CN215052253U - Bridge concatenation bar planting is punched, is chiseled with portable platform truck - Google Patents

Bridge concatenation bar planting is punched, is chiseled with portable platform truck Download PDF

Info

Publication number
CN215052253U
CN215052253U CN202120773275.4U CN202120773275U CN215052253U CN 215052253 U CN215052253 U CN 215052253U CN 202120773275 U CN202120773275 U CN 202120773275U CN 215052253 U CN215052253 U CN 215052253U
Authority
CN
China
Prior art keywords
bar planting
platform
bar
bridge
planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120773275.4U
Other languages
Chinese (zh)
Inventor
黄超
魏盟
刘俊龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Third Highway Engineering Co Ltd
Original Assignee
CCCC SHEC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Third Highway Engineering Co Ltd filed Critical CCCC SHEC Third Highway Engineering Co Ltd
Priority to CN202120773275.4U priority Critical patent/CN215052253U/en
Application granted granted Critical
Publication of CN215052253U publication Critical patent/CN215052253U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a bridge concatenation bar planting punches, chisels and uses portable platform truck, punch the bar planting hole locating fixture who establishes the interval including setting up bar planting punching operation platform, setting at the counter weight platform of old bridge roof beam body top surface, control bar planting hole of old bridge roof beam body side, bar planting punching operation platform and counter weight platform fixed connection become "the L" type structure, be equipped with a plurality of locating holes on the bar planting hole locating fixture. The utility model discloses a before new and old bridge concatenation, when beating on old bridge body and establishing the bar planting hole, the operation personnel stand in bar planting operation platform that punches, punch according to design position, interval with professional drilling equipment, carry out the roof beam body chisel hair. The device simple structure is reasonable, is favorable to the bridge concatenation bar planting to punch, when the chisel hair, guarantees operation personnel high altitude construction's safety, can effectively control simultaneously and plant the muscle hole interval, has guaranteed product quality, has improved work efficiency.

Description

Bridge concatenation bar planting is punched, is chiseled with portable platform truck
Technical Field
The utility model relates to a bridge construction technical field, concretely relates to bridge concatenation bar planting punches, chisels with portable platform truck.
Background
In the wide construction is pieced together to the bridge, before piecing together wide bridge beam slab and setting up, need punch the bar planting, chisel hair to old bridge side for the concatenation of new and old bridge, nevertheless in old bridge side operation, often the bridge is higher, belongs to high altitude construction, and the construction operation is dangerous great, and the operation construction quality of punching moreover is poor, and bar planting position, the unable assurance of degree of depth influence bridge concatenation quality, and the efficiency of construction is low.
Disclosure of Invention
The utility model provides a bridge concatenation bar planting punches, chisels and uses portable platform truck, when making the concatenation of new and old bridge, the bar planting hole degree of depth, the position that old bridge was beaten and was established satisfy the designing requirement, and the operation personnel is under construction in operation platform, has solved the bar planting hole position inaccurate, the degree of depth is not enough, the dangerous big grade defect of high altitude construction.
The technical scheme of the utility model is that: the utility model provides a bridge concatenation bar planting punches, chisels and uses portable platform truck, punches operation platform, the counter weight platform of setting at old bridge body top surface, the bar planting hole that the control bar planting hole was beaten and is established the interval including setting up the bar planting operation platform that punches in old bridge body side, the bar planting punches operation platform and counter weight platform fixed connection and becomes "fall L" type structure, be equipped with a plurality of locating holes on the bar planting hole location fixture.
The scheme is further that the bar planting punching operation platform and the balance weight platform are made of profile steel and are welded into an integral structure.
The scheme is further that pulleys are arranged between the bar planting punching operation platform and the old bridge body, and the pulleys are used for facilitating walking of the trolley when the trolley advances.
The scheme is further that walking wheels are arranged below the balance weight platform, and the number of the walking wheels is 4.
The scheme further includes the balancing weight, the balancing weight sets up in the top of counter weight platform, selects figure and weight as required, avoids the bar planting operation platform that punches to overturn, improves stability.
And furthermore, the steel bar planting punching operation platform is provided with punching equipment and roughening equipment.
According to the scheme, guard railings are arranged on the periphery of the bar planting punching operation platform.
The utility model has the advantages that: before new and old bridge concatenation, when beating on the old bridge body and establishing and plant the muscle hole, the operation personnel stand in planting the muscle operation platform that punches, punch according to design position, interval with professional drilling equipment, carry out the roof beam body chisel hair, the utility model has the advantages of simple and reasonable structure is favorable to the bridge concatenation to plant the muscle and punches, when chisel hair, guarantees operation personnel high altitude construction's safety, can effective control plant muscle hole interval simultaneously, has guaranteed product quality, has improved work efficiency.
Drawings
Fig. 1 is a schematic structural view of a mobile trolley for drilling and chiseling a spliced bar-planting bridge of the utility model;
FIG. 2 is a schematic structural view of a bar planting hole positioning fixture of a mobile trolley for drilling and chiseling the spliced bar planting of the bridge of the present invention;
wherein: 1. old bridge body, 2, the bar planting operation platform that punches, 3, walking wheel, 4, pulley, 5, balancing weight, 6, counter weight platform, 7, bar planting hole, 8, bar planting hole positioning fixture, 9, locating hole.
Detailed Description
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which a person skilled in the art can, without any creative effort, fully implement the present invention.
The utility model discloses a concrete implementation mode is: as shown in fig. 1-2, a portable platform truck for punching and chiseling spliced steel bars of a bridge comprises a steel bar planting punching operation platform 2 arranged on the side face of an old bridge body 1, a counterweight platform 6 arranged on the top face of the old bridge body 1 and a steel bar planting hole positioning fixture 8 for controlling a steel bar planting hole 7 to be punched and arranged at intervals, wherein the steel bar planting punching operation platform 2 and the counterweight platform 6 are fixedly connected into an inverted L-shaped structure, a plurality of positioning holes 9 are arranged on the steel bar planting hole positioning fixture 8, and the intervals of the positioning holes 9 are designed according to the steel bar planting hole 7.
The utility model discloses further, the bar planting operation platform that punches 2 and counter weight platform 6 make welded shaping structure as an organic whole by shaped steel.
The utility model discloses further, it sets up pulley 4 to plant the muscle between operation platform 2 and the old bridge body 1 of punching for the platform truck is when advancing, and the platform truck walking of being convenient for.
The utility model discloses further, 6 below of counter weight platform set up walking wheel 3, the figure of walking wheel 3 is 4.
The utility model discloses further, still include balancing weight 5, balancing weight 5 sets up in the top of counter weight platform 6, selects figure and weight as required, avoids the bar planting operation platform 1 that punches to tumble, improves stability.
The utility model discloses further, plant the muscle and be equipped with drilling equipment and chisel hair equipment on the operation platform 1 that punches, operating personnel plant muscle hole 7 and beat and establish on planting the muscle operation platform 1 that punches, beat and carry out the roof beam body chisel hair through chisel hair equipment after establishing the completion, guarantee operation personnel high altitude construction's safety.
The utility model discloses further, the bar planting operation platform 1 that punches is equipped with the rail guard all around, protection operating personnel safety.
While the preferred embodiments of the present invention have been described, it is to be understood that the invention is not limited to the precise embodiments described, and that equipment and structures not described in detail are understood to be practiced as commonly known in the art; any simple modification, equivalent change and modification made to the above embodiments according to the technical spirit of the present invention will still fall within the protection scope of the technical solution of the present invention by those skilled in the art without departing from the technical solution of the present invention.

Claims (6)

1. The utility model provides a bridge concatenation bar planting punches, chisels and uses portable platform truck which characterized in that, punches the bar planting hole locating fixture who establishes the interval including setting up at the bar planting operation platform that punches, setting at the counter weight platform of old bridge body top surface, control bar planting hole of old bridge body side, bar planting punching operation platform and counter weight platform fixed connection become "the L" type structure of falling, be equipped with a plurality of locating holes on the bar planting hole locating fixture.
2. The mobile trolley for drilling and chiseling a spliced bar-planting of a bridge as claimed in claim 1, wherein the bar-planting drilling operation platform and the counterweight platform are made of section steel and welded into an integral structure.
3. The mobile trolley for drilling and roughening spliced steel bars for bridges according to claim 1, wherein pulleys are arranged between the steel bar drilling platform and the old bridge body, and are used for facilitating the trolley to walk when the trolley advances.
4. The mobile trolley for drilling and chiseling a bridge splicing bar planting according to claim 1, wherein traveling wheels are arranged below the counterweight platform, and the number of the traveling wheels is 4.
5. The mobile trolley for drilling and chiseling a spliced bar-planting of a bridge as claimed in claim 1, further comprising a counterweight, wherein the counterweight is arranged above the counterweight platform, and the number and weight of the counterweight are selected as required, so that the tipping of the bar-planting drilling operation platform is avoided, and the stability is improved.
6. The movable trolley for drilling and chiseling spliced steel bars for bridges according to claim 1, wherein guard rails are arranged on the periphery of the steel bar planting drilling operation platform.
CN202120773275.4U 2021-04-15 2021-04-15 Bridge concatenation bar planting is punched, is chiseled with portable platform truck Active CN215052253U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120773275.4U CN215052253U (en) 2021-04-15 2021-04-15 Bridge concatenation bar planting is punched, is chiseled with portable platform truck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120773275.4U CN215052253U (en) 2021-04-15 2021-04-15 Bridge concatenation bar planting is punched, is chiseled with portable platform truck

Publications (1)

Publication Number Publication Date
CN215052253U true CN215052253U (en) 2021-12-07

Family

ID=79105203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120773275.4U Active CN215052253U (en) 2021-04-15 2021-04-15 Bridge concatenation bar planting is punched, is chiseled with portable platform truck

Country Status (1)

Country Link
CN (1) CN215052253U (en)

Similar Documents

Publication Publication Date Title
CN215052253U (en) Bridge concatenation bar planting is punched, is chiseled with portable platform truck
CN210127644U (en) A telescopic crowbar for construction engineering template demolishs construction
CN106522541A (en) Steel platform formwork lifting point bearing beams and lifting method for formwork system
CN216889750U (en) Detachable movable portal frame for improving hoisting operation safety
CN212296237U (en) Side slope drilling trolley
CN210564332U (en) Movable safety steel cat ladder
CN212897716U (en) Hard type protection device for prefabricated staircase entrance to a cave
CN210658042U (en) Prefabricated T roof beam high speed wears to restraint operating system
CN208105834U (en) The moving platform device of eminence welded steel beam cantilever
CN208502208U (en) Elevator special operating platform
CN221053693U (en) Dismounting machine platform of shield machine
CN108049624A (en) The moving platform device of eminence welded steel beam cantilever
CN219491647U (en) Tool type operation protection steel platform at prefabricated stair
CN219262448U (en) Single track hangs little crossbeam hanger rail installation all-in-one
CN218147849U (en) Dismounting assembly for dismounting bailey frame by using piercing oil jack
CN210917017U (en) Movable type outside formwork construction trolley
CN213417599U (en) Suspension construction device for box girder
CN218365544U (en) Prestressed concrete precast beam tensioning trolley
CN213571548U (en) Movable operation platform for bridge deck
CN218754515U (en) Assembled stair lifting device
CN206091266U (en) Outrigger steel cat ladder for construction
CN217677624U (en) Quick-mounting platform for overhauling converter
CN220285809U (en) Sliding mode for small-section slow-dip angle long inclined shaft
CN219095536U (en) Novel high altitude punching device
CN220267767U (en) Novel trolley-based cooperation lifting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant