CN214996011U - Concrete floor reserves hole device - Google Patents

Concrete floor reserves hole device Download PDF

Info

Publication number
CN214996011U
CN214996011U CN202121545202.6U CN202121545202U CN214996011U CN 214996011 U CN214996011 U CN 214996011U CN 202121545202 U CN202121545202 U CN 202121545202U CN 214996011 U CN214996011 U CN 214996011U
Authority
CN
China
Prior art keywords
plate body
plate
concrete floor
bottom plate
preformed hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121545202.6U
Other languages
Chinese (zh)
Inventor
叶在林
孔令宏
王伟
刘艳苹
贾海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202121545202.6U priority Critical patent/CN214996011U/en
Application granted granted Critical
Publication of CN214996011U publication Critical patent/CN214996011U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a concrete floor preformed hole device, which comprises a filling body, wherein the filling body comprises a bottom plate and a cylinder body arranged around the periphery of the bottom plate; the outer contour of the cross section of the bottom plate is circular; the barrel comprises a first plate body and a second plate body, one end of the first plate body is connected to the bottom plate, and the other end of the first plate body is connected to the second plate body; the outer diameter of the first plate body is gradually increased, and the outer diameter of the end, connected with the second plate body, of the first plate body is larger than that of the end, connected with the bottom plate, of the first plate body; the second plate body is cylindrical. During construction, the device is fixed on a floor panel, the device is dismantled after pouring and forming, and a reserved hole is formed in the position of the cylinder after the dismantling. The utility model provides a concrete floor reserves hole device can pinpoint the reservation hole on the concrete floor, and the device simple structure, and easy dismounting can also recycle.

Description

Concrete floor reserves hole device
Technical Field
The utility model relates to a concrete floor construction technical field especially relates to a concrete floor reserves hole device.
Background
In the process of pouring and forming the concrete floor slab, pipe openings for pipelines such as water, gas, power and the like need to be reserved on the floor slab, and pipelines between buildings are arranged through the reserved pipe openings. The traditional method is to place a polyvinyl chloride sleeve on a floor panel, pour the floor after the placement is finished, form a reserved hole at the position of the sleeve, and remove the polyvinyl chloride sleeve after pouring and forming. In the method, the polyvinyl chloride casing is very easy to be impacted or vibrated in the concrete pouring process, the precision of the reserved hole is seriously influenced, and the polyvinyl chloride casing cannot be repeatedly used, so that a large amount of waste is caused; in addition, the polyvinyl chloride casing pipe is difficult to separate from the floor slab, which brings inconvenience to the construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete floor reserves hole device, the device can pinpoint concrete floor's reservation hole, and simple structure, easy dismounting.
To achieve the purpose, the utility model adopts the following technical proposal:
a concrete floor hole reserving device comprises a filling body, wherein the filling body comprises a bottom plate and a cylinder body arranged around the periphery of the bottom plate;
the outer contour of the cross section of the bottom plate is circular; the barrel comprises a first plate body and a second plate body, one end of the first plate body is connected to the bottom plate, and the other end of the first plate body is connected to the second plate body; the outer diameter of the first plate body is gradually increased, and the outer diameter of the end, connected with the second plate body, of the first plate body is larger than that of the end, connected with the bottom plate, of the first plate body; the second plate body is cylindrical.
Preferably, the outer surface of the first plate body is a spherical surface.
Preferably, the second plate body is at least partially positioned outside the concrete floor slab at the reserved hole.
Preferably, the concrete floor hole reserving device further comprises a top plate, the top plate is connected to the second plate body, and the top plate is provided with a handle.
Preferably, the handle is rotatably connected to the top plate.
Preferably, the bottom plate is provided with a plurality of mounting through holes; the concrete floor hole reserving device further comprises a plurality of bolts, and the bolts are correspondingly arranged in the mounting through holes one to one.
Preferably, one of the mounting through holes is disposed at a central position of the bottom plate, and the rest of the mounting through holes are uniformly distributed along a circumferential direction of the bottom plate.
Preferably, the concrete floor hole reserving device further comprises a supporting plate, the supporting plate is arranged in the cylinder, and two ends of the supporting plate are respectively connected to the inner surface of the second plate body.
Preferably, the number of the support plates is multiple, and the support plates are uniformly distributed along the circumferential direction of the cylinder.
Preferably, the outer surface of the barrel is coated with a layer of release agent.
Has the advantages that: the utility model provides a concrete floor reserves hole device. In the concrete floor hole reserving device, the outer diameter of the first plate body is gradually increased, the outer diameter of one end, connected with the second plate body, of the first plate body is larger than that of one end, connected with the bottom plate, of the first plate body, and the second plate body is cylindrical. The structure can facilitate the device to be taken out of the reserved hole on one hand; on the other hand, in-process at follow-up shutoff floor preformed hole, adopt the device can reduce the manual work and play, chisel hair preformed hole's work load, effectively promote the efficiency of construction. The device can pinpoint the reservation hole on the concrete floor, simple structure, and easy dismounting can also recycle.
Drawings
Fig. 1 is a front view of a concrete floor preformed hole device provided by the utility model;
fig. 2 is a cross-sectional view at a-a of fig. 1.
In the figure: 1. a filler; 11. a base plate; 12. a barrel; 121. a first plate body; 122. a second plate body; 2. a top plate; 3. a handle; 4. mounting a through hole; 5. a bolt; 6. a nut; 7. a support plate; 8. a floor panel; 9. a concrete floor.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures.
In the description of the present invention, unless expressly stated or limited otherwise, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning permanently connected, detachably connected, or integral to one another; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
In the description of the present embodiment, the terms "upper", "lower", "right", etc. are used in an orientation or positional relationship based on that shown in the drawings only for convenience of description and simplicity of operation, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used only for descriptive purposes and are not intended to have a special meaning.
As shown in figure 1 and figure 2, the utility model provides a concrete floor reserves hole device, the device include obturator 1, and obturator 1 includes bottom plate 11 to and the barrel 12 of winding bottom plate 11 periphery setting. Alternatively, in this embodiment, the cylinder 12 and the bottom plate 11 are integrally formed, and in other embodiments, the cylinder 12 and the bottom plate 11 may be adhesively connected. The cross section of the bottom plate 11 is circular in outer contour; the cylinder 12 includes a first plate 121 and a second plate 122, one end of the first plate 121 is connected to the bottom plate 11, and the other end of the first plate 121 is connected to the second plate 122. The outer diameter of the first plate body 121 gradually increases, and the outer diameter of the end of the first plate body 121 connected to the second plate body 122 is larger than the outer diameter of the end of the first plate body 121 connected to the bottom plate 11; the second plate 122 is cylindrical. On one hand, the structure can facilitate the device to be taken out of the reserved hole after the reserved hole is formed; on the other hand, after all pipelines are installed, the reserved holes of the floor slab need to be plugged. The traditional method is that the periphery of a reserved hole to be sealed is kicked and roughened to form a cone or a bowl, so that the subsequent concrete pouring is facilitated, and the water seepage condition after the plugging is finished can be prevented; and then pouring concrete into the reserved hole for plugging. This embodiment the device has reduced the artifical work load of playing, chiseling the preformed hole of beating, can effectively promote the efficiency of construction, and fashioned preformed hole is of high quality, can further prevent the condition that the infiltration appears after the shutoff. In addition, in the floor slab pouring process, compare in the condition that the cross section outline of barrel 12 sets up to the polygon, the cross section outline of barrel 12 sets up to circular in this embodiment for barrel 12 week portion is whole to be pressed evenly, avoids barrel 12 to warp at the pouring in-process, and then influences the quality of reserving the hole.
Optionally, the outer surface of the first plate 121 is a spherical surface. In other embodiments, the outer surface of the first plate 121 may be provided as a tapered surface.
Further, the second plate 122 is at least partially located outside the concrete floor 9 at the reserved hole, so that the concrete can be prevented from pouring the whole reserved hole device into the floor in the process of pouring the floor.
Optionally, the base plate 11 is provided with a plurality of mounting through holes 4. Specifically, one of the mounting through holes 4 is disposed at a central position of the bottom plate 11, and the rest of the mounting through holes 4 are uniformly distributed along a circumferential direction of the bottom plate 11. Each mounting through hole 4 is fitted with a bolt 5. A plurality of bolts 5 can connect the floor 11 and floor panel 8 and are tightened by nuts 6. In the floor slab pouring process, the bottom plate 11 and the floor slab panel 8 are tightly attached to each other through the bolts 5 and the nuts 6, so that the position of the cylinder 12 can be fixed, and the situation that the cylinder 12 shifts under the impact of concrete to influence the quality of a reserved hole is avoided. In other embodiments, a self-tapping screw may be installed in each installation through-hole 4, and the bottom plate 11 and the floor panel 8 may be connected by a plurality of self-tapping screws.
The concrete floor hole reserving device further comprises a top plate 2, and the top plate 2 is connected to the second plate 122. Set up roof 2 and can prevent to pour the in-process, inside the concrete entering barrel 12, and then block up mounting hole 4, cause the problem that whole device can't be dismantled, also influence the device's used circularly simultaneously. The top plate 2 is provided with a handle 3, and optionally, the handle 3 is rotatably connected with the top plate 2, so that a person can conveniently pull the handle 3 at any angle. In this embodiment, the outer contour of the cross section of the handle 3 is rectangular, so that the device can be taken out of the reserved hole conveniently. In other embodiments, the cross-sectional outer contour of the handle 3 may also be configured as a semicircle.
Referring further to fig. 2, in this embodiment, the concrete floor hole reserving device further includes a supporting plate 7, the supporting plate 7 is disposed in the barrel 12, and two ends of the supporting plate 7 are respectively connected to the inner surface of the second plate 122. The setting of backup pad 7 has played the effect of supporting second plate body 122 for second plate body 122 can not take place to warp under the impact of concrete at the in-process of concreting floor 9, thereby has guaranteed the shaping quality in reservation hole. Optionally, the number of the supporting plates 7 is multiple, and the supporting plates 7 are uniformly distributed along the circumferential direction of the cylinder 12, so that the forming quality of the reserved hole is further ensured.
Optionally, the outer surface of the barrel 12 is coated with a release agent layer to further facilitate removal of the device from the preformed hole. In this embodiment, barrel 12, bottom plate 11 and roof 2 all adopt 5 mm's plastic slab customization, can be under the prerequisite of guaranteeing device bulk strength, reduce cost simultaneously, and the light in weight of plastic slab is convenient for take out the device in the reservation hole.
In the process of pouring and forming the concrete floor 9, firstly, a release agent is coated on the outer surface of the cylinder 12, the bottom plate 11 and the floor panel 8 are tightly attached through the bolt 5 and the nut 6, and then the top plate 2 is fixedly arranged on the second plate body 122 and tightly sealed by an adhesive tape; then, pouring and forming the concrete floor 9; after the floor slab is formed, the nut 6 is unscrewed, and a person grasps the handle 3 to pull the device out of the concrete floor slab 9, so that the forming of the reserved hole of the concrete floor slab is realized. The whole construction process is simple to operate and high in efficiency.
It is obvious that the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Numerous obvious variations, rearrangements and substitutions will now occur to those skilled in the art without departing from the scope of the invention. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. The concrete floor hole reserving device is characterized by comprising a filling body (1), wherein the filling body (1) comprises a bottom plate (11) and a cylinder body (12) arranged around the periphery of the bottom plate (11);
the outer contour of the cross section of the bottom plate (11) is circular; the barrel (12) comprises a first plate body (121) and a second plate body (122), one end of the first plate body (121) is connected to the bottom plate (11), and the other end of the first plate body (121) is connected to the second plate body (122); the outer diameter of the first plate body (121) is gradually increased, and the outer diameter of one end, connected with the second plate body (122), of the first plate body (121) is larger than that of one end, connected with the bottom plate (11), of the first plate body (121); the second plate body (122) is cylindrical.
2. A concrete floor preformed hole arrangement according to claim 1, characterized in that the outer surface of the first plate body (121) is spherical.
3. A concrete floor preformed hole arrangement according to claim 1, characterized in that the second plate body (122) is at least partly located outside the concrete floor (9) at the preformed hole.
4. The concrete floor preformed hole device according to claim 1, characterized in that, the concrete floor preformed hole device further comprises a top plate (2), the top plate (2) is connected to the second plate body (122), and the top plate (2) is provided with a handle (3).
5. A concrete floor preformed hole arrangement according to claim 4, characterized in that said handle (3) is rotatably connected with said top plate (2).
6. The concrete floor preformed hole device according to claim 1, characterized in that the bottom plate (11) is provided with a plurality of mounting through holes (4), and the number of the mounting through holes (4) is multiple; the concrete floor hole reserving device further comprises a plurality of bolts (5), and the bolts (5) are correspondingly arranged in the mounting through holes (4) one by one.
7. The concrete floor preformed hole device according to claim 6, wherein one of the installation through holes (4) is arranged at the central position of the bottom plate (11), and the rest of the installation through holes (4) are uniformly distributed along the circumferential direction of the bottom plate (11).
8. The concrete floor preformed hole device according to claim 1, characterized in that, the concrete floor preformed hole device further comprises a support plate (7), the support plate (7) is arranged in the cylinder (12), and two ends of the support plate (7) are respectively connected to the inner surface of the second plate body (122).
9. The concrete floor preformed hole device of claim 8, characterized in that the number of the supporting plates (7) is multiple, and the supporting plates (7) are uniformly distributed along the circumferential direction of the cylinder (12).
10. A concrete floor preformed hole arrangement according to claim 1, characterized in that the outer surface of the cylinder (12) is coated with a layer of release agent.
CN202121545202.6U 2021-07-08 2021-07-08 Concrete floor reserves hole device Active CN214996011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121545202.6U CN214996011U (en) 2021-07-08 2021-07-08 Concrete floor reserves hole device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121545202.6U CN214996011U (en) 2021-07-08 2021-07-08 Concrete floor reserves hole device

Publications (1)

Publication Number Publication Date
CN214996011U true CN214996011U (en) 2021-12-03

Family

ID=79103009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121545202.6U Active CN214996011U (en) 2021-07-08 2021-07-08 Concrete floor reserves hole device

Country Status (1)

Country Link
CN (1) CN214996011U (en)

Similar Documents

Publication Publication Date Title
CN209509012U (en) It is a kind of for connecting the suspension column structure of concrete foundation and steel column
CN106988529B (en) A kind of stair template structure and the stair construction method using the formwork structure
CN207296408U (en) Portable concrete constructional column irrigation device
CN207110468U (en) A kind of shear wall joint part template reinforcing device
CN207526100U (en) Wall is poured with aluminum alloy pattern plate leveling and ruggedized construction
CN214996011U (en) Concrete floor reserves hole device
CN106522545A (en) Self-disassembled adjustable opposite-pull screw device and assembling and disassembling method thereof
CN107504036B (en) Internal support device for casing and construction method thereof
CN214575676U (en) A separation device that is used for different model concrete placement of beam column joint
CN216201659U (en) Floor pours cloth machine location prefabricated section
CN214575683U (en) Combined sleeving mold for keeping and plugging cast-in-situ floor pay-off hole
CN212745338U (en) Vertical pump pipe fixer
CN209907945U (en) Pre-buried device of template is accepted to aluminum alloy template system
CN209907939U (en) Pre-buried device that reserved pipeline passed hole in floor concrete placement
CN211772773U (en) Bridge built-in fitting structure
CN210598171U (en) Floor thickness controller
JP4270518B2 (en) Corn production device and cone production pallet
CN217601727U (en) Embedded part of shock insulation support
KR20090036369A (en) Supporting equipment for concrete slab
CN214996009U (en) Tool for reserving reserved hole of vertical pipe
CN215564487U (en) Cast in situ concrete wall strutting arrangement
CN217720401U (en) Movable distribution box foundation
CN215889362U (en) Bowl mouth type electromechanical sleeve reservation device
CN214007724U (en) Anchoring part and heat-insulation-structure integrated wall body comprising same
CN217150674U (en) Embedded part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant