CN214887091U - Tunnel bow member assembled construction equipment - Google Patents

Tunnel bow member assembled construction equipment Download PDF

Info

Publication number
CN214887091U
CN214887091U CN202121732988.2U CN202121732988U CN214887091U CN 214887091 U CN214887091 U CN 214887091U CN 202121732988 U CN202121732988 U CN 202121732988U CN 214887091 U CN214887091 U CN 214887091U
Authority
CN
China
Prior art keywords
base
sleeves
sleeve
screw
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121732988.2U
Other languages
Chinese (zh)
Inventor
龚美
伏亚锋
李科
陈俊涛
郭鸿雁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhongjiao Guihuang Expressway Co ltd
Guizhou Provincial Traffic Engineering Quality Supervision Bureau
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
Guizhou Zhongjiao Guihuang Expressway Co ltd
Guizhou Provincial Traffic Engineering Quality Supervision Bureau
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhongjiao Guihuang Expressway Co ltd, Guizhou Provincial Traffic Engineering Quality Supervision Bureau, China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical Guizhou Zhongjiao Guihuang Expressway Co ltd
Priority to CN202121732988.2U priority Critical patent/CN214887091U/en
Application granted granted Critical
Publication of CN214887091U publication Critical patent/CN214887091U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to the technical field of tunnel construction, in particular to a tunnel arch assembling type construction device, which comprises a base, a slide way is fixedly arranged at the top of the base, an adjusting component is arranged in the slide way, a cross post is arranged at the top end of the base, the lower end of the cross post is fixedly connected on the adjusting component, a plurality of supporting components distributed in a circumferential array are arranged on the cross post, the supporting components comprise a supporting plate, sleeves are arranged at two ends of the supporting plate, one end of each sleeve is fixedly connected on the cross post, a plurality of first threaded holes distributed at equal intervals are arranged on each sleeve, a movable rod is arranged outside each sleeve, a plurality of second threaded holes distributed at equal intervals are arranged on each movable rod, one end of each movable rod is inserted in each sleeve, a plurality of bolts are arranged on each sleeve, a disc is fixedly arranged at the end part of each movable rod, the movable rods in the plurality of supporting components are detachably connected with the sleeves, and the movable rods and the sleeves are disassembled, when the device needs to be carried and transported, the movable rod and the sleeve are disassembled, so that the space can be saved, and the device is convenient to carry.

Description

Tunnel bow member assembled construction equipment
Technical Field
The utility model relates to a tunnel construction technical field especially relates to a tunnel bow member assembled construction equipment.
Background
In recent years, the underground engineering industry of China is rapidly developed, which not only shows the increase of quantity, but also develops and breaks through the technology rapidly. With the rapid development of the construction scale and speed of underground engineering, the installation speed and quality of the steel arch serving as the main supporting member of the underground primary engineering are particularly important for saving working hours, and the steel arch serving as the main supporting member of the underground engineering in China still adopts a field manual installation mode.
Because unable dismouting between current tunnel bow member strutting arrangement's the structure leads to occupation space and transport inconvenience in the actual transportation, and the position of the unable regulation backup pad of current tunnel bow member strutting arrangement simultaneously to unable adaptation different cross sectional area's tunnel, we provide a tunnel bow member assembled construction equipment for this reason.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the unable dismouting between the structure that has tunnel bow member strutting arrangement among the prior art, lead to occupation space and the inconvenient shortcoming of transport in the actual transportation, and the tunnel bow member assembled construction equipment who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the design is a tunnel arch frame assembly type construction device which comprises a base, wherein a slide way is fixedly installed at the top of the base, an adjusting component is arranged in the slide way and can move along the slide way, a cross post is arranged at the top end of the base, the lower end of the cross post is fixedly connected to the adjusting component, a plurality of supporting components distributed in a circumferential array are arranged on the cross post, each supporting component comprises a supporting plate, sleeves are arranged at two ends of each supporting plate, one end of each sleeve is fixedly connected to the cross post, a plurality of first threaded holes distributed at equal intervals are formed in each sleeve, a movable rod is arranged outside each sleeve, a plurality of second threaded holes distributed at equal intervals are formed in each movable rod, one end of each movable rod is inserted into each sleeve, a plurality of bolts are arranged on each sleeve and penetrate through the first threaded holes and the second threaded holes to connect the sleeves and the movable rods together through threads, the end part of the movable rod is fixedly provided with a disc, and the disc is connected with the supporting plate through a screw.
Preferably, the jacks are formed in four corners of the base, the movable rod is fixedly provided with a reinforcing rod, and the end part of the reinforcing rod is fixedly connected to the disc.
Preferably, both ends of the top of the base are fixedly provided with handles.
Preferably, the adjusting component comprises a sliding seat, the top of the sliding seat is fixedly connected with the cross column, and the sliding seat is arranged in the slide way in a sliding manner.
Preferably, the adjusting part still includes the screw rod, the screw rod runs through slide and tip and is rotatable the installation inboard at the slide respectively, the outer rotatable carousel of installing of slide, the pivot of carousel runs through the slide and links firmly with the screw rod.
The utility model provides a pair of tunnel bow member assembled construction equipment, beneficial effect lies in: the movable rods and the sleeves in the supporting assemblies are detachably connected, the movable rods and the sleeves are disassembled when the transporting device is transported, the space can be saved and the transporting device is convenient to transport by disassembling the movable rods and the sleeves, the movable rods are connected at different positions in the sleeves, and the positions of the supporting plates can be adjusted, so that the tunnels with different cross-sectional areas are adapted.
Drawings
Fig. 1 is the utility model provides a tunnel bow member assembled construction equipment's working schematic diagram.
Fig. 2 is the utility model provides a tunnel bow member assembled construction equipment's schematic structure diagram.
Fig. 3 is an enlarged schematic view of the support assembly of the tunnel arch fabricated construction device provided by the utility model.
In the figure: the device comprises a base 1, a slide way 2, a cross column 3, a supporting plate 4, a sleeve 5, a first threaded hole 6, a movable rod 7, a second threaded hole 8, a bolt 9, a disc 10, a reinforcing rod 11, a jack 12, a handle 13, a sliding seat 14, a screw 15, a rotary table 16 and a tunnel 101.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1:
referring to fig. 1-3, a tunnel arch assembling type construction device comprises a base 1, a slide way 2 is fixedly installed at the top of the base 1, an adjusting component is arranged in the slide way 2 and can move along the slide way 2, a cross post 3 is arranged at the top end of the base 1, the lower end of the cross post 3 is fixedly connected with the adjusting component, a plurality of supporting components distributed in a circumferential array are arranged on the cross post 3, each supporting component comprises a supporting plate 4, sleeves 5 are arranged at two ends of each supporting plate 4, one end of each sleeve 5 is fixedly connected with the cross post 3, a plurality of first threaded holes 6 distributed at equal intervals are formed in each sleeve 5, a movable rod 7 is arranged outside each sleeve 5, a plurality of second threaded holes 8 distributed at equal intervals are formed in each movable rod 7, one end of each movable rod 7 is inserted into each sleeve 5, a plurality of bolts 9 are arranged on each sleeve 5, each bolt 9 penetrates through the first threaded hole 6 and the second threaded hole 8 and connects the sleeve 5 with the movable rod 7 through a thread, the end part of the movable rod 7 is fixedly provided with a disc 10, and the disc 10 is connected with the support plate 4 through a screw.
The movable rod 7 and the sleeve 5 in the supporting assemblies are detachably connected, the movable rod 7 and the sleeve 5 are disassembled, when the device needs to be carried and transported, the device can be carried conveniently by disassembling the movable rod 7 and the sleeve 5, the position of the supporting plate 4 can be adjusted by connecting the movable rod 7 to different positions in the sleeve 5, so that the device is suitable for tunnels 101 with different cross-sectional areas, the working schematic diagram of the device can be referred to as that shown in figure 1 in the attached drawing of the specification, and the inner wall of the tunnel 101 is supported by the supporting plates 4.
Example 2:
referring to fig. 1-3, as another preferred embodiment of the present invention, the difference from embodiment 1 is that the jacks 12 are all opened at the four corners of the base 1, the external bolts of the accessible run through the jacks 12 and are inserted into the soil layer, so as to adjust the stability of the base 1, the movable rod 7 is fixedly provided with the reinforcing rod 11, the end of the reinforcing rod 11 is fixedly connected to the disc 10, and the supporting strength of the movable rod 7 can be improved. The handles 13 are fixedly mounted at the two ends of the top of the base 1, so that the base 1 is convenient to carry.
The adjusting component comprises a sliding seat 14, the top of the sliding seat 14 is fixedly connected with the cross column 3, and the sliding seat 14 is arranged in the slideway 2 in a sliding manner. The adjusting assembly further comprises a screw 15, the screw 15 penetrates through the sliding seat 14, the end portions of the screw 15 are respectively rotatably installed on the inner side of the slide way 2, a turntable 16 is rotatably installed outside the slide way 2, and a rotating shaft of the turntable 16 penetrates through the slide way 2 and is fixedly connected with the screw 15. Through setting up the adjusting part, rotate carousel 16 and drive screw rod 15 and rotate to make slide 14 remove along slide 2, can transversely adjust the position of a plurality of backup pads 4, because the partial position in tunnel needs to support, thereby support the different positions in tunnel 101, with different operating modes in being suitable for the reality.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The tunnel arch assembling type construction device comprises a base (1) and is characterized in that a slide way (2) is fixedly mounted at the top of the base (1), an adjusting component is arranged in the slide way (2) and can move along the slide way (2), a cross column (3) is arranged at the top end of the base (1), the lower end of the cross column (3) is fixedly connected onto the adjusting component, a plurality of supporting components distributed in a circumferential array are arranged on the cross column (3), each supporting component comprises a supporting plate (4), sleeves (5) are arranged at two ends of each supporting plate (4), one ends of the sleeves (5) are fixedly connected onto the cross column (3), a plurality of first threaded holes (6) distributed at equal intervals are formed in the sleeves (5), movable rods (7) are arranged outside the sleeves (5), a plurality of second threaded holes (8) distributed at equal intervals are formed in the movable rods (7), activity pole (7) one end is inserted and is established in sleeve pipe (5), be equipped with a plurality of bolts (9) on sleeve pipe (5), bolt (9) run through first screw hole (6) and second screw hole (8) and with sleeve pipe (5) and activity pole (7) threaded connection together, activity pole (7) tip fixed mounting has disc (10), disc (10) are connected with backup pad (4) through the screw.
2. The tunnel arch fabricated construction device according to claim 1, characterized in that the four corners of the base (1) are provided with insertion holes (12), the movable rod (7) is fixedly provided with a reinforcing rod (11), and the end of the reinforcing rod (11) is fixedly connected to the disc (10).
3. A tunnel arch fabricated construction device according to claim 1, wherein handles (13) are fixedly installed at both ends of the top of the base (1).
4. The assembled construction equipment of the tunnel arch according to the claim 1, characterized in that, the adjusting component includes a sliding base (14), the top of the sliding base (14) is fixedly connected with the cross pillar (3), the sliding base (14) is arranged in the slideway (2) in a sliding way.
5. The assembled construction device for the tunnel arch according to claim 4, wherein the adjusting component further comprises a screw (15), the screw (15) penetrates through the sliding base (14) and the ends of the screw are respectively rotatably installed at the inner sides of the sliding ways (2), a rotating disc (16) is rotatably installed outside the sliding ways (2), and a rotating shaft of the rotating disc (16) penetrates through the sliding ways (2) and is fixedly connected with the screw (15).
CN202121732988.2U 2021-07-28 2021-07-28 Tunnel bow member assembled construction equipment Expired - Fee Related CN214887091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121732988.2U CN214887091U (en) 2021-07-28 2021-07-28 Tunnel bow member assembled construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121732988.2U CN214887091U (en) 2021-07-28 2021-07-28 Tunnel bow member assembled construction equipment

Publications (1)

Publication Number Publication Date
CN214887091U true CN214887091U (en) 2021-11-26

Family

ID=78909941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121732988.2U Expired - Fee Related CN214887091U (en) 2021-07-28 2021-07-28 Tunnel bow member assembled construction equipment

Country Status (1)

Country Link
CN (1) CN214887091U (en)

Similar Documents

Publication Publication Date Title
CN204916605U (en) Prefab strutting arrangement
CN110985085A (en) Support arrangement for arch tunnel construction is used
CN214887091U (en) Tunnel bow member assembled construction equipment
CN110700282B (en) Side wall supporting device for foundation engineering construction
CN110921506A (en) Rotary lifting beam of coal mine transportation system
CN205294752U (en) Rescue robot platform
CN210002909U (en) Steel construction sky rail hydraulic pressure pushes away piston shoes device
CN210099340U (en) Improved steel bar framework positioning jig frame
CN219772748U (en) Bridge node reinforcing apparatus
CN216811114U (en) Civil engineering constructs support frame convenient to dismantle
CN218439266U (en) Drill rod mounting platform at soil outlet end of horizontal directional drilling
CN111677321A (en) Assembled building reinforced structure
CN213679558U (en) Tower crane support reinforcing apparatus for building be convenient for adjust
CN221074307U (en) Underground coal mine supporting anchor net fixing device
CN219809022U (en) Tunnel engineering steel arch centering positioning auxiliary device
CN219011856U (en) Stable type urban wall restoration support frame
CN213571967U (en) Combined pile pit supporting device convenient to install
CN218493198U (en) Stress unloading decomposition device for producing steel structure
CN214543393U (en) Roller type cable support
CN219298784U (en) Quick detach formula building engineering template bearing structure
CN215292509U (en) Cross support reinforcing apparatus for tunnel construction
CN220881148U (en) Quick welding platform for pipe-jacking steel reinforcement framework
CN212799409U (en) Water pumping test stand
CN216680913U (en) Auxiliary tool for welding shovel plate of tunneling machine
CN211898946U (en) Mounting structure of prefabricated building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126

CF01 Termination of patent right due to non-payment of annual fee