe.
In a third aspect, the application also provides a data center comprising the ventilation system.
In the embodiment of this application, provide a sack tuber pipe, through setting up: the ventilation pipe comprises a plurality of ventilation pipes, the ventilation pipes are made of cloth materials and are sequentially connected, a first bonding layer extending towards the outer side of each ventilation pipe is arranged at the first end of each ventilation pipe, a second bonding layer corresponding to the first bonding layer is arranged at the second end of each ventilation pipe, the first end of each ventilation pipe is adjacent to the second end of each ventilation pipe and is connected through a zipper, the first bonding layer is bonded on the second bonding layer, and the first bonding layer covers the zipper, so that the zipper is sealed by the first bonding layer. Like this, the contrast of galvanized iron tuber pipe among this application and the correlation technique, the sack tuber pipe has following advantage at least owing to adopt the cloth art material, and the ventilation pipe is difficult for the dewfall, and ventilation pipe light in weight, collapsible, and the transportation is convenient, and because adopt the zip fastener to link to each other between the ventilation pipe, the construction degree of difficulty greatly reduced bonds through first adhesive linkage moreover on the second adhesive linkage, so that first adhesive linkage is right the zip fastener seals, carries out the secondary through the junction between first adhesive linkage to the ventilation pipe promptly and seals, and first adhesive linkage bond with connected mode between the second adhesive linkage is also very convenient. Therefore, the technical problem that the construction difficulty of the data center ventilation pipe is high due to flange connection in the related technology is solved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, serve to provide a further understanding of the application and to enable other features, objects, and advantages of the application to be more apparent. The drawings and their description illustrate the embodiments of the invention and do not limit it. In the drawings:
fig. 1 is a schematic structural diagram of a cloth bag air duct provided in an embodiment of the present application.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted", "disposed", "provided", "connected", "slidably connected", "fixed", should be understood in a broad sense. For example, "connected" may be a fixed connection, a detachable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
In addition, the term "plurality" shall mean two as well as more than two.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
As shown in fig. 1, the embodiment of the application provides a sack tuber pipe, including a plurality of ventilation pipes 1, the material of ventilation pipe 1 includes the cloth art material, a plurality of ventilation pipes 1 connect gradually, the first end of ventilation pipe 1 be equipped with to the first adhesive linkage that extends in the ventilation pipe 1 outside, the second of ventilation pipe 1 is served and is equipped with the correspondence the second adhesive linkage of first adhesive linkage, the first end of ventilation pipe 1 is with adjacent the second end of ventilation pipe 1 passes through zip fastener 4 and links to each other, just first adhesive linkage bonds on the second adhesive linkage, first adhesive linkage covers on the zip fastener 4, so that first adhesive linkage is right zip fastener 4 seals.
Galvanized iron tuber pipe contrast among this application and the correlation technique, the sack tuber pipe has following advantage at least owing to adopt the cloth art material, and ventilation pipe 1 is difficult for the dewfall, and ventilation pipe 1 light in weight, collapsible, and the transportation is convenient, and because adopt zip fastener 4 to link to each other between the ventilation pipe 1, the construction degree of difficulty greatly reduced bonds through first adhesive linkage moreover on the second adhesive linkage, so that first adhesive linkage is right zip fastener 4 seals, carries out the secondary seal through the junction of first adhesive linkage between to ventilation pipe 1 promptly, and first adhesive linkage bond with connected mode between the second adhesive linkage is also very convenient.
Specifically, the first adhesive layer is adhered to the second adhesive layer through a matched magic tape.
Optionally, a plurality of resilient supports 2;
the ventilation pipe 1 comprises an outer wall and an inner wall attached to the outer wall;
the outer wall is made of a cloth material, and the inner wall is made of a sealing material, or the inner wall is made of a cloth material, and the outer wall is made of a sealing material;
the elastic support 2 is positioned inside the ventilation pipe 1, and the elastic support 2 is supported on the inner wall of the ventilation pipe 1, so that the ventilation pipe 1 is cylindrical.
Specifically, the elastic support 2 is supported on the inner wall of the ventilation pipe 1, so that the ventilation pipe 1 is cylindrical, and the outer wall and the inner wall of the ventilation pipe 1 are made of cloth materials and sealing materials respectively, so that the pipe wall of the ventilation pipe 1 is airtight.
Alternatively, to make the vent tube 1 cylindrical, the elastic support 2 is annular in shape.
Specifically, the elastic support 2 is an elastic plastic ring.
Optionally, to ensure the overall shape of the ventilation pipe 1, the plurality of elastic supports are uniformly distributed in the ventilation pipe 1 along the axial direction of the ventilation pipe 1.
Optionally, the sealing material comprises glue or sealant.
Specifically, the vent pipe 1 can be formed by uniformly coating the viscose or the sealant on the cloth bag.
Specifically, the lower end of the ventilation pipe 1 is provided with a plurality of air ports 3 communicated with a machine room of a data center. Therefore, outdoor fresh air can be conveyed to a machine room of the data center through the air opening 3.
Optionally, in order to prevent the tuyere 3 from cracking after long-term use, the edge of the tuyere 3 may be provided with a wrapping edge. Wherein, the material of the edge cover can be cloth art material.
Based on the same technical conception, the application also provides a ventilation system, which comprises the cloth bag air pipe.
Based on the same technical concept, the application also provides a data center comprising the ventilation system.
In the embodiment of this application, provide a sack tuber pipe, through setting up: a plurality of ventilation pipes 1, the material of ventilation pipe 1 includes the cloth art material, a plurality of ventilation pipes 1 connect gradually, the first end of ventilation pipe 1 is equipped with to the first adhesive linkage that extends in the ventilation pipe 1 outside, the second of ventilation pipe 1 is served and is equipped with the correspondence the second adhesive linkage of first adhesive linkage, the first end of ventilation pipe 1 is with adjacent the second end of ventilation pipe 1 passes through zip fastener 4 and links to each other, just first adhesive linkage bonds on the second adhesive linkage, first adhesive linkage covers on the zip fastener 4, so that first adhesive linkage is right zip fastener 4 seals. Like this, the contrast of galvanized iron tuber pipe among this application and the correlation technique, the sack tuber pipe has following advantage at least owing to adopt the cloth art material, and ventilation pipe 1 is difficult for the dewfall, and ventilation pipe 1 light in weight, collapsible, and the transportation is convenient, moreover because adopt zip fastener 4 to link to each other between the ventilation pipe 1, the construction degree of difficulty greatly reduced bonds through first adhesive linkage moreover on the second adhesive linkage, so that first adhesive linkage is right zip fastener 4 seals, carries out the secondary through the junction of first adhesive linkage between to the ventilation pipe 1 promptly and seals, and first adhesive linkage bond with connected mode between the second adhesive linkage is also very convenient. Therefore, the technical problem that the construction difficulty of the data center ventilation pipe is high due to flange connection in the related technology is solved.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims (10)
1. A sack tuber pipe, its characterized in that includes: the ventilation pipe comprises a plurality of ventilation pipes, the ventilation pipes are made of cloth materials and are sequentially connected, a first bonding layer extending towards the outer side of each ventilation pipe is arranged at the first end of each ventilation pipe, a second bonding layer corresponding to the first bonding layer is arranged at the second end of each ventilation pipe, the first end of each ventilation pipe is adjacent to the second end of each ventilation pipe and is connected through a zipper, the first bonding layer is bonded on the second bonding layer, and the first bonding layer covers the zipper, so that the zipper is sealed by the first bonding layer.
2. The cloth bag air duct of claim 1, wherein the first adhesive layer is adhered to the second adhesive layer by a hook and loop fastener.
3. The cloth bag air hose of claim 1, further comprising a plurality of resilient supports;
the ventilation pipe comprises an outer wall and an inner wall attached to the outer wall;
the outer wall is made of a cloth material, and the inner wall is made of a sealing material, or the inner wall is made of a cloth material, and the outer wall is made of a sealing material;
the elastic support is positioned in the ventilation pipe and supported on the inner wall of the ventilation pipe, so that the ventilation pipe is cylindrical.
4. The cloth bag air hose of claim 3, wherein the resilient support is annular in shape.
5. The cloth bag air hose of claim 4, wherein the resilient support is a resilient plastic ring.
6. The cloth bag air hose of claim 3, wherein the sealing material comprises a glue or sealant.
7. The cloth bag air duct of claim 1, wherein the lower end of the ventilation duct is provided with a plurality of air openings communicated with a machine room of a data center.
8. The cloth bag air duct of claim 7, wherein the edge of the air opening is provided with a covered edge.
9. A ventilation system comprising a cloth bag air duct according to any one of claims 1 to 8.
10. A data center comprising the ventilation system of claim 9.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121465637.XU CN215062775U (en) | 2021-06-29 | 2021-06-29 | Bag air pipe, ventilation system and data center |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121465637.XU CN215062775U (en) | 2021-06-29 | 2021-06-29 | Bag air pipe, ventilation system and data center |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215062775U true CN215062775U (en) | 2021-12-07 |
Family
ID=79230447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121465637.XU Active CN215062775U (en) | 2021-06-29 | 2021-06-29 | Bag air pipe, ventilation system and data center |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215062775U (en) |
-
2021
- 2021-06-29 CN CN202121465637.XU patent/CN215062775U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205781522U (en) | A kind of card waves joint design | |
CN103486358B (en) | A kind of high leakproofness aircraft earth surface air-conditioning air supplying hose and method of sewing thereof | |
CN215062775U (en) | Bag air pipe, ventilation system and data center | |
CN107096316A (en) | A kind of flexible filter bag device of pulse dust collector | |
CN215062776U (en) | Bag air pipe, ventilation system and data center | |
CN213452146U (en) | Air leakage prevention assembly for joint of rubber-plastic composite fiber fabric heat-insulation air pipe | |
CN212718555U (en) | Insulating brick powder material pipeline seal structure | |
CN205805127U (en) | A kind of solar energy air dome | |
CN2240093Y (en) | Flanged coupling insulating, silencing ventilating pipe | |
CN214064077U (en) | Air leakage prevention flexible air pipe system | |
CN105569433A (en) | Tent supporting frame structure, tent and use method of tent | |
CN218208225U (en) | Connect formula condensation soon and promote drain pipe | |
CN112431972A (en) | Air leakage prevention flexible air pipe system and machining method thereof | |
CN207271555U (en) | A kind of point glue equipment for PUR hot melt adhesive | |
CN2156349Y (en) | Sealing joint structure for air sealing type apparatus | |
CN218303764U (en) | High leakproofness heat preservation package | |
CN209988392U (en) | Lining bag opening connecting assembly | |
CN213789741U (en) | Quick mounting structure of fire control pipeline | |
CN220728483U (en) | Air distribution box and fresh air system | |
CN212942836U (en) | Automatic powder device under laminating | |
CN208997487U (en) | A kind of drinking-water pipe condensation-proof heat insulation sheath | |
CN215724047U (en) | Flexible rubber-plastic composite fiber fabric air pipe produced in modularization mode | |
CN208338772U (en) | It is a kind of to wrap food fermentation room of ordering | |
CN203529152U (en) | Packaging bag of air-conditioner connected pipes and packaging box of air-conditioner outdoor unit | |
CN218494395U (en) | High-temperature-resistant rubber sealing element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |