CN215060786U - On-spot mapping device of building engineering cost - Google Patents

On-spot mapping device of building engineering cost Download PDF

Info

Publication number
CN215060786U
CN215060786U CN202121458477.6U CN202121458477U CN215060786U CN 215060786 U CN215060786 U CN 215060786U CN 202121458477 U CN202121458477 U CN 202121458477U CN 215060786 U CN215060786 U CN 215060786U
Authority
CN
China
Prior art keywords
sleeve
plate
fixed mounting
mapping device
surveying instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121458477.6U
Other languages
Chinese (zh)
Inventor
王意义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121458477.6U priority Critical patent/CN215060786U/en
Application granted granted Critical
Publication of CN215060786U publication Critical patent/CN215060786U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the mapping device, especially, be an on-spot mapping device of building engineering cost, including base and surveying instrument, the top fixed mounting of base has the sleeve, the bracing piece has been cup jointed in the sleeve slides, the top of bracing piece is rotated and is installed the mounting panel, the bottom fixed mounting of mounting panel has the sleeve pipe, sheathed tube one side activity is provided with the kelly, a plurality of draw-in grooves have been seted up in the outside of bracing piece. The utility model has the advantages of reasonable design, through the cooperation of sleeve, bracing piece and screw rod, conveniently adjust the height of surveying instrument, through the cooperation of sleeve pipe, kelly, draw-in groove, reset spring, mounting panel and bracing piece, conveniently adjust the angle of surveying instrument to the use of surveying instrument has been made things convenient for, and through the cooperation of spout, sliding plate, fixed slot, supporting spring, wire rope, vertical axis and wire reel, the dismouting to surveying instrument is conveniently overhauld and is maintained the surveying instrument.

Description

On-spot mapping device of building engineering cost
Technical Field
The utility model relates to a mapping device technical field especially relates to an on-spot mapping device of building engineering cost.
Background
When assessing the construction cost, the construction cost site is often required, and a professional engineer surveys the site through a surveying instrument, so that the whole terrain is measured, and the overall assessment of the construction cost is more accurately performed.
However, the existing surveying and mapping device is mostly inconvenient to adjust the height and the angle, so that the use is limited, the surveying and mapping device is inconvenient to install and disassemble, the surveying and mapping device is inconvenient to overhaul and maintain, and therefore the construction engineering cost field surveying and mapping device is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the current mapping device and mostly inconveniently adjusting height and angle, lead to using limitedly, and inconvenient to the mapping device install and dismantle, lead to inconvenient to overhaul the shortcoming of maintaining to the mapping device, and the on-spot mapping device of building engineering cost who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction engineering cost on-site surveying and mapping device comprises a base and a surveying and mapping instrument, wherein a sleeve is fixedly installed at the top of the base, a supporting rod is slidably sleeved in the sleeve, a mounting plate is rotatably installed at the top end of the supporting rod, a sleeve is fixedly installed at the bottom of the mounting plate, a clamping rod is movably arranged on one side of the sleeve, a plurality of clamping grooves are formed in the outer side of the supporting rod, the clamping rod is movably clamped in the corresponding clamping grooves, a reset spring is fixedly installed on one side of the sleeve, a limiting plate is fixedly installed at one end, away from the sleeve, of the reset spring, the clamping rod is fixedly installed on one side of the limiting plate, a sliding groove is formed in one side of the mounting plate, a sliding plate is slidably sleeved in the sliding groove, a connecting rod is fixedly installed at the top of the sliding plate, the surveying and mapping instrument is fixedly installed at the top end of the connecting rod, and a groove is formed in the inner wall of the rear side of the sliding groove, the top of mounting panel rotates installs vertical axis, vertical axis's bottom fixed mounting has the wire reel, the front side fixed mounting of wire reel has wire rope, wire rope's front end fixed mounting has the fixed plate, the rear side of sliding plate is opened and is equipped with the fixed slot, fixed plate activity joint is in the fixed slot.
Preferably, a guide groove is formed in the inner wall of the top of the groove, a guide plate is sleeved in the guide groove in a sliding mode, the guide plate is fixedly installed at the top of the fixing plate, a supporting spring is fixedly installed on one side of the guide plate, and one end, far away from the guide plate, of the supporting spring is fixedly installed on the inner wall of one side of the guide groove.
Preferably, the top of the mounting plate is fixedly provided with a bearing, the vertical shaft is fixedly sleeved in an inner ring of the bearing, and the top end of the vertical shaft is fixedly provided with a hand wheel.
Preferably, a through hole is formed in one side of the sleeve, and the clamping rod is sleeved in the through hole in a sliding mode.
Preferably, the reset spring is sleeved outside the clamping rod, and the other side of the limiting plate is fixedly provided with a pull ring.
Preferably, a screw rod is arranged on one side of the sleeve in a threaded manner, and one end of the screw rod is movably abutted against one side of the supporting rod.
In the utility model, the construction cost on-site mapping device is convenient for adjusting the height of the mapping instrument by the matching of the sleeve, the support rod and the screw rod, and is convenient for adjusting the angle of the mapping instrument by the matching of the sleeve, the clamping rod, the clamping groove, the reset spring, the mounting plate and the support rod, thereby facilitating the use of the mapping instrument;
in the utility model, the construction cost on-site mapping device facilitates the disassembly and assembly of the mapping instrument and the maintenance of the mapping instrument through the matching of the sliding chute, the sliding plate, the fixed groove, the supporting spring, the steel wire rope, the vertical shaft and the wire spool;
the utility model has the advantages of reasonable design, through the cooperation of sleeve, bracing piece and screw rod, conveniently adjust the height of surveying instrument, through the cooperation of sleeve pipe, kelly, draw-in groove, reset spring, mounting panel and bracing piece, conveniently adjust the angle of surveying instrument to the use of surveying instrument has been made things convenient for, and through the cooperation of spout, sliding plate, fixed slot, supporting spring, wire rope, vertical axis and wire reel, the dismouting to surveying instrument is conveniently overhauld and is maintained the surveying instrument.
Drawings
Fig. 1 is a schematic structural diagram of a construction engineering cost field mapping device provided by the utility model;
fig. 2 is a cross-sectional view of the construction cost on-site surveying and mapping device of the utility model;
FIG. 3 is a partial left side sectional view of the construction cost on-site surveying and mapping apparatus of the present invention;
fig. 4 is a schematic structural diagram of a part a of the construction cost on-site surveying and mapping device of the present invention;
fig. 5 is the structural schematic diagram of part B of the construction engineering cost on-site surveying and mapping device provided by the utility model.
In the figure: 1. a base; 2. a sleeve; 3. a screw; 4. a support bar; 5. mounting a plate; 6. a chute; 7. a sliding plate; 8. a connecting rod; 9. a surveying instrument; 10. a card slot; 11. a support spring; 12. a clamping rod; 13. a sleeve; 14. a return spring; 15. a limiting plate; 16. a hand wheel; 17. a vertical axis; 18. a wire spool; 19. a groove; 20. a wire rope; 21. a fixing plate; 22. fixing grooves; 23. a guide plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, an on-site surveying and mapping device for construction cost of construction engineering comprises a base 1 and a surveying and mapping instrument 9, wherein a sleeve 2 is fixedly installed at the top of the base 1, a support rod 4 is slidably sleeved in the sleeve 2, the height of the surveying and mapping instrument 9 can be adjusted through the support rod 4, a mounting plate 5 is rotatably installed at the top end of the support rod 4, a sleeve 13 is fixedly installed at the bottom of the mounting plate 5, a clamping rod 12 is movably arranged at one side of the sleeve 13, a plurality of clamping grooves 10 are formed in the outer side of the support rod 4, the clamping rod 12 is movably clamped in the corresponding clamping grooves 10, a return spring 14 is fixedly installed at one side of the sleeve 13, a limiting plate 15 is fixedly installed at one end of the return spring 14 far away from the sleeve 13, the clamping rod 12 is fixedly installed at one side of the limiting plate 15, when the angle of the surveying and mapping instrument 9 needs to be adjusted, the limiting plate 15 is pulled to drive the clamping rod 12 to move to the right and separate from the clamping grooves 10, thereby do not fix mounting panel 5 and sleeve pipe 13, but rotatable mounting panel 5 and sleeve pipe 13 at this moment, thereby the angle of adjustable surveying instrument 9, convenient to use, after angle modulation, after loosening limiting plate 15, at this moment under the effect of reset spring 14, kelly 12 resets and joint in corresponding draw-in groove 10, thereby can fix mounting panel 5 and surveying instrument 9, mounting panel 5 one side has seted up spout 6, sliding sleeve has sliding plate 7 in spout 6, the top fixed mounting of sliding plate 7 has connecting rod 8, surveying instrument 9 is fixed mounting is on the top of connecting rod 8, seted up recess 19 on the rear side inner wall of spout 6, the top of mounting panel 5 is rotated and installed vertical axis 17, the bottom fixed mounting of vertical axis 17 has wire reel 18, the front side fixed mounting of wire reel 18 has wire rope 20, the front end fixed mounting of wire rope 20 has fixed plate 21, fixed slot 22 has been opened to the rear side of sliding plate 7, fixed plate 21 activity joint is in fixed slot 22, overhaul when maintaining surveying instrument 9 as required, rotate vertical axis 17, vertical axis 17 has driven the rotation of wire reel 18, wire reel 18 begins to receive wire rope 20, wire rope 20 has driven the antedisplacement of fixed plate 21 and has broken away from fixed slot 22, thereby carry out spacing fixed to sliding plate 7, can stimulate surveying instrument 9 right this moment, sliding plate 7 slides in spout 6, can take out surveying instrument 9 and overhaul the maintenance.
The utility model discloses in, the guide way has been seted up on recess 19's the top inner wall, guide plate 23 has been slided and has been cup jointed in the guide way, guide plate 23 fixed mounting is at the top of fixed plate 21, one side fixed mounting of guide plate 23 has supporting spring 11, supporting spring 11 keeps away from the one end fixed mounting of guide plate 23 on one side inner wall of guide way, through guide plate 23, can lead to fixed plate 21, make its more stable that removes, through supporting spring 11, the convenience carries out automatic reseing to fixed plate 21 after the removal, the convenience is fixed to sliding plate 7.
The utility model discloses in, the fixed bearing that is provided with in top of mounting panel 5, vertical axis 17 are fixed cup joints in the inner circle of bearing, and the top fixed mounting of vertical axis 17 has hand wheel 16, and through the bearing, it is convenient to support vertical axis 17, makes its rotatory more steady smooth and easy.
The utility model discloses in, the through-hole has been seted up to one side of sleeve pipe 13, and kelly 12 slides and cup joints in the through-hole, through the through-hole, conveniently leads kelly 12, makes more steady of its removal.
The utility model discloses in, reset spring 14 cup joints in the outside of kelly 12, and limiting plate 15's opposite side fixed mounting has the pull ring, through the pull ring, conveniently stimulates limiting plate 15 and kelly 12.
The utility model discloses in, one side screw thread of sleeve 2 is provided with screw rod 3, and the one end activity butt of screw rod 3 is in one side of bracing piece 4, through screw rod 3, conveniently fixes bracing piece 4 after adjusting to conveniently adjust the height of bracing piece 4, thereby can highly adjust surveying instrument 9.
In the utility model, when in use, the screw rod 3 is unscrewed, so that the screw rod 3 is not contacted with the support rod 4, the height of the support rod 4 can be adjusted up and down, thereby the height of the surveying instrument 9 can be adjusted, after the height is adjusted, the screw rod 3 is screwed down, so that the screw rod 3 is butted with one side of the support rod 4, the support rod 4 can be fixed, when the angle of the surveying instrument 9 needs to be adjusted, the limiting plate 15 is pulled, the limiting plate 15 drives the clamping rod 12 to move right and separate from the clamping groove 10, thereby the mounting plate 5 and the sleeve 13 are not fixed, at the moment, the mounting plate 5 and the sleeve 13 can be rotated, thereby the angle of the surveying instrument 9 can be adjusted, thereby the use is convenient, after the angle is adjusted, the limiting plate 15 is loosened, at the moment, under the action of the reset spring 14, the clamping rod 12 is reset and is clamped in the corresponding clamping groove 10, thereby the mounting plate 5 and the surveying instrument 9 can be fixed, then just can survey and draw the scene, when needs overhaul surveying instrument 9 and maintain, rotate hand wheel 16, hand wheel 16 has driven the rotation of vertical axis 17 and wire reel 18, wire reel 18 begins to receive wire rope 20, wire rope 20 has driven the antedisplacement of fixed plate 21 and has broken away from fixed slot 22, thereby spacing fixed to sliding plate 7, can stimulate surveying instrument 9 right this moment, sliding plate 7 slides in spout 6, can take out surveying instrument 9 and overhaul the maintenance, when needs are installed, place sliding plate 7 in spout 6, and promote surveying instrument 9 left, make surveying instrument 9 reset, loosen hand wheel 16, this moment under supporting spring 11's effect, fixed plate 21 antedisplacement resets and the joint is in fixed slot 22, thereby can fix sliding plate 7, thereby conveniently to the dismouting of surveying instrument 9, the maintenance of surveying instrument 9 of being convenient for.

Claims (6)

1. The utility model provides an on-spot mapping device of building engineering cost, includes base (1) and surveying instrument (9), its characterized in that, the top fixed mounting of base (1) has sleeve (2), sliding sleeve has bracing piece (4) in sleeve (2), the top of bracing piece (4) is rotated and is installed mounting panel (5), the bottom fixed mounting of mounting panel (5) has sleeve pipe (13), one side activity of sleeve pipe (13) is provided with kelly (12), a plurality of draw-in grooves (10) have been seted up in the outside of bracing piece (4), kelly (12) activity joint is in corresponding draw-in groove (10), one side fixed mounting of sleeve pipe (13) has reset spring (14), the one end fixed mounting that sleeve pipe (13) was kept away from in reset spring (14) has limiting plate (15), kelly (12) fixed mounting is in one side of limiting plate (15), spout (6) have been seted up to one side of mounting panel (5), sliding plate (7) have been slided in spout (6) and have been cup jointed, the top fixed mounting of sliding plate (7) has connecting rod (8), surveying instrument (9) fixed mounting is on the top of connecting rod (8), set up fluted (19) on the rear side inner wall of spout (6), the top of mounting panel (5) is rotated and is installed vertical axis (17), the bottom fixed mounting of vertical axis (17) has wire reel (18), the front side fixed mounting of wire reel (18) has wire rope (20), the front end fixed mounting of wire rope (20) has fixed plate (21), fixed slot (22) have been seted up to the rear side of sliding plate (7), fixed plate (21) activity joint is in fixed slot (22).
2. The construction cost on-site surveying and mapping device according to claim 1, wherein a guide groove is formed in an inner wall of a top portion of the groove (19), a guide plate (23) is slidably sleeved in the guide groove, the guide plate (23) is fixedly installed at the top portion of the fixing plate (21), a supporting spring (11) is fixedly installed on one side of the guide plate (23), and one end, far away from the guide plate (23), of the supporting spring (11) is fixedly installed on an inner wall of one side of the guide groove.
3. The construction cost on-site surveying and mapping device according to claim 1, characterized in that a bearing is fixedly arranged at the top of the mounting plate (5), the vertical shaft (17) is fixedly sleeved in an inner ring of the bearing, and a hand wheel (16) is fixedly arranged at the top end of the vertical shaft (17).
4. The construction cost on-site surveying and mapping device according to claim 1, characterized in that a through hole is opened at one side of the sleeve (13), and the clamping rod (12) is slidably sleeved in the through hole.
5. The construction cost on-site surveying and mapping device according to claim 1, characterized in that the return spring (14) is sleeved outside the clamping rod (12), and the other side of the limiting plate (15) is fixedly provided with a pull ring.
6. The construction cost on-site mapping device according to claim 1, characterized in that a screw (3) is threaded on one side of the sleeve (2), and one end of the screw (3) is movably abutted against one side of the support rod (4).
CN202121458477.6U 2021-06-29 2021-06-29 On-spot mapping device of building engineering cost Active CN215060786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121458477.6U CN215060786U (en) 2021-06-29 2021-06-29 On-spot mapping device of building engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121458477.6U CN215060786U (en) 2021-06-29 2021-06-29 On-spot mapping device of building engineering cost

Publications (1)

Publication Number Publication Date
CN215060786U true CN215060786U (en) 2021-12-07

Family

ID=79230253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121458477.6U Active CN215060786U (en) 2021-06-29 2021-06-29 On-spot mapping device of building engineering cost

Country Status (1)

Country Link
CN (1) CN215060786U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059849A (en) * 2022-06-16 2022-09-16 山东省地质矿产勘查开发局第七地质大队(山东省第七地质矿产勘查院) Hydraulic ring geological mapping equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059849A (en) * 2022-06-16 2022-09-16 山东省地质矿产勘查开发局第七地质大队(山东省第七地质矿产勘查院) Hydraulic ring geological mapping equipment

Similar Documents

Publication Publication Date Title
CN205309385U (en) Drilling equipment
CN215060786U (en) On-spot mapping device of building engineering cost
CN208418073U (en) A kind of rangefinder adapter rack
CN109014322B (en) Corner positioning device for drilling of inner wall of large pipeline
CN113108212B (en) Engineering mapping system
CN217688922U (en) Wireless soil moisture content instrument for monitoring soil moisture content
CN212535528U (en) Soft soil geotechnical engineering drilling device
CN210732706U (en) Construction equipment is used in construction of high accuracy wood system furniture installation
CN214093844U (en) Telescopic bracket for constructional engineering measurement
CN210241054U (en) Surveying instrument adjusting device for engineering
CN221881035U (en) Engineering total station
CN214224128U (en) Intelligent measuring device for hydraulic engineering management
CN216743683U (en) Adjustable fixed bolster for land planning measuring apparatu
CN209910660U (en) Pay-off is used in survey and drawing convenient to angle regulation
CN214470841U (en) Special mapping device of building engineering technical personnel
CN218863726U (en) Outdoor positioning equipment of geographic information system
CN218919310U (en) Grounding wire conductor end steering device
CN219298759U (en) Template for constructional engineering
CN215988033U (en) Engineering cost budget result show board
CN220871771U (en) Auxiliary marker post for engineering measurement
CN219243224U (en) Building surveys auxiliary stand with adjustable
CN219620540U (en) Cable pay-off rack
CN219177371U (en) RTK measuring apparatu is handheld fixed docking mechanism
CN220118964U (en) Water conservancy mapping instrument
CN219639825U (en) Photogrammetry camera convenient to installation is dismantled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant