CN214925580U CN202121400578.8U CN202121400578U CN214925580U CN 214925580 U CN214925580 U CN 214925580U CN 202121400578 U CN202121400578 U CN 202121400578U CN 214925580 U CN214925580 U CN 214925580U
Authority
CN
China
Prior art keywords
frame
layer frame
top layer
reinforcing plate
matched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121400578.8U
Other languages
Chinese (zh)
Inventor
唐龙财
洪为喜
陈寿凤
陈家厚
檀舟
黄爱苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Anqiyuan New Building Materials Co ltd
Original Assignee
Fujian Anqiyuan New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Anqiyuan New Building Materials Co ltd filed Critical Fujian Anqiyuan New Building Materials Co ltd
Priority to CN202121400578.8U priority Critical patent/CN214925580U/en
Application granted granted Critical
Publication of CN214925580U publication Critical patent/CN214925580U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a cement anchor with reinforced structure, including gusset plate one, top frame, middle level frame, bottom frame and gusset plate two, the top frame is installed to the bottom of gusset plate one, and the bottom of top frame installs middle level frame, and the bottom of middle level frame installs the bottom frame, and the ground stake point that the cooperation was used is installed to the bottom of gusset plate two, runs through on the gusset plate one to install the anchor rod that extends to in the top frame. The utility model relates to a cement anchor technical field specifically is a cement anchor with reinforced structure, through all being equipped with the mouth of pouring that the cooperation was used on top layer frame, middle level frame and bottom layer frame, its cement material accessible is pour the mouth and is poured into the frame in for form firm frame construction between frame and the frame, through the multilayer package assembly of pouring, the pressure that the top brought that bears that can be better, also can stabilize the use effectively.

Description

Cement anchor with reinforced structure
Technical Field
The utility model relates to a cement anchor technical field specifically is a cement anchor with reinforced structure.
Background
Anchor discs are devices typically buried in the earth that provide a fixed point to prevent uplift. The prefabricated concrete guy plate is a commonly used component in power transmission and transformation line engineering, and the guy plate soil-dressing construction comprises 9 procedures of material preparation, mold assembly, material preparation, stirring, transportation, pouring, vibration, mold removal, maintenance and the like. The factors influencing the concrete quality in the production of the anchor plate are many, and the production quality can be ensured only by carrying out dynamic quality control in the woollen concrete construction and preventing the occurrence of the problem in the bud. The cement anchor plate bears the upward pulling force, and steel bars are arranged on the plane side, so that the anchor plate is suitable for being matched with a conventional cement telegraph pole. Most cement anchor major structures on the market are firm inadequately, so need a neotype cement anchor:
in actual use, the traditional cement anchor plate has poor practicability when being installed and used, on one hand, most of the traditional cement anchor plates have poor stability in actual use and cannot be well fixed and used, and the integral installation practical effect of the device is influenced;
on the other hand, the traditional cement anchor plate is not convenient for workers to transport and install in actual use, and the overall practical effect of the device is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cement anchor with reinforced structure to the relatively poor problem of its practicality when proposing the installation in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a cement anchor with reinforced structure, includes gusset plate one, top layer frame, middle level frame, bottom frame and gusset plate two, the top layer frame is installed to the bottom of gusset plate one, and the bottom of top layer frame installs middle level frame, the bottom of middle level frame is installed bottom layer frame, and all is equipped with the mouth of pouring that the cooperation was used on top layer frame, middle level frame and the bottom frame, install even frame spare one that the cooperation was used between top layer frame and the middle level frame, install even frame spare two that the cooperation was used between middle level frame and the bottom frame, gusset plate two that the cooperation was used is installed to the bottom of bottom layer frame, and the ground stake point of cooperation use is installed to the bottom of gusset plate two, run through on the gusset plate one and install the acting as go-between pole that extends to the top layer frame.
Preferably, the first reinforcing plate is provided with a first connecting bolt penetrating through the top layer frame, the top layer frame and the first reinforcing plate are provided with a first through hole used in a matched mode, and the first reinforcing plate and the second reinforcing plate are internally provided with a first reinforcing inner steel layer used in a matched mode.
Preferably, the top layer frame, the middle layer frame and the bottom layer frame are internally provided with an inner mounting block, the first connecting frame piece and the second connecting frame piece are respectively provided with a fastening bolt extending into the inner mounting block, and the inner mounting block is internally provided with a first thread groove matched with the inner mounting block.
Preferably, the pouring opening is provided with a sealing bolt which is matched with the top layer frame, the middle layer frame and the bottom layer frame in a penetrating mode.
Preferably, a screw member penetrating through the second reinforcing plate and extending into the bottom layer frame is installed in the ground pile tip, a second thread groove matched with the second reinforcing plate is formed in the ground pile tip, and third through holes matched with the screw member are formed in the second reinforcing plate and the bottom layer frame.
Preferably, the second reinforcing plate is provided with a second connecting bolt penetrating through the bottom frame, and the bottom frame and the second reinforcing plate are provided with a fourth through hole matched with each other.
Preferably, a limiting block matched with the wire pulling rod is arranged between the wire pulling rod and the top of the first reinforcing plate, a fastening nut matched with the wire pulling rod and the top layer frame is installed between the wire pulling rod and the top layer frame, and the first reinforcing plate and the top layer frame are provided with two through holes matched with the reinforcing plate.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the top layer frame is arranged at the bottom of the first reinforcing plate, the middle layer frame is arranged at the bottom of the top layer frame, the bottom layer frame is arranged at the bottom of the middle layer frame, the second reinforcing plate matched with the bottom layer frame is arranged at the bottom of the bottom layer frame, and pouring openings matched with the top layer frame, the middle layer frame and the bottom layer frame are formed in the top layer frame, the middle layer frame and the bottom layer frame;
(2) the connecting frame piece I used in a matched mode is arranged between the top layer frame and the middle layer frame, the connecting frame piece II used in a matched mode is arranged between the middle layer frame and the bottom layer frame, when the connecting frame piece I is installed and used, the connecting frame piece I is different from a single traditional framework, a complete anchor plate is formed through a multi-layer assembly structure, when workers carry, split type transportation can be carried out, labor force of the workers can be effectively reduced, convenience in transportation can be improved, and therefore the overall practical effect of the device is improved;
(3) through installing the ground stake point of cooperation use in the bottom of gusset plate two, when installing the use, for the steadiness that can be better guarantee anchor plate, can carry out corresponding embedding fixed at the bottom installation ground stake point of its gusset plate two when the environment needs, can wholly carry out the firm protection of basic unit to the device effectively to the holistic installation practical function of device has also been improved.
Drawings
FIG. 1 is a schematic side view of the present invention;
fig. 2 is a schematic front view of the cross-sectional structure of the present invention;
FIG. 3 is a schematic side sectional view of the top frame of the present invention;
FIG. 4 is a schematic view of the top frame structure of the present invention;
fig. 5 is a schematic structural view of the second reinforcing plate of the present invention.
In the figure: 1. a first reinforcing plate; 101. connecting a first bolt; 102. reinforcing the inner steel layer; 2. a top layer frame; 201. an inner installation block; 202. a first thread groove; 203. punching a first hole; 204. punching a second hole; 3. a middle layer frame; 4. a seal bolt; 5. a bottom layer frame; 501. pouring a mouth; 502. punching a hole III; 503. punching a hole; 6. a ground pile tip; 601. a second thread groove; 602. a screw member; 7. a second reinforcing plate; 701. a second connecting bolt; 8. a frame connecting piece I; 801. a frame connecting piece II; 802. fastening a bolt; 9. a wire pulling rod; 901. a limiting block; 902. and (5) tightening the nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a cement anchor plate with a reinforced structure comprises a first reinforcing plate 1, a top layer frame 2, a middle layer frame 3, a bottom layer frame 5 and a second reinforcing plate 7, wherein the top layer frame 2 is installed at the bottom of the first reinforcing plate 1, the middle layer frame 3 is installed at the bottom of the top layer frame 2, a first connecting bolt 101 penetrating through the top layer frame 2 is installed on the first reinforcing plate 1, a first through hole 203 matched with the top layer frame 2 is formed in the top layer frame 2 and the first reinforcing plate 1, a reinforced inner steel layer 102 matched with the first reinforcing plate 1 and the second reinforcing plate 7 is arranged in the first reinforcing plate 1 and the second reinforcing plate 7, the bottom of the middle layer frame 3 is provided with the bottom layer frame 5, pouring openings 501 matched with the top layer frame 2, the middle layer frame 3 and the bottom layer frame 5 are formed in the top layer frame 2, the middle layer frame 3 and the bottom layer frame 5, and sealing bolts 4 matched with the top layer frame 2, the middle layer frame 3 and the bottom layer frame 5 are installed in the pouring openings 501 in a penetrating mode;
specifically, the top layer frame 2 is installed at the bottom of the reinforcing plate I1, the middle layer frame 3 is installed at the bottom of the top layer frame 2, the bottom layer frame 5 is installed at the bottom of the middle layer frame 3, the reinforcing plate II 7 matched with the bottom layer frame 5 is installed at the bottom of the bottom layer frame 5, and the pouring openings 501 matched with the top layer frame 2, the middle layer frame 3 and the bottom layer frame 5 are arranged on the top layer frame, the structure at the bottom of the reinforcing plate I1 can be buried in the ground according to actual needs when the device is installed and used, and cement materials can be injected into the frame through the pouring openings 501, so that a stable frame structure is formed between the frame and the frame;
specifically, a first connecting frame piece 8 which is matched with the top layer frame 2 is installed between the top layer frame 3 and the middle layer frame 3, a second connecting frame piece 801 which is matched with the bottom layer frame 5 is installed between the top layer frame 3 and the bottom layer frame 5, inner safety blocks 201 are arranged in the top layer frame 2, the middle layer frame 3 and the bottom layer frame 5, fastening bolts 802 which extend into the inner safety blocks 201 are installed on the first connecting frame piece 8 and the second connecting frame piece 801, and first thread grooves 202 which are matched with the inner safety blocks are formed in the inner safety blocks 201;
specifically, a connecting frame piece I8 which is matched with the top layer frame 2 and the middle layer frame 3 is arranged between the middle layer frame 3 and the bottom layer frame 5, and a connecting frame piece II 801 which is matched with the middle layer frame 3 and the bottom layer frame 5 is arranged between the middle layer frame 3 and the bottom layer frame, so that the installation and use are different from the traditional single framework, a complete anchor plate is formed by a multi-layer assembly structure, split transportation can be performed when workers transport, the labor force of the workers can be effectively reduced, the transportation convenience can be improved, and the integral practical effect of the device is improved;
specifically, a second reinforcing plate 7 matched with the bottom of the bottom layer frame 5 is installed at the bottom of the second reinforcing plate 7, a ground pile tip 6 matched with the bottom of the second reinforcing plate 7 is installed at the bottom of the ground pile tip 6, a screw member 602 penetrating through the second reinforcing plate 7 and extending into the bottom layer frame 5 is installed in the ground pile tip 6, and a second thread groove 601 matched with the ground pile tip 6 is formed in the ground pile tip 6;
specifically, the ground pile tips 6 matched with the reinforcing plate II 7 are arranged at the bottom of the reinforcing plate II 7, so that the ground pile tips 6 can be correspondingly embedded and fixed at the bottom of the reinforcing plate II 7 when the anchor plate II is installed and used, and the whole device can be effectively stabilized and protected by a base layer, so that the installation practical effect of the whole device is improved;
specifically, the second reinforcing plate 7 and the second bottom layer frame 5 are both provided with a third through hole 502 used in cooperation with a screw 602, the second reinforcing plate 7 is provided with a second connecting bolt 701 penetrating through the second bottom layer frame 5, and the second bottom layer frame 5 and the second reinforcing plate 7 are both provided with a fourth through hole 503 used in cooperation;
specifically, a stay wire rod 9 extending into the top layer frame 2 is installed on the first reinforcing plate 1 in a penetrating mode, a limiting block 901 matched with the stay wire rod 9 is arranged between the stay wire rod 9 and the top of the first reinforcing plate 1, a fastening nut 902 matched with the stay wire rod 9 and the top layer frame 2 is installed between the stay wire rod 9 and the top layer frame 2, and two through holes 204 matched with the reinforcing plate 1 and the top layer frame 2 are formed in the reinforcing plate.
The working principle is as follows: when the combined type wire drawing frame is used, firstly, the wire drawing rod 9 is installed on the reinforcing plate 1 in a penetrating mode, the top layer frame 2 is installed at the bottom of the reinforcing plate 1, the middle layer frame 3 is installed at the bottom of the top layer frame 2, the bottom layer frame 5 is installed at the bottom of the middle layer frame 3, the reinforcing plate two 7 used in a matched mode is installed at the bottom of the bottom layer frame 5, pouring openings 501 used in a matched mode are formed in the top layer frame 2, the middle layer frame 3 and the bottom layer frame 5, the structure of the bottom of the reinforcing plate 1 can be buried in the ground according to actual needs, cement materials can be poured into the frame through the pouring openings 501, a stable frame structure is formed between the frame and the frame, and the structure is assembled through multiple layers of pouring;
then, a connecting frame piece I8 which is matched with the top layer frame 2 and the middle layer frame 3 is arranged between the middle layer frame 3 and the bottom layer frame 5, and a connecting frame piece II 801 which is matched with the middle layer frame 3 and the bottom layer frame 5 is arranged between the middle layer frame and the bottom layer frame to form a complete anchor cable disc through a multi-layer assembly structure, so that split type transportation can be carried out when workers carry out transportation operation;
finally, the ground pile tip 6 which is matched with the ground pile tip is arranged at the bottom of the second reinforcing plate 7, so that the ground pile tip 6 can be correspondingly embedded and fixed at the bottom of the second reinforcing plate 7 when the environment needs.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a cement anchor with reinforced structure, includes gusset plate (1), top layer frame (2), middle level frame (3), bottom frame (5) and gusset plate two (7), its characterized in that: the bottom of gusset plate (1) is installed top layer frame (2), and middle-layer frame (3) are installed to the bottom of top layer frame (2), bottom frame (5) are installed to the bottom of middle-layer frame (3), and all are equipped with pouring mouth (501) that the cooperation was used on top layer frame (2), middle-layer frame (3) and bottom frame (5), install between top layer frame (2) and middle-layer frame (3) and cooperate even frame spare (8), install between middle-layer frame (3) and bottom frame (5) and cooperate even frame spare two (801) that use, gusset plate two (7) that cooperate and use are installed to the bottom of bottom frame (5), and the ground pile point (6) that cooperate and use are installed to the bottom of gusset plate two (7), run through on gusset plate (1) and install bracing wire rod (9) that extend to in top layer frame (2).
2. A cement guy-wire reel with reinforcement structure according to claim 1, characterized in that: the reinforcing plate I (1) is provided with a first connecting bolt (101) penetrating through the top layer frame (2), the top layer frame (2) and the reinforcing plate I (1) are provided with a first through hole (203) used in a matched mode, and the reinforcing plate I (1) and the reinforcing plate II (7) are internally provided with a reinforcing inner steel layer (102) used in a matched mode.
3. A cement guy-wire reel with reinforcement structure according to claim 1, characterized in that: all be equipped with interior ampere piece (201) in top layer frame (2), middle level frame (3) and bottom frame (5), even all install fastening bolt (802) that extend to in ampere piece (201) on frame spare (8) and even frame spare two (801), and be equipped with in the ampere piece (201) of interior ampere groove (202) that the cooperation was used.
4. A cement guy-wire reel with reinforcement structure according to claim 1, characterized in that: and a sealing bolt (4) matched with the top layer frame (2), the middle layer frame (3) and the bottom layer frame (5) for use is arranged on the pouring opening (501) in a penetrating manner.
5. A cement guy-wire reel with reinforcement structure according to claim 1, characterized in that: screw members (602) which penetrate through the second reinforcing plate (7) and extend into the bottom layer frame (5) are installed in the ground pile tip (6), a second thread groove (601) which is matched with the ground pile tip for use is formed in the ground pile tip (6), and third through holes (502) which are matched with the screw members (602) for use are formed in the second reinforcing plate (7) and the bottom layer frame (5).
6. A cement guy-wire reel with reinforcement structure according to claim 1, characterized in that: and a second connecting bolt (701) penetrating through the bottom layer frame (5) is installed on the second reinforcing plate (7), and a fourth through hole (503) matched with the second reinforcing plate (7) is formed in the bottom layer frame (5).
7. A cement guy-wire reel with reinforcement structure according to claim 1, characterized in that: a limiting block (901) matched with the wire pulling rod (9) is arranged between the wire pulling rod (9) and the top of the first reinforcing plate (1), a fastening nut (902) matched with the wire pulling rod (9) and the top layer frame (2) are arranged between the wire pulling rod (9) and the top layer frame (2), and two through holes (204) matched with the wire pulling rod (1) and the top layer frame (2) are formed in the reinforcing plate (1).
CN202121400578.8U 2021-06-23 2021-06-23 Cement anchor with reinforced structure Active CN214925580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121400578.8U CN214925580U (en) 2021-06-23 2021-06-23 Cement anchor with reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121400578.8U CN214925580U (en) 2021-06-23 2021-06-23 Cement anchor with reinforced structure

Publications (1)

Publication Number Publication Date
CN214925580U true CN214925580U (en) 2021-11-30

Family

ID=79049676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121400578.8U Active CN214925580U (en) 2021-06-23 2021-06-23 Cement anchor with reinforced structure

Country Status (1)

Country Link
CN (1) CN214925580U (en)

Similar Documents

Publication Publication Date Title
CA2585534C (en) Tower adapter, method of producing a tower foundation and tower foundation
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN102286980B (en) Steel truss foundation pit supporting structure
JP2013538952A (en) Root reinforcement
CN212405512U (en) Embedded column base connecting structure suitable for box column
CN214925580U (en) Cement anchor with reinforced structure
CN106759405A (en) A kind of soil-slope supporting construction and construction method
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
CN202466586U (en) Pressure-stabilizing and pile-sealing device for anchored and jacked pile
CN208219638U (en) A kind of deep foundation pit precast stake
CN207714300U (en) A kind of fabricated ocean engineering concrete architectural structure system
CN110055982A (en) A kind of novel anchor holding frame lattice miniature steel pipe pile supporting system
CN211498887U (en) Broken rock soil body cutting slope flexible retaining reinforced structure
CN210975868U (en) Narrow foundation tower steel construction basis with adjustable root is opened
CN210562210U (en) High ground water level underground structure in weak soil area
CN210288461U (en) Communication monitoring pole basis
CN204059396U (en) Fixed infrastructure bottom tower crane
CN207919592U (en) A kind of prefabricated assembled pile foundation of bearing platform plinth of transmission tower
CN202157328U (en) Steel truss type foundation pit supporting structure
CN203007973U (en) Combined type tower crane foundation
CN201810948U (en) Improved T-shaped head foundation bolt
CN216615932U (en) Assembled cross beam slab spiral pile foundation for power transmission line
CN213836682U (en) Slope protective structure for building
CN111379269A (en) Assembly type independent foundation and assembly method
CN216973567U (en) Loading machine counterweight

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant