CN214935452U - Wind-proof device for port logistics - Google Patents

Wind-proof device for port logistics Download PDF

Info

Publication number
CN214935452U
CN214935452U CN202022661387.9U CN202022661387U CN214935452U CN 214935452 U CN214935452 U CN 214935452U CN 202022661387 U CN202022661387 U CN 202022661387U CN 214935452 U CN214935452 U CN 214935452U
Authority
CN
China
Prior art keywords
lock sleeve
connection lock
wall
notch
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022661387.9U
Other languages
Chinese (zh)
Inventor
徐晓宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Zhongze Machinery Technology Co ltd
Original Assignee
Xuzhou Zhongze Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Zhongze Machinery Technology Co ltd filed Critical Xuzhou Zhongze Machinery Technology Co ltd
Priority to CN202022661387.9U priority Critical patent/CN214935452U/en
Application granted granted Critical
Publication of CN214935452U publication Critical patent/CN214935452U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a technical field is prevent wind in harbour commodity circulation, specifically is a safety device against wind that harbour commodity circulation was used, including the installation ground, the notch has been seted up to the inside of installation ground, and the inside fixed mounting of notch has pre-buried work piece, the top intermediate position department fixed mounting of pre-buried work piece has the installation piece, the top of installation piece is provided with first connection lock sleeve, the outer wall of first connection lock sleeve has cup jointed the second and has connected the lock sleeve. The utility model discloses a be provided with bracing piece and pressure spring, when first connection lock sleeve and second connection lock sleeve stretch, can make pressure spring cushion between first connection lock sleeve and the second connection lock sleeve, and then slow down the pressurized between first connection lock sleeve and the second connection lock sleeve, thereby avoid first connection lock sleeve and second connection lock sleeve to take place cracked condition after long-time the use, make the life of first connection lock sleeve and second connection lock sleeve more of a specified duration, and then make the effect of preventing wind of hoist better.

Description

Wind-proof device for port logistics
Technical Field
The utility model relates to a technical field is prevent wind in harbour commodity circulation specifically is a safety device against wind that harbour commodity circulation was used.
Background
In order to adapt to the trend of large-scale development of freight ships and improve the loading and unloading efficiency of the freight ships, port cranes are continuously developed in a large-scale direction, the gravity center of the port cranes is improved due to the large-scale cranes, the windward area is increased, and the possibility of suffering wind disasters is increased. In recent years, a large-scale crane in a port has a wind disaster accident caused by the attack of typhoons or hurricanes, and once the accident occurs, the production order of the wharf is directly influenced, and related enterprises suffer great economic loss and even casualties are caused.
Usually all fix large crane through article such as cable, avoid causing the condition of empting when external wind-force invades and attacks, but current cable structure is comparatively simple, and when wind-force is great, the ring between the cable can extrude each other, and in the in-process of long-time extrusion, the easy condition of breaking takes place for the cable, and it is comparatively inconvenient to use, consequently needs a wind-proof device that harbour commodity circulation was used to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a safety device against wind that harbour commodity circulation was used to solve the iron cable structure that proposes in the above-mentioned background art comparatively simple, when wind-force is great, the ring between the iron cable can extrude each other, at long-time extruded in-process, the easy cracked problem of taking place of iron cable.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a safety device against wind that harbour commodity circulation was used, includes the installation ground, the notch has been seted up to the inside of installation ground, and the inside fixed mounting of notch has pre-buried work piece, the top intermediate position department fixed mounting of pre-buried work piece has the installation piece, the top of installation piece is provided with first connection lock sleeve, the outer wall of first connection lock sleeve has cup jointed the second and has connected the lock sleeve, the inside fixed mounting of first connection lock sleeve has the bracing piece, the hole has all been seted up at the both ends of lock sleeve is connected to the second, the lock sleeve cup joints the outer wall at the bracing piece is connected to the second, pressure spring has been cup jointed to the outer wall of bracing piece, and pressure spring is located the inner wall that the lock sleeve is connected to the second.
Preferably, the top fixed mounting of pre-buried work piece has the dwang, vertical notch has been seted up to the inner wall of pre-buried work piece, and the dwang extends to the inside of notch, the bottom fixed mounting of dwang has first threaded rod, first inserted bar has been cup jointed to the outer wall of first threaded rod.
Preferably, the outer wall fixed mounting of dwang has first gear, horizontal notch has been seted up to the inner wall of pre-buried work piece, the inside fixed mounting of notch has the second threaded rod, the second threaded rod is close to the position department fixed mounting of first gear and has the second gear, second gear and first gear intermeshing, the outer wall of second gear has cup jointed the second inserted bar.
Preferably, the top of dwang is provided with the circular block, and the outer wall of circular block is provided with the thread groove, the circular block is located the upper surface of pre-buried work piece.
Preferably, the outer walls of the first embedded rod and the second embedded rod are fixedly provided with convex blocks, sliding grooves are formed in the two sides of the groove opening in the embedded workpiece, and the convex blocks are inserted in the sliding grooves.
Preferably, the outer wall of the second threaded rod is sleeved with a cross rod, and the cross rod is positioned inside a transverse notch in the embedded workpiece.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device is provided with bracing piece and pressure spring, when first connection lock sleeve and second connection lock sleeve stretch, can make pressure spring cushion between first connection lock sleeve and the second connection lock sleeve, and then slow down the pressurized between first connection lock sleeve and the second connection lock sleeve, thereby avoid first connection lock sleeve and second connection lock sleeve to take place cracked condition after long-time the use, make the life of first connection lock sleeve and second connection lock sleeve more of a specified duration, and then make the windproof effect of hoist better.
2. The device is provided with first pole and the second of inlaying and inlays the pole, rotate the dwang and can make first pole and the second of inlaying inlay the pole and remove, and then make first pole and the second of inlaying inlay the pole and extend to both sides to imbed into the inside of installation ground, stability when can increasing pre-buried workpiece setting, avoid wind-force great to cause pre-buried work piece to take place to empty and the condition that breaks away from, make pre-buried work piece's bearing nature better, and then make the wind-resistant of first connection lock sleeve and second connection lock sleeve better.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic side view of a cross-sectional structure of the first connecting sleeve of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 1;
fig. 4 is a schematic top view of the cross-sectional structure of the present invention.
In the figure: 1. installing a foundation; 2. pre-burying a workpiece; 3. mounting blocks; 4. a first connecting lock sleeve; 5. a second connecting lock sleeve; 6. a support bar; 7. a pressure spring; 8. rotating the rod; 9. a first gear; 10. a first threaded rod; 11. a first embedded rod; 12. a second gear; 13. a second threaded rod; 14. a second embedded rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment:
the utility model provides a safety device against wind that harbour commodity circulation was used, including installation ground 1, the notch has been seted up to the inside of installation ground 1, and the inside fixed mounting of notch has pre-buried work piece 2, the top intermediate position department fixed mounting of pre-buried work piece 2 has installation piece 3, the top of installation piece 3 is provided with first connection lock sleeve 4, the outer wall of first connection lock sleeve 4 has cup jointed the second and has connected lock sleeve 5, the inside fixed mounting of first connection lock sleeve 4 has bracing piece 6, the hole has all been seted up at the both ends of lock sleeve 5 is connected to the second, lock sleeve 5 cup joints the outer wall at bracing piece 6 is connected to the second, pressure spring 7 has been cup jointed to the outer wall of bracing piece 6, and pressure spring 7 is located the inner wall that lock sleeve 5 is connected to the second.
Further, the top fixed mounting of pre-buried work piece 2 has dwang 8, vertical notch has been seted up to pre-buried work piece 2's inner wall, and dwang 8 extends to the inside of notch, the bottom fixed mounting of dwang 8 has first threaded rod 10, first inserted bar 11 has been cup jointed to the outer wall of first threaded rod 10, dwang 8 rotates, and then make dwang 8 drive first threaded rod 10 and rotate, first threaded rod 10 drives first inserted bar 11 through helicitic texture and removes afterwards, can make first inserted bar 11 imbed the inside of installation ground 1, and then increase the stability between installation ground 1 and the pre-buried work piece 2, high durability and convenient use.
Further, a first gear 9 is fixedly installed on the outer wall of the rotating rod 8, a transverse notch is formed in the inner wall of the embedded workpiece 2, a second threaded rod 13 is fixedly installed inside the notch, a second gear 12 is fixedly installed at a position, close to the first gear 9, of the second threaded rod 13, the second gear 12 is meshed with the first gear 9, a second embedded rod 14 is sleeved on the outer wall of the second gear 12, the rotating rod 8 drives the first gear 9 to rotate in the rotating process, then the first gear 9 drives the second gear 12 to rotate, then the second gear 12 drives the second threaded rod 13 to rotate, the second embedded rod 14 can be driven to move through a threaded structure by the second threaded rod 13, the second embedded rod 14 can be embedded into the installation foundation 1, the stability of the embedded workpiece 2 is better by matching with the first embedded rod 11, and further the stability of the first connecting lock sleeve 4 and the second connecting lock sleeve 5 is better, is convenient to use.
Further, the top of dwang 8 is provided with the circular block, and the outer wall of circular block is provided with the thread groove, and the circular block is located pre-buried work piece 2's upper surface, can make dwang 8's rotation more convenient.
Further, the outer wall of the first embedded rod 11 and the second embedded rod 14 is fixedly provided with a convex block, the sliding grooves are formed in the two sides of the inner groove of the embedded workpiece 2, the convex block is inserted in the sliding grooves, the first embedded rod 11 and the second embedded rod 14 can move better in stability, the situation that the first embedded rod 11 and the second embedded rod 14 break away from each other is avoided, and the stability of the embedded workpiece 2 is better.
Further, the horizontal pole has been cup jointed to the outer wall of second threaded rod 13, and inside the horizontal notch of the pre-buried work piece 2 inside of horizontal pole position, can support second threaded rod 13, avoids second threaded rod 13 to rotate the condition that takes place to rock and break away from, and then makes the removal effect of second inserted bar 14 better, convenient to use.
The working principle is as follows: during the use, put into the inside of installing ground 1 with pre-buried work piece 2 and install, the dwang 8 rotates, and then make dwang 8 drive first threaded rod 10 and rotate, first threaded rod 10 drives first inserted bar 11 through helicitic texture and removes afterwards, can make first inserted bar 11 imbed the inside of installing ground 1, dwang 8 pivoted in-process drives first gear 9 and rotates, first gear 9 drives second gear 12 and rotates afterwards, second gear 12 drives second threaded rod 13 and rotates afterwards, can make second threaded rod 13 drive second inserted bar 14 through helicitic texture and remove, can make second inserted bar 14 imbed the inside of installing ground 1, cooperate first inserted bar 11 to make the stability of pre-buried work piece 2 better, and then make the stability of first connecting lock sleeve 4 and second connecting lock sleeve 5 better.
Afterwards when external wind-force is great, the first connecting lock sleeve 4 of hoist pulling and the lock sleeve 5 is connected to the second, the lock sleeve 5 is connected to the second afterwards extrudes compression spring 7, and then make compression spring 7 can be to connecting between lock sleeve 4 and the second and cushion, and then slow down the pressure between lock sleeve 5 is connected to first connecting lock sleeve 4 and second, thereby can increase the life-span of lock sleeve 5 is connected to first connecting lock sleeve 4 and second, avoid first connecting lock sleeve 4 and the second to connect the cracked condition of lock sleeve 5, make the pulling force of lock sleeve 5 is connected to first connecting lock sleeve 4 and second better, wind-proofness is better, high durability and convenient use, above be the whole theory of work of this scheme.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. A wind-proof device for port logistics comprises a mounting foundation (1), and is characterized in that: the utility model discloses a construction method of a foundation, including installation ground (1), the inside of installation ground (1) has seted up the notch, and the inside fixed mounting of notch has pre-buried work piece (2), the top intermediate position department fixed mounting of pre-buried work piece (2) has installation piece (3), the top of installation piece (3) is provided with first connection lock sleeve (4), the outer wall of first connection lock sleeve (4) has cup jointed second connection lock sleeve (5), the inside fixed mounting of first connection lock sleeve (4) has bracing piece (6), the hole has all been seted up at the both ends of second connection lock sleeve (5), the outer wall at bracing piece (6) is cup jointed in second connection lock sleeve (5), pressure spring (7) have been cup jointed to the outer wall of bracing piece (6), and pressure spring (7) are located the inner wall of second connection lock sleeve (5).
2. The wind-proof device for port logistics according to claim 1, characterized in that: the top fixed mounting of pre-buried work piece (2) has dwang (8), vertical notch has been seted up to the inner wall of pre-buried work piece (2), and dwang (8) extend to the inside of notch, the bottom fixed mounting of dwang (8) has first threaded rod (10), first inserted bar (11) have been cup jointed to the outer wall of first threaded rod (10).
3. The wind-proof device for port logistics according to claim 2, wherein: the outer wall fixed mounting of dwang (8) has first gear (9), horizontal notch has been seted up to the inner wall of pre-buried work piece (2), the inside fixed mounting of notch has second threaded rod (13), second threaded rod (13) are close to the position department fixed mounting of first gear (9) has second gear (12), second gear (12) and first gear (9) intermeshing, second inserted bar (14) have been cup jointed to the outer wall of second gear (12).
4. The wind-proof device for port logistics according to claim 3, wherein: the top of dwang (8) is provided with the circular block, and the outer wall of circular block is provided with the thread groove, the circular block is located the upper surface of pre-buried work piece (2).
5. The wind-proof device for port logistics according to claim 2, wherein: the outer walls of the first embedded rod (11) and the second embedded rod (14) are fixedly provided with protruding blocks, sliding grooves are formed in two sides of a notch in the embedded workpiece (2), and the protruding blocks are inserted into the sliding grooves.
6. The wind-proof device for port logistics according to claim 3, wherein: the outer wall of the second threaded rod (13) is sleeved with a cross rod, and the cross rod is positioned inside a transverse notch in the embedded workpiece (2).
CN202022661387.9U 2020-11-17 2020-11-17 Wind-proof device for port logistics Expired - Fee Related CN214935452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022661387.9U CN214935452U (en) 2020-11-17 2020-11-17 Wind-proof device for port logistics

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022661387.9U CN214935452U (en) 2020-11-17 2020-11-17 Wind-proof device for port logistics

Publications (1)

Publication Number Publication Date
CN214935452U true CN214935452U (en) 2021-11-30

Family

ID=79035197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022661387.9U Expired - Fee Related CN214935452U (en) 2020-11-17 2020-11-17 Wind-proof device for port logistics

Country Status (1)

Country Link
CN (1) CN214935452U (en)

Similar Documents

Publication Publication Date Title
CN214935452U (en) Wind-proof device for port logistics
CN112340610A (en) Wind-proof device for port logistics
CN212801689U (en) Monitoring devices of deep horizontal displacement of foundation ditch and vertical settlement
CN212408180U (en) High-stability wireless water level monitoring device
CN218150748U (en) Building water conservancy rock engineering monitoring devices
CN216566628U (en) Foundation pit support deformation monitoring device
CN214364248U (en) Green shear force wallboard
CN205617413U (en) Miniature clump of piles foundation pile with articulated joint
CN211998429U (en) Prefabricated component hoisting device for urban construction building
CN215419468U (en) Installation mechanism of communication base station feeder window
CN211225911U (en) Anti-sticking rope early warning device
CN109881973B (en) Rail guard is used in hydraulic engineering construction
CN112727225A (en) 10kV high-voltage tower base anti-deformation reinforcing device in subsidence area
CN220457733U (en) Integrated form creeping formwork monitoring control box
CN113152722B (en) Wind load-resistant buttress device for shock insulation layer
CN217298978U (en) Side slope building structure
CN216747700U (en) Groundwater, surface water and soil water coupling research water area monitoring devices
CN217212645U (en) Regional surface water data monitoring quality control device
CN213709196U (en) Arrange protection device of T roof beam fender tiny fragments of stone, coal, etc. wall outside root stress concentration department in during handle
CN215565835U (en) Concentric type double-pipe gas injection blowout preventer for wellhead
CN217028802U (en) Derrick lifting device for oil drilling
CN213234361U (en) A protection network for construction is built in room
CN217627182U (en) Hoisting mechanism for civil and architectural engineering construction
CN209975586U (en) Theftproof formula town road well lid
CN216009110U (en) Hydraulic cylinder piston thread locking structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211130