CN2149446Y - 一种高层建筑施工外脚手架 - Google Patents

一种高层建筑施工外脚手架 Download PDF

Info

Publication number
CN2149446Y
CN2149446Y CN 93202309 CN93202309U CN2149446Y CN 2149446 Y CN2149446 Y CN 2149446Y CN 93202309 CN93202309 CN 93202309 CN 93202309 U CN93202309 U CN 93202309U CN 2149446 Y CN2149446 Y CN 2149446Y
Authority
CN
China
Prior art keywords
outer scaffold
construction
electric block
upper frame
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93202309
Other languages
English (en)
Inventor
陈胜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 93202309 priority Critical patent/CN2149446Y/zh
Application granted granted Critical
Publication of CN2149446Y publication Critical patent/CN2149446Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型向公众提供一种高层建筑施工外脚 手架,主要由互相分开的、可分别固定于建筑物主体 上的上、下两部分架体和两个相应的电动葫芦构成, 两架体之间由一个电动葫芦联系着,另一个电动葫芦 悬挂在挑梁上,通过电动葫芦可将架体分部提升或下 降。该装置自重轻、使用灵活、装拆方便、不受整体施 工条件限制,可使主体施工与装修工作同时进行,立 交作业互不影响,能节约大量钢材,提高工效,特别适 合高层建筑快速施工使用。

Description

本实用新型属于建筑施工脚手架,尤其是一种高层建筑施工外脚手架。
目前,建筑工地使用的外墙脚手架主要有下列几种:1、从地面直立到顶式,2、人工分步提升式,3、整体提升式。这些类型的脚手架不同程度地存在使用钢材多,自重重,拆装麻烦,工效低,提升设备功率大,受整体施工条件限制等缺陷,不满足快速施工需要。 本实用新型的任务是提供一种高层建筑外脚手架,它不受整体施工条件限制,能满足快速施工的需要。
为完成上述任务,本实用新型采用的解决方案是:该装置是由互相分开的几部分架体组成,每部分又分上架体和下架体,上架体与下架之间用一个电动葫芦连接着,另一电动葫芦悬挂在挑梁上,上架体约为下架体垂直高度的两倍,两架体的垂直间距可任意调节,通过电动葫芦可以先上部后下部逐级提升,也可以先下部后上部逐级下降,从而减小使用于脚手架的钢材,并能分部立交作业,互不影响,达到满足快速施工要求的目的。
本实用新型的优点是:1、与现有的外墙脚手架相比,可省钢材85%;2、自重轻、所需提升设备的功率小;3、装拆方便,使用灵活、安全可靠;4、不受整体施工条件限制,可使主体施工和装修工作同时进行,立交作业互不影响,加快施工速度,提高工效。
图1是本实用新型的整体结构侧视图。
下面结合附图对本实用新型作进一步详细的描述。
在图1中,建筑物主体1的每一层楼下方预埋有固定螺栓2,用于固定挑梁3和上架体支架4。架体由立杆5,大横杆6、小横杆7扎成多层货架状,每层小横杆上面铺设作业脚手板8。挑梁3外端由斜撑9支撑,斜撑9由斜撑拉索10牵拉,支架4由支架拉索11牵拉。上电动葫芦12悬挂于挑梁3外端,通过挂钩连接上架体提手13,用于升降上部架体。下电动葫14悬挂于支架4的中部,通过挂钩连接吊索15,16是下架体,17是下架体支架,18是下架体支架拉索,19是安全网,20是导向筒,导向筒有两个,在上架体的第二步和第三步各安装一个,转移时轮换使用,以防导向筒阻止小横杆上升。
作业区需要向上转移时,按如下顺序进行:卸脱导向筒20,取脱上电动葫芦12上的挂钩,松脱挑梁3、斜撑9和斜撑拉索10与墙体固定的螺栓,往上一层楼层相应的预埋件安装固定好,将电动葫芦的挂钩钩上,将上架体拉住,然后松脱上架体支架4及支架拉索11与墙体固定的螺栓,安装好导向筒,先提升上架体,每次提升一层,架体在提升时,遇到导向筒挡住小横杆上升现象,这时电动葫芦暂停,将设在上架体第三步的导向筒与墙体连接的部位松脱,将设在第二步的导向筒安好,再次启动电动葫芦,架体继续上升。架子提升时还遇到挑梁挡住大横杆上升的现象,因此大横杆快接近挑梁时,电动葫芦暂停,在挑梁上方再安一条大横杆,安好后,拆开挑梁下方的大横杆,再次启动电动葫芦,架体上升,上升到预定的位置后,固定好支架4,钩上下挂钩,再松脱下架体支架17与墙体固定的螺栓及下架体拉索18与墙体固定的螺栓,随后提升下架体,到达预定位置将支架17固定好。当需要下降时,按相反的顺序进行,先降下架体,再降上架体,当一部分架体提升(或下降)完毕,再将电动葫芦移至另一部分,执行另一部分架体提升任务直到把各部分架体提升完毕,提升完后,上架体和下架体各部分分别联结起来,形成一个统一的整体。

Claims (1)

1、一种高层建筑施工外脚手架,主要由形似多层货架状的上、下两个架体和相应的两个电动葫芦组成,其特征在于:上架体与下架体是互相分开的,可分别固定在建筑物主体上,两架体之间由一个电动葫芦联系着,另一个电动葫芦悬挂于设在上架体上部的挑梁上,通过挂钩与上架体的提手相连接,上、下架体可随相应的电动葫芦分别提升或下降。
CN 93202309 1993-02-01 1993-02-01 一种高层建筑施工外脚手架 Expired - Fee Related CN2149446Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93202309 CN2149446Y (zh) 1993-02-01 1993-02-01 一种高层建筑施工外脚手架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93202309 CN2149446Y (zh) 1993-02-01 1993-02-01 一种高层建筑施工外脚手架

Publications (1)

Publication Number Publication Date
CN2149446Y true CN2149446Y (zh) 1993-12-15

Family

ID=33786529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93202309 Expired - Fee Related CN2149446Y (zh) 1993-02-01 1993-02-01 一种高层建筑施工外脚手架

Country Status (1)

Country Link
CN (1) CN2149446Y (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845883A (zh) * 2010-06-04 2010-09-29 刘玉伟 爬升脚手架体系及施工的方法
CN101852008A (zh) * 2010-06-04 2010-10-06 刘玉伟 一种升降脚手架装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845883A (zh) * 2010-06-04 2010-09-29 刘玉伟 爬升脚手架体系及施工的方法
CN101852008A (zh) * 2010-06-04 2010-10-06 刘玉伟 一种升降脚手架装置
CN101845883B (zh) * 2010-06-04 2012-08-29 刘玉伟 爬升脚手架体系及施工的方法

Similar Documents

Publication Publication Date Title
WO2022252633A1 (zh) 附着式升降脚手架中倒挂式起重动力设备的设置方法
CN205241084U (zh) 一种吊运机
CN2149446Y (zh) 一种高层建筑施工外脚手架
CN202441045U (zh) 导轨式电动附着升降脚手架
CN2187637Y (zh) 电动升降整体脚手架
CN216662305U (zh) 超高层塔吊底部附着式液压自爬升硬防护平台
CN213268983U (zh) 一种自爬升卸料平台
CN211949528U (zh) 一种高层建筑电梯井双层操作平台
CN2241727Y (zh) 一种高层建筑快速提升外脚手架
CN2230792Y (zh) 具有起重功能的塔式混凝土布料杆
CN2042492U (zh) 装修起重两用升降平台
CN2204832Y (zh) 自动整体升降外脚手架
CN2133627Y (zh) 高层凹凸部位悬挑升降脚手架
CN219638359U (zh) 一种建筑工程用吊篮
CN2175805Y (zh) 可分段式整体提升脚手架
CN218346758U (zh) 一种建筑施工用安全性高的防坠吊篮
CN218860197U (zh) 一种吊装立板机
CN2431342Y (zh) 一种多功能升降脚手架
CN221031324U (zh) 一种可伸缩带可翻转悬挂头式的井筒平台
CN213015293U (zh) 一种建筑工程用的脚手架
CN2682048Y (zh) 自升节、自升节提升装置及自升式加节装置
CN213114322U (zh) 一种多桁架式超宽型桥梁施工用挂篮
CN2248213Y (zh) 高层插管悬拉活动脚手架
CN210559077U (zh) 一种建筑工程吊装设备
CN2092578U (zh) 高层建筑自升降自保护操作架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee