CN214942780U - Structure is built in interim room in quick detachable building site - Google Patents

Structure is built in interim room in quick detachable building site Download PDF

Info

Publication number
CN214942780U
CN214942780U CN202120364687.2U CN202120364687U CN214942780U CN 214942780 U CN214942780 U CN 214942780U CN 202120364687 U CN202120364687 U CN 202120364687U CN 214942780 U CN214942780 U CN 214942780U
Authority
CN
China
Prior art keywords
plate
plates
clamping
supporting
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120364687.2U
Other languages
Chinese (zh)
Inventor
潘希
魏中杰
吴庆辉
黄国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Fucheng Construction Group Co ltd
Original Assignee
Zhejiang Fucheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Fucheng Construction Group Co ltd filed Critical Zhejiang Fucheng Construction Group Co ltd
Priority to CN202120364687.2U priority Critical patent/CN214942780U/en
Application granted granted Critical
Publication of CN214942780U publication Critical patent/CN214942780U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The application relates to a construction site temporary housing structure easy to disassemble, which belongs to the field of building construction and comprises two supporting plates, two side plates respectively arranged between the two supporting plates, a top plate simultaneously abutted against the tops of the supporting plates and the side plates, a connecting assembly arranged between the supporting plates and the side plates and used for connecting the supporting plates and the side plates, supporting frames arranged on two sides of the supporting plates, connecting pieces arranged between the supporting frames and the ground and used for connecting the supporting frames and the side plates, and a clamping assembly arranged on the supporting frames and used for fixing the top plate; the connecting assembly comprises two clamping connection plates which are fixedly connected and an inserting rod fixedly arranged below the clamping connection plates; the two clamping plates are mutually perpendicular and are provided with clamping grooves, the side plates and the adjacent supporting plates are respectively inserted into the two clamping grooves, and the inserting rods are connected with the ground. Which is convenient for quickly dismantling the temporary house.

Description

Structure is built in interim room in quick detachable building site
Technical Field
The application relates to the field of construction, especially, relate to a structure is built in quick detachable building site temporary room.
Background
The temporary house on the construction site is generally used for temporary residence of constructors, and like the house, the house is generally spliced through a heat insulation plate and a steel structure and is fastened and connected through bolts.
At present, the temporary building of building site includes front bezel, back plate, curb plate, roof, adopts more bolt or rivet connection between each board usually, but, when adopting a plurality of bolts or rivet connection, the construction volume is great, when building and demolising the temporary building, need demolish more bolt or rivet earlier.
In view of the above-mentioned related art, the inventor believes that there is a defect that it is cumbersome to remove the temporary housing at the construction site.
SUMMERY OF THE UTILITY MODEL
In order to facilitate demolising the temporary house fast, this application provides a structure is built in quick detachable building site temporary house.
The application provides a pair of structure is built in quick detachable building site temporary room adopts following technical scheme:
the utility model provides a structure is built in interim room in quick detachable building site, includes two backup pads, two curb plates that set up respectively between two backup pads, the roof of butt in backup pad and curb plate top simultaneously, set up the coupling assembling that is used for connecting both between backup pad and curb plate, set up the support frame in the backup pad both sides, set up the connecting piece that is used for connecting both between support frame and ground, set up the centre gripping subassembly that is used for fixed roof on the support frame.
By adopting the technical scheme, when constructors need to build a temporary building site, firstly marking and cleaning a foundation according to the size mark of the top plate, then fixing the support frame through the connecting piece, then connecting the support plate and the side plate through the connecting assembly, finally buckling the top plate on the tops of the support plate and the side plate, and fixing the top plate through the clamping assembly; when constructor need dismantle the interim room in building site, at first remove the fixed state of centre gripping subassembly, take off the roof, remove coupling assembling's connected state after that, take off curb plate and backup pad, remove the connecting piece afterwards, take off the support frame can, the dismantlement process of the interim room in whole building site is simple and convenient, need not to dismantle more bolt or rivet to be convenient for demolish the interim room fast.
Optionally, the connecting assembly comprises two fixedly connected clamping plates and an inserting rod fixedly arranged below the clamping plates;
the two clamping plates are mutually perpendicular and are provided with clamping grooves, the side plates and the adjacent supporting plates are respectively inserted into the two clamping grooves, and the inserting rods are connected with the ground.
Through adopting above-mentioned technical scheme, when constructor passes through coupling assembling to be connected backup pad and adjacent curb plate, at first according to mark marking off department with inserted bar and ground butt, peg graft the inserted bar to ground after that, fixed the joint board, backup pad and curb plate are pegged graft respectively to the joint inslot on the joint board afterwards, fixed backup pad and curb plate, can accomplish being connected of backup pad and adjacent curb plate.
Optionally, one end of the insertion rod, which is far away from the clamping plate, is provided with a spine part.
By adopting the technical scheme, the stress area of the spine part is reduced, so that the inserting rod can be conveniently inserted into the ground by constructors, and the labor intensity of the constructors is reduced.
Optionally, the two clamping plates are integrally formed.
Through adopting above-mentioned technical scheme, integrated into one piece sets up firm in connection, intensity is high, stable in use to it is more firm to make two connecting plates connect, and then improves connection stability between them.
Optionally, the clamping assembly comprises a connecting plate fixedly arranged on the support frame, a screw rod in threaded connection with the connecting plate, and a pressing plate rotatably connected to one end of the screw rod;
the connecting plate and the top plate are arranged at intervals, and the pressing plate is abutted to the top plate.
By adopting the technical scheme, when a constructor fixes the top plate through the clamping assembly, firstly, the screw rod is rotated, the screw rod pushes the compression plate to move towards one side close to the top plate, and finally, the compression plate is compressed on one side of the top plate; otherwise, the constructor can release the fixed state of the clamping assembly by reversely rotating the screw.
Optionally, a knob is fixedly arranged at one end of the screw rod, which is far away from the compression plate.
Through adopting above-mentioned technical scheme, constructor rotates the knob, and the knob can drive the screw rod and rotate to compress tightly the pressure strip or loosen, the knob provides handheld position for constructor, makes things convenient for constructor to rotate the screw rod.
Optionally, the connecting piece is a bolt.
Through adopting above-mentioned technical scheme, bolted connection construction is simple, convenient to detach and installation, antifatigue, and low in manufacturing cost, joint strength height.
Optionally, the periphery of the top plate is fixedly provided with a wrapping edge.
Through adopting above-mentioned technical scheme, bordure and wrap up the roof respectively with the junction of backup pad and curb plate to make the rainwater difficult in getting into interim room from the junction.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when a constructor needs to dismantle the temporary building site, firstly, the fixing state of the clamping assembly is released, the top plate is taken down, then, the connecting state of the connecting assembly is released, the side plate and the supporting plate are taken down, then, the connecting piece is released, and the supporting frame is taken down;
2. the sharp part reduces the stress area of the insertion rod, so that the insertion rod can be conveniently and quickly inserted into the ground by a constructor, and the labor intensity of the constructor is reduced;
3. the clamping assembly can quickly realize the fixation of the top plate and ensure that the top plate is not easily collapsed by wind force.
Drawings
FIG. 1 is a schematic structural diagram of a temporary housing structure of a company in an embodiment of the present application;
FIG. 2 is a schematic diagram showing an exploded structure of the connecting assembly;
fig. 3 is a partial structural view showing a clamping assembly.
Description of reference numerals: 1. a support plate; 2. a side plate; 3. a top plate; 4. edge covering; 5. a connecting assembly; 51. a clamping and connecting plate; 511. a clamping groove; 52. a plug rod; 521. a spike portion; 6. a support frame; 61. a support bar; 62. a connecting rod; 63. a supporting seat; 7. a connecting member; 8. a clamping assembly; 81. a connecting plate; 82. a screw; 83. a compression plate; 84. a knob.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses structure is built in quick detachable building site temporary room. Referring to fig. 1, the temporary housing construction structure of the construction site comprises two support plates 1, wherein the support plates 1 are rectangular, and the two support plates 1 are parallel to each other; two side plates 2 are respectively arranged between the two supporting plates 1, the side plates 2 are rectangular, the two side plates 2 are parallel to each other, and the two side plates 2 are respectively positioned at two ends of the supporting plates 1; the top of the supporting plate 1 and the top of the side plate 2 are provided with a top plate 3, the top plate 3 is also rectangular, and the top plate 3 is abutted to the supporting plate 1 and the side plate 2 simultaneously; the periphery of the top plate 3 is fixedly provided with a covered edge 4, and the covered edge 4 is used for wrapping the top plate 3 with the joint of the supporting plate 1 and the side plate 2 respectively, so that rainwater is not easy to enter the temporary house from the joint. A connecting assembly 5 is arranged between the supporting plate 1 and the side plate 2, and the connecting assembly 5 is used for connecting the supporting plate 1 and the side plate 2; two sides of the supporting plate 1 are provided with supporting frames 6, a connecting piece 7 is arranged between the supporting frames 6 and the ground, and the connecting piece 7 is used for connecting the supporting frames 6 with the ground; be provided with clamping component 8 on the support frame 6, clamping component 8 is used for fixed roof 3.
Referring to fig. 1 and 2, the support frame 6 includes two support rods 61, the support rods 61 are rectangular, and the support rods 61 are perpendicular to the ground; a connecting rod 62 is fixedly arranged between the two support rods 61, the connecting rod 62 is cuboid, and the connecting rod 62 is perpendicular to the support rods 61; the supporting seat 63 is fixedly arranged at one end of the supporting rod 61 far away from the connecting rod 62, the supporting seat 63 is rectangular, the connecting piece 7 is a bolt, and the bolt penetrates through the supporting seat 63 and is connected with the ground.
When constructors need to build a temporary building of a construction site, firstly marking and cleaning a foundation according to the size mark of the top plate 3, then fixing the supporting seat 63 in the supporting frame 6 with the ground through bolts, then connecting the supporting plate 1 with the side plate 2 through the connecting assembly 5, finally buckling the top plate 3 on the tops of the supporting plate 1 and the side plate 2, and fixing the top plate 3 through the clamping assembly 8; when constructor need dismantle the interim room in building site, at first remove the fixed state of centre gripping subassembly 8, take off roof 3, remove coupling assembling 5's connected state after that, take off curb plate 2 and backup pad 1, unscrew the bolt afterwards, take off support frame 6 can.
Referring to fig. 1 and 2, coupling assembling 5 includes two fixed connection's joint board 51, and joint board 51 is flat cuboid, two joint board 51 mutually perpendicular, and joint groove 511 has all been seted up to two joint board 51 integrated into one piece on two joint board 51, and curb plate 2 and adjacent backup pad 1 are pegged graft respectively in two joint grooves 511. An inserting rod 52 is fixedly arranged below the clamping plate 51, the inserting rod 52 is connected with the ground, a spine portion 521 is arranged at one end, away from the clamping plate 51, of the inserting rod 52, the spine portion 521 is used for reducing the stress area, and therefore a constructor can conveniently insert the inserting rod 52 into the ground.
When the constructor is connected the backup pad 1 with adjacent curb plate 2 through coupling assembling 5, at first according to mark marking off department with the spine portion 521 and the ground butt of peg 52, peg graft peg 52 to the ground in, fix joint board 51, in backup pad 1 and curb plate 2 peg graft the joint groove 511 on the joint board 51 respectively afterwards, fix backup pad 1 and curb plate 2, can accomplish being connected of backup pad 1 and adjacent curb plate 2.
Referring to fig. 1 and 3, the clamping assembly 8 includes a connecting plate 81 fixed on the supporting frame 6, the connecting plate 81 is rectangular, and the connecting plate 81 is spaced from the top plate 3; a screw rod 82 is connected to the connecting plate 81 in a threaded manner, and the screw rod 82 is perpendicular to the connecting plate 81; one end of the screw rod 82 is provided with a pressing plate 83, the pressing plate 83 is circular, the pressing plate 83 is rotatably connected with the screw rod 82, and the pressing plate 83 is abutted to the top plate 3; one end of the screw rod 82, which is far away from the pressing plate 83, is fixedly provided with a knob 84, and the knob 84 is used for providing a handheld part for constructors, so that the constructors can conveniently rotate the screw rod 82.
When a constructor fixes the top plate 3 through the clamping assembly 8, firstly, the knob 84 is rotated, the knob 84 can drive the screw rod 82 to rotate, the screw rod 82 pushes the pressing plate 83 to move towards one side close to the top plate 3, and finally, the pressing plate 83 is pressed on one side of the top plate 3; conversely, the worker rotates the knob 84 in the reverse direction to release the fixed state of the clamp assembly 8.
The implementation principle of the structure is built in quick detachable building site temporary room of this application embodiment does: when constructors need to build a temporary building of a construction site, firstly marking and cleaning a foundation according to the size mark of the top plate 3, then fixing the support frame 6 through bolts, then inserting the inserting rod 52 to the ground, respectively connecting the clamping plate 51 with the support plate 1 and the side plate 2, finally buckling the top plate 3 on the tops of the support plate 1 and the side plate 2, and rotating the knob 84 to enable the pressing plate 83 to fix the top plate 3; when constructor need dismantle the interim room in building site, at first the fixed state of centre gripping subassembly 8 is removed to the antiport knob 84, takes off roof 3, takes off curb plate 2 and backup pad 1 respectively from joint groove 511 after that to extract peg graft pole 52, unscrew the bolt afterwards, with support frame 6 dismantle can, the dismantlement process simple and convenient of the interim room in whole building site need not to dismantle more bolt or rivet, thereby be convenient for demolish the interim room fast.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a structure is built to quick detachable building site temporary housing which characterized in that: including two backup pads (1), two curb plate (2) of setting respectively between two backup pads (1), roof (3) at backup pad (1) and curb plate (2) top butt simultaneously, set up coupling assembling (5) that are used for connecting both between backup pad (1) and curb plate (2), support frame (6) of setting in backup pad (1) both sides, set up connecting piece (7) that are used for connecting both between support frame (6) and ground, set up centre gripping subassembly (8) that are used for fixed roof (3) on support frame (6).
2. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the connecting assembly (5) comprises two clamping plates (51) which are fixedly connected and an inserting rod (52) fixedly arranged below the clamping plates (51);
the two clamping plates (51) are perpendicular to each other, clamping grooves (511) are formed in the two clamping plates (51), the side plates (2) and the adjacent supporting plates (1) are respectively inserted into the two clamping grooves (511), and the inserting rods (52) are connected with the ground.
3. The temporary housing structure of easy-to-disassemble construction site according to claim 2, wherein: one end of the insertion rod (52) far away from the clamping plate (51) is provided with a spine part (521).
4. The temporary housing structure of easy-to-disassemble construction site according to claim 2, wherein: the two clamping plates (51) are integrally formed.
5. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the clamping assembly (8) comprises a connecting plate (81) fixedly arranged on the support frame (6), a screw rod (82) in threaded connection with the connecting plate (81), and a pressing plate (83) rotatably connected to one end of the screw rod (82);
the connecting plate (81) and the top plate (3) are arranged at intervals, and the pressing plate (83) is abutted to the top plate (3).
6. The temporary housing structure of easy-to-disassemble construction site of claim 5, wherein: and a knob (84) is fixedly arranged at one end of the screw rod (82) far away from the pressing plate (83).
7. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the connecting piece (7) is a bolt.
8. An easily disassembled temporary housing structure at a construction site according to any one of claims 1 to 7, wherein: and the periphery of the top plate (3) is fixedly provided with a wrapping edge (4).
CN202120364687.2U 2021-02-07 2021-02-07 Structure is built in interim room in quick detachable building site Active CN214942780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120364687.2U CN214942780U (en) 2021-02-07 2021-02-07 Structure is built in interim room in quick detachable building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120364687.2U CN214942780U (en) 2021-02-07 2021-02-07 Structure is built in interim room in quick detachable building site

Publications (1)

Publication Number Publication Date
CN214942780U true CN214942780U (en) 2021-11-30

Family

ID=79120509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120364687.2U Active CN214942780U (en) 2021-02-07 2021-02-07 Structure is built in interim room in quick detachable building site

Country Status (1)

Country Link
CN (1) CN214942780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961346A (en) * 2022-07-01 2022-08-30 中基华工程管理集团有限公司 Quick-mounting type temporary workshop

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961346A (en) * 2022-07-01 2022-08-30 中基华工程管理集团有限公司 Quick-mounting type temporary workshop
CN114961346B (en) * 2022-07-01 2024-03-12 中基华工程管理集团有限公司 Quick-mounting type temporary building

Similar Documents

Publication Publication Date Title
CN214942780U (en) Structure is built in interim room in quick detachable building site
CN216516127U (en) House frame convenient to assemble
CN112726831A (en) Assembled building site temporary house
CN214658813U (en) Template reinforced structure for construction
CN217811579U (en) Connection structure suitable for portal rigid frame
CN213519163U (en) Support frame for billboard
CN213297120U (en) Quick-release aluminum formwork for building construction
CN215760129U (en) Glue-free nail-free connecting assembly for bathroom
CN212959381U (en) Novel hoop
CN112343408B (en) Outdoor tent convenient to disassemble and assembling method thereof
CN212036772U (en) Drawer and connecting piece thereof
CN212743510U (en) Municipal afforestation ecological belt
CN211079905U (en) Construction protective fence for building bridge
CN113818689A (en) A building templates for building engineering's composite erection of being convenient for
CN113047439A (en) Multilayer large-span assembled integral space steel grid building structure
CN215530332U (en) Agricultural greenhouse structural part connector
CN213539916U (en) Connecting device for tent foot supporting plate and caster
CN108978953A (en) A kind of glass partition easy to install and its construction method of installation
CN214304707U (en) Connecting buckle for furniture installation
CN218029038U (en) Auxiliary fixing member for formwork
CN211448082U (en) Convenient-to-mount noise reduction device for civil construction disassembly of construction site
CN220414940U (en) Safety device for construction
CN211369107U (en) A acoustic celotex board that is used for making things convenient for dismouting in downtown area
CN210563754U (en) Municipal works protection network
CN219755018U (en) Connection structure between steel members

Legal Events

Date Code Title Description
GR01 Patent grant