CN214925439U - Segment prefabricated reserved hole channel device - Google Patents

Segment prefabricated reserved hole channel device Download PDF

Info

Publication number
CN214925439U
CN214925439U CN202120625813.5U CN202120625813U CN214925439U CN 214925439 U CN214925439 U CN 214925439U CN 202120625813 U CN202120625813 U CN 202120625813U CN 214925439 U CN214925439 U CN 214925439U
Authority
CN
China
Prior art keywords
hole
pore
gasbag
inlayer
inlayer gasbag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120625813.5U
Other languages
Chinese (zh)
Inventor
张华�
黄亮
赵西民
董星
江良雄
刘柏村
刘倍利
张煦宁
段继鑫
李浩钿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Zhengzhou University
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University, China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Zhengzhou University
Priority to CN202120625813.5U priority Critical patent/CN214925439U/en
Application granted granted Critical
Publication of CN214925439U publication Critical patent/CN214925439U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a technical field is assembled in the prefabricated of segment section, especially relates to a prefabricated device for reservation pore of segment section. Including the rubber stick, rubber stick center department is provided with the through-hole, installs supporting spring in the through-hole, still is provided with a plurality of pore on the rubber stick, and a plurality ofly and the setting of pore use the through-hole to set up and evenly distributed as central ring, are provided with the inlayer gasbag in the pore, and the inlayer gasbag is connected with pore surface bonding, is provided with the valve on the inlayer gasbag, and the inlayer gasbag has connect aerating device and force pump through the valve, and the inlayer gasbag is hollow pipeline structure, and the inside interpolation of inlayer gasbag is equipped with the reinforcing bar. The utility model discloses combined the advantage of traditional rubber stick, rubber pipeline and spring have the high elasticity, and during the axial atress, radial contraction, and because the existence of gasbag, change the extraction. The surface is smooth, and the hole wall is smooth. Can be used repeatedly, has long service life and low price. The problems of slurry leakage and the like are not easily caused in the concrete pouring process.

Description

Segment prefabricated reserved hole channel device
Technical Field
The utility model relates to a technical field is assembled in the prefabricated of segment section, especially relates to a prefabricated device for reservation pore of segment section.
Background
The segment prefabrication and assembly construction process divides a beam body into a plurality of segments, and all the segments are manufactured one by one in a prefabrication factory and are connected into a whole on a construction site. The method has the advantages of wide application in bridge construction. However, in the construction process, a pore channel needs to be reserved and a beam end needs to be fixed, so that the penetration and tensioning work of the prestressed steel strand is influenced, and the importance is high. The traditional method generally adopts a pre-embedded corrugated pipe to form a hole or a drawn rubber rod to form a hole, the former cannot be reused, and cracks are easy to appear during the manufacturing of a section, so that slurry leakage and hole plugging are caused. The latter is easy to deform, is fussy to position in pore channel forming, is commonly used for forming pores by small prestress, has large mass and can not meet the requirements of people. Therefore, there is a need for a device for segment prefabrication of a pre-cast tunnel to solve the above problems.
Disclosure of Invention
The utility model discloses a solve above-mentioned problem, provide a prefabricated device for reservation pore of festival section.
The utility model adopts the following technical proposal: the utility model provides a prefabricated device for reserved hole of segment, including the rubber stick, rubber stick center department is provided with the through-hole, install supporting spring in the through-hole, still be provided with a plurality of tunnels on the rubber stick, a plurality ofly set up and use the through-hole to set up and evenly distributed as central ring, be provided with the inlayer gasbag in the tunnel, the inlayer gasbag is connected with tunnel surface bonding, be provided with the valve on the inlayer gasbag, the inlayer gasbag has connect aerating device and force pump through the valve, the inlayer gasbag is hollow pipeline structure, the inside reinforcing bar that is equipped with of inserting of inlayer gasbag.
Further, the supporting spring is an annular structure with the outer diameter being the same as the inner diameter of the through hole and is made of an elastic material.
Furthermore, a plurality of supporting springs are uniformly arranged along the through hole and are connected with the inner surface of the through hole in an adhesive mode.
Further, the inner diameter D of the through hole is larger than the inner diameter D of the pore channel.
The working principle is as follows: during the use, place outer rubber hollow tube, insert the inlayer gasbag, insert the reinforcing bar that the shape preparation was accomplished in the inlayer gasbag, utilize aerating device to aerify to the inlayer gasbag through the valve to monitor gasbag atmospheric pressure, inflation pressure reaches the predetermined value after, stops to aerify, concreting, treat the concrete shaping and after the maintenance, open the valve and lose heart, take out the inlayer gasbag earlier, take out rubber tube and spring at last.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. through aerating device, the gasbag can closely meet with outer rubber tube, and contains the spring in the rubber tube way, forms the support, and non-deformable has solved the problem that traditional pulling out rubber tube is applicable to less prestressing force pore-forming.
2. The advantages of the traditional rubber rod are combined, the rubber pipeline and the spring have high elasticity, and are contracted in the radial direction when stressed in the axial direction, and the drawing is easier due to the existence of the air bag. The surface is smooth, and the hole wall is smooth. Can be used repeatedly, has long service life and low price. The problems of slurry leakage and the like are not easily caused in the concrete pouring process.
3. The inner layer air bag is in a hollow pipeline form and is connected with a reinforcing steel bar, and the reinforcing steel bar can be changed into a pore canal shape to help positioning. After the air bag leaks air, the reinforcing steel bar is easy to take out.
4. The traditional rubber rod is mostly in a solid or small hole form, and the mass can be reduced due to the existence of the air bag, so that the transportation is convenient.
Drawings
FIG. 1 is a side view of the present invention;
FIG. 2 is a perspective view of the present invention;
FIG. 3 is a cross-sectional view of the present invention;
in the figure, 1-a rubber rod, 2-an inner layer air bag, 3-a steel bar, 4-a supporting spring, 5-a through hole, 6-a valve and 7-a pore channel.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, a prefabricated device for reserving pore canal of segment, including rubber stick 1, rubber stick 1 center department is provided with through-hole 5, install supporting spring 4 in the through-hole 5, still be provided with a plurality of pore canals 7 on the rubber stick 1, a plurality of and pore canal 7 set up and use through-hole 5 as central annular setting and evenly distributed, be provided with inlayer gasbag 2 in the pore canal 7, inlayer gasbag 2 is connected with pore canal 7 surface bonding, be provided with valve 6 on the inlayer gasbag 2, inlayer gasbag 2 has connect aerating device and force pump through the valve, inlayer gasbag 2 is hollow pipeline structure, inlayer gasbag 2 is inside to be inserted and is equipped with reinforcing bar 3. The inner diameter D of the through hole 5 is larger than the inner diameter D of the porthole 7.
The support spring 4 is an annular structure having the same outer diameter as the inner diameter of the through-hole 5 and is made of an elastic material. The supporting springs 4 are uniformly arranged along the through holes 5, and the supporting springs 4 are connected with the inner surfaces of the through holes 5 in an adhesive mode. The supporting spring 4 is used for supporting the rubber rod 1, so that the hollow rubber rod 1 has a certain supporting force, and the rubber rod 1 is guaranteed not to be pressed and deformed by concrete when the concrete is poured to form a complete reserved hole channel.
The working principle is as follows: during the use, place outer rubber hollow tube, insert the inlayer gasbag, insert the reinforcing bar that the shape preparation was accomplished in the inlayer gasbag, utilize aerating device to aerify to the inlayer gasbag through the valve to monitor gasbag atmospheric pressure, inflation pressure reaches the predetermined value after, stops to aerify, concreting, treat the concrete shaping and after the maintenance, open the valve and lose heart, take out the inlayer gasbag earlier, take out rubber tube and spring at last.
The reserved hole channel has the shapes of a straight line, a curve and the like, the hole channel cannot shift and deform when concrete is poured, and the reinforcing steel bar has the function of fixing the shape.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (4)

1. The utility model provides a device for prefabricated preformed hole of segment which characterized in that: including rubber stick (1), rubber stick (1) center department is provided with through-hole (5), install supporting spring (4) in through-hole (5), still be provided with a plurality of pore (7) on rubber stick (1), a plurality of and pore (7) set up and evenly distributed with through-hole (5) as central ring, be provided with inlayer gasbag (2) in pore (7), inlayer gasbag (2) are connected with pore (7) surface bonding, be provided with valve (6) on inlayer gasbag (2), inlayer gasbag (2) have connect aerating device and force pump through the valve, inlayer gasbag (2) are hollow pipeline structure, inlayer gasbag (2) inside is inserted and is equipped with reinforcing bar (3).
2. The apparatus for segment prefabrication obligatory tunnel according to claim 1, characterized in that: the supporting spring (4) is of an annular structure with the outer diameter being the same as the inner diameter of the through hole (5) and is made of elastic materials.
3. The apparatus for segment prefabrication obligatory tunnel according to claim 2, characterized in that: the supporting springs (4) are uniformly arranged along the through holes (5), and the supporting springs (4) are connected with the inner surfaces of the through holes (5) in an adhesive mode.
4. Device for segmental prefabricated preformed canals according to claim 3, characterized in that: the inner diameter D of the through hole (5) is larger than the inner diameter D of the pore passage (7).
CN202120625813.5U 2021-03-29 2021-03-29 Segment prefabricated reserved hole channel device Active CN214925439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120625813.5U CN214925439U (en) 2021-03-29 2021-03-29 Segment prefabricated reserved hole channel device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120625813.5U CN214925439U (en) 2021-03-29 2021-03-29 Segment prefabricated reserved hole channel device

Publications (1)

Publication Number Publication Date
CN214925439U true CN214925439U (en) 2021-11-30

Family

ID=79039511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120625813.5U Active CN214925439U (en) 2021-03-29 2021-03-29 Segment prefabricated reserved hole channel device

Country Status (1)

Country Link
CN (1) CN214925439U (en)

Similar Documents

Publication Publication Date Title
US2706498A (en) Prestressed tubular concrete structures
CN101946044A (en) Construction of a wind energy plant
CN102359672A (en) Prestressed steel cylinder concrete push pipe
CN112853946A (en) Grouting sleeve, grouting sleeve connected assembled pier and construction method thereof
CN214925439U (en) Segment prefabricated reserved hole channel device
CN102095033B (en) One-time embedded water-stop section for construction engineering drainage and construction method thereof
CN106182364A (en) A kind of detachable steel core and the method making pre-stressed concrete hollow beam
CN206928285U (en) Prefabricated high-strength core body and pressure type anchor rod
CN210687315U (en) Combined type pipeline lining hose
US5608991A (en) Flexible form member and method of forming through hole by means of the form member
CN108842759B (en) Combined pile of prefabricated pipe pile and cast-in-place pile and construction process thereof
CN110468682A (en) A kind of precast segment assembly bridge joint structure and its construction method
CN100417856C (en) Pressure-resistant culvert pipe with small section and circumferential stress and preparation process thereof
CN213296095U (en) Self-positioning anchoring end sealing grout stopping device
CN110319281B (en) Fabric reinforced concrete-steel tube-FRP composite tube and manufacturing method thereof
CN210397980U (en) High leakproofness concrete conveying pipe
CN112012243A (en) Prefabricated integrated reinforced concrete inspection well and construction method thereof
CN209908670U (en) Concrete tower section of thick bamboo subassembly
CN112854482A (en) Nested formula steel column-concrete column connection structure
CN205893925U (en) Segmental assembling roof beam prestressed duct connector
CN110273360A (en) A kind of self-locking prestress anchorage system and construction method
CN211286302U (en) Inner cavity convex multi-point distributed grouting sleeve
CN107059865A (en) Prefabricated high-strength core body, pressure type anchor rod and its construction method
CN217710682U (en) Anti-pulling pipe pile with steel strand core
CN107969258B (en) Novel upright-column-free composite greenhouse bracket and manufacturing method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant