CN214955947U - Engineering cost progress management device - Google Patents
Engineering cost progress management device Download PDFInfo
- Publication number
- CN214955947U CN214955947U CN202120645344.3U CN202120645344U CN214955947U CN 214955947 U CN214955947 U CN 214955947U CN 202120645344 U CN202120645344 U CN 202120645344U CN 214955947 U CN214955947 U CN 214955947U
- Authority
- CN
- China
- Prior art keywords
- cost
- progress
- engineering
- bottom plate
- fence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 20
- 230000001681 protective effect Effects 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 6
- 238000007726 management method Methods 0.000 description 14
- 238000004364 calculation method Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000029305 taxis Effects 0.000 description 1
Images
Landscapes
- Fencing (AREA)
Abstract
The utility model discloses an engineering cost progress management device, including removing bottom plate and engineering cost show fence, the lower surface of removing the bottom plate is provided with the universal wheel, the last fixed surface of removing the bottom plate is connected with two dead levers, the top of dead lever is connected with the lower fixed surface of engineering cost show fence, the front of engineering cost show fence is provided with department's information district, cost progress district and cost content district respectively. This engineering cost progress management device, through department information district and department information card, can classify each work department and construction team, through cost progress district and total progress display lamp, can show the completion state of engineering total progress, through cost content district, the cost is accomplished the status lamp, control switch and cost content record card, can show the completion state of the content in stage and this stage, so that constructor knows the progress of total engineering, and the display effect is improved.
Description
Technical Field
The utility model relates to an engineering cost technical field specifically is an engineering cost progress management device.
Background
The construction cost is the total cost for some construction, and the core content is investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, construction settlement, completion settlement and the like. The main tasks of the engineering cost are as follows: according to the drawing, the quota and the specification of the list, direct fees, enterprise management fees, measure fees, planning fees, profits, taxes and the like contained in the project are calculated.
At present, in the process of construction and production activities, constructors cannot know the progress of engineering and can finish the engineering project as soon as possible, and certain defects exist in the aspect of display.
Therefore, a construction cost progress management apparatus is required.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering cost progress management device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a project cost progress management device comprises a movable bottom plate and a project cost display fence, wherein universal wheels are arranged on the lower surface of the movable bottom plate, two fixed rods are fixedly connected to the upper surface of the movable bottom plate, the top ends of the fixed rods are fixedly connected with the lower surface of the project cost display fence, a department information area, a cost progress area and a cost content area are respectively arranged on the front surface of the project cost display fence, a first clamping groove is formed in the front surface of the department information area, a department information card is inserted in the first clamping groove, a total progress display lamp is arranged on the front surface of the cost progress area, a cost completion status lamp, a control switch and a second clamping groove are respectively arranged on the front surface of the cost content area, a cost content recording card is inserted in the second clamping groove, a sliding groove is formed in the lower surface of the project cost display fence, and an extension writing board is slidably connected to the inner wall of the sliding groove, the front of engineering cost show fence is provided with the screw thread jackscrew, the screw thread end of screw thread jackscrew and the front overlap joint of extending the clipboard, the top fixedly connected with extension spring of extending the clipboard, the top of extension spring and the interior roof fixed connection of sliding tray.
Preferably, the number of universal wheels is four, four the universal wheels are arranged at four corners of the lower surface of the movable bottom plate in a rectangular array mode, and braking devices are arranged on the surfaces of the universal wheels.
Preferably, a protective ceiling is arranged at the top end of the engineering cost display fence, and an energy-saving lamp tube and a sound sensing device are respectively arranged on the lower surface of the protective ceiling.
Preferably, the lower surface fixedly connected with portable power source of engineering cost show fence.
Advantageous effects
The utility model provides an engineering cost progress management device possesses following beneficial effect:
1. this engineering cost progress management device, through setting up department information district and department information card, can classify each work department and construction team, through setting up cost progress district and total progress display lamp, can show the completion state of engineering total progress, through setting up cost content district, the cost completion state lamp, control switch and cost content record card, can show the content in stage and the completion state of this stage content, so that constructor knows the progress of total engineering, and the display effect is improved.
2. This engineering cost progress management device, through setting up energy-saving fluorescent tube and sound induction system, the constructor of being convenient for watches or revises progress content to the content on engineering cost show fence at night, through setting up extension clipboard, extension spring and screw jackscrew, will extend in the clipboard income sliding tray when not using, keep this construction cost progress management device's clean and tidy nature, can be with extending the clipboard suction downwards when using, utilize the screw jackscrew to fix, it writes the summary to correspond total construction cost progress condition of accomplishing on extending the clipboard.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A in FIG. 1;
fig. 3 is a schematic view of the side-cut structure of the sliding groove of the present invention.
In the figure: the system comprises a movable bottom plate 1, an engineering cost display fence 2, universal wheels 3, a fixing rod 4, a department information area 5, a cost progress area 6, a cost content area 7, a department information card 8, a total progress display lamp 9, a cost completion status lamp 10, a control switch 11, a cost content recording card 12, a protective ceiling 13, an energy-saving lamp tube 14, a sound sensing device 15, a mobile power supply 16, an extension writing board 17, a thread jackscrew 18 and a tension spring 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an engineering cost progress management device, is including removing bottom plate 1 and engineering cost show fence 2, and the lower surface that removes bottom plate 1 is provided with universal wheel 3, and the quantity of universal wheel 3 is four, and four universal wheels 3 are the four corners department that the rectangle array set up at removal bottom plate 1 lower surface, and the surface of universal wheel 3 is provided with arresting gear.
Two fixed rods 4 are fixedly connected to the upper surface of the movable bottom plate 1, the top ends of the fixed rods 4 are fixedly connected with the lower surface of the project cost display column 2, the front surface of the project cost display column 2 is respectively provided with a department information area 5, a cost progress area 6 and a cost content area 7, the front surface of the department information area 5 is provided with a first card slot, a department information card 8 is inserted in the first card slot, each work department and construction team can be classified by arranging the department information area 5 and the department information card 8, the front surface of the cost progress area 6 is provided with a total progress display lamp 9, the completion state of the total project progress can be displayed by arranging the cost progress area 6 and the total progress display lamp 9, the front surface of the cost content area 7 is respectively provided with a cost completion state lamp 10, a control switch 11 and a second card slot, a cost content recording card 12 is inserted in the second card slot, through setting up cost content district 7, cost completion status lamp 10, control switch 11 and cost content record card 12, can show the content in this stage and the completion state of this stage content to constructor knows the progress of total engineering, has improved the bandwagon effect.
The top end of the engineering cost display column 2 is provided with a protective ceiling 13, the lower surface of the protective ceiling 13 is respectively provided with an energy-saving lamp tube 14 and a sound sensing device 15, the lower surface of the engineering cost display column 2 is fixedly connected with a mobile power supply 16, and the arrangement of the energy-saving lamp tube 14 and the sound sensing device 15 is convenient for constructors to watch the content of the engineering cost display column 2 or modify the progress content at night.
The sliding tray has been seted up to engineering cost show fence 2's lower surface, the inner wall sliding connection of sliding tray has extension clipboard 17, engineering cost show fence 2's front is provided with screw thread jackscrew 18, the screw thread end of screw thread jackscrew 18 and the front overlap joint of extension clipboard 17, the top fixedly connected with extension spring 19 of extension clipboard 17, the top of extension spring 19 and the interior roof fixed connection of sliding tray, extend clipboard 17 through the setting, extension spring 19 and screw thread jackscrew 18, in the board 17 income sliding tray will be extended when not using, keep this cost progress management device's clean and tidy nature, can be with extending clipboard 17 suction down when using, utilize screw thread jackscrew 18 to fix, it writes the summary to correspond total cost progress completion condition on extension clipboard 17.
The working principle is as follows: when the project cost progress management device is used, all work departments and construction teams can be classified through the department information area 5 and the department information card 8, the completion state of the total project progress can be displayed through the cost progress area 6 and the total progress display lamp 9, the construction content of the stage and the completion state of the content of the stage can be displayed through the cost content area 7, the cost completion state lamp 10, the control switch 11 and the cost content recording card 12, so that constructors can know the progress of the total project, the display effect is improved, the extension writing board 17 is collected into the sliding groove through the extension writing board 17, the extension spring 19 and the thread jackscrew 18 when not used, the integral tidiness of the project cost progress management device is kept, the extension writing board 17 is downwards sucked in when in use and is fixed through the thread jackscrew 18, the completion condition corresponding to the total construction cost progress is written on the extension writing board 17, and the content of the construction cost display column 2 can be conveniently watched or the progress content can be conveniently modified by constructors at night through the energy-saving lamp tube 14 and the sound sensing device 15.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a construction cost progress management device, includes removal bottom plate (1) and construction cost show fence (2), its characterized in that: the lower surface of the movable bottom plate (1) is provided with universal wheels (3), the upper surface of the movable bottom plate (1) is fixedly connected with two fixed rods (4), the top ends of the fixed rods (4) are fixedly connected with the lower surface of the engineering cost display fence (2), the front of the engineering cost display fence (2) is respectively provided with a department information area (5), a cost progress area (6) and a cost content area (7), the front of the department information area (5) is provided with a first clamping groove, a department information card (8) is inserted in the first clamping groove, the front of the cost progress area (6) is provided with a total progress display lamp (9), the front of the cost content area (7) is respectively provided with a cost completion status lamp (10), a control switch (11) and a second clamping groove, a cost content recording card (12) is inserted in the second clamping groove, the lower surface of engineering cost show fence (2) has seted up the sliding tray, the inner wall sliding connection of sliding tray has extends clipboard (17), the front of engineering cost show fence (2) is provided with screw thread jackscrew (18), the screw thread end of screw thread jackscrew (18) and the front overlap joint of extending clipboard (17), extend top fixedly connected with extension spring (19) of clipboard (17), the top of extension spring (19) and the interior roof fixed connection of sliding tray.
2. A construction cost progress management apparatus according to claim 1, characterized in that: the number of universal wheels (3) is four, four the universal wheels (3) are arranged at four corners of the lower surface of the movable bottom plate (1) in a rectangular array mode, and braking devices are arranged on the surfaces of the universal wheels (3).
3. A construction cost progress management apparatus according to claim 1, characterized in that: the top end of the engineering cost display fence (2) is provided with a protective ceiling (13), and the lower surface of the protective ceiling (13) is respectively provided with an energy-saving lamp tube (14) and a sound sensing device (15).
4. A construction cost progress management apparatus according to claim 1, characterized in that: the lower surface of the engineering cost display fence (2) is fixedly connected with a mobile power supply (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120645344.3U CN214955947U (en) | 2021-03-30 | 2021-03-30 | Engineering cost progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120645344.3U CN214955947U (en) | 2021-03-30 | 2021-03-30 | Engineering cost progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214955947U true CN214955947U (en) | 2021-11-30 |
Family
ID=79039790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120645344.3U Expired - Fee Related CN214955947U (en) | 2021-03-30 | 2021-03-30 | Engineering cost progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214955947U (en) |
-
2021
- 2021-03-30 CN CN202120645344.3U patent/CN214955947U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214955947U (en) | Engineering cost progress management device | |
CN208148947U (en) | A kind of Art Design creation platform | |
CN203250422U (en) | Chinese language literature teaching board | |
CN205104175U (en) | Teams and groups build multi -functional panel | |
CN216562401U (en) | Investment progress display device for engineering cost | |
CN206541530U (en) | Urban planning shows service platform device | |
CN211154380U (en) | Drawing device for drawing building budget | |
CN208027656U (en) | A kind of construction engineering cost Multifunctional demonstration plate | |
CN210129364U (en) | Secretary writes explanation and uses show board | |
CN208622011U (en) | A kind of Multi-function computer display device | |
CN212587137U (en) | Engineering cost show board | |
CN216256246U (en) | Display device for territory space planning layout | |
CN204808496U (en) | Intelligent terminal of insertible finance IC -card | |
CN213308124U (en) | Cost workbench for engineering cost management | |
CN206115793U (en) | Finance training set | |
CN209373875U (en) | A kind of Automation of Electric Systems experimental provision | |
CN110584327A (en) | Drawing device for drawing building budget | |
CN215435764U (en) | Display device for financial economic analysis | |
CN218463355U (en) | Book folding and flattening device | |
CN208848241U (en) | One kind managing platform based on big fellow's government affairs service network | |
CN211349575U (en) | Commodity circulation specialty talent culture auxiliary teaching aid | |
CN213751833U (en) | Novel fence is puted up to process flow for building engineering management | |
CN210865265U (en) | Display device for economics | |
CN214203092U (en) | Be used for theater construction project construction management device | |
CN210324623U (en) | Teaching auxiliary device for engineering cost |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211130 |