CN214889330U - Compound underground city reserves pre-buried structure - Google Patents

Compound underground city reserves pre-buried structure Download PDF

Info

Publication number
CN214889330U
CN214889330U CN202120845931.7U CN202120845931U CN214889330U CN 214889330 U CN214889330 U CN 214889330U CN 202120845931 U CN202120845931 U CN 202120845931U CN 214889330 U CN214889330 U CN 214889330U
Authority
CN
China
Prior art keywords
plate
bottom plate
side plates
fixedly connected
underground city
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120845931.7U
Other languages
Chinese (zh)
Inventor
李康德
陈德卓
朱锦秋
邝汉兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Water & Electricity Equipment Installation Co ltd
Original Assignee
Guangdong Water & Electricity Equipment Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Water & Electricity Equipment Installation Co ltd filed Critical Guangdong Water & Electricity Equipment Installation Co ltd
Priority to CN202120845931.7U priority Critical patent/CN214889330U/en
Application granted granted Critical
Publication of CN214889330U publication Critical patent/CN214889330U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a composite underground city reserved embedded structure, which comprises a main frame, upright rods and a bottom plate, wherein the main frame comprises a middle frame and side plates, the side plates are symmetrically arranged at two sides of the middle frame, the side plates are fixedly connected with the middle frame, the upright posts are symmetrically arranged on the side plates and are vertically and fixedly connected with the side plates, the bottom plate is arranged on the lower end surfaces of the side plates and is fixedly connected with the side plates, when a user needs to transport, the main frame, the upright stanchion and the bottom plate can be mutually detached, so as to ensure that the equipment can be better loaded, transported and used, when the upright post reaches a designated position, a user can firstly stably pass the lower end of the side plate through the clamping groove and enter the mounting sleeve, when a plurality of upright posts are installed, a user can install the upright posts at the lower end of the main frame through the bottom plate, the screw is then stably inserted through the attachment hole and then the user is mounted on the head of the screw by means of the nut.

Description

Compound underground city reserves pre-buried structure
Technical Field
The utility model relates to a city pre-buried mechanism technical field specifically is a pre-buried structure is reserved in compound underground city.
Background
Need to reserve pre-buried pipe fitting when adorning to drainage line in urban construction and fix for later stage uses, often need fix a position pre-buried pipeline with the model at the pre-buried in-process of reservation of pipeline.
The utility model discloses an inventor discovers, and the pre-buried mechanism simple structure is reserved in current city, and stability is relatively poor at the in-process of in-service use, and the use can't normally be installed at the in-process of pipe laying like this, and the pre-buried mechanism structure is reserved in traditional city comparatively fixed simultaneously, and is inconvenient to dismantle into each part respectively with it, and it is very inconvenient to transport like this, needs whole change when the part damages, increases cost of maintenance.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pre-buried structure is reserved in compound underground city aims at improving current city and reserves pre-buried mechanism simple structure, and stability is relatively poor at the in-process of in-service use, and the in-process of laying the pipeline can't normally install the use like this, and the pre-buried mechanism structure is reserved in traditional city simultaneously comparatively fixed, and is inconvenient to dismantle into each part respectively with it, transports like this very inconveniently, needs the whole change when the part damages, increases cost of maintenance's problem.
The utility model discloses a realize like this:
the utility model provides a pre-buried structure is reserved in compound underground city, includes body frame, pole setting and bottom plate, the body frame includes well frame and curb plate, the curb plate symmetry sets up in the both sides of well frame, and curb plate and well frame fixed connection, the pole setting symmetry sets up on the curb plate, and pole setting and curb plate vertical fixation are connected, the bottom plate is installed at the lower terminal surface of curb plate, and bottom plate and curb plate fixed connection.
Furthermore, the middle frame comprises a horizontal plate and arc-shaped plates, the arc-shaped plates are symmetrically arranged on two sides of the horizontal plate, and the arc-shaped plates are fixedly connected with the horizontal plate.
Furthermore, the up end of horizontal plate still evenly is provided with a plurality of rubber blocks, the backup pad is installed to the upper end of rubber block, the backup pad passes through rubber block and horizontal plate fixed connection.
Furthermore, the side plates are symmetrically provided with mounting sleeves, the middle parts of the side plates are provided with connecting holes, and the lower ends of the mounting sleeves are further provided with clamping grooves.
Furthermore, the lower extreme of pole setting is provided with the fixture block with draw-in groove matched with, the fixture block takes shape with pole setting is integrative.
Furthermore, the two sides of the bottom plate are symmetrically provided with screw rods corresponding to the connecting holes, and the screw rods are vertically and fixedly connected with the bottom plate.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a pre-buried structure is reserved in compound underground city, can be with the body frame when the user needs the transportation, pole setting and bottom plate three are dismantled each other and are removed, guarantee that equipment can be better load the transportation and use, the user just can pass the draw-in groove with the pole setting is stable from the curb plate lower extreme and enter into the installation cover after reacing appointed position at first, the user just can install the lower extreme at the body frame through the bottom plate after having all to install when many pole settings, then with the stable connecting hole that passes of screw rod, then the user passes through the nut and installs the head at the screw rod, guarantee to support the fixture block, the pole setting just can and the body frame between mutual fixation get up like this, and guarantee through the setting of block rubber that the pipeline has certain buffering effect in the backup pad, avoid appearing the condition of destruction in the use.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a perspective view of the device of the present invention;
FIG. 2 is a schematic structural view of the mainframe of FIG. 1;
FIG. 3 is a front view of the device of FIG. 2;
FIG. 4 is a bottom view of the device of FIG. 2;
figure 5 is a schematic structural view of the pole of figure 1;
fig. 6 is a schematic structural view of the base plate shown in fig. 1.
In the figure: 1. a main frame; 11. a middle frame; 111. a horizontal plate; 112. an arc-shaped plate; 113. a rubber block; 114. a support plate; 12. a side plate; 121. installing a sleeve; 122. connecting holes; 123. a card slot; 2. erecting a rod; 21. a clamping block; 3. a base plate; 31. a screw.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
Referring to fig. 1, fig. 2, fig. 3, fig. 4, fig. 5 and fig. 6, a pre-buried structure is reserved in compound underground city, including body frame 1, pole setting 2 and bottom plate 3, body frame 1 includes well frame 11 and curb plate 12, it supports the erection pipeline through well frame 11 and uses to guarantee that the user can be stable through the structure setting to body frame 1, guarantee to carry out spacing fixed purpose to pole setting 2 through the setting to curb plate 12 simultaneously, curb plate 12 symmetry sets up the both sides at well frame 11, and curb plate 12 and well frame 11 fixed connection, through reserving pre-buried mechanism structure and installation process to traditional city and researching, design a pre-buried structure is reserved in compound underground city, can dismantle pole setting 1, pole setting 2 and bottom plate 3 three each other when guaranteeing that the user needs to transport, guarantee that equipment can be better loads the transportation and use, the user just can pass pole setting 2 stable from curb plate 12 lower extreme after reacing appointed position at first The clamping groove 123 enters the mounting sleeve 121, after the upright posts 2 are mounted, a user can mount the upright posts at the lower end of the main frame 1 through the bottom plate 3, the screw rod 31 stably penetrates through the connecting hole 122, the user mounts the upright posts at the head of the screw rod 31 through nuts to support the clamping blocks 21, so that the upright posts 2 can be fixed with the main frame 1, the upright posts 2 and the bottom plate 3 can stably bury the bottom plate 3 after being fixedly connected with each other, so that the user can place and support pipelines through the support plate 114, meanwhile, the arrangement of the arc-shaped plate 112 ensures that the pipelines are limited in use and certain buffering effect is achieved on the support plate 114 through the arrangement of the rubber block 113, the situation of damage in the using process is avoided, and the problem that the existing urban pre-buried mechanism is simple in structure is effectively solved, the stability is poor in the actual use process, so that the pipeline can not be normally installed and used in the pipeline laying process, meanwhile, the traditional urban reserved embedded mechanism is relatively fixed in structure and is inconvenient to disassemble into various parts, so that the transportation is very inconvenient, the whole pipeline needs to be replaced when the parts are damaged, and the maintenance cost is increased;
the middle frame 11 comprises a horizontal plate 111 and arc plates 112, the arc plates 112 are symmetrically arranged at two sides of the horizontal plate 111, the arc plates 112 are fixedly connected with the horizontal plate 111, the purpose of connecting the arc plates 112 at two sides through the horizontal plate 111 is ensured through the structural arrangement of the middle frame 11, the upper end surface of the horizontal plate 111 for ensuring the arc plates 112 at two sides to limit and fix an installed pipeline is uniformly provided with a plurality of rubber blocks 113, the upper end of each rubber block 113 is provided with a supporting plate 114, the supporting plate 114 is fixedly connected with the horizontal plate 111 through the rubber blocks 113, the buffering effect of the supporting plate 114 is ensured through the arrangement of the rubber blocks 113, so that the pipeline is stably placed and used through the supporting plate 114, the side plates 12 are symmetrically provided with installation sleeves 121, the middle parts of the side plates 12 are provided with connection holes 122, the lower ends of the installation sleeves 121 are also provided with clamping grooves 123, the clamping and the installation sleeves 121 and 123 are arranged to ensure that the vertical rods 2 are clamped and fixed inside, meanwhile, the purpose of matching, installing and fixing the screw 31 is ensured by arranging the connecting hole 122, the aperture of the hole 121 is smaller than the diameter of the clamping groove 123, and the clamping block 21 can be clamped and fixed through the clamping groove 123 when the vertical rod 2 passes through the installing sleeve 121;
the upright stanchion 2 is symmetrically arranged on the side plate 12, the upright stanchion 2 is vertically and fixedly connected with the side plate 12, the upright stanchion 2 is arranged to facilitate the positioning of external equipment and the installation and use of the external equipment, the lower end of the upright stanchion 2 is provided with a fixture block 21 matched with the clamping groove 123, the fixture block 21 and the upright stanchion 2 are integrally formed, the diameter of the fixture block 21 is larger than that of the upright stanchion 2, the clamping block 21 is arranged to ensure that the upright rod 2 is more stable in the clamping groove 123, the bottom plate 3 is arranged on the lower end surface of the side plate 12, the bottom plate 3 is fixedly connected with the side plate 12, the purpose that the equipment can be stably fixed on the ground is ensured by arranging the bottom plate 3, the two sides of the bottom plate 3 are symmetrically provided with the screw rods 31 corresponding to the connecting holes 122, the screw rods 31 are vertically and fixedly connected with the bottom plate 3, the purpose of fixing the base plate 3 and the main frame 1 to each other is to fit a nut by providing the screw 31.
The device obtained by the design can basically meet the use of a composite underground city reserved embedded structure, but the designer further improves the device according to the aim of further improving the function of the device.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a pre-buried structure is reserved in compound underground city which characterized in that: including body frame (1), pole setting (2) and bottom plate (3), body frame (1) is including well frame (11) and curb plate (12), curb plate (12) symmetry sets up the both sides in well frame (11), and curb plate (12) and well frame (11) fixed connection, pole setting (2) symmetry sets up on curb plate (12), and pole setting (2) and curb plate (12) vertical fixation are connected, the lower terminal surface at curb plate (12) is installed in bottom plate (3), and bottom plate (3) and curb plate (12) fixed connection.
2. A composite underground city reserved embedded structure according to claim 1, wherein the middle frame (11) comprises a horizontal plate (111) and arc plates (112), the arc plates (112) are symmetrically arranged on two sides of the horizontal plate (111), and the arc plates (112) are fixedly connected with the horizontal plate (111).
3. A composite underground city reserved embedded structure according to claim 2, wherein a plurality of rubber blocks (113) are uniformly arranged on the upper end surface of the horizontal plate (111), a support plate (114) is installed at the upper end of each rubber block (113), and the support plate (114) is fixedly connected with the horizontal plate (111) through the rubber blocks (113).
4. A composite underground city reserved embedded structure according to claim 3, wherein the side plates (12) are symmetrically provided with mounting sleeves (121), the middle parts of the side plates (12) are provided with connecting holes (122), and the lower ends of the mounting sleeves (121) are further provided with clamping grooves (123).
5. A composite underground city reserved embedded structure according to claim 4, wherein the lower end of the vertical rod (2) is provided with a clamping block (21) matched with the clamping groove (123), and the clamping block (21) and the vertical rod (2) are integrally formed.
6. A composite underground city reserved embedded structure according to claim 5, wherein the two sides of the bottom plate (3) are symmetrically provided with screw rods (31) corresponding to the connecting holes (122), and the screw rods (31) are vertically and fixedly connected with the bottom plate (3).
CN202120845931.7U 2021-04-23 2021-04-23 Compound underground city reserves pre-buried structure Active CN214889330U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120845931.7U CN214889330U (en) 2021-04-23 2021-04-23 Compound underground city reserves pre-buried structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120845931.7U CN214889330U (en) 2021-04-23 2021-04-23 Compound underground city reserves pre-buried structure

Publications (1)

Publication Number Publication Date
CN214889330U true CN214889330U (en) 2021-11-26

Family

ID=78888420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120845931.7U Active CN214889330U (en) 2021-04-23 2021-04-23 Compound underground city reserves pre-buried structure

Country Status (1)

Country Link
CN (1) CN214889330U (en)

Similar Documents

Publication Publication Date Title
CN214889330U (en) Compound underground city reserves pre-buried structure
CN212249293U (en) Electric spool fixing device based on manger plate platform
CN212178084U (en) Can have enough to meet need concrete pump line elbow and consolidate steel support
CN209881308U (en) Reinforced cable bridge
CN106025963A (en) Anti-leakage overhead incoming line combination fixing apparatus for 10kV distribution room
CN205637823U (en) Ready -package wall body covering or awning on a car, boat, etc. room
CN208386087U (en) A kind of mobile network's cable support device
CN216716118U (en) Lamp pole convenient to dismantle
CN219654449U (en) Movable protective railing between bridge construction joints
CN213402072U (en) Telescopic electric power box body device
CN218813841U (en) Landscape lamp foundation ground cage
CN212775955U (en) Pipe pillow for reinforced concrete drainage pipe
CN112332754B (en) Photovoltaic support base protection device
CN211816408U (en) Concrete prefabricated part for comprehensive pipe gallery
CN205480072U (en) Laboratory is with camera, cell -phone support frame
CN204243541U (en) A kind of power distribution cabinet assembly being easy to locate based on triangle and arc splice plate
CN210508220U (en) Floor support convenient to installation
CN210716309U (en) Pipeline supporting device
CN220341961U (en) Photovoltaic support bridge connecting mechanism
CN217269350U (en) Assembly type building base with light steel structure
CN211817151U (en) Civil engineering's bulkhead
CN220254082U (en) Bus bridge convenient to install and detach
CN212849670U (en) Temporary cable erection support for building construction
CN217402490U (en) Multi-edge rod structure
CN219826223U (en) 5G base station base locating rack that suitability is wide

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant