CN215052931U - Composite pile for constructional engineering - Google Patents
Composite pile for constructional engineering Download PDFInfo
- Publication number
- CN215052931U CN215052931U CN202120463215.2U CN202120463215U CN215052931U CN 215052931 U CN215052931 U CN 215052931U CN 202120463215 U CN202120463215 U CN 202120463215U CN 215052931 U CN215052931 U CN 215052931U
- Authority
- CN
- China
- Prior art keywords
- fixed
- sides
- installation
- cylinder
- composite pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a composite pile for building engineering, the power distribution box comprises a cylinder body, spacing inserted bar is all installed to the lower extreme in the inside both sides of cylinder, the inside middle part of cylinder is the fixed installation pole that is provided with all, both sides the relative one end of spacing inserted bar is the fixed oblique piece that is provided with all, it is provided with fixed spring, both sides all to fix between fixed oblique piece one side and the inside one side of cylinder the relative one end of spacing inserted bar all is located inside the fixed spring. The utility model discloses when pressing the installation pole down to remove, the gag lever post that all stimulates both sides through the operation arm-tie removes toward opposite one side, and all stretch spacing spring, and press the installation pole down to remove the back, loosen the operation arm-tie of both sides simultaneously again, and all drive the gag lever post of both sides through spacing spring after stretching toward relative one side removal, then will all make gag lever post one end and the inside butt joint of fixed orifices, thereby increase the installation pole and prevent the not hard up condition from appearing pressing the steadiness in the use.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a composite pile for building engineering.
Background
The building engineering is a part of construction engineering, and refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, and comprises plants, theaters, hotels, shops, schools, hospitals, houses and the like, so that the requirements of people on production, living, learning, public activities and the like are met;
the traditional composite pile for the construction engineering has the following defects;
at present, the construction engineering is a very common implementation mode in the national construction process, the composite pile is very important using equipment, and the structure of the existing composite pile is simpler in the working process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a composite pile for building engineering to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a composite pile for building engineering, includes the cylinder, spacing inserted bar is all installed to the lower extreme in the inside both sides of cylinder, the inside middle part of cylinder is all fixed and is provided with the installation pole, both sides the relative one end of spacing inserted bar is all fixed and is provided with fixed sloping block, it is all fixed between fixed sloping block one side and the inside one side of cylinder and is provided with fixed spring, both sides the relative one end of spacing inserted bar all is located inside fixed spring, the fixed installation cover that is provided with between the inside upper end of cylinder, the installation pole passes installation cover middle part, installation pole upper end passes the cylinder and fixes being provided with the connection installation roof.
Preferably, the fixed port has all been seted up at installation pole outside both sides upper end middle part, the logical groove of installation has all been seted up at the relative position that is located the fixed port in the upper end in the cylinder both sides, the inside fixed gag lever post that is provided with of logical groove of installation, both sides the relative one end of gag lever post all docks with the fixed port inside, the gag lever post is all passed the fixed operation arm-tie that is provided with of logical groove of installation in the one end of keeping away from the fixed port, operation arm-tie one side and installation are led to all fixed being provided with spacing spring between the inslot portion.
Preferably, the installation openings are formed in the two sides of the interior of the column body at the opposite positions of the limiting insertion rods, and the notches are formed in the opposite positions of the interior of the column body at the installation openings.
Preferably, inclined planes are arranged on two sides of the bottom end of the mounting rod, and the upper ends of the opposite sides of the fixed inclined blocks on the two sides are both in inclined plane structures.
Preferably, the reinforcing rib layers are fixedly arranged on the periphery of the outer portion of the column body.
Preferably, the limiting inserted rod, the mounting rod, the connecting and mounting top plate and the fixed inclined block are all made of alloy materials.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the mounting rod is pressed to move downwards, the limiting rods on two sides are pulled to move towards the opposite side through the operation pull plates, the limiting springs are all stretched, and after the mounting rod is pressed to move downwards, the operation pull plates on two sides are simultaneously loosened, the stretched limiting springs drive the limiting rods on two sides to move towards the opposite side, one end of each limiting rod is butted with the inner part of the fixed port, and therefore the stability of the mounting rod in the pressing use process is improved, and the loosening condition is prevented;
2. the utility model discloses simultaneously when using install the cylinder in the ground back, rethread connection installation roof is pressed the installation pole and is moved down to make the inclined plane of installation pole bottom both sides and the inclined plane contact of fixed sloping block, when the installation pole lasts down to move, just promote the fixed sloping block of both sides simultaneously and move toward opposite one side, then will promote the spacing inserted bar of both sides simultaneously and move toward opposite one side, and inject the spacing inserted bar of both sides soil layer the inside, thereby increase the fastness of integrated device in the course of the work.
Drawings
Fig. 1 is a schematic view of the overall structure of a composite pile for construction engineering of the present invention;
fig. 2 is an enlarged structural view of a portion a in fig. 1 in the composite pile for construction engineering of the present invention;
fig. 3 is an enlarged structural view of a portion B in fig. 1 in the composite pile for construction engineering of the present invention.
In the figure: 1. a cylinder; 2. mounting a rod; 3. fixing the inclined block; 4. a limiting inserted rod; 5. installing a sleeve; 6. a limiting rod; 7. connecting and installing a top plate; 8. a fixed port; 9. operating a pulling plate; 10. fixing the spring; 11. a recess; 12. installing a through groove; 13. and a limiting spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a composite pile for building engineering, including cylinder 1, spacing inserted bar 4 is all installed to the lower extreme in 1 inside both sides of cylinder, 1 inside middle part of cylinder is all fixed and is provided with installation pole 2, the relative one end of the spacing inserted bar 4 in both sides is all fixed and is provided with fixed sloping block 3, all fixed being provided with fixed spring 10 between 3 one side of fixed sloping block and 1 inside one side of cylinder, the relative one end of the spacing inserted bar 4 in both sides all is located inside fixed spring 10, the fixed installation cover 5 that is provided with between the upper end in 1 inside of cylinder, installation pole 2 passes installation cover 5 middle parts, 2 upper ends of installation pole are passed 1 fixed connection installation roof 7 that is provided with of cylinder.
The middle parts of the upper ends of two sides of the exterior of the installation rod 2 are respectively provided with a fixed port 8, the upper ends of two sides of the cylinder 1 are respectively provided with an installation through groove 12 at the opposite position of the fixed port 8, the interior of the installation through groove 12 is respectively and fixedly provided with a limiting rod 6, the opposite ends of the limiting rods 6 at two sides are respectively butted with the interior of the fixed port 8, one end of the limiting rod 6 far away from the fixed port 8 penetrates through the installation through groove 12 and is fixedly provided with an operation pulling plate 9, a limiting spring 13 is respectively and fixedly arranged between one side of the operation pulling plate 9 and the interior of the installation through groove 12, thus when the installation rod 2 is pressed to move downwards, the limiting rods 6 at two sides are pulled to move towards the opposite side by the operation pulling plate 9, the limiting springs 13 are all stretched, after the installation rod 2 is pressed to move downwards, the operation pulling plates 9 at two sides are simultaneously loosened, and the limiting rods 6 at two sides are all driven to move towards the opposite side by the stretched limiting springs 13, one end of the limiting rod 6 is butted with the inside of the fixed port 8, so that the stability of the mounting rod 2 in the pressing use process is improved, and the loosening condition is prevented; mounting through holes are formed in the two sides of the interior of the column body 1 at the opposite positions of the limiting inserted rods 4, and notches 11 are formed in the interior of the column body 1 at the opposite positions of the mounting holes, so that the fixing springs 10 can be conveniently mounted and fixed through the notches 11; inclined planes are arranged on two sides of the bottom end of the mounting rod 2, the upper ends of the opposite sides of the fixed inclined blocks 3 on the two sides are both in an inclined plane structure, so that after the cylinder 1 is mounted in the ground when the mounting rod is used, the mounting rod 2 is pressed to move downwards through the connection mounting top plate 7, the inclined planes on the two sides of the bottom end of the mounting rod 2 are in contact with the inclined planes of the fixed inclined blocks 3, when the mounting rod 2 continuously moves downwards, the fixed inclined blocks 3 on the two sides are simultaneously pushed to move towards the opposite sides, the limiting insertion rods 4 on the two sides are simultaneously pushed to move towards the opposite sides, and the limiting insertion rods 4 on the two sides are inserted into the soil layer, so that the firmness of the whole device in the working process is improved; the reinforcing rib layers are fixedly arranged on the periphery of the outer part of the column body 1, so that the service life of the column body 1 in the use process is prolonged conveniently through the reinforcing rib layers; spacing inserted bar 4, installation pole 2, connection installation roof 7 and fixed sloping block 3 all adopt the alloy material to make, thereby such material is both firm and matter light increases the life-span in the use.
The working principle is as follows: when the installation rod 2 is pressed to move downwards, the limiting rods 6 on two sides are all pulled to move towards the opposite side by operating the pulling plates 9, the limiting springs 13 are all stretched, after the installation rod 2 is pressed to move downwards, the operation pulling plates 9 on two sides are simultaneously loosened, the limiting rods 6 on two sides are all driven to move towards the opposite side by the stretched limiting springs 13, one end of each limiting rod 6 is butted with the inside of the fixed port 8, so that the stability of the installation rod 2 in the pressing use process is improved, the loosening condition is prevented, after the cylinder 1 is installed in the ground in the use process, the installation rod 2 is pressed to move downwards by connecting the installation top plate 7, the inclined planes on two sides of the bottom end of the installation rod 2 are in contact with the inclined planes of the fixed inclined blocks 3, when the installation rod 2 continuously moves downwards, the fixed inclined blocks 3 on two sides are simultaneously pushed to move towards the opposite side, the limiting insertion rods 4 on the two sides are pushed to move towards the opposite side at the same time, and the limiting insertion rods 4 on the two sides are inserted into the soil layer, so that the firmness of the whole device in the working process is improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A composite pile for constructional engineering, comprising a column body (1), characterized in that: spacing inserted bar (4) are all installed to the lower extreme in cylinder (1) inside both sides, equal fixed installation pole (2) that are provided with in cylinder (1) inside middle part, both sides spacing inserted bar (4) relative one end is all fixed and is provided with fixed sloping block (3), all fixed being provided with between fixed sloping block (3) one side and cylinder (1) inside one side fixed spring (10), both sides spacing inserted bar (4) relative one end all is located inside fixed spring (10), fixed installation cover (5) of being provided with between cylinder (1) inside middle and upper end, installation pole (2) pass installation cover (5) middle part, installation pole (2) upper end passes cylinder (1) fixed connection installation roof (7).
2. A composite pile for construction engineering according to claim 1, characterised in that: fixed mouthful (8) have all been seted up at installation pole (2) outside both sides upper end middle part, the relative position that upper end was lieing in fixed mouthful (8) has all been seted up installation through groove (12) in cylinder (1) both sides, the installation leads to the inside fixed gag lever post (6) that is provided with of groove (12), both sides the relative one end of gag lever post (6) all docks with fixed mouthful (8) inside, gag lever post (6) all passes installation through groove (12) fixed operation arm-tie (9) that is provided with in the one end of keeping away from fixed mouthful (8), operation arm-tie (9) one side and installation lead to all fixedly between groove (12) inside being provided with spacing spring (13).
3. A composite pile for construction engineering according to claim 1, characterised in that: the mounting openings are formed in the two sides of the inner portion of the column body (1) at the relative positions of the limiting insertion rods (4), and notches (11) are formed in the inner portion of the column body (1) at the relative positions of the mounting openings.
4. A composite pile for construction engineering according to claim 1, characterised in that: inclined planes are arranged on two sides of the bottom end of the mounting rod (2), and the upper ends of the opposite sides of the fixed inclined blocks (3) on two sides are both of inclined plane structures.
5. A composite pile for construction engineering according to claim 1, characterised in that: and reinforcing rib layers are fixedly arranged on the periphery of the outer part of the column body (1).
6. A composite pile for construction engineering according to claim 1, characterised in that: the limiting insertion rod (4), the mounting rod (2), the connecting and mounting top plate (7) and the fixed inclined block (3) are all made of alloy materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120463215.2U CN215052931U (en) | 2021-03-04 | 2021-03-04 | Composite pile for constructional engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120463215.2U CN215052931U (en) | 2021-03-04 | 2021-03-04 | Composite pile for constructional engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215052931U true CN215052931U (en) | 2021-12-07 |
Family
ID=79254460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120463215.2U Active CN215052931U (en) | 2021-03-04 | 2021-03-04 | Composite pile for constructional engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215052931U (en) |
-
2021
- 2021-03-04 CN CN202120463215.2U patent/CN215052931U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215052931U (en) | Composite pile for constructional engineering | |
CN210439783U (en) | Warning rail for building safety protection | |
CN210738128U (en) | Building safety protection net | |
CN214220423U (en) | Assembly type leveling installation structure of waterproof wall surface | |
CN212084524U (en) | Warning device for construction | |
CN114922553A (en) | Electrician climbs and hangs ladder | |
CN206844646U (en) | A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability | |
CN108284238B (en) | Perforating device for building based on multidirectional drilling technique | |
CN209924495U (en) | Civil engineering construction support | |
CN215201846U (en) | Dustproof device of impact drill for constructional engineering | |
CN213573163U (en) | A reinforced structure for housing construction | |
CN212716161U (en) | Building that reliability is high and guardrail for civil engineering | |
CN215212089U (en) | Ceramic OA floor | |
CN218952685U (en) | PVC floor with hasp structure | |
CN214402745U (en) | Novel building engineering template supporting device based on BIM | |
CN218933498U (en) | Wood structure prefabricated wall connection structure | |
CN211775225U (en) | Building waterproofing membrane auxiliary device for paves | |
CN215491804U (en) | Building engineering environment monitoring device | |
CN218624940U (en) | Fixed-size spraying extrusion flat tube | |
CN212002456U (en) | A consolidate bearing structure for building engineering | |
CN221168342U (en) | Square steel joist structure convenient to installation | |
CN210622207U (en) | Assembled double entry floor | |
CN215407080U (en) | Modular external corner closing structure of assembled wall | |
CN221031311U (en) | Building engineering building climbing frame | |
CN214740498U (en) | Protective net for constructional engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |