CN214941544U - Engineering construction furred ceiling structure is built in room - Google Patents

Engineering construction furred ceiling structure is built in room Download PDF

Info

Publication number
CN214941544U
CN214941544U CN202120492085.5U CN202120492085U CN214941544U CN 214941544 U CN214941544 U CN 214941544U CN 202120492085 U CN202120492085 U CN 202120492085U CN 214941544 U CN214941544 U CN 214941544U
Authority
CN
China
Prior art keywords
connecting rod
ceiling structure
counter sink
engineering construction
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120492085.5U
Other languages
Chinese (zh)
Inventor
蔡玉萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhaoshuo Construction Engineering Co ltd
Original Assignee
Sichuan Zhaoshuo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Zhaoshuo Construction Engineering Co ltd filed Critical Sichuan Zhaoshuo Construction Engineering Co ltd
Priority to CN202120492085.5U priority Critical patent/CN214941544U/en
Application granted granted Critical
Publication of CN214941544U publication Critical patent/CN214941544U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a ceiling structure for building engineering construction, it includes jib and fixed frame, fixed frame and jib fixed connection, main joist and fixed frame looks joint, the spout has been seted up on the main joist, can dismantle with the tapered end through the rolling subassembly in the spout on the main joist and be connected, the rolling subassembly can be along main joist length direction reciprocating sliding in the spout, the tapered end is kept away from the one end of fixed frame and is pegged graft and has the connecting rod, be provided with fastening assembly in the tapered end, fastening assembly is used for being connected the tapered end with the connecting rod stably, the one end that the tapered end was kept away from to the connecting rod is connected with the acoustic celotex board. This application has the effect of the sound effect of inhaling that promotes the furred ceiling structure.

Description

Engineering construction furred ceiling structure is built in room
Technical Field
The application relates to the technical field of architectural decoration, in particular to a ceiling structure for building engineering construction.
Background
Present furred ceiling structure is in the family, the office, by the wide application in entertainment place etc, the structural style of furred ceiling is various, most universal furred ceiling structure is by hanging the subassembly, skeleton and ceiling are constituteed, when the construction furred ceiling structure construction furred ceiling of engineering is built in current room, adopt the frame-type to tie up the mode of connection or single ceiling hanging mode usually, though simple structure is practical, but the live time becomes the back that becomes long, because the influence of flagging gravity and tie up the position and tie up the uneven reason of exerting oneself when tying up, cause the stiff end to become flexible easily, flagging drops even, bring the potential safety hazard for working life, in the correlation technique, the construction furred ceiling structure of engineering is all the frame worn-out fur in most of rooms, can't eliminate to the noise that upstairs transmitted, direct influence is people's life rest.
In view of the above-mentioned related art, the inventors consider that there is a defect that the ceiling structure has a poor sound-absorbing effect.
SUMMERY OF THE UTILITY MODEL
In order to promote the sound absorbing effect of furred ceiling structure, this application provides a building engineering construction furred ceiling structure.
The application provides a pair of engineering construction furred ceiling structure is built in room adopts following technical scheme:
the utility model provides a building engineering construction furred ceiling structure, includes jib and fixed frame, fixed frame and jib fixed connection, main joist and fixed frame looks joint, the spout has been seted up along its length direction to the main joist, can dismantle through the rolling subassembly in the spout on the main joist and be connected with the tapered end, the rolling subassembly can be along the reciprocal slip of main joist length direction in the spout, the tapered end is kept away from the one end of fixed frame and is pegged graft there is the connecting rod, the tapered end one end is kept away from to the connecting rod and is connected with the acoustic celotex board, be provided with fastening assembly in the tapered end, fastening assembly is used for being connected the tapered end with the connecting rod stably, the one end that the tapered end was kept away from to the connecting rod is connected with the acoustic celotex board.
Through adopting the above-mentioned technical scheme, during the installation furred ceiling structure, install the jib on the ceiling earlier, keep away from the one end and the fixed frame fixed connection of ceiling with every jib again, again with main joist and fixed frame looks joint, the spout of seting up on the main joist is connected with the roll subassembly, make the roll subassembly can follow main joist length direction and remove, be connected the roll subassembly with the tapered end again, the acoustic celotex board is connected with the one end that the tapered end was kept away from to the connecting rod, tapered end and connecting rod looks plug-in connection, and fasten connecting rod and tapered end through fastening components, paste each other tightly install on the ceiling with the base of acoustic celotex board, the sound absorbing effect of furred ceiling structure has been promoted, the function of reinforcing sound insulation.
Optionally, the rolling assembly comprises a roller, a support and a screw, the roller is rotatably connected with the support, one end of the screw is fixedly connected with the support, the axis of the screw is perpendicular to the axis of the roller, and one end of the screw, which is far away from the support, is spirally connected with threads arranged on the lock head.
Through adopting above-mentioned technical scheme, gyro wheel and spout cooperate roll connection, make the gyro wheel can roll along main joist length direction in the spout and move, the gyro wheel rotates and sets up on the support, is connected with the screw rod on the support, and the support was kept away from to the screw rod one end and tapered end screwed connection for be convenient for demolish between tapered end and the screw rod, roll the subassembly simultaneously and carry out roll connection with the main joist, the subassembly of being convenient for roll drives the tapered end and removes along main joist length direction.
Optionally, the fastening assembly comprises a spring and a pressure head, a containing groove for containing the locking assembly is formed in the lock head, one end of the spring is connected with the pressure head, one end, far away from the pressure head, of the spring is connected with the bottom wall of the containing groove, and one end, far away from the spring, of the pressure head is connected with the clamping groove formed in the connecting rod in a clamped mode.
Through adopting above-mentioned technical scheme, the fastening component sets up inside the tapered end, when pegging graft the connecting rod when the tapered end is inside, the connecting rod is at the in-process that inserts the tapered end, connecting rod circumference lateral wall extrusion pressure head, pressure head extrusion spring, the connecting rod inserts the back completely, draw-in groove and pressure head looks joint on the connecting rod restrict the connecting rod and remove along the tapered end axis, make connecting rod and plug peg graft the fastening.
Optionally, the shape of one end of the pressure head, which is in contact with the connecting rod, is a circular arc cone.
Through adopting above-mentioned technical scheme, the one end of pressure head and connecting rod looks joint sets up to circular arc toper structure for in the pressure head is convenient for block goes into the draw-in groove on the connecting rod.
Optionally, a plurality of ribs are arranged on the circumferential surface of the connecting rod, the length direction of the ribs is consistent with that of the connecting rod, the ribs are uniformly distributed on the circumferential surface of the connecting rod, a slot which is spliced with the connecting rod is arranged on the lock head, and the connecting rod and the ribs are combined to form a cross section shape consistent with that of the slot.
Through adopting above-mentioned technical scheme, be provided with a plurality of ribs on the connecting rod, and the slot cross sectional shape of seting up on the cross section that rib and connecting rod combination formed and the tapered end is unanimous, and when the rib makeed the connecting rod to peg graft into the tapered end inside, the rib restriction connecting rod rotated around the tapered end axis, and the rib played the effect of grafting direction simultaneously.
Optionally, be provided with flexible magnet strip on the edge of acoustic celotex board, flexible magnet strip is used for the acoustic celotex board when installation to inhale tightly each other.
Through adopting above-mentioned technical scheme, be provided with the flexible magnet strip on the edge of acoustic celotex board, the flexible magnet strip is used for adsorbing two adjacent acoustic celotex boards and pastes tightly, promotes syllable-dividing seal.
Optionally, the one end that the tapered end was kept away from to the connecting rod is provided with the countersunk head, the countersunk hole has been seted up on the acoustic celotex board, just the countersunk hole runs through the acoustic celotex board, the countersunk hole includes the counter sink, the connecting rod is worn to establish on the countersunk hole, countersunk head and counter sink bottom surface looks butt, be provided with the annular on the counter sink inner wall, the annular is with heavy lid looks joint, heavy lid is used for sheltering from the counter sink.
By adopting the technical scheme, the hanging head is arranged at one end, away from the lock head, of the connecting rod, when the connecting rod is arranged in the countersunk hole formed in the sound insulation board in a penetrating manner, the hanging head on the connecting rod is abutted against the bottom surface of the countersunk groove in the countersunk hole, so that the sound insulation board is hung on the hanging head of the connecting rod, and the effect of hanging the sound insulation board on the connecting rod is achieved; the sinking cover is covered in the sinking groove, so that the sinking cover is clamped with the annular groove on the inner wall of the sinking groove to achieve the effect of sealing and sound insulation.
Optionally, a sealing gasket is arranged on the bottom surface of the sinking groove.
Through adopting above-mentioned technical scheme, be provided with seal ring between string head and the counter sink bottom surface for on the string head of acoustic celotex board hookup on the connecting rod, airtight sound insulation when seal ring further acoustic celotex board installation.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when installing the furred ceiling structure, install the jib on the ceiling earlier, keep away from the one end and the fixed frame fixed connection of ceiling with every jib again, again with main joist and fixed frame looks joint, the spout of seting up on the main joist is connected with the roll subassembly, make the roll subassembly can follow main joist length direction and remove, be connected the roll subassembly with the tapered end again, the acoustic celotex board is connected with the one end that the tapered end was kept away from to the connecting rod, tapered end and connecting rod looks plug-in connection, and fasten connecting rod and tapered end through fastening components, paste each other the base of acoustic celotex board and tightly install on the ceiling, the sound absorbing effect of furred ceiling structure has been promoted, strengthen syllable-dividing function.
2. The gyro wheel cooperatees roll connection with the spout, makes the gyro wheel can roll along main joist length direction in the spout and removes, and the gyro wheel rotates and sets up on the support, is connected with the screw rod on the support, and the one end and the tapered end screwed connection of support are kept away from to the screw rod for be convenient for demolish between tapered end and the screw rod, roll the subassembly simultaneously and carry out roll connection with the main joist, the subassembly of being convenient for roll drives the tapered end and removes along main joist length direction.
Drawings
FIG. 1 is the overall structure view of the ceiling structure for building construction engineering in the embodiment of the application.
Fig. 2 is an exploded view of the fixing frame and the main keel of the ceiling structure in the construction of the building engineering of the embodiment of the application.
FIG. 3 is a partial view of a rolling assembly of a ceiling structure in the construction of building projects according to an embodiment of the application.
Fig. 4 is a sectional view taken along line a-a of fig. 3.
Fig. 5 is an exploded view of a rolling assembly of a ceiling structure in construction of a building construction project according to an embodiment of the present application.
Fig. 6 is another perspective view of an exploded view of a rolling assembly of a ceiling structure for building construction according to an embodiment of the present application.
Fig. 7 is a partial view of flexible magnets at the edges of an acoustic baffle plate of a ceiling structure in the construction of a housing construction project according to an embodiment of the present application.
Description of reference numerals: 1. a boom; 2. a fixing frame; 3. a main keel; 4. a sound insulating board; 5. a lock head; 51. accommodating grooves; 52. a slot; 6. a chute; 7. rotating the block; 8. a rolling component; 81. a roller; 82. a support; 83. a screw; 9. a fastening assembly; 91. a pressure head; 92. a spring; 10. a connecting rod; 101. a rib; 11. sinking the cover; 111. clamping a head; 12. hanging a head; 13. a countersunk hole; 131. sinking a groove; 1311. a ring groove; 14. a sealing gasket; 15. a flexible magnet strip; 16. and (4) bolts.
Detailed Description
The present application is described in further detail below with reference to figures 1-7.
The embodiment of the application discloses engineering construction furred ceiling structure is built in room.
Combine fig. 1 and fig. 2, a building engineering construction furred ceiling structure includes jib 1 and fixed frame 2, main joist 3 and fixed frame 2 looks joint, 1 one end of jib is connected with expansion bolts 16, install expansion bolts 16 in the ceiling, the one end of keeping away from the ceiling on jib 1 welds with fixed frame 2 mutually, hinged joint has turning block 7 on the fixed frame 2, all set up threaded hole on turning block 7 and the fixed frame 2, and turning block 7 rotates the back, can align the threaded hole axis on turning block 7 and the fixed frame 2, also set up the screw hole of same diameter on the main joist 3, after advancing main joist 3 card into fixed frame 2, wear to establish into threaded hole with bolt 16 again, bolt 16 is with turning block 7, main joist 3 and 2 locking, play the effect that restriction main joist 3 removed.
Combine fig. 3 and fig. 4, the spout 6 has been seted up on the main joist 3, can dismantle with tapered end 5 through rolling subassembly 8 in the spout 6 on the main joist 3 and be connected, rolling subassembly 8 includes gyro wheel 81, support 82 and screw rod 83, support 82 welds with screw rod 83 one end mutually, gyro wheel 81 rotates with support 82 to be connected, gyro wheel 81 axis is mutually perpendicular with screw rod 83 axis, make gyro wheel 81 can rotate around its self axis, the screw thread screwed connection of seting up on support 82 was kept away from to screw rod 83 one end and the tapered end 5, gyro wheel 81 rolls the cooperation mutually with spout 6 and gyro wheel 81 can follow main joist 3 length direction roll movement simultaneously, gyro wheel 81 roll movement drives branch and removes, branch removes drive tapered end 5 and removes.
Combine fig. 4 and fig. 5, the one end that fixed frame 2 was kept away from to tapered end 5 is pegged graft and is had connecting rod 10, the one end that tapered end 5 was kept away from to connecting rod 10 is connected with acoustic celotex board 4, be provided with fastening assembly 9 in the tapered end 5, fastening assembly 9 is used for being connected tapered end 5 and connecting rod 10 stably, fastening assembly 9 includes spring 92 and pressure head 91, be provided with the holding tank 51 that holds locking assembly in the tapered end 5, holding tank 51 opening direction is mutually perpendicular with tapered end 5 axis, spring 92 one end welds with pressure head 91 mutually, the one end that pressure head 91 was kept away from to spring 92 welds with holding tank 51 diapire mutually, the draw-in groove looks joint of seting up on one end of keeping away from spring 92 on the pressure head 91 and the connecting rod 10, the one end shape that pressure head 91 and connecting rod 10 contacted is the circular arc toper.
With reference to fig. 5 and 6, six ribs 101 are disposed on the circumferential surface of the connecting rod 10, the length direction of the ribs 101 is consistent with the length direction of the connecting rod 10, the ribs 101 are uniformly distributed on the circumferential surface of the connecting rod 10, and the connecting rod 10 and the ribs 101 are combined to form a cross section whose shape is consistent with the cross section of the slot 52 of the lock head 5, which is inserted into the connecting rod 10.
Combine fig. 5 and fig. 6, the one end welding that tapered end 5 was kept away from to connecting rod 10 has hanging head 12, the shape of hanging head 12 is the hexagon, counter sink 13 has been seted up on acoustic celotex board 4, and counter sink 13 runs through acoustic celotex board 4, counter sink 131 has been seted up on the side that tapered end 5 was kept away from to counter sink 13, when wearing to establish connecting rod 10 on counter sink 13, hanging head 12 and counter sink 131 bottom surface looks butt, and it has seal ring 14 to bond on the counter sink 131 bottom surface, make acoustic celotex board 4 articulate on hanging head 12 on connecting rod 10. The inner wall of the sinking groove 131 is provided with a plurality of ring grooves 1311 along the circumferential surface of the inner wall, the ring grooves 1311 are uniformly distributed on the circumferential surface of the inner wall of the sinking groove 131, the ring grooves 1311 are used for being clamped with the sinking cover 11 which covers and shields the sinking hole, the sinking cover 11 is provided with a clamping head 111 which is clamped with the ring grooves 1311, and when the sinking cover 11 is covered in the sinking groove 131, the clamping head 111 is clamped with the ring grooves 1311.
Referring to fig. 7, a flexible magnet strip 15 is bonded to an edge of the sound insulation panel 4, and the flexible magnet strip 15 is used to tightly absorb the sound insulation panels 4 when the sound insulation panels 4 are mounted.
The installation process of the ceiling structure for building engineering construction in the embodiment of the application is as follows:
when the suspended ceiling structure is installed, one end of the suspender 1 is connected with the expansion bolt 16, the expansion bolt 16 is kept away from the suspender 1, one end of the suspender is welded with the fixed frame 2, the expansion bolt 16 is installed in the ceiling, and the plurality of suspenders 1 are uniformly distributed and installed on the ceiling
And then the roller 81 of the rolling component 8 is matched with the main keel 3 in a rolling way with the sliding groove 6, a plurality of rolling components 8 are distributed on one main keel 3, the lock head 5 is screwed on the screw 83 welded on the support 82, the main keel 3 is clamped with the fixed frame 2 welded on the suspender 1, after the clamping of the main keel 3 is completed, the rotating block 7 on the fixed frame 2 is rotated to be attached to the main keel 3, the main keel 3 is fastened with the fixed frame 2 and the rotating block 7 through the bolt 16, and the main keel 3 is fastened on the suspender 1.
And then bonding a sealing washer 14 on the bottom surface of the sunk groove 131, penetrating the connecting rod 10 out along the sunk hole 13, enabling the hanging head 12 to be abutted against the sealing washer 14, then inserting the connecting rod 10 into the slot 52 of the lock head 5, enabling the clamping groove on the connecting rod 10 to be clamped and fastened with the pressure head 91, enabling the connecting rod 10 to be fastened and connected with the lock head 5, and enabling the sound insulation board 4 to be hung on the connecting rod 10.
After 4 installations of acoustic celotex board are accomplished, remove acoustic celotex board 4, make gyro wheel 81 remove along 3 length direction of main joist for 3 length direction removal are also followed to acoustic celotex board 4, inhale tightly each other two adjacent acoustic celotex board 4 flexible magnet strip 15 on through 4 edges of acoustic celotex board, inhale tightly the back each other with the acoustic celotex board 4 of a plurality of quantity, finally install acoustic celotex board 4 on the ceiling, play the effect of making an uproar that falls of giving sound insulation.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a building engineering construction furred ceiling structure which characterized in that: comprises a suspender (1) and a fixed frame (2), wherein the fixed frame (2) is fixedly connected with the suspender (1), the main keel (3) is clamped with the fixing frame (2), the main keel (3) is provided with a sliding groove (6) along the length direction thereof, a lock head (5) is detachably connected in the sliding groove (6) on the main keel (3) through a rolling component (8), the rolling component (8) can slide in the sliding groove (6) in a reciprocating way along the length direction of the main keel (3), a connecting rod (10) is inserted at one end of the lock head (5) far away from the fixed frame (2), one end of the connecting rod (10) far away from the lock head (5) is connected with a sound insulation board (4), a fastening component (9) is arranged in the lock head (5), the fastening component (9) is used for stably connecting the lock head (5) with the connecting rod (10), and one end of the connecting rod (10) far away from the lock head (5) is connected with the sound insulation board (4).
2. The ceiling structure for house building engineering construction according to claim 1, wherein: the rolling assembly (8) comprises a roller (81), a support (82) and a screw rod (83), the roller (81) is rotatably connected with the support (82), one end of the screw rod (83) is fixedly connected with the support (82), the axis of the screw rod (83) is perpendicular to that of the roller (81), and one end, far away from the support (82), of the screw rod (83) is spirally connected with a thread arranged on the lock head (5).
3. The ceiling structure for house building engineering construction according to claim 1, wherein: fastening components (9) include spring (92) and pressure head (91), be provided with holding tank (51) that hold locking components in tapered end (5), spring (92) one end is connected with pressure head (91), the one end that pressure head (91) were kept away from in spring (92) is connected with holding tank (51) diapire, the draw-in groove looks joint of seting up on one end of keeping away from spring (92) on pressure head (91) and connecting rod (10).
4. The ceiling structure for house building engineering construction according to claim 3, wherein: and one end of the pressure head (91) contacted with the connecting rod (10) is in the shape of an arc cone.
5. The ceiling structure for house building engineering construction according to claim 1, wherein: the novel connecting rod is characterized in that a plurality of ribs (101) are arranged on the circumferential surface of the connecting rod (10), the length direction of the ribs (101) is consistent with that of the connecting rod (10), the ribs (101) are uniformly distributed on the circumferential surface of the connecting rod (10), a slot (52) which is connected with the connecting rod (10) in an inserting mode is formed in the lock head (5), and the connecting rod (10) and the ribs (101) are combined to form a cross section shape which is consistent with that of the slot (52).
6. The ceiling structure for house building engineering construction according to claim 1, wherein: be provided with flexible magnet strip (15) on the edge of acoustic celotex board (4), flexible magnet strip (15) are used for acoustic celotex board (4) when installation with acoustic celotex board (4) each other inhale tightly.
7. The ceiling structure for house building engineering construction according to claim 1, wherein: connecting rod (10) keep away from the one end of tapered end (5) and be provided with string head (12), counter sink (13) have been seted up on acoustic celotex board (4), just acoustic celotex board (4) are run through in counter sink (13), counter sink (13) are including counter sink (131), connecting rod (10) are worn to establish on counter sink (13), string head (12) and counter sink (131) bottom surface looks butt, be provided with annular (1311) on counter sink (131) inner wall, annular (1311) and counter sink (11) looks joint, counter sink (13111) are used for sheltering from counter sink (131).
8. The ceiling structure for house building engineering construction according to claim 7, wherein: and a sealing gasket (14) is arranged on the bottom surface of the sinking groove (131).
CN202120492085.5U 2021-03-08 2021-03-08 Engineering construction furred ceiling structure is built in room Active CN214941544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120492085.5U CN214941544U (en) 2021-03-08 2021-03-08 Engineering construction furred ceiling structure is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120492085.5U CN214941544U (en) 2021-03-08 2021-03-08 Engineering construction furred ceiling structure is built in room

Publications (1)

Publication Number Publication Date
CN214941544U true CN214941544U (en) 2021-11-30

Family

ID=79118008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120492085.5U Active CN214941544U (en) 2021-03-08 2021-03-08 Engineering construction furred ceiling structure is built in room

Country Status (1)

Country Link
CN (1) CN214941544U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263305A (en) * 2021-12-13 2022-04-01 中建五局安装工程有限公司 Suspended ceiling mounting structure, mounting equipment and construction method for dust-free workshop
CN115288351A (en) * 2022-09-05 2022-11-04 浙江省一建建设集团有限公司 Integrated mounting structure of indoor furred ceiling integration

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263305A (en) * 2021-12-13 2022-04-01 中建五局安装工程有限公司 Suspended ceiling mounting structure, mounting equipment and construction method for dust-free workshop
CN114263305B (en) * 2021-12-13 2023-09-08 中建五局安装工程有限公司 Suspended ceiling mounting structure for dust-free workshop, mounting equipment and construction method
CN115288351A (en) * 2022-09-05 2022-11-04 浙江省一建建设集团有限公司 Integrated mounting structure of indoor furred ceiling integration
CN115288351B (en) * 2022-09-05 2024-05-07 浙江省一建建设集团有限公司 Integrated mounting structure of indoor furred ceiling integration

Similar Documents

Publication Publication Date Title
CN214941544U (en) Engineering construction furred ceiling structure is built in room
CN108086569B (en) A kind of ceiling structure of stable connection
CN211172657U (en) Suspended ceiling connecting structure
CN108691385A (en) A kind of construction and decoration plug-in type ceiling structure
CN210266549U (en) Environmental monitoring device is used in building engineering construction
CN219471408U (en) Wallboard is decorated in heating of indoor building
CN208815746U (en) A kind of integrated modular furred ceiling leveling connector
CN109838059B (en) Prefabricated external wall panel and construction method thereof
CN209082798U (en) A kind of integrated modular plaster tablet suspended ceiling
CN111042425A (en) Integrated decorative suspended ceiling
CN214220092U (en) Reliably-connected assembled indoor wall
CN213498593U (en) Noise reduction device of energy-saving shot blasting machine
CN212715558U (en) GRC board articulates connection structure for curtain
CN214994941U (en) Assembled steel construction building exterior wall cladding
CN211548523U (en) Assembled building side fascia
CN212427676U (en) Concatenation formula building curtain structure convenient to installation
CN218502469U (en) Baking finish house that panel beating baking finish was used
CN218714182U (en) Waterproof curtain wall structure
CN219548091U (en) Curtain wall mounting fixing frame
CN210530053U (en) Conveniently splice building curtain wall panel
CN220394938U (en) Spliced building curtain wall structure
CN221372625U (en) Heavy hundred-grade keel suspended ceiling
CN209163329U (en) The building materials of wall decoration are hung
CN215519222U (en) Partition wall and outer curtain wall handing-over department block structure
CN220814411U (en) Curtain wall fixing device for preset installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant