CN214914615U - Novel environment-friendly production line for barite powder - Google Patents

Novel environment-friendly production line for barite powder Download PDF

Info

Publication number
CN214914615U
CN214914615U CN202121141399.7U CN202121141399U CN214914615U CN 214914615 U CN214914615 U CN 214914615U CN 202121141399 U CN202121141399 U CN 202121141399U CN 214914615 U CN214914615 U CN 214914615U
Authority
CN
China
Prior art keywords
equipment box
air
sewage
production line
novel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121141399.7U
Other languages
Chinese (zh)
Inventor
王晓东
孙建军
蒋鹏
刘永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Naiman Banner Zhongyi Sand Industry Co ltd
Original Assignee
Naiman Banner Zhongyi Sand Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naiman Banner Zhongyi Sand Industry Co ltd filed Critical Naiman Banner Zhongyi Sand Industry Co ltd
Priority to CN202121141399.7U priority Critical patent/CN214914615U/en
Application granted granted Critical
Publication of CN214914615U publication Critical patent/CN214914615U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The utility model discloses a novel environment-friendly production line for barite powder, which comprises an equipment box, a spraying device, a sewage rack and a production and transportation line, wherein two air suction holes are arranged at the middle position of the upper surface of the equipment box, the two air suction holes are symmetrically arranged about the central line of the width direction of the equipment box, the inner walls of the two air suction holes are respectively provided with a supporting platform, the two air suction holes are respectively provided with an air extractor through the supporting platform, and the spraying device is arranged inside the equipment box; this novel blanc fixe environment-friendly production line, blanc fixe has the phenomenon that the dust drifted in the air when transporting on the production transportation line, when the process equipment box below, the dust that drifts in the air exhauster of equipment box can be absorb, can pass through two-layer active carbon plate in absorbing, the active carbon plate can adsorb the dust, before the dehydration, can add water in to the water tank, start the suction pump and make water spout from two water injection pipeline, further reduce the dust in air and the building stones, make workshop air and environment environmental protection more.

Description

Novel environment-friendly production line for barite powder
Technical Field
The utility model relates to a blanc fixe production technical field especially relates to a novel blanc fixe environment-friendly production line.
Background
Barite crystals belong to the orthorhombic (orthorhombic) crystal system of sulfate minerals. Usually, the crystal is thick plate-like or columnar crystal, and is often a dense block-like or plate-like or granular aggregate. The color is colorless and transparent when the color is pure, and the color is dyed into various colors when the color contains impurities, and the color is white with streak marks, and the glass is glossy and transparent to semitransparent. The barite powder is also called natural barium sulfate, and is mainly used as a weighting agent for petroleum and natural gas drilling mud, and used for producing lithopone or used as a shielding agent for X rays in the industries of medicine, atomic energy industry, vehicle brake materials, packaging tapes, high-grade paint, hospital radiation-proof gravity walls and the like.
The barite powder is firstly subjected to gravity separation treatment on ores in production, is crushed by using a jaw crusher, is then subjected to fine ore treatment by using a vibrating screen and a jigger, and is finally subjected to dehydration equipment or natural air drying to reduce moisture. Conveying the blanc fixe in the production line can vibrate and tremble, causes the phenomenon that the dust that the blanc fixe raw and other materials contain flies and rises, can influence the air quality of workshop, neither environmental protection nor sanitation, influences the environment.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problems and providing an environment-friendly barite powder production line for reducing dust and suppressing dust.
In order to achieve the above purpose, the technical scheme of the utility model is that: a novel environment-friendly production line for barite powder comprises an equipment box, a spraying device, a sewage rack and a production and transportation line, wherein two air suction holes are formed in the middle of the upper surface of the equipment box and are symmetrically arranged relative to the central line of the width direction of the equipment box, a supporting platform is arranged on the inner wall of each air suction hole, an air suction device is arranged on each air suction hole through the supporting platform, the spraying device is arranged inside the equipment box, two telescopic rod groups capable of sliding up and down are arranged on the lower surface of the equipment box and are symmetrically arranged relative to the central line of the width direction of the equipment box, the opposite sides of the two telescopic rod groups are fixedly connected with the sewage rack, a sewage discharge hole is formed in the surface of the sewage rack, a bottom plate is arranged at one end, far away from the equipment box, of each telescopic rod group, and a pulley is arranged on the lower surface of the bottom plate, the production transport line is arranged between the lower surface of the equipment box and the upper surface of the sewage rack.
Preferably, the air extractor includes: support body, first spacing, the spacing of second, air exhauster and activated carbon plate, the air exhauster sets up the inside at the support body, first spacing and the spacing both ends of setting at the support body of second, the inside of first spacing and the spacing of second all is provided with the activated carbon plate, the upper surface of first spacing is provided with the first in command.
Preferably, sprinkler includes water tank, suction pump, water spray pipe and hose, the inner diapire of water tank is provided with the suction pump, the lower surface of equipment box is provided with two water spray pipe, two water spray pipe sets up about equipment box length direction's central line symmetry, two water spray pipe passes through the hose and all is connected with the delivery port of suction pump.
Preferably, the telescopic rod group comprises two telescopic frames, and the two telescopic frames are symmetrically arranged about a central line of the equipment box in the length direction.
Preferably, the expansion bracket comprises a long rod, a sliding rod, a positioning pin, a threaded hole and a positioning hole, the threaded hole is formed in the surface of the long rod, the sliding rod is connected with the long rod in a sliding mode, the surface of the sliding rod is provided with a plurality of positioning holes, and the positioning pin penetrates through the threaded hole and extends to the inside of the positioning hole.
Preferably, the upper surface of bottom plate is provided with the draw-in groove, the inside of draw-in groove is provided with the bilge pit, the both sides face of bilge pit width direction all is provided with the second handle, the bilge pit sets up in the blowoff hole below.
Preferably, the upper surface of the equipment box is provided with a water feeding cover and a water feeding pipe, the water feeding cover is connected with the water tank, and the water feeding pipe is connected with the water tank.
Preferably, a communicating vessel is arranged on the side surface of the equipment box and connected with the water tank.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a transport the blanc fixe through the production transportation line and cooperate other equipment to form the production line again, the blanc fixe has the phenomenon of dust drift when transporting on the production transportation line, when passing through the equipment box below, the dust that drifts in the air extractor in the equipment box can absorb, can pass through two-layer active carbon plate in absorbing, the active carbon plate can adsorb the dust, before the dehydration, can add water to the water tank, start the suction pump and make water spout from two water spray pipes, further reduce the dust in air and the building stones, make workshop air and environment more environmental protection;
2. the utility model discloses a telescopic link group can be adjusted from top to bottom, can make the equipment box according to the demand height-adjusting, and two air extractors can directly take out when out of work, change two activated carbon plates, can directly inspect and maintain the air exhauster, and during the water spray, dust and water smoke in the air can fall on the production transportation line, and some can fall on sewage frame, and water smoke can flow from the blowhole when more, flows into the bilge pit, and is environmental protection more to ground environment.
Drawings
Fig. 1 is a schematic structural view of the novel barite powder environment-friendly production line of the utility model.
Fig. 2 is a left side view of the environment-friendly barite powder production line of the utility model.
Fig. 3 is a front view of the environment-friendly barite powder production line of the utility model.
Fig. 4 is a schematic structural view of the air extractor of the present invention.
Fig. 5 is an enlarged view of a portion a in fig. 3 according to the present invention.
In the figure: 1. an equipment box; 2. a suction hole; 3. an air extractor; 301. a frame body; 302. a first limit bracket; 303. a second limiting frame; 304. an exhaust fan; 305. an activated carbon plate; 4. a spraying device; 401. a water tank; 402. a water pump; 403. a water spray pipe; 404. a hose; 5. a telescopic rod group; 51. a telescopic frame; 501. a long rod; 502. a slide bar; 503. positioning pins; 504. A threaded hole; 505. positioning holes; 6. a base plate; 7. a pulley; 8. a sewage rack; 9. a sewage draining hole; 10. a card slot; 11. a sewage tank; 12. production and transportation lines; 13. a water adding cover; 14. A water feeding pipe; 15. a communicating vessel; 16. a first handle; 17. a second handle.
Detailed Description
The present invention will now be described in further detail with reference to the accompanying drawings. The attached drawings are simplified schematic diagrams, and merely illustrate the basic structure of the present invention in a schematic manner, and thus show only the components related to the present invention.
Referring to fig. 1-5, a novel environment-friendly production line for barite powder comprises an equipment box 1, a spraying device 4, a sewage rack 8 and a production transport line 12. The production transport line 12 can transport barite powder raw materials and is matched with a jaw crusher, a jigger, a vibrating screen, dewatering equipment and other devices to form a barite powder production line. The production transport line 12 is arranged below the equipment box 1, above the sewage rack 8 and between the two groups of telescopic rod groups 5.
Two air draft holes 2 are formed in the middle of the upper surface of the equipment box 1, the air draft holes 2 are circular, and the upper surface and the lower surface of the equipment box 1 are communicated. The two air exhaust holes 2 are symmetrically formed about the center line of the equipment box 1 in the width direction. The inner walls of the two air draft holes 2 are welded with supporting platforms which are welded at the lowest ends of the air draft holes 2, and the supporting platforms are in a metal ring shape and can drag the air draft device 3. The two air draft holes 2 are provided with air draft devices 3 through the supporting platform. A sealing ring can be added around the air extractor 3 to make it more stable. The air extractor 3 includes: a frame body 301, a first limiting frame 302, a second limiting frame 303, an exhaust fan 304 and an activated carbon plate 305. The whole air extractor 3 is E-shaped and made of stainless steel metal. The exhaust fan 304 is installed inside the frame body 301 through a bolt, and the first limiting frame 302 and the second limiting frame 303 are welded at two ends of the frame body 301. The side surfaces of the first limiting frame 302 and the second limiting frame 303 are provided with openings, the rest surfaces are provided with grooves, and the activated carbon plate can be put into the openings. An activated carbon plate 305 is arranged inside each of the first limiting frame 302 and the second limiting frame 303. The activated carbon plate 305 is shaped like a plate brick and is matched with the first limiting frame 302 and the second limiting frame 303. The handle is welded to the upper surface of the first limiting frame 302.
A spraying device 4 is provided inside the equipment cabinet 1, the spraying device 4 including a water tank 401, a suction pump 402, a water spray pipe 403, and a hose 404. The inner wall of the water tank 401 is coated with an anti-rust coating. A suction pump 402 is installed on the inner bottom wall of the water tank 401, and two water spraying pipes 403 are welded on the lower surface of the equipment box 1. The surface of the water spraying pipe 403 has a plurality of water spraying holes, which can spray fine mist water. Two water spraying pipes 403 are symmetrically welded with respect to the center line of the length direction of the equipment box 1, and both the two water spraying pipes 403 are connected with the water outlet of the water suction pump 402 through a hose 404.
Two telescopic rod groups 5 capable of sliding up and down are welded on the lower surface of the equipment box 1. The telescopic rod group 5 includes two telescopic frames 51, and the two telescopic frames 51 are symmetrically arranged about a center line of the length direction of the equipment box 1. The expansion bracket 51 is a rectangular column as a whole, and is made of an aluminum alloy material as a whole. The expansion bracket includes: stock 501, slide bar 502, locating pin 503, screw hole 504 and locating hole 505, screw hole 504 has been seted up on the surface of stock 501, slide bar 502 and stock 501 sliding connection, and stock 501 is inside to be seted up with the same slide of slide bar 502, and has added lubricating oil. The surface of the sliding rod 502 is provided with a plurality of positioning holes 505, and the positioning pins 503 penetrate through the threaded holes 504 and extend into the positioning holes 505. Two telescopic link group 5 are welded about the central line symmetry of equipment case 1 width direction, and two telescopic link group 5 have four telescopic link 51 to constitute, and four telescopic link 51 welds the four corners department at equipment case 1 lower surface. The opposite side surfaces of the two telescopic rod groups 5 are connected with the sewage rack 8 through bolts. The sewage frame 8 is of a tray type, and a fixing plate is arranged at the corner and can be fixed on the telescopic rod group 5 through bolts. The surface of the sewage rack 8 is provided with a sewage draining hole 9. The bottom surface of the sewage rack 8 is in an inclined state, and the sewage discharge hole 9 is the lowest part.
The bottom plate 6 is welded at one end, far away from the equipment box 1, of each telescopic rod group 5. The bottom plate 6 is made of aluminum alloy. A pulley 7 is fixed to the lower surface of the base plate 6 by a bolt. The production transport line 12 is arranged between the lower surface of the equipment box 1 and the upper surface of the sewage rack 8. The lower surface of the production line 12 does not contact the sewage rack 8, and the upper surface of the production line 12 is at least thirty centimeters high away from the water spray pipe 403. The upper surface of the bottom plate 6 is provided with a clamping groove 10, and a sewage groove 11 is arranged in the clamping groove 10. The sewage tank 11 may be made of glass. The surface of the sewage tank 11 is adhered with a second handle 17, and the sewage tank 11 is arranged below the sewage discharge hole 9, so that sewage can directly flow into the sewage tank 11. The upper surface of the equipment box 1 is provided with a water adding cover 13 and a water adding pipe 14, the water adding cover 13 is connected with a water tank 401, and the water adding pipe 14 is connected with the water tank 401. A valve is arranged on the water feeding pipe 14. A communicating vessel 15 is installed on the side surface of the equipment box 1, and the communicating vessel 15 is connected with the water tank 401. The duct of the communicating vessel 15 may be made of transparent plastic.
The jaw crusher, the jigger, the vibrating screen, the dewatering equipment and other devices in the embodiments are all common equipment in the market, and are not described in detail. The existing exhaust fan 304 and water pump 402 are common daily and commercially available electrical components, and the power supply is 220V. The suction fan 304 may use the suction fan of a small, high power industrial grade brushless motor. The suction pump 402 may use a small submersible pump.
This neotype barite powder environment-friendly production line is when using, and production transport line 12 transports the barite powder raw materials, and device such as jaw crusher, jigging machine, shale shaker and dewatering equipment are increased or reduce equipment according to actual demand around the cooperation, form the barite powder production line. When the device is installed, the production transport line 12 needs to be placed between the equipment box 1 and the sewage rack 8, the lower surface of the production transport line 12 is not in contact with the sewage rack 8, the upper surface of the production transport line 12 is at least thirty centimeters away from the water spraying pipeline 403, the height of the production transport line 12 can be adjusted through the telescopic rod group 5 according to requirements, or the height of the production transport line 12 is directly adjusted, and when the telescopic rod group 5 is adjusted, water needs to be added into the water tank 401 before water is added.
Before use, the suction fan 304 of the air suction device 3 is checked, and the activated carbon plate 305 is inserted into the first and second limiting plates and then placed into the suction hole 2. Water is added into a water tank 401, the equipment box 1 can be pushed to a proper position through a pulley 9, a power supply is connected, an exhaust fan 304 and a water suction pump 402 are started, dust on the surface of the barite powder raw material and in the air is sucked into an air extractor 3, water is sprayed out of two water spraying pipelines 403 through the water suction pump 402, and the air and the dust in the stone are further reduced.
After the barite powder is dehydrated or air-dried, the barite powder can be subjected to dust removal and dust fall only by using the air extractor 3 without using the water pump 402.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.

Claims (8)

1. The utility model provides a novel environment-friendly production line of blanc fixe, includes equipment box (1), sprinkler (4), sewage frame (8) and production supply line (12), its characterized in that: the middle position of the upper surface of the equipment box (1) is provided with two air suction holes (2), the two air suction holes (2) are symmetrically arranged relative to the central line of the equipment box (1) in the width direction, the inner walls of the two air suction holes (2) are respectively provided with a supporting platform, the two air suction holes (2) are respectively provided with an air suction device (3) through the supporting platform, the spraying device (4) is arranged in the equipment box (1), the lower surface of the equipment box (1) is provided with two telescopic rod groups (5) capable of sliding up and down, the two telescopic rod groups (5) are symmetrically arranged relative to the central line of the equipment box (1) in the width direction, the opposite sides of the two telescopic rod groups (5) are respectively and fixedly connected with a sewage rack (8), the surface of the sewage rack (8) is provided with a sewage discharge hole (9), one ends of the two telescopic rod groups (5) far away from the equipment box (1) are respectively provided with a bottom plate (6), the lower surface of bottom plate (6) is provided with pulley (7), production transportation line (12) set up between the lower surface of equipment box (1) and sewage frame (8) upper surface.
2. The novel barite powder environment-friendly production line as claimed in claim 1, is characterized in that: the air extractor (3) comprises: support body (301), first spacing (302), spacing (303) of second, air exhauster (304) and activated carbon plate (305), air exhauster (304) set up the inside at support body (301), first spacing (302) and spacing (303) of second set up the both ends at support body (301), the inside of first spacing (302) and spacing (303) of second all is provided with activated carbon plate (305), the upper surface of first spacing (302) is provided with the first in command (16).
3. The novel barite powder environment-friendly production line as claimed in claim 1, is characterized in that: sprinkler (4) include water tank (401), suction pump (402), water spray pipe (403) and hose (404), the interior diapire of water tank (401) is provided with suction pump (402), the lower surface of equipment case (1) is provided with two water spray pipe (403), two water spray pipe (403) all are connected with the delivery port of suction pump (402) about the central line symmetry setting of equipment case (1) length direction, two water spray pipe (403) pass through hose (404).
4. The novel barite powder environment-friendly production line as claimed in claim 1, is characterized in that: the telescopic rod group (5) comprises two telescopic frames (51), and the two telescopic frames (51) are symmetrically arranged relative to the central line of the length direction of the equipment box (1).
5. The novel barite powder environment-friendly production line as claimed in claim 4, is characterized in that: the telescopic frame (51) comprises a long rod (501), a sliding rod (502), a positioning pin (503), a threaded hole (504) and a positioning hole (505), wherein the threaded hole (504) is formed in the surface of the long rod (501), the sliding rod (502) is in sliding connection with the long rod (501), the surface of the sliding rod (502) is provided with a plurality of positioning holes (505), and the positioning pin (503) penetrates through the threaded hole (504) and extends to the inside of the positioning hole (505).
6. The novel barite powder environment-friendly production line as claimed in claim 1, is characterized in that: the upper surface of bottom plate (6) is provided with draw-in groove (10), the inside of draw-in groove (10) is provided with sewage groove (11), sewage groove (11) width direction's both sides face all is provided with second handle (17), sewage groove (11) set up in blowoff hole (9) below.
7. The novel barite powder environment-friendly production line as claimed in claim 1, is characterized in that: the upper surface of equipment box (1) is provided with water cover (13) and filler pipe (14), filler cover (13) is connected with water tank (401), filler pipe (14) are connected with water tank (401).
8. The novel barite powder environment-friendly production line as claimed in claim 1, is characterized in that: the side of the equipment box (1) is provided with a communicating vessel (15), and the communicating vessel (15) is connected with the water tank (401).
CN202121141399.7U 2021-05-26 2021-05-26 Novel environment-friendly production line for barite powder Active CN214914615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121141399.7U CN214914615U (en) 2021-05-26 2021-05-26 Novel environment-friendly production line for barite powder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121141399.7U CN214914615U (en) 2021-05-26 2021-05-26 Novel environment-friendly production line for barite powder

Publications (1)

Publication Number Publication Date
CN214914615U true CN214914615U (en) 2021-11-30

Family

ID=79059662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121141399.7U Active CN214914615U (en) 2021-05-26 2021-05-26 Novel environment-friendly production line for barite powder

Country Status (1)

Country Link
CN (1) CN214914615U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115487637A (en) * 2022-09-08 2022-12-20 鸿钜新能源动力(江西)有限公司 Multistage purification system applied to air pollution environment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115487637A (en) * 2022-09-08 2022-12-20 鸿钜新能源动力(江西)有限公司 Multistage purification system applied to air pollution environment

Similar Documents

Publication Publication Date Title
WO2020048297A1 (en) Inflation-type large flotation machine and flotation method therefor
CN214914615U (en) Novel environment-friendly production line for barite powder
CN206203225U (en) A kind of regrinding-material elevator
CN206970272U (en) A kind of preceding road processing unit of integrated heavy oil sewage
CN219216881U (en) Belt edge Cheng Mibi dry fog dust suppression device
CN206831058U (en) Modularization channel steel base
CN206360334U (en) A kind of adjustable aluminum alloy pattern plate height adjuster
NO161362B (en) TRANSPORT CABLE FOR DUST-SHAPE OR FINE CORN, DRY MATERIAL.
AU2015394640B2 (en) A drive module and its uses, a flotation plant and a method of changing of the drive module
CN204933146U (en) A kind of atomizing sprinkling system being applied in dust and suppressing on-the-spot
CN204568761U (en) A kind of cement material conveyer
CN207063047U (en) A kind of gear mud weir for being used to prevent columns base sludge impurity from entering absorbing well, absorption well
CN204162469U (en) A kind of dreg inhaling device automatically
CN1157760C (en) Installation for working wafers
CN215027277U (en) Circulating dust collection mechanism for waste gas pipeline
CN201482347U (en) Pulse bag type dust collector
CN204039091U (en) The plating salt solution atomization and vaporization device that a kind of sun power is auxiliary
CN205995615U (en) A kind of pipeline of slurry removes irony device
CN212052087U (en) Flotation deinking device for papermaking
CN210875772U (en) Suspension type iron removing machine
CN204425801U (en) BGA simple worktable
CN209456111U (en) A kind of air-dissolving air-float equipment
CN208857119U (en) The sludge-tank quickly handled
CN203824628U (en) Novel evacuating device for modifier weighing
CN209777545U (en) Ash raising prevention device for green development of coal resources

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant