CN215052978U - Pile turning device guide frame of vibration hammer - Google Patents

Pile turning device guide frame of vibration hammer Download PDF

Info

Publication number
CN215052978U
CN215052978U CN202120739200.4U CN202120739200U CN215052978U CN 215052978 U CN215052978 U CN 215052978U CN 202120739200 U CN202120739200 U CN 202120739200U CN 215052978 U CN215052978 U CN 215052978U
Authority
CN
China
Prior art keywords
guide
clamping
pile
joint
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120739200.4U
Other languages
Chinese (zh)
Inventor
陈元万
林登
张雅春
贾敏
张剑
杨震宇
陈增增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongan Machinery Co ltd
Original Assignee
Yongan Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongan Machinery Co ltd filed Critical Yongan Machinery Co ltd
Priority to CN202120739200.4U priority Critical patent/CN215052978U/en
Application granted granted Critical
Publication of CN215052978U publication Critical patent/CN215052978U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a pile ware leading truck is turned over to vibratory hammer, replace the leading truck that originally needs whole change through less alignment jig, and then reduce the cost of transportation, workman's labour and engineering storage and purchase cost, and by the joint inclined plane of installation department toward joint portion direction slope, when making the leading truck install in inserting the tubular pile, its access face can be by narrow widen, make it conveniently insert in the tubular pile more, simultaneously by the tapered guide part of narrow widen, can progressively strengthen the joint force of tubular pile, improve the stability of centre gripping tubular pile, press the central line fretwork with the leading truck simultaneously, the material saving quantity, and therefore, the cost is reduced, the intensity is guaranteed when lightening weight.

Description

Pile turning device guide frame of vibration hammer
Technical Field
The utility model relates to an engineering machine tool field, in particular to pile ware leading truck is turned over to vibratory hammer.
Background
When the vibration hammer and the impact hammer are installed with the pile body, the pile body lying on the ground needs to be clamped through a crane and a pile turning device, the pile body is turned over to the ground in a vertical direction, then the pile body is hung to the position where pile driving needs to be conducted and the pile body is fixed, and finally the vibration hammer or the impact hammer is moved to the position of the pile body through the crane to conduct pile driving.
The traditional pile turning device mainly comprises an adjusting seat and a plurality of clamps arranged on the adjusting seat, wherein a clamping jaw of a vibration hammer clamp is provided with a movable clamping block and a static clamping block respectively, the clamping jaw drives the clamping blocks by utilizing a hydraulic oil cylinder to clamp a steel pipe pile extending between the movable clamping jaw block and the static clamping jaw block, when the pile turning device is used for clamping pipe piles of different specifications, a guide frame with the diameter consistent with that of the pipe pile to be clamped is arranged in the center of an adjusting seat of the pile turning device, after the guide frame is inserted into the steel pipe pile to slightly tension and fix the steel pipe pile, the steel pipe pile is clamped and fixed by the clamp to realize double fixation, however, in the connection mode, the guide frames with different specifications are required to be replaced according to tubular piles with different specifications, so that the guide frames with multiple specifications are required to be arranged on an engineering side, the engineering cost is increased, the weight of the existing guide frame is heavy, and the transportation cost and the labor force of workers are increased undoubtedly.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough to above-mentioned prior art is directed against, a pile ware leading truck is turned over to the vibratory hammer is provided, replace the leading truck that originally needs whole change through less alignment jig, and then reduce the cost of transportation, workman's labour and engineering storage and purchase cost, and by the joint inclined plane of installation department toward joint portion direction slope, when making the leading truck install in inserting the tubular pile, its access face can be by narrow widen, make it conveniently insert in the tubular pile more, simultaneously by the tapered guide part of narrow widen, can progressively strengthen the joint force of tubular pile, improve the stability of centre gripping tubular pile, press the central line fretwork with the leading truck simultaneously, the material saving quantity, the cost is reduced, the proof strength when lightening.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a vibratory hammer turns over stake ware leading truck, including install the installation department on turning over the stake ware and be used for with the joint portion of tubular pile joint, its characterized in that: joint portion encircles and is equipped with two at least mount pads, all be equipped with on the mount pad and can dismantle the alignment jig of being connected with the installation department, be equipped with the joint inclined plane on the alignment jig, the joint inclined plane is inclined toward joint portion direction by the installation department.
By adopting the technical scheme, the plurality of mounting seats are arranged on the clamping portion, the adjusting frame can be detachably connected with the clamping portion, when the tubular pile is required to be clamped, the adjusting frame with the corresponding height is selected according to the diameter of the clamped tubular pile, namely, the height of the adjusting frame and the width of the clamping portion are combined to be suitable for the diameter of the tubular pile, the guide frame which needs to be replaced by the whole original guide frame is replaced by the smaller adjusting frame, the transportation cost is further reduced, the labor and the engineering storage and purchase cost of workers are reduced, and the clamping inclined plane is inclined towards the direction of the clamping portion from the mounting portion.
The pile driver guide frame of the vibration hammer can be further configured as follows: the one end that the installation department was kept away from to joint portion is equipped with the guide part, the guide part is the taper type structure of gradually inclining by the installation department toward joint portion direction.
By adopting the technical scheme, the conical guide part is arranged, so that the access surface of the guide frame can be widened from narrow to wide when the guide frame is inserted into the tubular pile for installation, the tubular pile can be more conveniently inserted into the tubular pile, and meanwhile, the clamping force of the tubular pile can be gradually increased by the narrow and wide conical guide part, so that the stability of clamping the tubular pile is improved.
The pile driver guide frame of the vibration hammer can be further configured as follows: the clamping inclined plane comprises at least two clamping plates which correspond to each other, and a plurality of reinforcing connecting plates are arranged between the clamping plates.
Adopt above-mentioned technical scheme, through the joint board that corresponds each other as the contact surface with the tubular pile joint, make joint inclined plane center by the fretwork, material saving quantity, reduce cost guarantees intensity when lightening weight, reduces equipment and participates in the weight of shaking, increases the amplitude, makes its ability centre gripping can be greatly heavier stake, improves stability through a plurality of enhancement connecting plates again.
The pile driver guide frame of the vibration hammer can be further configured as follows: the installation department is interior to be seted up a plurality of installation fretwork groove, forms the erection bracing board between each installation fretwork groove, the gathering of erection bracing board one end is on the leading truck central line.
By adopting the technical scheme, the installation hollow grooves are formed in the installation part, the number of the installation hollow grooves is consistent with that of the installation seats, the installation supporting plates formed by the installation hollow grooves can be gathered on the center line of the guide frame, the supporting center is gathered a little, the bearing capacity is improved, the installation part is hollowed out, the material consumption is saved, the cost is reduced, and the weight is reduced while the strength is ensured.
The pile driver guide frame of the vibration hammer can be further configured as follows: a plurality of clamping hollow grooves are formed in the clamping portion, a clamping supporting plate is formed between each clamping hollow groove, and one end of each clamping supporting plate is gathered on the central line of the guide frame.
Adopt above-mentioned technical scheme, through offering joint fretwork groove at the guide part, the quantity in joint fretwork groove is unanimous with the mount pad quantity, makes the joint backup pad of its formation can gather on the leading truck central line, will support the center gathering a bit, improves the bearing capacity, is hollowed out along with this joint portion simultaneously, material saving quantity, reduce cost, assurance strength when lightening.
The pile driver guide frame of the vibration hammer can be further configured as follows: the mounting seat is connected with the adjusting frame through a bolt.
By adopting the technical scheme, the mounting seat is connected with the adjusting frame through the bolt, so that the mounting seat is more convenient to disassemble and more stable during mounting.
The pile driver guide frame of the vibration hammer can be further configured as follows: a plurality of guide hollow grooves are formed in the guide portion, guide supporting plates are formed among the guide hollow grooves, and one ends of the guide supporting plates are gathered on the central line of the guide frame.
By adopting the technical scheme, the guide hollow grooves are formed in the guide part, the number of the guide hollow grooves is consistent with that of the installation seats, the guide support plates formed by the guide hollow grooves can be gathered on the center line of the guide frame, the support center is gathered a little, the bearing capacity is improved, and meanwhile, the guide hollow grooves are hollowed out along the guide part, so that the material consumption is saved, the cost is reduced, and the weight is reduced while the strength is ensured.
The pile driver guide frame of the vibration hammer can be further configured as follows: the number of the mounting seats is 6.
The present invention will be further described with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic perspective view of an embodiment of the present invention.
Fig. 2 is an exploded view of fig. 1.
Fig. 3 is a cross-sectional view of an embodiment of the present invention.
Fig. 4 is a top view of an embodiment of the present invention.
Fig. 5 is an effect diagram of the embodiment of the present invention when connected with a pile driver.
Detailed Description
As shown in fig. 1-4, a pile driver guide frame is turned over to a vibratory hammer, which comprises an installation part 2 installed on a pile driver 1 and a clamping part 3 used for clamping with a tubular pile, wherein the clamping part 3 is surrounded by six installation seats 4, the installation seats 4 are respectively provided with an adjusting frame 5 connected with the installation part 2 through a bolt, the adjusting frame 5 is provided with a clamping inclined plane 51, the clamping inclined plane 51 is inclined towards the clamping part 3 from the installation part 2, one end of the clamping part 3, which is far away from the installation part 2, is provided with a guide part 6, the guide part 6 is a cone-shaped structure gradually inclined towards the clamping part 3 from the installation part 2, the clamping inclined plane 51 comprises at least two clamping plates 52 corresponding to each other, a plurality of reinforcing connecting plates 53 are arranged between the clamping plates 52, a plurality of installation hollowed grooves 21 are arranged in the installation part 2, and installation supporting plates 22 are formed between the installation hollowed grooves 21, the gathering of erection bracing board one end is on leading truck central line a, a plurality of joint fretwork groove 31 has been seted up in joint portion 3, forms joint backup pad 32 between each joint fretwork groove 31, the gathering of joint backup pad 32 one end is on leading truck central line a, set up a plurality of direction fretwork groove 61 in the guide portion 6, form direction backup pad 62 between each direction fretwork groove 61, the gathering of direction backup pad 62 one end is on leading truck central line a.
As shown in fig. 5, installation department 2 of turning over a ware leading truck passes through the bolt and installs on turning over a ware 1, and set up the central point that puts at each anchor clamps 7, when needs are to the tubular pile centre gripping, only need be according to the diameter of centre gripping tubular pile, choose for use the alignment jig 5 that corresponds the height, the height of alignment jig promptly and the width of joint portion 3 combine the diameter of fitting tubular pile can, insert the tubular pile in 6 convenient the inserting of guide part of toper structure again, because the tubular pile is hollow cylinder, each anchor clamps 7 encircles on the tubular pile tightly again with the equal leading truck central line an of alignment jig 5, just can cooperate 5 dual fixes to the inside and outside of tubular pile, and the stability is improved.

Claims (8)

1. The utility model provides a vibratory hammer turns over stake ware leading truck, including install the installation department on turning over the stake ware and be used for with the joint portion of tubular pile joint, its characterized in that: joint portion encircles and is equipped with two at least mount pads, all be equipped with on the mount pad and can dismantle the alignment jig of being connected with the installation department, be equipped with the joint inclined plane on the alignment jig, the joint inclined plane is inclined toward joint portion direction by the installation department.
2. The guide frame of a pile driver of a vibratory hammer as set forth in claim 1, wherein: the one end that the installation department was kept away from to joint portion is equipped with the guide part, the guide part is the taper type structure of gradually inclining by the installation department toward joint portion direction.
3. A vibro-hammer pile driver guide according to claim 1 or 2, wherein: the clamping inclined plane comprises at least two clamping plates which correspond to each other, and a plurality of reinforcing connecting plates are arranged between the clamping plates.
4. A vibro-hammer pile driver guide according to claim 1 or 2, wherein: the installation department is interior to be seted up a plurality of installation fretwork groove, forms the erection bracing board between each installation fretwork groove, the gathering of erection bracing board one end is on the leading truck central line.
5. A vibro-hammer pile driver guide according to claim 1 or 2, wherein: a plurality of clamping hollow grooves are formed in the clamping portion, a clamping supporting plate is formed between each clamping hollow groove, and one end of each clamping supporting plate is gathered on the central line of the guide frame.
6. A vibro-hammer pile driver guide according to claim 1 or 2, wherein: the mounting seat is connected with the adjusting frame through a bolt.
7. The guide frame of a pile driver of a vibratory hammer as set forth in claim 2, wherein: a plurality of guide hollow grooves are formed in the guide portion, guide supporting plates are formed among the guide hollow grooves, and one ends of the guide supporting plates are gathered on the central line of the guide frame.
8. The vibratory hammer flipper guide of claim 7, wherein: the number of the mounting seats is 6.
CN202120739200.4U 2021-04-12 2021-04-12 Pile turning device guide frame of vibration hammer Active CN215052978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120739200.4U CN215052978U (en) 2021-04-12 2021-04-12 Pile turning device guide frame of vibration hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120739200.4U CN215052978U (en) 2021-04-12 2021-04-12 Pile turning device guide frame of vibration hammer

Publications (1)

Publication Number Publication Date
CN215052978U true CN215052978U (en) 2021-12-07

Family

ID=79149071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120739200.4U Active CN215052978U (en) 2021-04-12 2021-04-12 Pile turning device guide frame of vibration hammer

Country Status (1)

Country Link
CN (1) CN215052978U (en)

Similar Documents

Publication Publication Date Title
CN215052978U (en) Pile turning device guide frame of vibration hammer
CN210756074U (en) Angle steel welding frock
KR101274427B1 (en) Adjustment apparatus for support of ship
CN202337982U (en) Clamping conversion joint of high-frequency hydraulic vibrating hammer
CN216515594U (en) Waterproof curtain steel pipe pile driving supporting structure
CN211735424U (en) Subway construction template reinforcing apparatus
CN108842540B (en) Track sleeper-changing vehicle
CN112550597A (en) Large wood wedge clamping method for slipway edge pier
CN211419478U (en) A multi-functional instrument car for curb hoist and mount
CN210684694U (en) Arm subassembly is embraced to circular pile for vibratory hammer
CN112550596A (en) Large wood wedge clamping device for slipway ridge pier
CN213709567U (en) Subway construction template reinforcing apparatus
JP6134346B2 (en) Sheet pile co-falling prevention device and sheet pile construction method
CN218991607U (en) Hydraulic engineering tunnel top strutting arrangement
CN216809891U (en) Pile pulling device for hydraulic engineering construction
CN210770008U (en) Engineering mechanical equipment vibration damping mount
CN216068123U (en) Floating holding device of splitting machine
CN213682099U (en) A pile device for river course renovation
CN217231512U (en) Down-through railway frame box culvert jacking construction device
CN218204365U (en) Constructional engineering pile device
CN213204125U (en) Auxiliary device for connecting tubular pile and hydraulic hoop of pile machine
CN215036764U (en) Clamp for preventing template support frame main keel and U-shaped support from stress overturning
CN212801529U (en) Combined pile for constructional engineering
CN219994089U (en) Quick connector for constant diameter cement electric pole
CN221002641U (en) Drilling frame for drilling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant