CN214997440U - Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment - Google Patents

Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment Download PDF

Info

Publication number
CN214997440U
CN214997440U CN202121347201.0U CN202121347201U CN214997440U CN 214997440 U CN214997440 U CN 214997440U CN 202121347201 U CN202121347201 U CN 202121347201U CN 214997440 U CN214997440 U CN 214997440U
Authority
CN
China
Prior art keywords
groove
support
pile driver
driver body
emergency rescue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121347201.0U
Other languages
Chinese (zh)
Inventor
路厚芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121347201.0U priority Critical patent/CN214997440U/en
Application granted granted Critical
Publication of CN214997440U publication Critical patent/CN214997440U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a stake drilling equipment is speedily carried out rescue work and flood control emergency rescue in yellow river hydraulic engineering relates to drilling equipment technical field. The technical key points are as follows: including pile driver body and solid fixed ring, pile driver body week side is connected with sliding assembly, gu fixed ring top fixedly connected with a plurality of support grooves, it is a plurality of support groove parallel arrangement, support the inslot and be provided with the spring, the spring lower extreme with gu fixed ring fixed connection, spring upper end fixedly connected with kicking block, support the inslot and seted up the draw-in groove, the kicking block is in slide along the axis that supports the groove in the draw-in groove, it has flexible bracing piece to support the articulated of groove lower extreme. The device can put into the pile driver body and support the groove, through sliding assembly for the pile driver body slides in supporting the inslot, and then plays support and guide effect to the pile driver body, makes the pile driver body have reliable stability, makes things convenient for going on of pile work, the staff's that significantly reduces intensity of labour.

Description

Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment
Technical Field
The utility model relates to a drilling equipment technical field specifically is a stake drilling equipment is speedily carried out rescue work and flood control speedily carries out rescue work to yellow river hydraulic engineering.
Background
At present use in the emergency rescue flood prevention engineering most just handheld pile driver, handheld pile driver has advantages such as small, light in weight, portable, however present handheld pile driver, it is great to shake, stability is serious not enough, need two people's collaborative operation at least, the stake is longer, the pile driver need be raised to higher position, cause a lot of inconveniences to the process of piling, consequently need a yellow river hydraulic engineering emergency rescue flood prevention emergency wood pile drilling equipment to solve the problem that exists at present.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a stake drilling equipment that speedily carries out rescue work and flood control emergency rescue in yellow river hydraulic engineering, the output of solid fixed ring accessible pile driver body, the pile driver body can slide in the ring that a plurality of support grooves enclose, sliding assembly and support groove cooperation work, make things convenient for the motion of pile driver body in the support groove, the spring provides the effort for pile driver body during operation, realize buffering absorbing effect, kicking block and sliding assembly cooperation work, transmit the kinetic energy of pile driver body to the spring, flexible bracing piece fixes the device in the position that needs the pile, and stability is reliable, and adjustable height is applicable to different scenes. The device can put into the pile driver body and support the groove, through sliding assembly for the pile driver body slides in supporting the inslot, and then plays support and guide effect to the pile driver body, makes the pile driver body have reliable stability, makes things convenient for going on of pile work, the staff's that significantly reduces intensity of labour.
The above object of the present invention can be achieved by the following technical solutions:
the utility model provides a stake drilling equipment that emergency rescue was speedily carried out rescue work in yellow river hydraulic engineering, includes pile driver body and solid fixed ring, pile driver body week side is connected with slip subassembly, gu a plurality of support grooves of fixed ring top fixedly connected with, a plurality of support groove parallel arrangement, support the inslot and be provided with the spring, the spring lower extreme with gu fixed ring fixed connection, spring upper end fixedly connected with kicking block, support the inslot and seted up the draw-in groove, the kicking block is in slide along the axis that supports the groove in the draw-in groove, it has flexible bracing piece to support the groove lower extreme to articulate.
Through adopting above-mentioned technical scheme, gu the output of solid fixed ring accessible pile driver body, the pile driver body can slide in the ring that a plurality of support grooves enclose, sliding assembly and support groove cooperation work, make things convenient for the motion of pile driver body in supporting the inslot, the spring provides the effort for pile driver body during operation, realize buffering absorbing effect, kicking block and sliding assembly cooperation work, transmit the kinetic energy of pile driver body to the spring, flexible bracing piece fixes the device in the position that needs the pile, and the stability is reliable, and adjustable height, be applicable to different scenes. The device can put into the pile driver body and support the groove, through sliding assembly for the pile driver body slides in supporting the inslot, and then plays support and guide effect to the pile driver body, makes the pile driver body have reliable stability, makes things convenient for going on of pile work, the staff's that significantly reduces intensity of labour.
The present invention may be further configured in a preferred embodiment as: the sliding assembly comprises a connecting piece, the connecting piece is fixed on the periphery of the pile driver body, guide wheels are rotatably connected to two sides of the connecting piece, a pressing block is fixedly connected to the lower end of the connecting piece, the connecting piece can slide in the clamping groove, and the guide wheels can slide on the side wall of the supporting groove.
Through adopting above-mentioned technical scheme, the connecting piece slides in the draw-in groove to for the work of pile driver body provides reliable holding power, the setting up of guide pulley makes things convenient for the pile driver body to slide in the support inslot, and the briquetting transmits the gravity and the effort of pile driver body to the kicking block on, when pile work goes on, makes the effect of spring full play shock attenuation buffering.
The present invention may be further configured in a preferred embodiment as: the lower end of the telescopic supporting rod is fixedly connected with an inserting nail.
Through adopting above-mentioned technical scheme, the peg is pegged graft flexible bracing piece in earth, further promotes the device's stability, convenient and practical, reliable and stable.
The present invention may be further configured in a preferred embodiment as: the supporting ring is fixedly connected above the supporting groove, and the supporting groove is positioned on the inner side of the supporting ring.
Through adopting above-mentioned technical scheme, the support ring provides other holding power for supporting the groove, prevents during pile driving work, because the shaking force of pile driver body, the slope takes place for supporting the groove, promotes the stability and the life of integrated device.
To sum up, the utility model discloses a following at least one useful technological effect:
1. through the output of solid fixed ring accessible pile driver body, the pile driver body can slide in the ring that a plurality of support grooves enclose, sliding assembly and support groove cooperation work, make things convenient for the motion of pile driver body in supporting the inslot, the spring provides the effort for pile driver body during operation, realize buffering absorbing effect, kicking block and sliding assembly cooperation work, transmit the kinetic energy of pile driver body to the spring, flexible bracing piece fixes the device in the position that needs the pile, and the stability is reliable, and adjustable height, be applicable to different scenes. The device can place the pile driver body into the supporting groove, and the pile driver body slides in the supporting groove through the sliding assembly, so that the pile driver body is supported and guided, the pile driver body has reliable stability, pile driving work is convenient to carry out, and labor intensity of workers is greatly reduced;
2. slide in the draw-in groove through the connecting piece to for the work of pile driver body provides reliable holding power, the setting up of guide pulley makes things convenient for the pile driver body to slide in the holding power, and the briquetting transmits the gravity and the effort of pile driver body to the kicking block on, when pile work goes on, makes the effect of spring full play shock attenuation buffering.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a pile driver body;
FIG. 3 is a schematic view of a part of the structure of the present invention;
FIG. 4 is a top view of the support slot;
fig. 5 is an enlarged view at a in fig. 2.
Reference numerals: 1. a pile driver body; 2. a fixing ring; 3. a sliding assembly; 31. a connecting member; 32. a guide wheel; 33. briquetting; 4. a support groove; 5. a spring; 6. a top block; 7. a card slot; 8. a telescopic support rod; 9. inserting a nail; 10. and (3) supporting the ring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1 and 2, the yellow river hydraulic engineering emergency rescue flood prevention emergency wood pile drilling device disclosed by the invention comprises a pile driver body 1 and a fixing ring 2, the fixing ring 2 can pass through the output end of the pile driver body 1, a sliding assembly 3 is connected to the periphery of the pile driver body 1, as shown in fig. 3 and 4, a plurality of supporting grooves 4 are fixedly connected to the upper portion of the fixing ring 2, the supporting grooves 4 are arranged in parallel, the pile driver body 1 can slide in a ring surrounded by the supporting grooves 4, the sliding assembly 3 cooperates with the supporting grooves 4 to facilitate the movement of the pile driver body 1 in the supporting grooves 4, springs 5 are arranged in the supporting grooves 4, the lower ends of the springs 5 are fixedly connected with the fixing ring 2, as shown in fig. 3, the upper ends of the springs 5 are fixedly connected with ejector blocks 6, the springs 5 are in an unexpanded state when not receiving the pressure of the ejector blocks 6, the springs 5 are expanded and contracted in the supporting grooves 4 along the axial direction of the supporting grooves 4, support and to have seted up draw-in groove 7 in the groove 4, kicking block 6 slides along the axis that supports groove 4 in draw-in groove 7, spring 5 provides the effort for pile driver body 1 during operation, realize buffering absorbing effect, kicking block 6 and 3 cooperation works of sliding component, transmit pile driver body 1's kinetic energy to spring 5, it has flexible bracing piece 8 to support 4 lower extremes in groove, flexible bracing piece 8 is fixed the device in the position that needs the pile, and stability is reliable, and adjustable height is applicable to different scenes. The device can put into support groove 4 with pile driver body 1, through sliding assembly 3 for pile driver body 1 slides in support groove 4, and then plays support and guide effect to pile driver body 1, makes pile driver body 1 have reliable stability, makes things convenient for going on of pile driving work, the staff's that significantly reduces intensity of labour.
As shown in fig. 2 and 5, the sliding assembly 3 includes a connecting member 31, the connecting member 31 is fixed on the periphery of the pile driver body 1, the connecting member 31 slides in the clamping groove 7 and provides reliable supporting force for the operation of the pile driver body 1, guide wheels 32 are rotatably connected to both sides of the connecting member 31, the guide wheels 32 can slide on the side walls of the supporting groove 4, the pile driver body 1 can slide in the supporting groove 4 conveniently due to the arrangement of the guide wheels 32, a pressing block 33 is fixedly connected to the lower end of the connecting member 31, the connecting member 31 can slide in the clamping groove 7, the pressing block 33 transmits the gravity and the acting force of the pile driver body 1 to the top block 6, and when the pile driver operates, the spring 5 can fully play the role of damping and buffering.
As shown in fig. 3, 8 lower extremes of flexible bracing piece fixedly connected with inserts nail 9, inserts nail 9 and pegs graft flexible bracing piece 8 in earth, further promotes the device's stability, convenient and practical, reliable and stable.
As shown in fig. 3, a support ring 10 is fixedly connected above the support groove 4, the support groove 4 is located inside the support ring 10, and the support ring 10 provides additional support force for the support groove 4, so as to prevent the support groove 4 from tilting due to the vibration force of the pile driver body 1 during the pile driving operation, thereby improving the stability and the service life of the whole device.
The implementation principle of the embodiment is as follows: when the device is used, firstly, the telescopic supporting rod 8 is erected at the position where the pile is required to be driven, after the telescopic supporting rod 8 is rotated, the length of the telescopic supporting rod 8 is adjusted, the inserted nails 9 are inserted into soil, then the pile driver body 1 is installed from the upper part of the supporting groove 4, the pressing block 33 is pressed on the top block 6, the connecting piece 31 is clamped in the clamping groove 7, the output end of the pile driver body 1 penetrates through the fixing ring 2, the output end of the pile driver body 1 is connected with a wooden pile, the piling operation is performed in alignment with the ground, the piling body 1 moves in the supporting groove 4 when it is operated, the guide wheel 32 slides on the inner wall of the supporting groove 4, and at this time, the piling body is inserted into the soil along with the wooden pile, the spring 5 reciprocates between compression motion and extension motion, and the general trend is compression state, and the spring 5 cushions the shaking force that the pile driver body 1 caused, and it can to take out pile driver body 1 after the pile is accomplished. The device can put into support groove 4 with pile driver body 1, through sliding assembly 3 for pile driver body 1 slides in support groove 4, and then plays support and guide effect to pile driver body 1, makes pile driver body 1 have reliable stability, makes things convenient for going on of pile driving work, the staff's that significantly reduces intensity of labour.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.

Claims (4)

1. The utility model provides a yellow river hydraulic engineering emergency rescue flood prevention emergency wood pile drilling equipment, includes pile driver body (1) and solid fixed ring (2), its characterized in that: pile driver body (1) week side is connected with sliding assembly (3), gu a plurality of support grooves of fixed ring (2) top fixedly connected with (4), it is a plurality of support groove (4) parallel arrangement, be provided with spring (5) in support groove (4), spring (5) lower extreme with gu fixed ring (2) fixed connection, spring (5) upper end fixedly connected with kicking block (6), draw-in groove (7) have been seted up in support groove (4), kicking block (6) are in slide along the axis that supports groove (4) in draw-in groove (7), it has flexible bracing piece (8) to support groove (4) lower extreme to articulate.
2. The yellow river hydraulic engineering emergency rescue flood control emergency wood pile drilling device according to claim 1, characterized in that: sliding component (3) include connecting piece (31), connecting piece (31) are fixed in the week side of pile driver body (1), connecting piece (31) both sides all rotate and are connected with guide pulley (32), connecting piece (31) lower extreme fixedly connected with briquetting (33), connecting piece (31) can slide in draw-in groove (7), guide pulley (32) can slide on the lateral wall of supporting groove (4).
3. The yellow river hydraulic engineering emergency rescue flood control emergency wood pile drilling device according to claim 1, characterized in that: the lower end of the telescopic supporting rod (8) is fixedly connected with an inserting nail (9).
4. The yellow river hydraulic engineering emergency rescue flood control emergency wood pile drilling device according to claim 1, characterized in that: a support ring (10) is fixedly connected above the support groove (4), and the support groove (4) is positioned on the inner side of the support ring (10).
CN202121347201.0U 2021-06-17 2021-06-17 Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment Expired - Fee Related CN214997440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121347201.0U CN214997440U (en) 2021-06-17 2021-06-17 Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121347201.0U CN214997440U (en) 2021-06-17 2021-06-17 Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment

Publications (1)

Publication Number Publication Date
CN214997440U true CN214997440U (en) 2021-12-03

Family

ID=79128085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121347201.0U Expired - Fee Related CN214997440U (en) 2021-06-17 2021-06-17 Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment

Country Status (1)

Country Link
CN (1) CN214997440U (en)

Similar Documents

Publication Publication Date Title
CN214997440U (en) Yellow river hydraulic engineering emergency rescue flood prevention emergency rescue stake drilling equipment
CN113982136A (en) Steel construction building with shock attenuation antidetonation function
CN116905544B (en) A foundation structure that is used for building antidetonation to have high support nature
CN114136697B (en) Soil sampling device and method for coal mining subsidence gangue filling area
CN214996339U (en) Supporting device for building construction
CN111846741B (en) Anti-seismic building steel structure assembly and using method thereof
CN214363481U (en) Municipal works are with pile device
CN213148379U (en) Sampling device for engineering geological investigation
CN208009396U (en) A kind of vertical battering ram stabilising arrangement
CN113618851A (en) Intelligent supporting device of wood processing platform
CN213267871U (en) Pile pulling equipment for hydraulic engineering
CN218347087U (en) Town road foundation ditch safety device
CN213654200U (en) Construction hanging basket
CN210140403U (en) But height-adjusting's liftout device
CN213204111U (en) Pile driver for soft plastic powder sand pipeline foundation treatment
CN220389409U (en) Movable placing rack
CN218149600U (en) Multifunctional construction scaffold
CN213268807U (en) Scaffold frame of gardens construction usefulness
CN220565222U (en) Anti-overturning support for piling equipment
CN215715274U (en) Constructional engineering pile device
CN221194169U (en) Buffer support for civil engineering
CN115262932B (en) Movable slope operating platform suitable for slope reinforcement
CN217631563U (en) Anti-seismic workshop
CN113445486B (en) Drill rod detecting machine for project supervision and using method thereof
CN114673152B (en) Building electronic piling positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211203