CN214889366U - Wall-mounted gas pipeline installation mechanism - Google Patents

Wall-mounted gas pipeline installation mechanism Download PDF

Info

Publication number
CN214889366U
CN214889366U CN202121642288.4U CN202121642288U CN214889366U CN 214889366 U CN214889366 U CN 214889366U CN 202121642288 U CN202121642288 U CN 202121642288U CN 214889366 U CN214889366 U CN 214889366U
Authority
CN
China
Prior art keywords
wall
fixed
gas pipeline
fixing
splint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121642288.4U
Other languages
Chinese (zh)
Inventor
李林
吴文剑
杨花蕊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121642288.4U priority Critical patent/CN214889366U/en
Application granted granted Critical
Publication of CN214889366U publication Critical patent/CN214889366U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a wall-mounted gas pipeline installation mechanism, which relates to the field of pipeline installation, and comprises a fixed splint and a movable splint, wherein the fixed splint is formed by fixedly connecting two fixed columns through a bottom connecting block, the outer walls of the two fixed columns are fixedly connected with a lower clamp holder, the inner parts of the fixed columns are provided with inner guide rails, the movable splint is in a T-shaped plate shape, the outer wall of the bottom of the T-shaped plate is fixedly provided with an upper clamp holder, the bottoms of the two sides of the T-shaped plate are fixedly connected with guide rods, the movable splint is connected between the inner guide rails of the fixed splint in a sliding way through the guide rods, the bottom of the guide rods is welded with springs, the other end of the springs is welded at the top of the fixed block, the movable splint can move up and down along the fixed splint through the design of the guide rails and the guide rods, the automatic clamping of the movable splint can be realized, and finally, the fixing is realized through a first adjusting hole and a second adjusting hole, can easily carry out fixed clamp to the gas pipeline of different diameters size and connect, it is more convenient to use.

Description

Wall-mounted gas pipeline installation mechanism
Technical Field
The utility model relates to a piping erection field especially relates to a wall-hanging gas pipeline installation mechanism.
Background
Along with the process of urbanization, city resident quantity is more and more, the gas use amount also progressively increases, often will lay a large amount of gas pipelines when the construction, traditional gas pipeline lays and mostly uses the ferrule screw to fix, the installation is comparatively troublesome, even the gas pipeline diameter size of same circuit also can be different, corresponding ferrule is also different with the screw model, greatly increased's pipe laying needs the cost, for this the novel wall-hanging gas pipeline installation mechanism that provides is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a wall-hanging gas pipeline installation mechanism has solved traditional piping erection and has used ferrule and screw fixation not only to install comparatively troublesome, and the different required ferrule of pipeline diameter is different with the screw size simultaneously, greatly increased the technical problem of pipeline laying cost.
For solving the technical problem, the utility model provides a pair of wall-hanging gas pipeline installation mechanism, including solid fixed splint and movable clamp plate, solid fixed splint comprises two fixed columns through bottom connecting block fixed connection, and two holder under the equal fixedly connected with on the fixed column outer wall, the inside guide rail that has all seted up of fixed column, movable clamp plate is the T template molding, T template bottom outer wall fixed mounting has last holder, the equal fixedly connected with guide arm in T template both sides bottom, movable clamp plate passes through guide arm sliding connection between solid fixed splint's the guide rail inner wall, the welding of guide arm bottom has the spring, the spring other end welds in the fixed block top.
Preferably, the guide arm is the same with the guide rail degree of depth with the total length of spring and fixed block, and two fixed orifices one has all been seted up to fixed column bottom outer wall, set up on the fixed block outer wall with fixed orifices assorted fixed orifices two, fixed column top outer wall has all been seted up regulation hole one, and the same reason set up on the guide arm outer wall a plurality ofly with regulation hole assorted regulation hole two, fixed orifices one and the same design of a regulation hole diameter, just fixed orifices one all is equipped with the screw with regulation hole one.
Preferably, the inner side clamping surfaces of the lower clamp holder and the upper clamp holder are arc surfaces with opposite opening directions, silica gel pads are arranged on the arc surfaces of the lower clamp holder and the upper clamp holder, and the corners of the silica gel pads are subjected to beveling treatment.
Preferably, the lower clamp holder and the upper clamp holder are both provided with triangular fixing blocks, and the outer wall of the top of the triangular fixing block of the upper clamp holder is provided with a screw hole.
Preferably, the outer wall of the inner side of each fixing column is provided with a sliding groove, the outer walls of two sides of each T-shaped plate are fixedly connected with raised bars, and the raised bars and the sliding grooves are matched.
Preferably, the outer walls of the upper side and the lower side of the fixed column are fixedly welded with connecting plates, and the connecting plates are provided with connecting holes.
Compared with the prior art, the utility model provides a pair of wall-hanging gas pipeline installation mechanism has following beneficial effect:
(1) the utility model provides a wall-hanging gas pipeline installation mechanism, through the design of guide rail and guide arm, make movable clamp plate can reciprocate along solid fixed splint, deuterogamy spring and fixed block, can realize movable clamp plate's automatic clamp and connect, fix through regulation hole one and regulation hole two at last, can easily carry out solid fixed clamp to the gas pipeline of different diameters size and connect, it is more convenient to use.
(2) The utility model provides a wall-hanging gas pipeline installation mechanism through the design of spout and sand grip, can restrict the removal route of moving the splint, also can play the supporting effect to moving the splint simultaneously.
Drawings
Fig. 1 is a schematic view of a wall-mounted gas pipeline installation mechanism according to the present invention;
fig. 2 is an assembly schematic view of a wall-mounted gas pipeline installation mechanism of the present invention;
fig. 3 is a schematic three-dimensional structure view of a fixing clamp plate in the wall-mounted gas pipeline mounting mechanism of the present invention;
fig. 4 is a schematic three-dimensional structure view of a movable clamp plate in the wall-mounted gas pipeline mounting mechanism of the present invention;
fig. 5 is a front cross-sectional view of the wall-mounted gas pipeline installation mechanism of the present invention.
Reference numbers in the figures: 1. fixing the clamping plate; 2. moving the clamping plate; 3. fixing a column; 4. connecting blocks; 5. a lower clamp holder; 6. a guide rail; 7. a T-shaped plate; 8. an upper clamp holder; 9. a guide bar; 10. a spring; 11. a fixed block; 12. a first fixing hole; 13. a second fixing hole; 14. a first adjusting hole; 15. a second adjusting hole; 16. a screw; 17. a silica gel pad; 18. a screw hole; 19. a chute; 20. a convex strip; 21. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
An embodiment is given by fig. 1-5, the utility model relates to a wall-hanging gas pipeline installation mechanism, including solid fixed splint 1 and movable clamp plate 2, gu fixed splint 1 comprises two fixed columns 3 through 4 fixed connections in bottom connecting block, and holder 5 under the equal fixedly connected with on the 3 outer walls of two fixed columns, guide rail 6 has all been seted up to fixed column 3 inside, movable clamp plate 2 is the 7 molding of T template, 7 outer wall fixed mounting in T template have last holder 8, 7 equal fixedly connected with guide arm 9 in both sides bottom of T template, movable clamp plate 2 passes through guide arm 9 sliding connection between the 6 inner walls of guide rail of solid fixed splint 1, the welding of guide arm 9 bottom has spring 10, the spring 10 other end welds in fixed block 11 tops.
Wherein, the total length of the guide rod 9, the spring 10 and the fixed block 11 is the same as the depth of the guide rail 6, the outer walls of the bottoms of the two fixed columns 3 are respectively provided with a first fixed hole 12, the outer wall of the fixed block 11 is provided with a second fixed hole 13 matched with the first fixed hole 12, the outer walls of the tops of the fixed columns 3 are respectively provided with a first adjusting hole 14, the outer wall of the guide rod 9 is provided with a plurality of second adjusting holes 15 matched with the first adjusting holes 14, the first fixed holes 12 and the first adjusting holes 14 have the same diameter design, the first fixed holes 12 and the first adjusting holes 14 are respectively provided with screws 16, the movable clamp plate 2 is inserted into the guide rail 6 along the guide rod 9, the bottom of the fixed block 11 is connected with the inner wall of the bottom of the guide rail 6, the first fixed holes 12 are just communicated with the second fixed holes 13, the screws 16 penetrate through the first fixed holes 12 and the second fixed holes 13 to fix the fixed block 11 and the guide rail 6, and the extension spring 10 can be moved, the movable clamping plate 2 is moved upwards or reset, and after the movable clamping plate 2 is moved to a specified position, the guide rod 9 and the whole movable clamping plate 2 can be fixed by the screw 16 passing through the first adjusting hole 14 and the second adjusting hole 15.
Wherein, the inboard clamping face of lower holder 5 and last holder 8 is the arcwall face that the opening direction is relative, makes things convenient for the pipeline of the different diameters of centre gripping size to use, and the arcwall face of lower holder 5 and last holder 8 all installs silica gel pad 17, and silica gel pad 17 edge department is through oblique cutting processing, and silica gel pad 17 can avoid the centre gripping position to receive serious extrusion, and oblique cutting edge is handled and can be increased clamping range.
Wherein, lower holder 5 all is equipped with the triangle fixed block with last holder 8, and goes up holder 8's triangle fixed block top outer wall and seted up screw 18, and the triangle fixed block can increase the holding power of face to the holder, avoids the pipeline overweight to make the holder fracture.
Wherein, spout 19 has all been seted up to the inboard outer wall of two fixed columns 3, and equal fixedly connected with sand grip 20 on the 7 both sides outer walls of T template, sand grip 20 and the design of spout 19 phase-match, and movable clamp plate 2 can slide about spout 19 are inside through sand grip 20, and the restriction movable clamp plate 2's removal route also can play the effect of fixed stay simultaneously.
Wherein, equal fixed welding has connecting plate 21 on the outer wall of both sides about fixed column 3, and has all seted up the connecting hole on the connecting plate 21, can be fixed in the wall with solid fixed splint 1 through connecting plate 21 and connecting hole on, make things convenient for the centre gripping pipeline to use.
The working principle is as follows: when using this device, earlier be fixed in the wall through connecting plate 21 with solid fixed splint 1 on, inside sand grip 20 and the guide arm 9 on the splint 2 will move insert spout 19 and guide rail 6 respectively, pass fixed orifices one 12 and two 13 messenger fixed block 11 and guide rail 6 reciprocal anchorages with screw 16 again, move splint 2 through the pull-up and make the holder 8 shift up and put into the gas pipeline, it presss from both sides tight gas pipeline to loosen holder 8 under the effect of internal spring 10 on the splint 2, at this moment, pass another screw 16 regulation hole one 14 and two 15 messenger guide arms 9 and guide rail 6 reciprocal anchorages with corresponding regulation hole, thereby make and move splint 2 and solid fixed splint 1 reciprocal anchorages, it is inseparabler to the gas pipeline centre gripping.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A wall-mounted gas pipeline installation mechanism comprises a fixed splint (1) and a movable splint (2), it is characterized in that the fixed splint (1) is formed by fixedly connecting two fixed columns (3) through a bottom connecting block (4), and the outer walls of the two fixed columns (3) are fixedly connected with lower clampers (5), the fixed columns (3) are internally provided with guide rails (6), the movable clamping plate (2) is in a T-shaped plate (7) shape, an upper clamper (8) is fixedly arranged on the outer wall of the bottom of the T-shaped plate (7), the bottoms of the two sides of the T-shaped plate (7) are fixedly connected with guide rods (9), the movable clamping plate (2) is connected between the inner walls of the guide rails (6) of the fixed clamping plate (1) in a sliding way through the guide rods (9), the bottom of the guide rod (9) is welded with a spring (10), and the other end of the spring (10) is welded to the top of the fixing block (11).
2. The wall-mounted type gas pipeline mounting mechanism according to claim 1, wherein the total length of the guide rod (9) with the spring (10) and the fixing block (11) is the same as the depth of the guide rail (6), the outer walls of the bottoms of the two fixing columns (3) are respectively provided with a first fixing hole (12), the outer wall of the fixing block (11) is provided with a second fixing hole (13) matched with the first fixing hole (12), the outer wall of the top of each fixing column (3) is provided with a first adjusting hole (14), similarly, the outer wall of the guide rod (9) is provided with a plurality of second adjusting holes (15) matched with the first adjusting holes (14), the first fixing holes (12) and the first adjusting holes (14) have the same hole diameter design, and the first fixing holes (12) and the first adjusting holes (14) are respectively provided with screws (16).
3. The wall-mounted type gas pipeline installation mechanism according to claim 1, wherein the inner side clamping surfaces of the lower clamp holder (5) and the upper clamp holder (8) are arc-shaped surfaces with opposite opening directions, the arc-shaped surfaces of the lower clamp holder (5) and the upper clamp holder (8) are provided with silica gel pads (17), and corners of the silica gel pads (17) are subjected to beveling treatment.
4. A wall-mounted gas pipeline mounting mechanism as claimed in claim 1, wherein the lower holder (5) and the upper holder (8) are provided with triangular fixing blocks, and the outer wall of the top of the triangular fixing block of the upper holder (8) is provided with a screw hole (18).
5. A wall-mounted gas pipeline mounting mechanism as claimed in claim 1, wherein the inner outer walls of the two fixing posts (3) are provided with sliding grooves (19), and the outer walls of the two sides of the T-shaped plate (7) are fixedly connected with raised strips (20), wherein the raised strips (20) are designed to match with the sliding grooves (19).
6. A wall-mounted type gas pipeline mounting mechanism as claimed in claim 1, wherein the outer walls of the upper and lower sides of the fixed column (3) are fixedly welded with connecting plates (21), and the connecting plates (21) are respectively provided with a connecting hole.
CN202121642288.4U 2021-07-20 2021-07-20 Wall-mounted gas pipeline installation mechanism Active CN214889366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121642288.4U CN214889366U (en) 2021-07-20 2021-07-20 Wall-mounted gas pipeline installation mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121642288.4U CN214889366U (en) 2021-07-20 2021-07-20 Wall-mounted gas pipeline installation mechanism

Publications (1)

Publication Number Publication Date
CN214889366U true CN214889366U (en) 2021-11-26

Family

ID=78926839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121642288.4U Active CN214889366U (en) 2021-07-20 2021-07-20 Wall-mounted gas pipeline installation mechanism

Country Status (1)

Country Link
CN (1) CN214889366U (en)

Similar Documents

Publication Publication Date Title
CN214889366U (en) Wall-mounted gas pipeline installation mechanism
CN214978875U (en) Water tank guardrail welding tool with high speed and good stability
CN215941992U (en) Pipeline welding fixing clamp for petrochemical industry
CN211804594U (en) Bending part welding fixture
CN213562235U (en) Connecting pipe cold-charging clamping device
CN210908774U (en) Device for welding branch pipes of cooling water pipe
CN204867676U (en) Processing of ribbed pipe internal tooth is with supplementary clamping jaw
CN211490218U (en) Pipe clamping mechanism
CN214393315U (en) Needle tube tapping clamp
CN213259113U (en) Machining device capable of rapidly clamping bridge steel mould
CN215699403U (en) Building pipe welding device
CN215791848U (en) Aluminum-plastic combination frock convenient to adjust
CN210105285U (en) K-plate steel molding plate with double rectangular pipe sliding positioning clamps
CN210615545U (en) Elbow welding device
CN216828428U (en) Bending device for reinforcing mesh production
CN219618527U (en) Welding machine fixing device for large-caliber pipeline
CN210397944U (en) Temporary supporting device for plastic pipeline in building construction
CN213745532U (en) Separation guide mechanism of flexible pipe of pipeline robot
CN214162902U (en) Compound pressure pipe production is moulded to MVPE double-deck steel and is used anchor clamps
CN211759087U (en) Heat exchanger clamping device
CN215238354U (en) Heat exchange copper pipe internal thread processing clamping device
CN210589337U (en) Manipulator convenient to press from both sides and get article
CN212419343U (en) Half trimming die for external support of automobile exhaust pipe
CN216779945U (en) Y type tee bend copper pipe forming device that bends
CN214789420U (en) Fixing support adaptable to pipelines with different diameters