CN214889718U - Building leak protection water blocks up instrument - Google Patents

Building leak protection water blocks up instrument Download PDF

Info

Publication number
CN214889718U
CN214889718U CN202121056194.9U CN202121056194U CN214889718U CN 214889718 U CN214889718 U CN 214889718U CN 202121056194 U CN202121056194 U CN 202121056194U CN 214889718 U CN214889718 U CN 214889718U
Authority
CN
China
Prior art keywords
building
backup pad
pipeline
base
leakage prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121056194.9U
Other languages
Chinese (zh)
Inventor
张悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121056194.9U priority Critical patent/CN214889718U/en
Application granted granted Critical
Publication of CN214889718U publication Critical patent/CN214889718U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model relates to a building leak protection water blocking tool, including base, spacing groove, spliced pole and second backup pad, the inside of spliced pole is run through and is installed the gas tube, the screw has been seted up to the both ends symmetry of base, the inside threaded connection of screw has the screw rod, inside the opening in both ends of base has the spacing groove, the inside slidable mounting of spacing groove has the stopper, the upper surface of stopper is connected with the connecting plate, splint are all installed to the upper end of connecting plate, the second backup pad is installed to the upper end of spliced pole, the top of second backup pad is provided with first backup pad, first backup pad with be provided with the rubber layer between the second backup pad. The utility model discloses the inflated rubber layer of accessible blocks up inside the pipeline, and the interval between two splint of staff's accessible screw rod adjustment simultaneously for but the device centre gripping has greatly improved the practicality of device on the pipeline of different diameters.

Description

Building leak protection water blocks up instrument
Technical Field
The utility model relates to a leak protection water technical field, concretely relates to building leak protection water blocks up instrument.
Background
The water leakage prevention of the building is a measure taken from the aspects of building materials and construction for preventing water from permeating certain parts of the building, a pipeline in the building is damaged after being used for a long time, and the pipeline needs to be blocked at the moment so as to be convenient for a worker to maintain.
Through the massive search, the prior art is found, the publication number is CN206942727U, and a downhole string differential pressure type plugging tool is disclosed, which is mainly used in the constructions of drilling and sand washing, slurry replacement, milling and the like in the well repair operation of an oil field, wherein a circulating channel of the downhole string is opened under the action of differential pressure during construction, and the circulating channel of the downhole string is temporarily closed during shutdown, so that the well head repair liquid is prevented from overflowing, and the safe and clean production of the downhole operation is realized. This blocking tool includes casing, center tube and seal cover, and the center tube is equipped with baffle and interior baffle, all is equipped with the circulation on the baffle at center tube both ends and opens the hole, is equipped with the circulation hole on the body of interior baffle both sides, and center tube and seal cover are all installed in the casing, and the both sides installation spring of seal cover is fixed on the casing through the pin, the circulation hole of shutoff center tube, and the casing both ends are connected with top connection and lower clutch, have realized cleaner production, safety in production's purpose. Meanwhile, the well mouth is clean, so that the working efficiency can be improved, the potential safety hazard can be eliminated, and the well mouth cleaning device has good use effect and economic benefit.
To sum up, current blocking tool does not have the location splint to the pipeline when the use, and the skew takes place for the blocking device easily, and then leads to blockking up not tight, takes place to leak, can't block up different diameter pipelines simultaneously, and the practicality is relatively poor, can't satisfy the in-service use demand.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building leak protection water blocking tool has solved above technical problem.
The utility model provides a scheme as follows of above-mentioned technical problem: the utility model provides a building leak protection water blocking tool, includes base, spacing groove, spliced pole and second backup pad, the inside of spliced pole is run through and is installed the gas tube, the screw has been seted up to the both ends symmetry of base, the inside threaded connection of screw has the screw rod, inside the opening in both ends of base has the spacing groove, the inside slidable mounting of spacing groove has the stopper, the upper surface of stopper is connected with the connecting plate, splint are all installed to the upper end of connecting plate, the second backup pad is installed to the upper end of spliced pole, the top of second backup pad is provided with first backup pad, first backup pad with be provided with the rubber layer between the second backup pad.
The utility model has the advantages that: the utility model discloses the position of splint is adjusted to the staff accessible rotation screw rod for but splint joint different diameters's pipeline, greatly improve device's practicality, aerify the rubber layer through the gas tube simultaneously, make the rubber layer take place the inflation laminating at the inner wall of pipeline, and then make the device block up the pipeline, avoid the pipeline to take place to leak.
On the basis of the technical scheme, the utility model discloses can also do following improvement.
Furthermore, a connector is arranged at the opening of the lower end of the inflation tube.
The beneficial effect of adopting the further scheme is that: the connector can be convenient for the staff to be connected gas tube and inflation equipment.
Further, the lower end of the inflation tube is provided with a control valve.
The beneficial effect of adopting the further scheme is that: the staff can control the inflation tube through the control valve.
Furthermore, a sliding groove is formed in the upper end of the limiting groove, and the connecting plate is slidably mounted inside the sliding groove.
The beneficial effect of adopting the further scheme is that: the connecting plate can stably slide in the sliding groove.
Further, the clamping plate is designed in an arc-shaped plate process.
The beneficial effect of adopting the further scheme is that: the arc-shaped clamping plates can improve the contact surface of the clamping plates for clamping the pipeline, and greatly improve the stability of clamping the pipeline by the clamping plates.
Furthermore, the bracing piece is installed to the upper end symmetry of second backup pad, install the upper end of bracing piece first backup pad.
The beneficial effect of adopting the further scheme is that: the support rod can separate the first support plate from the second support plate so as to accommodate the rubber layer.
Further, a pipeline is arranged above the base, and the upper end of the connecting column is arranged in the pipeline.
The beneficial effect of adopting the further scheme is that: the staff can put the device into the inside of pipeline, and the accessible base is with the stable support of device in the mouth of pipe department simultaneously.
The above description is only an overview of the technical solution of the present invention, and in order to make the technical means of the present invention clearer and can be implemented according to the content of the description, the following detailed description is made with reference to the preferred embodiments of the present invention and accompanying drawings. The detailed description of the present invention is given by the following examples and the accompanying drawings.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
fig. 1 is a schematic main sectional view of a building water leakage prevention blocking tool provided in an embodiment of the present invention;
fig. 2 is an enlarged schematic view of a structure a in fig. 1 of a building water leakage prevention blocking tool provided by an embodiment of the present invention;
fig. 3 is a schematic front view of a plugging device body of a building water leakage prevention plugging tool according to an embodiment of the present invention;
fig. 4 is a schematic top view of a building water leakage prevention blocking tool fig. 3 according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a base; 2. a splint; 3. a pipeline; 4. a rubber layer; 5. a first support plate; 6. a support bar; 7. a second support plate; 8. an inflation tube; 9. connecting columns; 10. a control valve; 11. a connecting port; 12. a screw; 13. a screw hole; 14. a chute; 15. a connecting plate; 16. a limiting block; 17. A limiting groove.
Detailed Description
The principles and features of the present invention are described below in conjunction with the accompanying fig. 1-4, the examples given are intended to illustrate the present invention and are not intended to limit the scope of the invention. The invention is described in more detail in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become more apparent from the following description. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
As shown in figures 1 to 4, the utility model provides a building water leakage prevention blocking tool, which comprises a base 1, a limiting groove 17, a connecting column 9 and a second supporting plate 7, wherein the connecting column 9 is installed in the center of the base 1 in a penetrating way, a worker can carry the device through the connecting column 9, an inflation tube 8 is installed in the connecting column 9 in a penetrating way, the inflation tube 8 can fill the gas generated by an air pump device into the device, screw holes 13 are symmetrically formed in the two ends of the base 1, a screw 12 is connected to the internal threads of the screw holes 13, the limiting groove 17 is formed in the two ends of the base 1, a limiting block 16 is installed in the limiting groove 17 in a sliding way, the limiting block 16 can prevent the splint 2 from falling off the device, the position of the limiting block 16 in the limiting groove 17 can be adjusted when the screw 12 rotates, the upper surface of the limiting block 16 is connected with a connecting plate 15, and the splint 2 is installed at the upper end of the connecting plate 15, the device can clamp the pipeline 3 through two clamping plates 2, so that a worker can rapidly install the pipeline, a second supporting plate 7 is installed at the upper end of a connecting column 9, a first supporting plate 5 is arranged above the second supporting plate 7, and a rubber layer 4 is arranged between the first supporting plate 5 and the second supporting plate 7.
Preferably, a connector 11 is installed at an opening at the lower end of the inflation tube 8, the connector 11 can facilitate a worker to connect the inflation tube 8 with equipment such as an air pump, and the air delivered by the air pump is delivered into the inflation tube 8 through the connector 11.
Preferably, the control valve 10 is installed at the lower end of the inflation tube 8, and a worker can control the inflation tube 8 through the control valve 10, so that the opening and closing states of the inflation tube 8 can be controlled conveniently, after the gas is inflated into the rubber layer 4, the worker can close the inflation tube 8 through the control valve 10, and the phenomenon that the rubber layer 4 cannot block the pipeline 3 due to gas leakage is avoided.
Preferably, the upper end of the limiting groove 17 is provided with a sliding groove 14, the connecting plate 15 is slidably mounted inside the sliding groove 14, the connecting plate 15 can stably slide inside the sliding groove 14, meanwhile, the sliding groove 14 can ensure that the connecting plate 15 plays a limiting role, when the screw 12 pushes the limiting block 16, the connecting plate 15 can be prevented from shaking, and the abrasion generated in the using process of the device is reduced.
Preferably, splint 2 are arc process design, and curved splint 2 can improve 2 centre gripping pipelines 3's of splint contact surface, has greatly improved 2 centre gripping pipelines 3's of splint stability, and staff's accessible splint 2 is installed the stable card in pipeline 3's mouth of pipe department, avoids the device to take place to drop.
Preferably, bracing piece 6 is installed to the upper end symmetry of second backup pad 7, and first backup pad 5 is installed to the upper end of bracing piece 6, and bracing piece 6 can separate first backup pad 5 and second backup pad 7, is convenient for hold rubber layer 4 for rubber layer 4 expands more easily and laminates with 3 inner walls of pipeline, improves the effect that the device blockked up pipeline 3.
Preferably, base 1's top is provided with pipeline 3, and the upper end of spliced pole 9 is installed in pipeline 3's inside, and the staff can put into pipeline 3's inside with the device, and accessible base 1 supports the device steady support in pipeline 3's mouth of pipe department simultaneously for the staff can install the device fast, effectively reduces staff's intensity of labour.
The utility model discloses a concrete theory of operation and application method do: the utility model makes the rubber layer 4 expand by gas, so that the rubber layer 4 is attached to the inner wall of the pipeline 3, the pipeline 3 can be blocked by the device, meanwhile, the screw 12 can be rotated by the worker, the stopper 16 is pushed by the screw 12, and the position of the clamping plate 2 is further adjusted, so that the clamping plate 2 can clamp the pipelines 3 with different diameters, the practicability of the device is greatly improved, when the clamping plate 2 fixes the device in the pipeline 3, the worker can be connected with the inflation tube 8 by equipment such as an air pump, and the control valve 10 is opened, the gas is filled in the rubber layer 4, so that the rubber layer 4 expands, when the rubber layer 4 expands to a certain degree, the outer wall of the rubber layer 4 is fully attached to the inner wall of the pipeline 3, the device seals and blocks the pipeline 3, the water in the pipeline 3 is prevented from leaking, and the maintenance operation is convenient for the worker, the applicability of the device is effectively improved.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way; the present invention can be smoothly implemented by those skilled in the art according to the drawings and the above description; however, those skilled in the art should understand that changes, modifications and variations made by the above-described technology can be made without departing from the scope of the present invention, and all such changes, modifications and variations are equivalent embodiments of the present invention; meanwhile, any changes, modifications, evolutions, etc. of the above embodiments, which are equivalent to the actual techniques of the present invention, still belong to the protection scope of the technical solution of the present invention.

Claims (7)

1. The utility model provides a building leak protection water blocks up instrument which characterized in that: comprises a base (1), a limit groove (17), a connecting column (9) and a second supporting plate (7), a connecting column (9) is arranged in the center of the base (1) in a penetrating way, an inflation tube (8) is arranged in the connecting column (9) in a penetrating way, screw holes (13) are symmetrically formed in two ends of the base (1), a screw rod (12) is connected with the inner threads of the screw holes (13), limiting grooves (17) are formed in the two ends of the base (1), limiting blocks (16) are slidably mounted in the limiting grooves (17), the upper surface of the limiting block (16) is connected with a connecting plate (15), the upper ends of the connecting plates (15) are provided with clamping plates (2), a second supporting plate (7) is arranged at the upper end of the connecting column (9), a first supporting plate (5) is arranged above the second supporting plate (7), a rubber layer (4) is arranged between the first supporting plate (5) and the second supporting plate (7).
2. The water leakage prevention blocking tool for the building as claimed in claim 1, wherein: and a connector (11) is arranged at the opening at the lower end of the inflation tube (8).
3. The water leakage prevention blocking tool for the building as claimed in claim 1, wherein: and a control valve (10) is arranged at the lower end of the inflation tube (8).
4. The water leakage prevention blocking tool for the building as claimed in claim 1, wherein: the upper end of the limiting groove (17) is provided with a sliding groove (14), and the connecting plate (15) is slidably mounted inside the sliding groove (14).
5. The water leakage prevention blocking tool for the building as claimed in claim 1, wherein: the clamping plate (2) is designed in an arc-shaped plate process.
6. The water leakage prevention blocking tool for the building as claimed in claim 1, wherein: bracing piece (6) are installed to the upper end symmetry of second backup pad (7), install the upper end of bracing piece (6) first backup pad (5).
7. The water leakage prevention blocking tool for the building as claimed in claim 1, wherein: the pipeline (3) is arranged above the base (1), and the upper end of the connecting column (9) is installed inside the pipeline (3).
CN202121056194.9U 2021-05-17 2021-05-17 Building leak protection water blocks up instrument Active CN214889718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121056194.9U CN214889718U (en) 2021-05-17 2021-05-17 Building leak protection water blocks up instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121056194.9U CN214889718U (en) 2021-05-17 2021-05-17 Building leak protection water blocks up instrument

Publications (1)

Publication Number Publication Date
CN214889718U true CN214889718U (en) 2021-11-26

Family

ID=78945439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121056194.9U Active CN214889718U (en) 2021-05-17 2021-05-17 Building leak protection water blocks up instrument

Country Status (1)

Country Link
CN (1) CN214889718U (en)

Similar Documents

Publication Publication Date Title
CN208153002U (en) All-metal screw pump infuses the steam injection string and flow string for adopting integral process tubing string
US1852717A (en) Gas lift appliance for oil wells
WO2024152577A1 (en) Buried pipeline leakage and collapse model box capable of switching between internal and external seepage working conditions
CN202834568U (en) Quick pressurized plugging device for pipeline
CN201650211U (en) Multifunctional cross
CN104975818A (en) Equipment and process method for pulling and dropping oil pipe
CN214889718U (en) Building leak protection water blocks up instrument
CN209195329U (en) Wellhead equipment
CN2753869Y (en) Snubbing replaceable high-pressure natural gas recovery wellhead sluice valve device
WO2021068694A1 (en) Accumulator group-type pressure compensation apparatus for managed pressure drilling
US3840072A (en) Method and apparatus for use in well operations
CN212250012U (en) High-temperature high-pressure self-blowing geothermal well killing device
CN112228120B (en) Quick plugging device for water and sand gushing in complex environment of shield construction
CN210798886U (en) Flow divider for offshore oil drilling
CN208184697U (en) A kind of high-pressure packing sand-control construction wellhead assembly
CN219532392U (en) Device for testing tightness of dyke-penetrating culvert pipe
CN114046138B (en) Device for discharging mud and rock debris on surface layer and use method
CN109944564A (en) A kind of high leakproofness casing tube equipment
CN218324810U (en) Gas drainage drilling plugging device
CN113187537B (en) Gas extraction drilling hole sealing device and method
CN214567784U (en) Petroleum storage tank convenient to store
CN105064944B (en) One kind possesses the adjustable biliquid of working space and moves operation window
CN205036340U (en) Sucker rod antifouling blowout preventer that goes into well
CN220151319U (en) Leakage blocking device for sea water oil gas well drilling
CN219888019U (en) Plugging structure for oil field oil testing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant