CN214899876U - Many adaptations cable construction auxiliary stand - Google Patents

Many adaptations cable construction auxiliary stand Download PDF

Info

Publication number
CN214899876U
CN214899876U CN202121432506.1U CN202121432506U CN214899876U CN 214899876 U CN214899876 U CN 214899876U CN 202121432506 U CN202121432506 U CN 202121432506U CN 214899876 U CN214899876 U CN 214899876U
Authority
CN
China
Prior art keywords
clamping part
telescopic link
screw
cable construction
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121432506.1U
Other languages
Chinese (zh)
Inventor
陈文曲
杨海益
吴晓凌
詹晓阳
李春
谢萍萍
林家学
陈明辉
张德禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Urban Power Supply Service Branch Of Xiamen Electric Power Engineering Group Co ltd
Original Assignee
Urban Power Supply Service Branch Of Xiamen Electric Power Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urban Power Supply Service Branch Of Xiamen Electric Power Engineering Group Co ltd filed Critical Urban Power Supply Service Branch Of Xiamen Electric Power Engineering Group Co ltd
Priority to CN202121432506.1U priority Critical patent/CN214899876U/en
Application granted granted Critical
Publication of CN214899876U publication Critical patent/CN214899876U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Of Indoor Wiring (AREA)

Abstract

The utility model relates to a multi-adaptation cable construction auxiliary stand, including accepting the board, it is provided with first clamping part and second clamping part respectively to move about on accepting the board, first clamping part and second clamping part are respectively through first screw rod and second screw rod and accepting board swing joint, the sub-unit connection of accepting the board has the rotation tray, the lower part activity of rotating the tray is provided with three telescopic links, all be provided with the connecting rod on the three telescopic link, the middle part of three telescopic link is all fixed through setting up the mounting, the bottom of three telescopic link is all movably provided with adjusting member; the utility model discloses the practicality is strong, and the operation is got up very simply, can realize the automatic adaptation of ground unevenness, and the rigidity that adapts to different cross-section cables is fixed, satisfies cable termination, joint under the various angles and salvagees, the construction, has not only improved the operating condition, shortens when salvageing moreover, improves and salvagees efficiency.

Description

Many adaptations cable construction auxiliary stand
Technical Field
The utility model relates to a many adaptations cable construction auxiliary stand uses at cable construction appurtenance technical field.
Background
As is known, most of the conventional auxiliary supports for cable construction are made of local materials due to the influence of the flatness of a site and the angle of process manufacture, are various in style, inconvenient to use and incapable of being telescopically adjusted, and in addition, the conventional supports are fixed, the height of the conventional supports cannot meet the construction operation requirements under different conditions, and the anchor ear parts can be fixed only according to the size of the cross section of the cable and the adjustment of anchor ear bolts, so that the construction and rush repair time is prolonged; the non-standard of support leads to cable termination and joint manufacturing process to appear the deviation easily, also seriously influences power cable construction progress and salvagees for a long time.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a many adaptations cable construction auxiliary stand can realize the automatic adaptation of ground unevenness, adapts to the rigidity of different cross-section cables fixed, satisfies cable termination, joint under the various angles and salvagees, the construction, has not only improved the operating condition, shortens moreover to salvage long, improves and salvages efficiency.
The technical scheme of the utility model as follows:
the utility model provides a many adaptations cable construction auxiliary stand, is including accepting the board, it is provided with first clamping part and second clamping part to accept the activity respectively on the board, first clamping part and second clamping part respectively through first screw rod and second screw rod with accept board swing joint, the sub-unit connection who accepts the board has the rotation tray, the lower part activity of rotating the tray is provided with three telescopic link, all be provided with the connecting rod on the three telescopic link, the middle part of three telescopic link is all fixed through setting up the mounting, the equal activity in bottom of three telescopic link is provided with adjusting member.
The two sides of the bearing plate are provided with elongated chutes, the two chutes are arranged in a symmetrical structure, and the two chutes are respectively movably connected with the first clamping part and the second clamping part.
The first clamping part and the second clamping part are respectively connected with the sliding groove through a lug with the bottoms integrally connected, a limiting hole is formed in the lug, an internal thread is arranged in the limiting hole, and the two lugs are respectively connected with the first screw and the second screw in a rotating mode through the limiting hole.
The first screw and the second screw penetrate through the convex blocks at the bottoms of the first clamping part and the second clamping part respectively, and the ends of the first screw and the second screw are in threaded connection with the inner wall surfaces of the two sliding grooves respectively.
The three telescopic links are all cylindrical hollow structures, the telescopic links are in threaded connection or clamped connection with the fixing pieces arranged in the middle of the telescopic links, the adjusting component at the bottom of the telescopic links is of a U-shaped structure with an opening facing downwards, and the center of the top surface of the adjusting component is hinged to the bottom surface of the telescopic links.
All be provided with a columniform connecting rod on the inside wall of three telescopic link, an end of three connecting rods rotates with the connecting block that sets up under rotating the tray respectively and is connected, and another end of three connecting rods rotates with the lateral wall face of three telescopic link respectively and is connected.
A plurality of through holes are formed in the wall surfaces of the first clamping portion and the second clamping portion.
The utility model discloses following beneficial effect has:
1. the utility model provides a length of three telescopic rods of many adaptation cable construction auxiliary stand can independently adjust respectively, with the altitude mixture control on adaptation unevenness or high drop ground, the telescopic link adopts automatic regulation component with the contact on ground, can realize the automatic adaptation of ground unevenness, the rotation tray of first clamping part and second clamping part adopts 360 pivoted components, can satisfy the cable terminal under the various angles, connect and salvage, the construction, the interlock part of first clamping part and second clamping part, use two-way first screw rod and second screw rod to connect, through adjusting first screw rod and second screw rod and the threaded connection who accepts the board, with the size of distance is adjustable between realization first clamping part and the second clamping part, be adapted to the rigidity of different cross-section cables fixed.
2. Utilize the utility model provides a through-hole of seting up on the first clamping part second clamping part to and the cylindrical hollow structure of telescopic link, all be favorable to reducing the whole weight of auxiliary stand, be convenient for remove and carry in the work progress.
Drawings
Fig. 1 is a schematic structural view of the present invention;
the reference numbers in the figures denote:
1. a first clamping portion; 2. a second clamping portion; 3. a first screw; 4. a second screw; 5. a through hole; 6. a bearing plate; 7. rotating the tray; 8. a telescopic rod; 9. a connecting rod; 10. a fixing member; 11. an adjustment member.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1, a many adaptation cable construction auxiliary stand, including accepting board 6, it is provided with first clamping part 1 and second clamping part 2 to accept the activity respectively on the board 6, first clamping part 1 and second clamping part 2 respectively through first screw rod 3 and second screw rod 4 with accept board 6 swing joint, the sub-unit connection who accepts board 6 has rotation tray 7, the activity of the lower part that rotates tray 7 is provided with three telescopic link 8, all be provided with connecting rod 9 on the three telescopic link 8, the middle part of three telescopic link 8 is all fixed through setting up mounting 10, the bottom of three telescopic link 8 is all movable and is provided with adjusting member 11.
The two sides of the bearing plate 6 are provided with elongated chutes, the two chutes are arranged in a symmetrical structure, and the two chutes are respectively movably connected with the first clamping part 1 and the second clamping part 2.
The first clamping part 1 and the second clamping part 2 are respectively connected with the sliding groove through a lug with the bottoms integrally connected, a limiting hole is formed in the lug, an internal thread is arranged in the limiting hole, and the two lugs are respectively connected with the first screw rod 3 and the second screw rod 4 in a rotating mode through the limiting hole.
The first screw rod 3 and the second screw rod 4 respectively penetrate through the convex blocks at the bottoms of the first clamping part 1 and the second clamping part 2, and the ends of the first screw rod 3 and the second screw rod 4 are respectively in threaded connection with the inner wall surfaces of the two sliding grooves.
The three telescopic links 8 are all cylindrical hollow structures, the telescopic links 8 are in threaded connection or clamping connection with the fixing parts 10 arranged in the middle of the telescopic links 8, the adjusting members 11 connected to the bottoms of the telescopic links 8 are U-shaped structures with downward openings, and the centers of the top surfaces of the adjusting members 11 are hinged to the bottom surfaces of the telescopic links 8.
All be provided with a columniform connecting rod 9 on the inside wall of three telescopic link 8, an end of three connecting rods 9 rotates with the connecting block that sets up under rotating tray 7 respectively and is connected, and another end of three connecting rods 9 rotates with the side wall face of three telescopic link 8 respectively and is connected.
A plurality of through holes 5 are formed in the wall surfaces of the first clamping portion 1 and the second clamping portion 2.
The utility model discloses a theory of operation:
when the utility model is used, firstly, the three telescopic rods 8 are respectively adjusted to proper heights according to the site conditions so as to adapt to the height adjustment of uneven or high-fall ground, the angle of the telescopic rod 8 is adjusted through an adjusting component 11 hinged to the bottom of the telescopic rod 8, automatic adaptation to uneven ground is realized, the three telescopic rods 8 are connected through a connecting rod 9 to keep stable, the angle of the bearing plate 6 is further adjusted through rotating the tray 7, and the requirements of rush repair and construction of cable terminals and joints under various angles can be met, the distance between the engaging parts of the first and second clamping parts 1 and 2 is then adjusted according to the cross-section of the cable, through the sliding of the convex blocks at the bottoms of the first clamping part 1 and the second clamping part 2 in the sliding groove, the first screw rod 3 and the second screw rod 4 are further matched to fix the sliding blocks, so that the rigid fixation of cables with different sections is realized.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (7)

1. The utility model provides a many adaptations cable construction auxiliary stand which characterized in that: including accepting board (6), it is provided with first clamping part (1) and second clamping part (2) to accept respectively the activity on board (6), first clamping part (1) and second clamping part (2) respectively through first screw rod (3) and second screw rod (4) and accept board (6) swing joint, the sub-unit connection who accepts board (6) has rotation tray (7), the lower part activity of rotating tray (7) is provided with three telescopic link (8), all be provided with connecting rod (9) on three telescopic link (8), the middle part of three telescopic link (8) is all fixed through setting up mounting (10), the equal activity in bottom of three telescopic link (8) is provided with adjusting member (11).
2. The multi-adaptive cable construction auxiliary support frame of claim 1, wherein: the two sides of the bearing plate (6) are provided with elongated chutes, the two chutes are arranged in a symmetrical structure, and the two chutes are movably connected with the first clamping part (1) and the second clamping part (2) respectively.
3. The multi-adaptive cable construction auxiliary support frame of claim 2, wherein: the first clamping part (1) and the second clamping part (2) are respectively connected with the sliding groove through a lug with the bottoms integrally connected, a limiting hole is formed in the lug, an internal thread is arranged in the limiting hole, and the two lugs are respectively connected with the first screw (3) and the second screw (4) in a rotating mode through the limiting hole.
4. A multi-adaptive cable construction auxiliary stand according to claim 3, wherein: the first screw (3) and the second screw (4) penetrate through the convex blocks at the bottoms of the first clamping part (1) and the second clamping part (2) respectively, and the ends of the first screw (3) and the second screw (4) are in threaded connection with the inner wall surfaces of the two sliding grooves respectively.
5. The multi-adaptive cable construction auxiliary support frame of claim 1, wherein: three telescopic link (8) are cylindrical hollow structure, and telescopic link (8) and the setting mounting (10) threaded connection or the joint in middle part rather than, adjusting member (11) that telescopic link (8) bottom is connected are opening U type structure down, and the center of adjusting member (11) top face is articulated with the bottom face of telescopic link (8).
6. The multi-adaptive cable construction auxiliary support frame of claim 5, wherein: all be provided with a columniform connecting rod (9) on the inside wall of three telescopic link (8), an end of three connecting rod (9) rotates with the connecting block that sets up under rotating tray (7) respectively and is connected, and another end of three connecting rod (9) rotates with the side wall face of three telescopic link (8) respectively and is connected.
7. The multi-adaptive cable construction auxiliary support frame of claim 4, wherein: a plurality of through holes (5) are formed in the wall surfaces of the first clamping part (1) and the second clamping part (2).
CN202121432506.1U 2021-06-25 2021-06-25 Many adaptations cable construction auxiliary stand Expired - Fee Related CN214899876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121432506.1U CN214899876U (en) 2021-06-25 2021-06-25 Many adaptations cable construction auxiliary stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121432506.1U CN214899876U (en) 2021-06-25 2021-06-25 Many adaptations cable construction auxiliary stand

Publications (1)

Publication Number Publication Date
CN214899876U true CN214899876U (en) 2021-11-26

Family

ID=78930422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121432506.1U Expired - Fee Related CN214899876U (en) 2021-06-25 2021-06-25 Many adaptations cable construction auxiliary stand

Country Status (1)

Country Link
CN (1) CN214899876U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114976990A (en) * 2022-06-14 2022-08-30 杭州电子科技大学信息工程学院 Communication cable salvagees auxiliary device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114976990A (en) * 2022-06-14 2022-08-30 杭州电子科技大学信息工程学院 Communication cable salvagees auxiliary device
CN114976990B (en) * 2022-06-14 2024-01-30 杭州电子科技大学信息工程学院 Communication cable rush repair auxiliary device

Similar Documents

Publication Publication Date Title
CN214899876U (en) Many adaptations cable construction auxiliary stand
CN110644674B (en) Concatenation formula steel construction truss
CN112978589B (en) Tower crane attachment fixing device
CN117513542A (en) Combined fastening connector and quick assembly method thereof
CN218292773U (en) Concatenation formula building templates
CN216076489U (en) Strutting arrangement is used in building engineering construction
CN111305638A (en) Adjustable cross arm staple bolt structure
CN111586897A (en) Mobile wireless communication base station
CN212078597U (en) Combined building scaffold
CN214755369U (en) Adjustable wire duct bridge frame adapter
CN110571728B (en) Adjustable support frame is used in crane span structure installation
CN220620973U (en) Supporting device for building construction
CN213185303U (en) Cable clamp
CN216740009U (en) Stable form frame node structure of housing construction
CN220896113U (en) Support frame for dismounting electric screen cabinet
CN220848661U (en) Fixed support of attached lifting scaffold
CN214575531U (en) Anti-falling device for climbing frame
CN216766686U (en) Interface construction operation platform that adapts to shaped steel roof beam height and width
CN217420589U (en) Novel plain type partition plate installation is adjusted device
CN216893419U (en) Adjustable connecting device for horizontal truss of scaffold
CN215889272U (en) Operation platform for building construction with adjustable area
CN219916816U (en) Insulator framework fixing tool
CN219840374U (en) Angle adjusting device suitable for multi-angle inclined roof formwork support
CN214100702U (en) One-way antidetonation support of crane span structure
CN217475772U (en) Steel member fixing device for steel structure manufacturing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126

CF01 Termination of patent right due to non-payment of annual fee