CN214925876U - Drilling equipment is used in intelligent building's construction - Google Patents
Drilling equipment is used in intelligent building's construction Download PDFInfo
- Publication number
- CN214925876U CN214925876U CN202120331961.6U CN202120331961U CN214925876U CN 214925876 U CN214925876 U CN 214925876U CN 202120331961 U CN202120331961 U CN 202120331961U CN 214925876 U CN214925876 U CN 214925876U
- Authority
- CN
- China
- Prior art keywords
- output shaft
- casing
- construction
- intelligent building
- cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 32
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 239000000428 dust Substances 0.000 claims abstract description 15
- 238000004140 cleaning Methods 0.000 claims abstract description 13
- 238000007789 sealing Methods 0.000 claims description 3
- 238000009435 building construction Methods 0.000 claims 1
- 238000010521 absorption reaction Methods 0.000 abstract description 8
- 230000006978 adaptation Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 206010066054 Dysmorphism Diseases 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- Earth Drilling (AREA)
Abstract
The utility model relates to a construction technical field especially relates to a drilling equipment is used in intelligent building's construction, which comprises a housing, four recesses have been seted up to chassis bottom, and equal fixed mounting has the vertical decurrent first flexible motor of output shaft in the recess, the output shaft fixed mounting of first flexible motor has the bottom plate, and bottom plate bottom fixed mounting has the universal wheel, chassis bottom has seted up the cavity, and fixed mounting has the vertical decurrent flexible motor of second of output shaft in the casing, the output shaft of the flexible motor of second passes through the cavity and connects and install the rotating electrical machines, and the output shaft bottom of rotating electrical machines is connected and is installed the drill bit, the cavity both sides are connected with the dust absorption pipe, chassis both ends sliding connection has the cleaning box, and cleaning box one side set up the through-hole with dust absorption pipe adaptation, cleaning box bottom is equipped with the filter plate, and the filter plate bottom is equipped with the vacuum pump. The utility model discloses, possess higher drilling efficiency to have good stability, can avoid the dust to splash simultaneously, conveniently clear up the work.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a drilling equipment is used in intelligent building's construction.
Background
The core of the intelligent building is a 5A system, and the intelligent building organically integrates the 5 systems through a communication network system, integrates the structure, the system, the service, the management and the optimized combination of the structure, the system, the service and the management, so that the building has the characteristics of safety, convenience, high efficiency and energy conservation. The intelligent building is a discipline with cross property at the edge, which relates to computer technology, automatic control, communication technology, building technology and the like, and more new technologies are applied to the intelligent building.
In the construction and the work progress of intelligent building, drilling equipment carries out drilling work also need to be used, but current drilling is people handheld rig and is driled to ground, drilling efficiency is low, because the straightness that hangs down that the staff hardly guarantees the drill bit causes the hole can bore to one side, unable stability can not be kept, and there is the not problem of controlling of drilling depth well still, and can cause the dust to splash during drilling, it is internal easily to be inhaled by the workman, and be not convenient for clear up the work, certain limitation has, therefore, need design a drilling equipment for intelligent building's construction and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the drilling equipment is used in intelligent building's construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a drilling equipment is used in intelligent building's construction, includes the casing, four recesses have been seted up to chassis bottom, and equal fixed mounting has the vertical decurrent first flexible motor of output shaft in the recess, the output shaft fixed mounting of first flexible motor has the bottom plate, and bottom plate bottom fixed mounting has the universal wheel, chassis bottom has seted up the cavity, and fixed mounting has the vertical decurrent flexible motor of second of output shaft in the casing, the output shaft of the flexible motor of second passes through the cavity and connects and install the rotating electrical machines, and the output shaft bottom of rotating electrical machines connects and install the drill bit, the cavity both sides are connected with the dust absorption pipe, casing both ends sliding connection has the cleaning box, and cleaning box one side set up with the through-hole of dust absorption pipe adaptation, cleaning box bottom portion is equipped with the filter plate, and the bottom is equipped with the vacuum pump.
Preferably, the output shaft of the rotating motor is of a threaded structure, and the top end of the drill bit is provided with a threaded groove matched with the drill bit.
Preferably, the top end of the machine shell is designed to be an inclined structure, and a cushion is laid on the machine shell.
Preferably, a control panel is fixedly mounted at the top end of the casing and is connected with the first telescopic motor, the second telescopic motor, the rotating motor and the vacuum pump through a circuit.
Preferably, the two sides of the shell are connected with observation windows, scales are marked on the surfaces of the observation windows, and marks are marked on the outer sides of the rotating motors.
Preferably, the pedals are connected and installed on two sides of the machine shell, and sealing gaskets are paved on the bottom of the machine shell and the bottom of the pedals.
The utility model has the advantages that: the utility model discloses, can remove through the universal wheel, and can utilize first flexible motor to receive the universal wheel into in the casing, can play fine fixed effect equally, can be through the flexible motor of second, rotating electrical machines and drill bit work of driling, the cavity can play fine guide effect simultaneously, avoid boring to one side, can also be through sitting on the cushion or stepping on the footboard, increase the stability of casing, thereby work of punching better, and the drill bit then can be dismantled through the screw thread, thereby change, can know the drilling depth through mark on the rotating electrical machines and the mark on the observation window simultaneously, conveniently control, in drilling, can also inhale the clearance incasement with the dust through vacuum pump and dust absorption pipe, conveniently clear up the work, and has the practicality.
Drawings
Fig. 1 is a front view of a drilling device for construction of an intelligent building provided by the present invention;
fig. 2 is a side view of the drilling device for construction of an intelligent building provided by the present invention;
fig. 3 is the utility model provides a drilling equipment's for construction front structure schematic diagram of intelligent building.
In the figure: the device comprises a machine shell 1, a first telescopic motor 2, a bottom plate 3, universal wheels 4, a cavity 5, a second telescopic motor 6, a rotary motor 7, a drill bit 8, a dust suction pipe 9, a cleaning box 10, a filter plate 11, a vacuum pump 12, a cushion 13, a control panel 14, an observation window 15 and a pedal 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example (b): referring to fig. 1-3, a drilling device for construction of an intelligent building comprises a casing 1, four grooves are arranged at the bottom of the casing 1, and the grooves are all fixedly provided with a first telescopic motor 2 with an output shaft vertically downward, the output shaft of the first telescopic motor 2 is fixedly provided with a bottom plate 3, and the bottom of the bottom plate 3 is fixedly provided with a universal wheel 4, the bottom of the machine shell 1 is provided with a cavity 5, a second telescopic motor 6 with an output shaft vertically downward is fixedly arranged in the machine shell 1, the output shaft of the second telescopic motor 6 is connected with a rotating motor 7 through the cavity 5, and the bottom of the output shaft of the rotating motor 7 is connected with a drill bit 8, the two sides of the cavity 5 are connected with dust absorption pipes 9, the two ends of the machine shell 1 are connected with a cleaning box 10 in a sliding way, and one side of the cleaning box 10 is provided with a through hole matched with the dust absorption pipe 9, the bottom of the cleaning box 10 is provided with a filter plate 11, and the bottom of the filter plate 11 is provided with a vacuum pump 12.
Further, the output shaft of the rotating motor 7 is of a threaded structure, and a threaded groove matched with the top end of the drill bit 8 is formed in the top end of the drill bit.
Furthermore, the top end of the machine shell 1 is designed to be an inclined structure, and a cushion 13 is laid on the top end of the machine shell.
Further, a control panel 14 is fixedly mounted at the top end of the casing 1, and the control panel 14 is connected with the first telescopic motor 2, the second telescopic motor 6, the rotating motor 7 and the vacuum pump 12 through lines.
Furthermore, the two sides of the casing 1 are connected with observation windows 15, the surfaces of the observation windows 15 are marked with scales, and the outer sides of the rotating motors 7 are marked with marks.
Furthermore, the two sides of the casing 1 are connected with pedals 16, and sealing gaskets are respectively paved at the bottom of the casing 1 and the bottoms of the pedals 16.
The working principle is as follows: during the use, can promote drilling equipment through universal wheel 4 and remove, remove to appointed place after, observe through observation window 15, make 8 alignment positions of drill bit, utilize first flexible motor 2 of control panel 14 withdrawal, it is fixed in casing 1 to take universal wheel 4 in, make drill bit 8 meet with ground, then sit on cushion 13, open flexible motor 6 of second and rotating electrical machines 7 through control panel 14, carry out drilling work, during drilling, can judge the drilling depth through mark on the rotating electrical machines 7 and the mark on the observation window 15, the dust that forms during drilling can be separated by casing and sealed pad, be inhaled in the clearance case 10 and by the filter plate 11 separation through dust absorption pipe 9 by vacuum pump 12, treat to clear up after drilling work.
Those not described in detail in this specification are within the skill of the art.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description ground and the record of attached drawing, and the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and equipment all adopt prior art, and conventional model, including circuit connection adopts conventional connection mode among the prior art, does not detailed here again.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The drilling device for construction of the intelligent building comprises a casing (1) and is characterized in that four grooves are formed in the bottom of the casing (1), a first telescopic motor (2) with an output shaft vertically downward is fixedly mounted in each groove, a bottom plate (3) is fixedly mounted on the output shaft of the first telescopic motor (2), universal wheels (4) are fixedly mounted at the bottom of the bottom plate (3), a cavity (5) is formed in the bottom of the casing (1), a second telescopic motor (6) with an output shaft vertically downward is fixedly mounted in the casing (1), a rotating motor (7) is connected and mounted on the output shaft of the second telescopic motor (6) through the cavity (5), a drill bit (8) is connected and mounted at the bottom of the output shaft of the rotating motor (7), dust suction pipes (9) are connected to two sides of the cavity (5), cleaning boxes (10) are slidably connected to two ends of the casing (1), and one side of the cleaning box (10) is provided with a through hole matched with the dust suction pipe (9), the bottom of the cleaning box (10) is provided with a filter plate (11), and the bottom of the filter plate (11) is provided with a vacuum pump (12).
2. The drilling device for the construction of the intelligent building as claimed in claim 1, wherein the output shaft of the rotating motor (7) is of a threaded structure, and the top end of the drill bit (8) is provided with a threaded groove adapted thereto.
3. The intelligent building construction drilling device as claimed in claim 1, wherein the top end of the casing (1) is designed to be inclined, and a cushion (13) is laid on the top end.
4. The drilling device for the construction of the intelligent building as claimed in claim 1, wherein a control panel (14) is fixedly mounted at the top end of the casing (1), and the control panel (14) is connected with the first telescopic motor (2), the second telescopic motor (6), the rotating motor (7) and the vacuum pump (12) through lines.
5. The drilling device for construction of intelligent building as claimed in claim 1, wherein said casing (1) is connected with observation windows (15) on both sides, said observation windows (15) are marked with scales on the surface, and the outside of the rotating electrical machine (7) is marked with marks.
6. The drilling device for construction of intelligent buildings as claimed in claim 1, wherein pedals (16) are connected and installed on two sides of the casing (1), and sealing gaskets are laid on the bottom of the casing (1) and the bottom of the pedals (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120331961.6U CN214925876U (en) | 2021-02-05 | 2021-02-05 | Drilling equipment is used in intelligent building's construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120331961.6U CN214925876U (en) | 2021-02-05 | 2021-02-05 | Drilling equipment is used in intelligent building's construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214925876U true CN214925876U (en) | 2021-11-30 |
Family
ID=79119766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120331961.6U Active CN214925876U (en) | 2021-02-05 | 2021-02-05 | Drilling equipment is used in intelligent building's construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214925876U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114888985A (en) * | 2022-03-15 | 2022-08-12 | 中国建筑第八工程局有限公司 | Auxiliary drilling construction device and construction method thereof |
-
2021
- 2021-02-05 CN CN202120331961.6U patent/CN214925876U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114888985A (en) * | 2022-03-15 | 2022-08-12 | 中国建筑第八工程局有限公司 | Auxiliary drilling construction device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212428567U (en) | Rock drilling device | |
CN214925876U (en) | Drilling equipment is used in intelligent building's construction | |
CN205989070U (en) | A kind of electric drill | |
CN108661554A (en) | Based on plasma channel and mechanical drilling tool combined unit and its boring method | |
CN213674515U (en) | Furniture manufacturing saw-dust cleaning equipment that punches | |
CN212154752U (en) | Framework for directional sensor | |
CN211389559U (en) | Outer wall body perforating device is built in room | |
CN215804420U (en) | Road surface engineering drilling equipment | |
CN211900486U (en) | Miniature foundation stabilization drilling machine | |
CN112140358A (en) | Convenient to use's drilling equipment for security protection engineering construction | |
CN215396100U (en) | Building wall drilling equipment | |
CN215698166U (en) | Hole position perforating device is irregularly used to steel pylons | |
CN220593631U (en) | Dustproof protection cover integrated wall body electric drill that punches | |
CN211221448U (en) | Outer wall perforating device of building for building engineering | |
CN214644856U (en) | Drilling equipment for construction | |
CN220566072U (en) | Petroleum underground operation auxiliary device | |
CN221568387U (en) | Guide cylinder for water well drilling machine | |
CN212837609U (en) | Noise reduction barrier for rotary drilling rig | |
CN216831370U (en) | Efficient timber drilling equipment | |
CN214214298U (en) | Tapping device for building engineering | |
CN211440640U (en) | Drilling rod for drilling dust collector | |
CN205799078U (en) | One is exempted to clear up electric drill auxiliary device | |
CN221703643U (en) | Road drilling machine | |
CN213648159U (en) | Perforating device for municipal construction | |
CN216593776U (en) | Green building engineering noise monitoring control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231109 Address after: No. 17 Buxin Middle Road, Huangli Town, Wujin District, Changzhou City, Jiangsu Province, 213000 Patentee after: Changzhou Yunti Digital Technology Co.,Ltd. Address before: 33 Gehu Middle Road, Wujin District, Changzhou City, Jiangsu Province Patentee before: CHANGZHOU VOCATIONAL INSTITUTE OF ENGINEERING |