CN214940054U - Prestressed high-strength concrete pipe pile connecting device - Google Patents

Prestressed high-strength concrete pipe pile connecting device Download PDF

Info

Publication number
CN214940054U
CN214940054U CN202022723821.1U CN202022723821U CN214940054U CN 214940054 U CN214940054 U CN 214940054U CN 202022723821 U CN202022723821 U CN 202022723821U CN 214940054 U CN214940054 U CN 214940054U
Authority
CN
China
Prior art keywords
connecting plate
fixedly connected
strength concrete
tubular pile
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022723821.1U
Other languages
Chinese (zh)
Inventor
黄海燕
周勇军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Dali New Building Materials Technology Co ltd
Original Assignee
Fujian Dali New Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Dali New Building Materials Technology Co ltd filed Critical Fujian Dali New Building Materials Technology Co ltd
Priority to CN202022723821.1U priority Critical patent/CN214940054U/en
Application granted granted Critical
Publication of CN214940054U publication Critical patent/CN214940054U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a prestressing force high-strength concrete tubular pile connecting device, including first connecting plate, first connecting plate upper end rotates through two first pivots and rotates respectively to be connected with the connecting rod, the supporting clamping mechanism who is used for pressing from both sides tight one of them tubular pile that is equipped with of bull stick, first connecting plate upper end fixedly connected with biax motor, the supporting slewing mechanism who rotates two connecting rods that is equipped with of biax motor, first connecting plate below is equipped with the second connecting plate, the supporting connection structure that is equipped with of first connecting plate and second connecting plate, the supporting rolling mechanism that is used for fixing a position another tubular pile that is equipped with of second connecting plate. The utility model discloses rational in infrastructure, it can be quick fix a position not unidimensional tubular pile, guarantees the accurate nature of its connection process.

Description

Prestressed high-strength concrete pipe pile connecting device
Technical Field
The utility model relates to a tubular pile technical field especially relates to a prestressing force high-strength concrete tubular pile connecting device.
Background
The prestressed concrete tubular pile can be divided into post-tensioning prestressed tubular pile and pre-tensioning prestressed tubular pile, the pre-tensioning prestressed tubular pile is a hollow cylindrical body elongated concrete prefabricated component made up by adopting pre-tensioning prestressing process and centrifugal forming method, mainly formed from cylindrical pile body, end plate and steel ferrule.
However, the installation of the tubular piles requires accurate positioning connection of the two tubular piles, the deviation of the vertical direction of the tubular piles cannot exceed 2mm, and once the deviation is too large, subsequent bolting and welding instability of the tubular piles is easily caused, so that subsequent production and processing are affected.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the high-strength concrete tubular pile connecting device of prestressing force that proposes, it can be quick fix a position not unidimensional tubular pile, guarantees the accurate nature of its connection.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a prestressing force high-strength concrete tubular pile connecting device, includes first connecting plate, first connecting plate upper end rotates through two first pivots and rotates respectively to be connected with the connecting rod, the supporting clamping mechanism who is used for pressing from both sides tight one of them tubular pile that is equipped with of bull stick, first connecting plate upper end fixedly connected with biax motor, the supporting slewing mechanism who rotates two connecting rods that is equipped with of biax motor, first connecting plate below is equipped with the second connecting plate, the supporting connection structure that is equipped with of first connecting plate and second connecting plate, the supporting rolling mechanism that is used for fixing a position another tubular pile that is equipped with of second connecting plate.
Preferably, the clamping mechanism comprises two clamping plates which are rotatably connected with the tail ends of the connecting rods, the side walls of the two clamping plates are fixedly connected with arc-shaped plates, and the inner side walls of the two arc-shaped plates are fixedly connected with rubber pads.
Preferably, slewing mechanism includes first connecting plate both ends fixed connection's baffle, two the baffle inside wall is equallyd divide and is do not rotated through two second pivots and be connected with the worm, two the worm other end all with double-shaft motor output shaft end fixed connection, the end fixed connection of first pivot has the worm wheel with worm meshing.
Preferably, the connecting structure comprises a cylinder fixedly connected below the first connecting plate, a cylinder is connected to the inner side wall of the cylinder in a sliding mode, and a bolt penetrating through the cylinder and connected with the cylinder in a threaded mode is arranged beside the cylinder.
Preferably, the rolling mechanism comprises two rotating rods which are rotatably connected with the side wall of the second connecting plate through a torsion spring, and the tail ends of the two rotating rods are rotatably connected with rod bodies.
Preferably, two gradienters are fixedly connected with the side wall of the first connecting plate.
Compared with the prior art, the utility model, its beneficial effect does:
1. the rapid clamping and positioning of one of the tubular piles are realized through the clamping mechanism, the tubular piles with different sizes can be adapted, and the rapid operation of the clamping mechanism is realized through the rotating mechanism, so that the clamping is rapid and simple.
2. The quick clamping and positioning of the other tubular pile are realized through the rolling mechanism, the stability of the installation process is ensured, the cooperative work of the rolling mechanism and the clamping mechanism is realized through the connecting structure, and the normal and stable connection is ensured.
Drawings
Fig. 1 is a schematic structural view of a prestressed high-strength concrete pipe pile connection device provided by the utility model;
fig. 2 is a schematic structural view of a clamping mechanism of a prestressed high-strength concrete pipe pile connecting device provided by the utility model;
fig. 3 is the utility model provides a prestressing force high-strength concrete tubular pile connecting device's A department enlargies the structure schematic diagram.
In the figure: the device comprises a first connecting plate 1, a second connecting plate 2, a cylinder 3, a column 4, a bolt 5, a level 6, a connecting rod 7, a clamping plate 8, an arc-shaped plate 9, a rotating rod 10, a rod 11, a worm wheel 12, a worm 13, a baffle 14 and a double-shaft motor 15.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Referring to fig. 1-3, a prestressed high-strength concrete tubular pile connecting device, including first connecting plate 1, 1 upper end of first connecting plate rotates through two first pivots and rotates respectively and is connected with connecting rod 7, the supporting clamping mechanism who is used for pressing from both sides tight one of them tubular pile that is equipped with of connecting rod 7, clamping mechanism includes the clamp plate 8 that two connecting rod 7 end rotation are connected, the equal fixedly connected with arc 9 of two clamp plate 8 lateral walls, the equal fixedly connected with rubber pad of two arc 9 inside walls, through clamping mechanism realized the tight location of the quick clamp to one of them tubular pile to can adapt to not unidimensional tubular pile.
1 upper end fixedly connected with double-shaft motor 15 of first connecting plate, double-shaft motor 15 is supporting to be equipped with the slewing mechanism who rotates two connecting rods 7, slewing mechanism includes 1 both ends fixed connection's of first connecting plate baffle 14, two 14 inside walls of baffle are equallyd divide and are do not rotated through two second pivots and be connected with worm 13, two 13 other ends of worm all with the terminal fixed connection of 15 output shafts of double-shaft motor, the terminal fixedly connected with of first pivot and the worm wheel 12 of worm 13 meshing, realized the fast operation to pressing from both sides tight mechanism through slewing mechanism, make to press from both sides tightly simple more fast.
1 below of first connecting plate is equipped with second connecting plate 2, and first connecting plate 1 and the supporting connection structure that is equipped with of second connecting plate 2, connection structure include 1 below fixed connection's of first connecting plate drum 3, and 3 inside wall sliding connection of drum have a cylinder 4, and cylinder 4 is equipped with on one side run through drum 3 and with 4 threaded connection's of cylinder bolt 5, has realized the collaborative work to rolling mechanism and clamping mechanism through connection structure, has guaranteed its normal stable connection.
The supporting rolling mechanism that is used for fixing a position another tubular pile that is equipped with of second connecting plate 2, rolling mechanism includes that 2 lateral walls of second connecting plate rotate two bull sticks 10 of connecting through torsion spring, two bull sticks 10 end are all rotated and are connected with the rod body 11, 1 lateral wall fixedly connected with of first connecting plate two spirit levels 6, realized pressing from both sides tight location fast to another tubular pile through rolling mechanism, the stability of its installation has been guaranteed, whether align through spirit level 6 observation two tubular piles.
When the utility model is used, when the tubular pile is needed to be connected, the side wall of the first connecting plate 1 is abutted against the outer wall of the tubular pile, the double-shaft motor 15 is started, the two worms 13 are respectively driven by the rotation of the double-shaft motor 15 to rotate, the connecting rod 7 drives the clamping plate 8 which is rotatably connected to rotate inwards, the clamping plate 8 abuts against the arc-shaped plate 9 at the tail end against the side wall, the rubber pad on the inner side wall of the arc-shaped plate 9 ensures the stability of the clamping, the two rotating rods 10 are pulled open at the moment, the second connecting plate 2 abuts against the outer wall of the other tubular pile, the rotating rods 10 are loosened, the two rod bodies 11 abut against the side wall of the tubular pile, the clamping and the positioning of the other tubular pile are completed, at the moment, whether the two tubular piles are aligned or not is observed by only the two gradienters 6 on the side wall of the first connecting plate 1, thereby realizing the stable connection of the tubular pile, the existence of the bolt 5 enables the distance between the first connecting plate 1 and the second connecting plate 2 to be adjustable, so that the whole device can adapt to different tubular piles.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a prestressing force high-strength concrete tubular pile connecting device, includes first connecting plate (1), its characterized in that, first connecting plate (1) upper end rotates through two first pivots and rotates respectively to be connected with connecting rod (7), connecting rod (7) are supporting to be equipped with and are used for pressing from both sides the clamping mechanism who presss from both sides tight one of them tubular pile, first connecting plate (1) upper end fixedly connected with biax motor (15), biax motor (15) are supporting to be equipped with the slewing mechanism who rotates two connecting rods (7), first connecting plate (1) below is equipped with second connecting plate (2), first connecting plate (1) and second connecting plate (2) are supporting to be equipped with connection structure, second connecting plate (2) are supporting to be equipped with the roll mechanism that is used for fixing a position another tubular pile.
2. The prestressed high-strength concrete pipe pile connecting device according to claim 1, wherein the clamping mechanism comprises two clamping plates (8) rotatably connected with the ends of the connecting rods (7), the side walls of the two clamping plates (8) are fixedly connected with arc-shaped plates (9), and the inner side walls of the two arc-shaped plates (9) are fixedly connected with rubber pads.
3. The prestressed high-strength concrete pipe pile connecting device according to claim 1, wherein the rotating mechanism comprises baffle plates (14) fixedly connected with two ends of the first connecting plate (1), two baffle plates (14) are divided into two inner side walls which are respectively connected with a worm (13) in a rotating mode through two second rotating shafts, the other ends of the worms (13) are fixedly connected with the tail ends of output shafts of the double-shaft motor (15), and the tail ends of the first rotating shafts are fixedly connected with worm wheels (12) meshed with the worms (13).
4. The prestressed high-strength concrete pipe pile connecting device according to claim 1, wherein the connecting structure comprises a cylinder (3) fixedly connected below the first connecting plate (1), a cylinder (4) is slidably connected to the inner side wall of the cylinder (3), and a bolt (5) penetrating through the cylinder (3) and in threaded connection with the cylinder (4) is arranged beside the cylinder (4).
5. The prestressed high-strength concrete pipe pile connecting device according to claim 1, wherein the rolling mechanism comprises two rotating rods (10) rotatably connected to the side walls of the second connecting plate (2) through torsion springs, and rod bodies (11) are rotatably connected to the tail ends of the two rotating rods (10).
6. The prestressed high-strength concrete pipe pile connecting device according to claim 1, wherein two levels (6) are fixedly connected to the side wall of the first connecting plate (1).
CN202022723821.1U 2020-11-23 2020-11-23 Prestressed high-strength concrete pipe pile connecting device Active CN214940054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022723821.1U CN214940054U (en) 2020-11-23 2020-11-23 Prestressed high-strength concrete pipe pile connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022723821.1U CN214940054U (en) 2020-11-23 2020-11-23 Prestressed high-strength concrete pipe pile connecting device

Publications (1)

Publication Number Publication Date
CN214940054U true CN214940054U (en) 2021-11-30

Family

ID=79035450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022723821.1U Active CN214940054U (en) 2020-11-23 2020-11-23 Prestressed high-strength concrete pipe pile connecting device

Country Status (1)

Country Link
CN (1) CN214940054U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382291A (en) * 2022-02-23 2022-04-22 彭茹新 Concrete pouring conduit segmentation unscrewing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382291A (en) * 2022-02-23 2022-04-22 彭茹新 Concrete pouring conduit segmentation unscrewing device
CN114382291B (en) * 2022-02-23 2024-03-19 广东尚博特新材料科技有限公司 Sectional unscrewing device for concrete pouring conduit

Similar Documents

Publication Publication Date Title
CN214940054U (en) Prestressed high-strength concrete pipe pile connecting device
CN210789463U (en) Cutting device for steel structure engineering
CN211553553U (en) Building detects uses material fixing device
CN107401192A (en) For vertically underpining load transfer device after the blocking of prestressing force circle concrete tubular pile
CN117444006A (en) Plate bending machine device based on roller diameter adjustment and use method
CN205243009U (en) Ribbed steel bar formwork support is to drawing fastening tool
CN113737791B (en) Eccentric moment adjustable hydraulic vibration pile hammer
CN212191044U (en) Bridge pouring steel reinforcement cage supporting and tightening frame
CN215168203U (en) Temporary reinforcing device for hoisting steel truss
CN210212495U (en) Clamping device for pipeline transportation
CN211589091U (en) Welding fixing device is used in H shaped steel production
CN113833950A (en) Automatic point taking device of resiliometer
CN215828221U (en) Tower crane attaches wall spare mounting structure
CN113622663B (en) Construction template connecting device for constructional engineering
CN220049839U (en) Building reinforcing steel bar material bending device
CN218090990U (en) Quality detection device based on all-round high-pressure injection worker method reinforcing pile
CN213135633U (en) Device for aligning welding among prestressed pipe piles
CN216340099U (en) Steel structure supporting upright post for assembly type building
CN216839426U (en) Municipal works are with pile device with strong stability
CN218779973U (en) Half grout sleeve clamping device
CN113718770A (en) Prestressed pipe pile cutting device
CN221167854U (en) Adjustable internal support device for foundation pit supporting construction
CN220928718U (en) Quick-release frame formwork support system
CN211101285U (en) Reinforcing bar device of flare-outing for building
CN112983746B (en) Steel tower cylinder auxiliary mounting device of wind driven generator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant