CN214939986U - High-speed construction is with soil subsidence survey and drawing protector with safeguard function - Google Patents

High-speed construction is with soil subsidence survey and drawing protector with safeguard function Download PDF

Info

Publication number
CN214939986U
CN214939986U CN202121166763.5U CN202121166763U CN214939986U CN 214939986 U CN214939986 U CN 214939986U CN 202121166763 U CN202121166763 U CN 202121166763U CN 214939986 U CN214939986 U CN 214939986U
Authority
CN
China
Prior art keywords
fixed
top cover
buffer
pile body
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121166763.5U
Other languages
Chinese (zh)
Inventor
白杰
李岩
张春辉
郭李
李世武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Hengnuosituo Surveying And Mapping Co ltd
Original Assignee
Guizhou Hengnuosituo Surveying And Mapping Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Hengnuosituo Surveying And Mapping Co ltd filed Critical Guizhou Hengnuosituo Surveying And Mapping Co ltd
Priority to CN202121166763.5U priority Critical patent/CN214939986U/en
Application granted granted Critical
Publication of CN214939986U publication Critical patent/CN214939986U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vibration Dampers (AREA)

Abstract

The utility model provides a high-speed building is with land subsidence survey and drawing protector with safeguard function. High-speed building with safeguard function subsides survey and drawing protector with soil includes: a settlement measuring pile body; the protection device is arranged outside the sedimentation measurement pile body and comprises a top cover, a bottom ferrule and a fixed shaft for connecting the top cover and the bottom ferrule, and a buffer sleeve is rotatably connected to the outer surface of the fixed shaft; and the buffer device is fixed on one side of the fixed shaft. The utility model provides a high-speed building is with soil subsidence survey and drawing protector with safeguard function sets up protector through the outside at the settlement measurement pile body and protects to elasticity through cushion sleeve self, and cushion sleeve's rotation unloads the power when the vehicle strikes cushion sleeve's the outside, avoids the vehicle directly to hit to the settlement measurement pile body, provides the safety protection ability.

Description

High-speed construction is with soil subsidence survey and drawing protector with safeguard function
Technical Field
The utility model relates to a subside survey and drawing technical field, especially relate to a high-speed construction is subsided with soil and is surveyed protection device with safeguard function.
Background
The settlement is the influence of the ground foundation soil under the continuous action of heavy pressure and low load generated by excessive underground water pumping, solid mineral mining, petroleum (natural gas) mining, brine pumping, buildings or roads and the like because of vertical deformation or settlement caused by compression under the action of building load, and ground settlement can be caused by underground construction and the like.
At present, when settlement observation is carried out, a settlement measuring pile body is basically set, then whether a building collapses or inclines or not is measured through the settlement measuring pile body, and the settlement measuring pile body needs to be set for measurement when an expressway is built so as to cause problems in time.
In the prior art, in order to measure the settlement of the expressway, the settlement measuring pile body is usually installed at a short distance from the expressway, and if the settlement measuring pile body is impacted out of control in the process of vehicle travel, huge impact force is generated, so that the vehicle is excessively damaged, and the settlement measuring pile body is damaged.
Therefore, there is a need to provide a land subsidence surveying and mapping protection device with protection function for high-speed construction to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a high-speed building is with land subsidence survey and drawing protector with safeguard function has solved if the process at the vehicle stroke is out of control and has collided the problem that subside measurement pile body can produce huge impact force.
In order to solve the technical problem, the utility model provides a high-speed building with land subsides survey and drawing protector with safeguard function includes: a settlement measuring pile body;
the protection device is arranged outside the sedimentation measurement pile body and comprises a top cover, a bottom ferrule and a fixed shaft for connecting the top cover and the bottom ferrule, and a buffer sleeve is rotatably connected to the outer surface of the fixed shaft;
the buffer device is fixed on one side of the fixed shaft and comprises a plurality of buffer springs, and one end of each buffer spring is fixedly connected with a buffer arc plate;
the top of the fixed shaft is fixed to the bottom of the top cover, the bottom of the fixed shaft is fixed to the outer portion of the bottom ferrule, the fixed shaft is used for supporting the top cover, and the top cover, the bottom ferrule and the fixed shaft are all made of steel.
Preferably, a plurality of fixed shafts are arranged between the top cover and the bottom ferrule, the fixed shafts are arranged in a ring shape, and the sedimentation measurement pile body penetrates through the bottom ferrule and is located in the center of the fixed shafts.
Preferably, the length of the fixed shaft is 80cm, and the length of all the fixed shafts arranged between the top cover and the bottom ferrule is kept consistent.
Preferably, the springs are uniformly fixed on one side of the fixed shaft, and the buffer arc plate is attached to the inner surface of the buffer sleeve.
Preferably, a fixed outer ring for fixing the bottom ferrule is arranged on the ground on the outer side of the settlement measuring pile body, a bolt is arranged on the fixed outer ring, and the bolt is used for penetrating through the fixed outer ring to fix the fixed outer ring and the bottom ferrule together.
Preferably, the anti-smashing device is fixed to the top of the top cover and comprises a fixed sleeve, a compression spring is fixedly connected to the bottom of the inner wall of the fixed sleeve, a movable rod is fixedly connected to the top of the compression spring, and the anti-smashing top cover is fixedly connected to the top of the movable rod.
Preferably, the fixed sleeve is fixed on the top of the top cover, and the top of the movable rod is located outside the fixed sleeve.
The top of the anti-smashing top cover is designed into a curved surface.
Compared with the prior art, the utility model provides a high-speed building with land subsides survey and drawing protector with safeguard function has following beneficial effect:
the utility model provides a high-speed construction is with soil settlement survey and drawing protector with safeguard function, set up protector through the outside of subsiding the measurement pile body and protect, and elasticity through cushion sleeve self, and cushion sleeve's rotation unloads power when the vehicle strikes cushion sleeve's the outside, avoid the vehicle directly to hit to the settlement measurement pile body, reduce the vehicle and subside the impact between the measurement pile body, the safety protection ability is provided, when striking cushion sleeve through the vehicle, can further reduce the impact force that cushion sleeve received through buffer spring, promote protector's safety protection ability.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of a land subsidence surveying and mapping protection device with a protection function for high-speed construction provided by the utility model;
FIG. 2 is a schematic view of the interior of the cushion sleeve of FIG. 1;
FIG. 3 is a schematic view of the overall structure of the shielding device of FIG. 1;
fig. 4 is a schematic structural diagram of a second embodiment of the land subsidence surveying and mapping protection device for high-speed construction, which has a protection function and is provided by the present invention;
fig. 5 is a schematic structural view of the part of the anti-pound device shown in fig. 4.
Reference numbers in the figures:
1. a settlement measuring pile body;
2. the protection device comprises a protection device 21, a top cover 22, a bottom ferrule 23, a fixed shaft 24 and a buffer sleeve;
3. the buffer device 31, the buffer spring 32 and the buffer arc plate;
4. a fixed outer ring, 5, a bolt;
6. the anti-smashing device comprises a 61 anti-smashing device body, a fixed sleeve, 62, a compression spring, 63, a movable rod, 64 and an anti-smashing top cover.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
First embodiment
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural diagram of a first embodiment of a high-speed construction land subsidence surveying and mapping protection device with a protection function according to the present invention; FIG. 2 is a schematic view of the interior of the cushion sleeve of FIG. 1; fig. 3 is a schematic view of the overall structure of the protection device of fig. 1. High-speed construction with safeguard function subsides survey and drawing protector and includes: a settlement measuring pile body 1;
the protection device 2 is arranged outside the sedimentation measurement pile body 1, the protection device 2 comprises a top cover 21, a bottom ferrule 22 and a fixed shaft 23 for connecting the top cover 21 and the bottom ferrule 22, and a buffer sleeve 24 is rotatably connected to the outer surface of the fixed shaft 23;
the buffer device 3 is fixed on one side of the fixed shaft 23, the buffer device 3 comprises a plurality of buffer springs 31, and one end of each buffer spring 31 is fixedly connected with a buffer arc plate 32;
the top of the fixed shaft 23 is fixed at the bottom of the top cover 21, the bottom of the fixed shaft 23 is fixed at the outside of the bottom ferrule 22, the fixed shaft 23 is used for providing support for the top cover 21, and the top cover 21, the bottom ferrule 22 and the fixed shaft 23 are all made of steel.
The bottom of the settlement measuring pile body 1 is buried under the ground, the inner side of the buffering sleeve 24 is made of steel, and the outer side of the buffering sleeve 24 is coated with a layer of elastic rubber, so that the generated impact force is reduced when objects impact the outer side of the buffering sleeve 24.
A plurality of fixed shafts 23 are arranged between the top cover 21 and the bottom ferrule 22, the plurality of fixed shafts 23 are arranged in a ring shape, and the sedimentation measurement pile body 1 passes through the bottom ferrule 22 and is positioned at the central position of the plurality of fixed shafts 23.
The distance between any adjacent two of the fixed shafts 23 is equal.
The length of the fixed shaft 23 is 80cm, and the length of all the fixed shafts 23 arranged between the top cover 21 and the bottom ferrule 22 is kept consistent.
The length of the fixing shaft 23 may be 60cm, 90cm, or the like, and may be selected according to actual needs, and the diameter of the fixing shaft 23 may be customized.
The springs 31 are uniformly fixed on one side of the fixed shaft 23, and the buffer arc plate 32 is attached to the inner surface of the buffer sleeve 24.
The outer surface of the buffer arc plate 32 and the inner surface of the buffer sleeve 24 are in arc conformity, so that the buffer arc plate 32 and the buffer sleeve 24 are in buffer fit.
A fixed outer ring 4 used for fixing the bottom ferrule 22 is arranged on the ground on the outer side of the settlement measurement pile body 1, a bolt 5 is arranged on the fixed outer ring 4, and the bolt 5 is used for penetrating through the fixed outer ring 4 to fix the fixed outer ring 4 and the bottom ferrule 22 together.
The fixed outer ring 4 and the bottom ferrule 22 are fixed together by using the bolt 5, so that the protection device 2 is always sleeved outside the settlement measuring pile body 1, and meanwhile, after the bolt 5 is taken down, the protection device 2 can be taken down from the settlement measuring pile body 1.
The utility model provides a high-speed building with soil subsides survey and drawing protector with safeguard function's theory of operation as follows:
by sleeving the protection device 2 on the outer side of the settlement measuring pile body 1, when a vehicle collides against the settlement measuring pile body 1, the vehicle can firstly contact with the buffer sleeve 24 and drive the buffer sleeve 24 to rotate, the impact force of a part of the vehicle is removed through the rotation of the buffer sleeve 24, the vehicle is prevented from being out of control and directly colliding against the settlement measuring pile body 1, and the safety protection capability of the settlement measuring pile body 1 is improved;
when a vehicle collides against the buffer sleeve 24, the buffer sleeve 24 is pressed and the buffer arc plate 32 is pressed by the buffer sleeve 24, the buffer arc plate 32 transmits the pressure to the buffer spring 31, and the buffer spring 31 buffers the vehicle, so that the impact force of the vehicle on the buffer sleeve 24 is reduced, and the safety protection capability of the settlement measuring pile body 1 is further improved.
Compared with the prior art, the utility model provides a high-speed building with land subsides survey and drawing protector with safeguard function has following beneficial effect:
protection is carried out by arranging the protection device 2 outside the settlement measuring pile body 1, the elasticity of the buffer sleeve 24 is utilized, the rotation of the buffer sleeve 24 is used for unloading force when the vehicle collides with the outside of the buffer sleeve 24, the direct collision of the vehicle to the settlement measuring pile body 1 is avoided, the impact force between the vehicle and the settlement measuring pile body 1 is reduced, the safety protection capability is provided, when the vehicle collides with the buffer sleeve 24, the impact force received by the buffer sleeve 24 can be further reduced through the buffer spring 31, and the safety protection capability of the protection device 2 is improved.
Second embodiment
Referring to fig. 4 and 5, based on the first embodiment of the present application, a high-speed construction land subsidence surveying and mapping protection device with a protection function is provided, and a second embodiment of the present application provides another high-speed construction land subsidence surveying and mapping protection device with a protection function. The second embodiment is only the preferred mode of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the difference that the high-speed building that provides subsides survey and drawing protector with safeguard function subsides with soil that the second embodiment of this application provided lies in, the high-speed building that has safeguard function subsides survey and drawing protector with soil still includes prevents pounding device 6, prevent pounding device 6 and be fixed in the top of top cap 21, prevent pounding device 6 and include fixed sleeve 61, the bottom fixedly connected with pressurized spring 62 of fixed sleeve 61 inner wall, pressurized spring 62's top fixedly connected with movable rod 63, movable rod 63's top fixedly connected with prevents pounding top cap 64.
The fixing sleeve 61 may be fixed to the top of the top cover 21 by welding.
The fixed sleeve 61 is fixed on the top of the top cover 21, and the top of the movable rod 63 is located outside the fixed sleeve 61.
By the cooperation of the movable rod 63 and the fixed sleeve 61, it can be ensured that the movable rod 63 can only move in the vertical direction.
The top of the anti-smashing top cover 64 is designed into a curved surface.
When the rainwater falls on the smash-proof top cover 64, the rainwater can slide off the smash-proof top cover 64.
The utility model provides a high-speed building with soil subsides survey and drawing protector with safeguard function's theory of operation as follows:
when falling object falls down, can pound prevent pounding on the top cap 64 to pushing down prevents pounding top cap 64, prevent pounding top cap 64 and push down compression spring 62 through movable rod 63, carry out the resistance to compression through compression spring 62, promote the compressive capacity who prevents pounding top cap 64.
Compared with the prior art, the utility model provides a high-speed building with land subsides survey and drawing protector with safeguard function has following beneficial effect:
the top of the top cover 21 is provided with the anti-smashing top cover 64 for pressure resistance protection, so that objects falling from the high air or broken rocks at the mountain edge are prevented from falling onto the protection device 2, and the protection device 2 is prevented from being damaged and deformed by being pressed from the upper side.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a subside survey and drawing protector with safeguard function with land for high-speed construction which characterized in that includes:
a settlement measuring pile body;
the protection device is arranged outside the sedimentation measurement pile body and comprises a top cover, a bottom ferrule and a fixed shaft for connecting the top cover and the bottom ferrule, and a buffer sleeve is rotatably connected to the outer surface of the fixed shaft;
the buffer device is fixed on one side of the fixed shaft and comprises a plurality of buffer springs, and one end of each buffer spring is fixedly connected with a buffer arc plate;
the top of the fixed shaft is fixed to the bottom of the top cover, the bottom of the fixed shaft is fixed to the outer portion of the bottom ferrule, the fixed shaft is used for supporting the top cover, and the top cover, the bottom ferrule and the fixed shaft are all made of steel.
2. A land subsidence survey and protection device with protection function for high-speed construction according to claim 1, wherein a plurality of fixing shafts are arranged between the top cover and the bottom ring, the plurality of fixing shafts are arranged in a ring shape, and the subsidence measuring pile body passes through the bottom ring and is located at the central position of the plurality of fixing shafts.
3. The ground subsidence surveying and mapping protector with protection function for high-speed construction according to claim 1, wherein the length of the fixing shaft is 80cm, and the length of all fixing shafts disposed between the top cover and the bottom collar is kept uniform.
4. The earth subsidence surveying and mapping protector with protective function for high-speed construction according to claim 1, wherein a plurality of the springs are uniformly fixed on one side of the fixed shaft, and the buffer arc plate is attached to the inner surface of the buffer sleeve.
5. The high-speed land subsidence surveying and mapping protective device with protective function as claimed in claim 4, wherein a fixed outer ring for fixing the bottom ring is arranged on the ground outside the subsidence measuring pile body, and a bolt is arranged on the fixed outer ring and is used for fixing the fixed outer ring and the bottom ring together by penetrating through the fixed outer ring.
6. The land subsidence surveying and mapping protection device with the protection function for high-speed construction according to claim 1, further comprising a smashing prevention device, wherein the smashing prevention device is fixed on the top of the top cover, the smashing prevention device comprises a fixed sleeve, a compression spring is fixedly connected to the bottom of the inner wall of the fixed sleeve, a movable rod is fixedly connected to the top of the compression spring, and a smashing prevention top cover is fixedly connected to the top of the movable rod.
7. The land subsidence surveying and mapping protector with protection function for high-speed construction according to claim 6, wherein the fixed sleeve is fixed on the top of the top cover, and the top of the movable rod is located outside the fixed sleeve.
8. The land subsidence surveying and mapping protector with protection function for high-speed construction according to claim 7, wherein the top of the anti-smashing top cover is designed to be a curved surface.
CN202121166763.5U 2021-05-28 2021-05-28 High-speed construction is with soil subsidence survey and drawing protector with safeguard function Expired - Fee Related CN214939986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121166763.5U CN214939986U (en) 2021-05-28 2021-05-28 High-speed construction is with soil subsidence survey and drawing protector with safeguard function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121166763.5U CN214939986U (en) 2021-05-28 2021-05-28 High-speed construction is with soil subsidence survey and drawing protector with safeguard function

Publications (1)

Publication Number Publication Date
CN214939986U true CN214939986U (en) 2021-11-30

Family

ID=79060167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121166763.5U Expired - Fee Related CN214939986U (en) 2021-05-28 2021-05-28 High-speed construction is with soil subsidence survey and drawing protector with safeguard function

Country Status (1)

Country Link
CN (1) CN214939986U (en)

Similar Documents

Publication Publication Date Title
KR101064655B1 (en) Excitation device and downhole seismic test method using it
Palmeira et al. Protection of buried pipes against accidental damage using geosynthetics
Vannucchi et al. Soil liquefaction phenomena observed in recent seismic events in Emilia-Romagna Region, Italy
CN214939986U (en) High-speed construction is with soil subsidence survey and drawing protector with safeguard function
Zhang et al. Reliability analysis of seismic stability of shield tunnel face under multiple correlated failure modes
CN102644265A (en) Rammer and method for tamping subgrade
Hussein et al. Dynamics of pile driving as a function of ram drop height
CN205280054U (en) Telescopic settlement monitoring point device
KR100641677B1 (en) Safety diagnosis apparatus of well boxbasis for bridge
CN211038650U (en) Prevent that rock fall strikes tunnel lining structure
CN214842823U (en) Collaborative device for intercepting blasting flyrock and slowing down vibration
CN114880826B (en) Method for judging instability failure mode of high-strength pile composite foundation under embankment
CN104746522B (en) A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system
CN209816961U (en) Floating connecting device of hydraulic hammer
de Silva et al. Estimation of the ground shaking from the response of rigid bodies
Beim et al. Dynamic testing of enlarged base Franki piles
Jing et al. Analysis and numerical simulation on dynamic response of buried pipeline caused by rock fall impaction
Li et al. Research on Application of Lattice Anchor System Design and Construction Monitoring in Slope Protection
Asadollahi Pajouh et al. Full scale crash test on a group of piles in clay
Jaksa et al. Ground vibrations associated with installing enlarged-base driven cast-in-situ piles
CN216523454U (en) Explosion-proof equipment for detecting detonator
CN216474921U (en) Mechanical property parameter measuring equipment for saturated soil foundation
Li et al. Simulation analysis on seismic damage and isolation measures of high-piled piers
Seidel et al. The instantaneous liquefaction of silty soils during installation of displacement piles
Bustamante et al. Comparative study on the load bearing capacity of driven steel H piles in a layered marl

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211130