CN214995828U - Anti-falling device for building construction climbing frame - Google Patents
Anti-falling device for building construction climbing frame Download PDFInfo
- Publication number
- CN214995828U CN214995828U CN202120923023.5U CN202120923023U CN214995828U CN 214995828 U CN214995828 U CN 214995828U CN 202120923023 U CN202120923023 U CN 202120923023U CN 214995828 U CN214995828 U CN 214995828U
- Authority
- CN
- China
- Prior art keywords
- fixed
- workman
- rope
- spring
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a frame is climbed in construction and is used anti-falling device, which comprises a housin, the through-hole has been seted up at the top of casing, be provided with the sliding sleeve in the through-hole, slide in the sliding sleeve and cup jointed the slide bar, the bottom of slide bar extends to in the casing and is connected with the fixed plate, the top of fixed plate is fixed with the spring, the top of spring is fixed at the inside top of casing. The utility model discloses in through becket system on workman's waist belly, the hasp that sets up through two second wire rope tip can be fixed two second wire rope on climbing the frame to provide safety measure to the workman, avoid the workman to take place to fall and cause the tumble injury on climbing the frame, the protectiveness when having improved the workman's operation, and the spring rope can follow according to workman's home range and lengthen and shorten, avoid frequently changing the problem of hasp position, the noose slides and cup joints on the becket, can avoid it to cause the influence to workman's normal work.
Description
Technical Field
The utility model relates to a construction auxiliary assembly technical field especially relates to a building construction climbs frame and uses anti-falling device.
Background
The climbing frame is also called a lifting frame, can be divided into hydraulic type, electrodynamic type, manual pull type and other main types according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, can ascend or descend upwards along buildings, and makes the scaffold technology completely changed by the system: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting processes of the scaffold (the scaffold is used till the construction is finished after one-time assembly) are eliminated, the scaffold is not limited by the height of a building, the manpower and the materials are greatly saved, and the traditional scaffold is greatly improved in the safety angle. Has great development advantages in high-rise buildings.
The frame of climbing is needed to assist the workman to be under construction often in the construction, and its workman climbing carries out the operation on climbing the frame, because of its operation often in the eminence, and lack corresponding safety measure, very easily takes place the workman and falls incident such as injury from climbing the frame, consequently, in order to solve this type of problem, we have provided a building construction and have climbed anti-falling device for frame.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing an anti-falling device for a building construction climbing frame.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a construction climbs and uses anti-falling device, includes the casing, the through-hole has been seted up at the top of casing, be provided with the sliding sleeve in the through-hole, sliding sleeve has cup jointed the slide bar in the sliding sleeve, the bottom of slide bar extends to in the casing and is connected with the fixed plate, the top of fixed plate is fixed with the spring, the top of spring is fixed at the inside top of casing, the top of slide bar extends to the outside of casing and is connected with first wire rope, first wire rope's end connection has the spring rope, the end fixing of spring rope has the loop, sliding sleeve has cup jointed the becket bridle in the becket, be provided with the tool bag on the becket, the bottom of casing is fixed with two second wire rope, two second wire rope's tip all is provided with the shackle.
Preferably, a sliding block is fixed on the side face of the fixing plate, a sliding groove is formed in the inner wall of the shell, and the sliding block is slidably mounted in the sliding groove.
Preferably, a fixed block is fixed at the bottom end of the sliding rod and is fixed at the top of the fixed plate.
Preferably, the rope ring is provided with an illuminating lamp and an electronic watch, the bottom of the shell is fixedly provided with a connecting plate, and the two second steel wire ropes are fixed to the bottom of the connecting plate.
Preferably, a connecting block is fixed at the top end of the sliding rod, and the first steel wire rope is fixed at the top of the connecting block.
Preferably, a hanging ring is fixed at the end of the first steel wire rope, and the spring rope is fixed on the hanging ring.
Compared with the prior art, the beneficial effects of the utility model are that:
1: the utility model discloses in through becket system on workman's waist belly, the hasp that sets up through two second wire rope tip can be fixed two second wire rope on climbing the frame to provide safety measure to the workman, avoid the workman to take place to fall and cause the tumble injury on climbing the frame, the protectiveness when having improved the workman's operation, and the spring rope can follow according to workman's home range and lengthen and shorten, avoid frequently changing the problem of hasp position, the noose slides and cup joints on the becket, can avoid it to cause the influence to workman's normal work.
2: the utility model discloses in use through the cooperation of slide bar, sliding sleeve, fixed plate and spring, can take place when falling at the workman, cause the reining injury to the workman because of gravity reason when avoiding reining in the staff whereabouts suddenly because of first wire rope and second wire rope's rigidity problem, can provide a cushioning effect for the workman, improved the protectiveness to the workman.
Drawings
Fig. 1 is a schematic structural view of an anti-falling device for a climbing frame for building construction, which is provided by the utility model;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a partially enlarged view of a portion B in fig. 1.
In the figure: the multifunctional tool bag comprises a shell 1, a first steel wire rope 2, a lifting ring 3, a spring rope 4, a rope sleeve 5, a rope ring 6, a tool bag 7, an electronic watch 8, a lighting lamp 9, a connecting plate 10, a second steel wire rope 11, a hook 12, a sliding rod 13, a connecting block 14, a spring 15, a sliding sleeve 16, a fixed block 17, a fixed plate 18, a sliding block 19 and a sliding chute 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an anti-falling device for a building construction climbing frame comprises a shell 1, a through hole is formed in the top of the shell 1, a sliding sleeve 16 is arranged in the through hole, a sliding rod 13 is slidably sleeved in the sliding sleeve 16, the bottom end of the sliding rod 13 extends into the shell 1 and is connected with a fixing plate 18, a spring 15 is fixed at the top of the fixing plate 18, the top end of the spring 15 is fixed at the top of the inside of the shell 1, the top end of the sliding rod 13 extends to the outside of the shell 1 and is connected with a first steel wire rope 2, the end of the first steel wire rope 2 is connected with a spring rope 4, a rope sleeve 5 is fixed at the end of the spring rope 4, a rope ring 6 is slidably sleeved in the rope sleeve 5, a tool bag 7 is arranged on the rope ring 6, two second steel wire ropes 11 are fixed at the bottom of the shell 1, and hooks 12 are arranged at the ends of the two second steel wire ropes 11.
Fixed plate 18's side is fixed with slider 19, spout 20 has been seted up to casing 1's inner wall, slider 19 slidable mounting is in spout 20, slide bar 13's bottom mounting has fixed block 17, fixed block 17 is fixed at fixed plate 18's top, be provided with light 9 and electronic watch 8 on the becket 6, casing 1's bottom is fixed with connecting plate 10, two second wire rope 11 are all fixed in the bottom of connecting plate 10, slide bar 13's top is fixed with connecting block 14, first wire rope 2 is fixed at the top of connecting block 14, first wire rope 2's end fixing has rings 3, spring rope 4 is fixed on rings 3.
The working principle is as follows: when in use, the rope ring 6 is sleeved on the waist abdomen of an operation worker, the clasps 12 at the end parts of the two second steel wire ropes 11 are fixed on the climbing frame, thereby providing safety measures for the worker, avoiding falling injury of the worker on the climbing frame, improving the protection for the worker during operation, the spring rope 4 can be lengthened and shortened along with the movement range of the worker, avoiding the problem of frequent replacement of the position of the clasps 12, the rope sleeve 5 is slidably sleeved on the rope ring 6, avoiding the influence on the normal operation of the worker, through the matching use of the sliding rod 13, the sliding sleeve 146, the fixed plate 18 and the spring 15, avoiding hurting the worker due to gravity when the worker falls down suddenly due to the rigidity problem of the first steel wire rope 2 and the second steel wire rope 11, providing a buffer action for the worker, improving the protection for the worker, through the arrangement of the two second steel wire ropes 11, can avoid the workman to take place to fall often because of the position of adjustment buckle 12 and lose the safeguard measure, divide into two steps through two buckles 12 and adjust its position, can make one of them buckle 12 fix all the time and guarantee workman's safety on climbing the frame, the instrument bag 7 that sets up on becket bridle 6 can be convenient for the workman to deposit the instrument and use, has improved the convenience of its workman when the operation.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a falling preventing device for building construction climbing frame, includes casing (1), its characterized in that, the through-hole has been seted up at the top of casing (1), be provided with sliding sleeve (16) in the through-hole, sliding sleeve (16) are slided and have been cup jointed slide bar (13), the bottom of slide bar (13) extends to in casing (1) and is connected with fixed plate (18), the top of fixed plate (18) is fixed with spring (15), the top of spring (15) is fixed at the inside top of casing (1), the top of slide bar (13) extends to the outside of casing (1) and is connected with first wire rope (2), the end connection of first wire rope (2) has spring rope (4), the end fixing of spring rope (4) has noose (5), sliding sleeve (6) has been slided and cup jointed in noose (5), be provided with tool bag (7) on noose (6), two second steel wire ropes (11) are fixed at the bottom of the shell (1), and hooks (12) are arranged at the end parts of the two second steel wire ropes (11).
2. The fall preventing device for the building construction climbing frame according to claim 1, characterized in that a sliding block (19) is fixed on the side surface of the fixing plate (18), a sliding groove (20) is formed in the inner wall of the housing (1), and the sliding block (19) is slidably mounted in the sliding groove (20).
3. The fall preventing device for the building construction climbing frame according to claim 1, characterized in that a fixed block (17) is fixed at the bottom end of the sliding rod (13), and the fixed block (17) is fixed at the top of a fixed plate (18).
4. The anti-falling device for the building construction climbing frame is characterized in that an illuminating lamp (9) and an electronic watch (8) are arranged on the rope ring (6), a connecting plate (10) is fixed at the bottom of the shell (1), and the two second steel wire ropes (11) are fixed at the bottom of the connecting plate (10).
5. The anti-falling device for the building construction climbing frame is characterized in that a connecting block (14) is fixed at the top end of the sliding rod (13), and the first steel wire rope (2) is fixed at the top of the connecting block (14).
6. The anti-falling device for the building construction climbing frame is characterized in that a lifting ring (3) is fixed at the end part of the first steel wire rope (2), and the spring rope (4) is fixed on the lifting ring (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120923023.5U CN214995828U (en) | 2021-04-30 | 2021-04-30 | Anti-falling device for building construction climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120923023.5U CN214995828U (en) | 2021-04-30 | 2021-04-30 | Anti-falling device for building construction climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214995828U true CN214995828U (en) | 2021-12-03 |
Family
ID=79089021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120923023.5U Active CN214995828U (en) | 2021-04-30 | 2021-04-30 | Anti-falling device for building construction climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214995828U (en) |
-
2021
- 2021-04-30 CN CN202120923023.5U patent/CN214995828U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110639139A (en) | High-voltage transmission line iron tower anti-falling device with differential self-locking device and method | |
CN214995828U (en) | Anti-falling device for building construction climbing frame | |
CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
CN201614731U (en) | Novel electric lifting scaffold | |
CN114436114A (en) | Prefabricated part hoisting device based on bim technology | |
CN116767502A (en) | A isolated plant that is used for unmanned aerial vehicle to hang to establish and climbs tower safety and prevent weighing down rope | |
CN203969312U (en) | Climbing vertical ladder coupling type anti-drop safety gloves | |
CN207845065U (en) | A kind of manned crane hanging basket | |
CN114082118B (en) | High-altitude anti-falling tool and using method | |
CN211201730U (en) | Novel cable shaft well head cat ladder | |
CN205287308U (en) | Novel transmission & distribution pole climbing safety protection device | |
CN218338841U (en) | Pre-hanging safety belt device | |
CN208380493U (en) | It is a kind of for climb production nickel sulfate reaction kettle staircase | |
CN207194054U (en) | A kind of driver's cabin for being easy to disengaging | |
CN111991719A (en) | Safety belt for building site scaffold | |
CN214302802U (en) | High-stability protection device for high-rise building construction | |
CN203989582U (en) | A kind of safety belt buckles support | |
CN218187577U (en) | Safety belt hanging device for high-altitude maintenance operation of factory building | |
CN207943039U (en) | A kind of frame hangs the skid of aerial cable | |
CN219548364U (en) | Top-support type anti-falling system for attached lifting scaffold | |
CN210697105U (en) | A buckle tooth formula mounting structure for interior decoration | |
CN211357509U (en) | Speed difference automatic controller | |
CN218092872U (en) | Safety ladder for water conservancy station | |
CN211201718U (en) | Cat ladder for housing construction | |
CN204829782U (en) | Bayonet extension expanding weighs down and draws hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |