CN215055411U - Concrete pouring equipment - Google Patents

Concrete pouring equipment Download PDF

Info

Publication number
CN215055411U
CN215055411U CN202023307981.4U CN202023307981U CN215055411U CN 215055411 U CN215055411 U CN 215055411U CN 202023307981 U CN202023307981 U CN 202023307981U CN 215055411 U CN215055411 U CN 215055411U
Authority
CN
China
Prior art keywords
annular
head
connecting pipe
connecting rod
spout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023307981.4U
Other languages
Chinese (zh)
Inventor
鲁琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
Original Assignee
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC TDC Yantai Environmental Protection Dredging Co Ltd filed Critical CCCC TDC Yantai Environmental Protection Dredging Co Ltd
Priority to CN202023307981.4U priority Critical patent/CN215055411U/en
Application granted granted Critical
Publication of CN215055411U publication Critical patent/CN215055411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete placement equipment relates to the relevant technical field of concrete placement, including first connecting pipe, the lower extreme of first connecting pipe is provided with connecting device, the lower extreme of first connecting pipe has through connecting device swing joint to pour the head, L type connecting rod is provided with two, two in the one end of first annular backup pad the arc wall has been seted up to one side of L type connecting rod, and slidable mounting has second annular backup pad between two L type connecting rods. The utility model discloses a set up connecting device, can be so that first connecting pipe and pour and need not use the meshing between the screw thread to connect when connecting between the head, only need will pour and peg graft just can connect between head and the first connecting pipe for more convenience when connecting between pouring head and the first connecting pipe has improved the efficiency that the building was pour simultaneously, simple and practical.

Description

Concrete pouring equipment
Technical Field
The utility model relates to a concrete placement correlation technique field specifically is a concrete placement equipment.
Background
Along with the high building of a seat pulls out the ground in the city now, make also more and more fast at the speed to the high building construction now, general building need use the concrete to pour the concrete to the inside of skeleton after having built the skeleton, and present concrete placement pipeline is when pouring, need use to pour head and pipeline and connect, current pouring head and pipeline are connected with the cooperation between the screw thread when connecting, make pipeline and pouring head inconvenient when connecting, consequently need a neotype concrete placement equipment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete placement equipment to solve the inconvenient problem of when the head of pouring that the above-mentioned background art provided and pipeline connect.
In order to solve the technical problem, the utility model provides a following technical scheme: the concrete pouring equipment comprises a first connecting pipe, wherein a connecting device is arranged at the lower end of the first connecting pipe, and a pouring head is movably connected to the lower end of the first connecting pipe through the connecting device.
Preferably, the connecting device comprises a first connecting rod, an L-shaped connecting rod and a first annular supporting plate, one end of the first connecting rod is fixedly installed at the lower end of the first connecting pipe, a through hole is formed in one side of the first connecting rod, an annular sliding groove is formed in the middle of the upper end of the pouring head, the first annular supporting plate is slidably installed in an inner cavity of the annular sliding groove, and one end of the L-shaped connecting rod is rotatably installed at one end, far away from the bottom of the inner cavity of the annular sliding groove, of the first annular supporting plate.
Preferably, the L-shaped connecting rods are provided with two arc-shaped grooves at one end of the first annular supporting plate, and the second annular supporting plate is slidably mounted between the two L-shaped connecting rods.
Preferably, the connecting device further comprises a sliding block and a spring, first sliding grooves are formed in two sides of the pouring head, one end of each first sliding groove is communicated with one side of the corresponding annular sliding groove, and one end of the sliding block is slidably mounted in an inner cavity of the corresponding first sliding groove and fixedly connected with one side of the corresponding first annular supporting plate.
Preferably, one end of the spring is fixedly installed on one side of the inner cavity of the first sliding groove, and the other end of the spring is fixedly installed at the upper end of the sliding block.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a set up connecting device, can be so that first connecting pipe and pour and need not use the meshing between the screw thread to connect when connecting between the head, only need will pour and peg graft just can connect between head and the first connecting pipe for more convenience when connecting between pouring head and the first connecting pipe has improved the efficiency that the building was pour simultaneously, simple and practical.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
fig. 2 is a cross-sectional view of a first connection pipe of the present invention;
fig. 3 is a cross-sectional view of the connection device of the present invention.
In the figure: 1. a first connecting pipe; 2. pouring a head; 3. a connecting device; 31. a slider; 32. a first chute; 33. a first connecting rod; 34. a through hole; 35. an annular chute; 36. an L-shaped connecting rod; 37. a second annular support plate; 38. a spring; 39. a first annular support plate.
Detailed Description
In order to solve the inconvenient problem of when the head of pouring that the above-mentioned background art provided and pipeline are connected, the embodiment of the utility model provides a concrete placement equipment. The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-3, the present embodiment provides a concrete pouring apparatus, including a first connecting pipe 1, a connecting device 3 is disposed at a lower end of the first connecting pipe 1, wherein the other end of the first connecting pipe 1 is connected to a pipeline for pouring cement, and a pouring head 2 is movably connected to the lower end of the first connecting pipe 1 through the connecting device 3, wherein the connecting device 3 can make the connection between the first connecting pipe 1 and the pouring head 2 more convenient, so that the concrete is more convenient when pouring a building formwork.
In order to solve the problem how to facilitate the connection between the first connecting pipe 1 and the casting head 2, the connecting device 3 includes a first connecting rod 33, an L-shaped connecting rod 36 and a first annular supporting plate 39, one end of the first connecting rod 33 is fixedly installed at the lower end of the first connecting pipe 1, and a through hole 34 is formed in one side of the first connecting rod 33, wherein the lower end of the first connecting rod 33 is arc-shaped, so that the first connecting rod 33 can be more conveniently placed between the two L-shaped connecting rods 36, and meanwhile, the first connecting rod 33 can be placed inside the casting head 2, so that the first connecting pipe 1 and the casting head 2 are connected.
In order to solve the problem that the connection between the first connecting pipe 1 and the pouring head 2 is more convenient, the annular sliding groove 35 is formed in the middle of the upper end of the pouring head 2, the first annular supporting plate 39 is slidably mounted in an inner cavity of the annular sliding groove 35, one end of the L-shaped connecting rod 36 is rotatably mounted at one end, far away from the bottom of the inner cavity of the annular sliding groove 35, of the first annular supporting plate 39, the first annular supporting plate 39 can drive the L-shaped connecting rod 36 to slide up and down in the inner cavity of the annular sliding groove 35, meanwhile, one end of the L-shaped connecting rod 36 can be placed in the inner cavity of the through hole 34, the L-shaped connecting rod 36 can be connected with the first connecting rod 33, and the first connecting pipe 1 and the pouring head 2 are more convenient to connect.
In order to solve the problem how to facilitate the first connecting rod 33 to slide into the inner cavity of the annular sliding groove 35 and then fix the first connecting rod 33, two L-shaped connecting rods 36 are arranged at one end of a first annular supporting plate 39, an arc-shaped groove is formed in one side of each L-shaped connecting rod 36, and a second annular supporting plate 37 is slidably arranged between the two L-shaped connecting rods 36, wherein when the second annular supporting plate 37 slides between the two L-shaped connecting rods 36, the openings of the two L-shaped connecting rods 36 can be enlarged, and when the second annular supporting plate 37 slides into the inner cavity of the arc-shaped groove, the two L-shaped connecting rods 36 can be in a state of being parallel to each other, so that one sides of the two L-shaped connecting rods 36 are placed into the inner cavity of the through hole 34, and the first connecting rod 33 is fixed.
In order to solve the problem of how to conveniently control the size of the opening between the two L-shaped connecting rods 36, the connecting device 3 further comprises a sliding block 31 and a spring 38, the two sides of the pouring head 2 are provided with first sliding grooves 32, one end of each first sliding groove 32 is communicated with one side of each annular sliding groove 35, one end of each sliding block 31 is slidably mounted in the inner cavity of each first sliding groove 32 and is fixedly connected with one side of each first annular supporting plate 39, wherein the sliding block 31 slides up and down in the inner cavity of each first sliding groove 32 to drive the first annular supporting plates 39 to slide up and down in the inner cavities of the annular sliding grooves 35, so that the purpose of controlling the size of the opening between the two L-shaped connecting rods 36 is achieved.
In order to solve the problem of convenient detachment between the first connecting pipe 1 and the pouring head 2, one end of the spring 38 is fixedly installed at one side of the inner cavity of the first sliding chute 32, and the other end is fixedly installed at the upper end of the sliding block 31, wherein, the spring 38 can make one side of the sliding block 31 and the bottom of the inner cavity of the first sliding chute 32 contact with each other, so that, when the lower end of the first connecting rod 33 and the second annular support plate 37 are brought into contact with each other, the first annular support plate 39 does not move, so that the two L-shaped connecting rods 36 can fix the first connecting rod 33, and at the same time, push the slider 31, the sliding block 31 can drive the first annular supporting plate 39 to slide up and down in the inner cavity of the annular sliding chute 35, so that the arc-shaped groove and the second annular supporting plate 37 slide relatively to each other, and the L-shaped connecting rod 36 and the through hole 34 are separated relatively to each other, so that the first connecting pipe 1 and the pouring head 2 can be detached more conveniently.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. A concrete pouring device comprising a first connecting pipe (1), characterized in that: the lower end of the first connecting pipe (1) is provided with a connecting device (3), and the lower end of the first connecting pipe (1) is movably connected with a pouring head (2) through the connecting device (3);
connecting device (3) include head rod (33), L type connecting rod (36) and first annular support board (39), the one end fixed mounting of head rod (33) has been seted up at the lower extreme of first connecting pipe (1), and one side has seted up through-hole (34), annular spout (35) have been seted up at the upper end middle part of pouring head (2), first annular support board (39) slidable mounting is in the inner chamber of annular spout (35), the one end of L type connecting rod (36) is rotated and is installed the one end of keeping away from annular spout (35) inner chamber bottom in first annular support board (39).
2. A concrete pouring apparatus according to claim 1, wherein: l type connecting rod (36) are provided with two, two in the one end of first annular backup pad (39) arc wall has been seted up to one side of L type connecting rod (36), and slidable mounting has second annular backup pad (37) between two L type connecting rods (36).
3. A concrete pouring apparatus according to claim 1, wherein: connecting device (3) still include slider (31) and spring (38), first spout (32) have been seted up to the both sides of pouring head (2), the one end of first spout (32) and one side of annular spout (35) communicate each other, the one end slidable mounting of slider (31) is in the inner chamber of first spout (32), and with one side fixed connection of first annular backup pad (39).
4. A concrete pouring apparatus according to claim 3, wherein: one end of the spring (38) is fixedly arranged at one side of the inner cavity of the first sliding chute (32), and the other end of the spring is fixedly arranged at the upper end of the sliding block (31).
CN202023307981.4U 2020-12-30 2020-12-30 Concrete pouring equipment Active CN215055411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023307981.4U CN215055411U (en) 2020-12-30 2020-12-30 Concrete pouring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023307981.4U CN215055411U (en) 2020-12-30 2020-12-30 Concrete pouring equipment

Publications (1)

Publication Number Publication Date
CN215055411U true CN215055411U (en) 2021-12-07

Family

ID=79222758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023307981.4U Active CN215055411U (en) 2020-12-30 2020-12-30 Concrete pouring equipment

Country Status (1)

Country Link
CN (1) CN215055411U (en)

Similar Documents

Publication Publication Date Title
CN215055411U (en) Concrete pouring equipment
CN210917304U (en) Stable type tamper
CN218704409U (en) Electronic connector equipment for packing
CN212899799U (en) Novel gate valve
CN214696888U (en) Wall pouring formwork supporting device
CN213150132U (en) Enterprise sand table model convenient to plan
CN211285610U (en) Water conservancy water and electricity construction fastening processing apparatus
CN213320414U (en) Fixing device for MPP pipe centering cutting
CN213704982U (en) Drawing clamping device for architectural design
CN210756169U (en) Electric hydraulic pipeline internal butt-joint device
CN208329659U (en) It builds and spreads grey auxiliary tool
CN207819405U (en) A kind of sliding cable trench cover
CN220030666U (en) Spacing frock of reinforced concrete drain pipe mandrel production mould
CN216340853U (en) Building engineering construction template device
CN218323323U (en) Assembly type structure thermal insulation wall
CN214251108U (en) Water flow monitoring device for water supply and drainage engineering
CN217580293U (en) Construction equipment with integral laying function for inspection well for building block brick
CN217870430U (en) Miniature pile structure for deep foundation pit construction
CN212926438U (en) Stable prefabricated concrete member
CN215173430U (en) Intelligent controller capable of being replaced quickly
CN215790568U (en) Concrete pouring device
CN216688931U (en) A road surface template bearing structure for highway is laid
CN214459422U (en) Reinforced structure for concrete construction template
CN210348209U (en) Sand table for urban planning and construction
CN217519369U (en) Combined bridge frame for laying fire fighting pipes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant