CN214885355U - Construction platform for high-rise building overhanging structural layer - Google Patents
Construction platform for high-rise building overhanging structural layer Download PDFInfo
- Publication number
- CN214885355U CN214885355U CN202121066001.8U CN202121066001U CN214885355U CN 214885355 U CN214885355 U CN 214885355U CN 202121066001 U CN202121066001 U CN 202121066001U CN 214885355 U CN214885355 U CN 214885355U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- construction platform
- rise building
- fixing
- shaped connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a construction platform of high-rise building structural layer of encorbelmenting relates to building construction technical field. The utility model discloses a protection component, dismouting subassembly and backup pad, protection component include right angle connecting rod and dead lever, and the one end at right angle connecting rod and dead lever top is connected with the bottom of backup pad, and the dismouting subassembly includes U-shaped connecting rod and link block, the inside wall of U-shaped connecting rod and one side fixed connection of link block. The utility model discloses a set up protection component and dismouting subassembly, the construction platform security performance of having solved current high-rise building structural layer of encorbelmenting is relatively poor, can't increase effectual protection to construction platform, greatly reduced the device's security to and need the staff to install in construction department, the step is comparatively loaded down with trivial details, the danger coefficient is higher, get up very inconvenience to this kind of interim operation panel and handling frame dismouting, can't carry out quick installation and the problem of demolising to the device.
Description
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a construction platform of high-rise building structural layer of encorbelmenting.
Background
The high-rise building is a residential building with the building height of more than 27m and a non-single-storey factory building, a warehouse and other civil buildings with the building height of more than 24m, and the high-rise building is formed by building with more than a certain number of floors or height. The height or the number of layers of the starting point of the high-rise building are different from national regulations, and no absolute and strict standard exists, but the high-rise building still has the following defects in actual use:
1. the construction platform of the existing high-rise building overhanging structure layer has poor safety performance, effective protection cannot be added to the construction platform, the danger of falling objects at high altitude is great due to the high building, and the psychological pressure of high altitude construction on workers is great, so that the safety of the device is greatly reduced;
2. the construction platform of current high-rise building structural layer of encorbelmenting needs the staff to install in construction department when using, and the step is comparatively loaded down with trivial details, and danger coefficient is higher, and to this kind of temporary operation panel and handling frame dismouting inconvenience of getting up very, can't carry out quick installation and demolish to the device.
Therefore, the existing construction platform for the cantilever structure layer of the high-rise building cannot meet the requirements in practical use, so that an improved technology is urgently needed in the market to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction platform of high-rise building structural layer of encorbelmenting, through setting up protection component and dismouting subassembly, it is relatively poor to have solved the construction platform security performance of current high-rise building structural layer of encorbelmenting, can't increase effectual protection to construction platform, because the building is higher, the danger of falling object from high altitude is very big, and the high altitude construction is great to staff's psychological pressure, greatly reduced the device's security, and need the staff to install in construction department, the step is comparatively loaded down with trivial details, the danger coefficient is higher, the inconvenience very of getting up to this kind of interim operation panel and handling frame dismouting, can't carry out quick installation and the problem of demolising to the device.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a construction platform of high-rise building structural layer of encorbelmenting, including protection component, dismouting subassembly and backup pad, protection component includes right angle connecting rod and dead lever, the one end at right angle connecting rod and dead lever top is connected with the bottom of backup pad, the dismouting subassembly includes U-shaped connecting rod and link block, one side fixed connection of the inside wall of U-shaped connecting rod and link block.
Further, the connecting sliding grooves are formed in the two sides of the supporting plate, the inner wall of each connecting sliding groove is connected with the outer wall of the corresponding connecting sliding block in a sliding mode, the fence is fixedly connected to the top of the supporting plate, the device can protect the safety of workers who are constructed on the supporting plate by means of the fence arranged on the supporting plate, and safety of the device is greatly improved.
Furthermore, a connecting through hole is formed in one end of the top of each right-angle connecting rod and one end of the top of each fixing rod, a first fixing bolt is connected to the inner wall of each connecting through hole in a threaded mode, the top of the first fixing bolt penetrates through the connecting through hole and is fixedly connected with the bottom of the supporting plate, the connecting through hole is formed in the right-angle connecting rods, the right-angle connecting rods and the fixing rods can be fixed to the supporting plates through the first fixing bolts, and therefore the protection assembly is more stable when in use.
Further, right angle connecting rod angle side fixedly connected with second protection network, the first protection network of fixedly connected with between the right angle connecting rod, the third protection network of fixedly connected with between right angle connecting rod and the dead lever, the device utilization can protect and connect around the construction platform at first protection network, second protection network and third protection network, greatly increased the device's barrier propterty.
Further, the equal joint in both ends of U-shaped connecting rod has first fixing base, the joint has the gag lever post on the U-shaped connecting rod of first fixing base front side, the joint has the second fixing base on the U-shaped connecting rod of gag lever post front side, and the device utilizes joint gag lever post, first fixing base and second fixing base on the U-shaped connecting rod, can carry on spacingly to the position of U-shaped connecting rod, takes place the displacement when avoiding using.
Further, the both ends of first fixing base and second fixing base threaded connection respectively have second fixing bolt, second fixing bolt has sixteen, and the device utilizes second fixing bolt to fix first fixing base and second fixing base, greatly increased the device's steadiness.
The utility model discloses following beneficial effect has:
1. the utility model discloses a set up protection component, connect between right angle connecting rod and dead lever through using first protection network, second protection network and third protection network to fix it in the backup pad through first fixing bolt, can improve staff's factor of safety, reduce psychological pressure, avoid the danger of high altitude weight thing, greatly increased the device's practicality.
2. The utility model discloses a set up the dismouting subassembly, carry on spacingly to the U-shaped connecting rod through with first fixing base and second fixing base, in the link block of construction platform sliding connection on the U-shaped connecting rod that will install, avoid needing to install under unsettled state for installation safety more, and it is convenient to dismantle, and the next use of being convenient for has improved staff's work efficiency greatly.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
figure 2 is an exploded view of the shield assembly of figure 1 in accordance with the present invention;
fig. 3 is a schematic structural view of the dismounting assembly of fig. 1 according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a fence; 2. a guard assembly; 201. a right angle connecting rod; 202. a first protection net; 203. a second protective net; 204. a third protection net; 205. fixing the rod; 206. a first fixing bolt; 207. a connecting through hole; 3. disassembling and assembling the components; 301. a U-shaped connecting rod; 302. a first fixed seat; 303. a second fixing bolt; 304. a second fixed seat; 305. a limiting rod; 306. connecting the sliding block; 4. connecting the sliding chute; 5. and a support plate.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Please refer to fig. 1-3, the utility model relates to a construction platform of high-rise building structural layer of encorbelmenting, including protection component 2, dismouting subassembly 3 and backup pad 5, protection component 2 includes right angle connecting rod 201 and dead lever 205, the one end at right angle connecting rod 201 and dead lever 205 top is connected with backup pad 5's bottom, dismouting subassembly 3 includes U-shaped connecting rod 301 and link block 306, one side fixed connection of U-shaped connecting rod 301's inside wall and link block 306, connecting chute 4 has been seted up to backup pad 5's both sides, connecting chute 4's inner wall and link block 306's outer wall sliding connection, backup pad 5's top fixedly connected with rail 1.
As shown in fig. 2, a connecting through hole 207 is formed at one end of the top of the right-angle connecting rod 201 and the fixing rod 205, a first fixing bolt 206 is connected to the inner wall of the connecting through hole 207 in a threaded manner, the top of the first fixing bolt 206 passes through the connecting through hole 207 and is fixedly connected with the bottom of the supporting plate 5, a second protection net 203 is fixedly connected to the side of the corner of the right-angle connecting rod 201, a first protection net 202 is fixedly connected between the right-angle connecting rods 201, a third protection net 204 is fixedly connected between the right-angle connecting rod 201 and the fixing rod 205, when in use, a worker pushes one end of the right-angle connecting rod 201 and the fixing rod 205 against the bottom of the supporting plate 5, the first fixing bolt 206 passes through the connecting through hole 207 by using an external tool, and fixes the right-angle connecting rod 201 and the fixing rod 205 at the bottom of the supporting plate 5, at this time, the first protection net 202, the second protection net 203 and the third protection net 204 surround the periphery of the supporting plate 5, and first protection network 202, second protection network 203 and third protection network 204 have certain elasticity, can cushion and protect the article that drops, and when dismantling, only need the staff pull down first fixing bolt 206 with the help of external instrument can.
As shown in FIG. 3, a first fixing seat 302 is fastened to both ends of a U-shaped connecting rod 301, a limiting rod 305 is fastened to the U-shaped connecting rod 301 at the front side of the first fixing seat 302, a second fixing seat 304 is fastened to the U-shaped connecting rod 301 at the front side of the limiting rod 305, second fixing bolts 303 are respectively screwed to both ends of the first fixing seat 302 and the second fixing seat 304, and sixteen second fixing bolts 303 are provided, when the device is used, a worker places one end of the U-shaped connecting rod 301 at a cantilever position of a high-rise building, fastens the limiting rod 305 to the U-shaped connecting rod 301, and inserts the U-shaped connecting rod into the building, then fastens the first fixing seat 302 and the second fixing seat 304 to the U-shaped connecting rod 301 at both sides of the limiting rod 305 by using an external tool, at the moment, fixes the first fixing seat 302 and the second fixing seat 304 by using the second fixing bolt 303, and finally connects the connecting chutes 4 at both sides of the supporting plate 5 with the connecting slide block 306, the supporting plate 5 can be quickly moved and detached.
One specific application of this embodiment is: during the use, fix rail 1 on backup pad 5, at this moment, the staff uses external instrument to pass connecting hole 207 with first fixing bolt 206, fixes right angle connecting rod 201 and dead lever 205 in the bottom of backup pad 5 to and with first fixing base 302 and second fixing base 304 joint to the U-shaped connecting rod 301 of gag lever post 305 both sides, fix first fixing base 302 and second fixing base 304 through second fixing bolt 303, again with the backup pad 5 connection installed on link block 306 can.
The above is only the preferred embodiment of the present invention, and the present invention is not limited thereto, any technical solutions recorded in the foregoing embodiments are modified, and some technical features thereof are replaced with equivalent ones, and any modification, equivalent replacement, and improvement made thereby all belong to the protection scope of the present invention.
Claims (6)
1. The utility model provides a construction platform of high-rise building structural layer of encorbelmenting, includes protection component (2), dismouting subassembly (3) and backup pad (5), its characterized in that: protection component (2) include right angle connecting rod (201) and dead lever (205), the one end at right angle connecting rod (201) and dead lever (205) top is connected with the bottom of backup pad (5), dismouting subassembly (3) are including U-shaped connecting rod (301) and link block (306), the inside wall of U-shaped connecting rod (301) and one side fixed connection of link block (306).
2. The construction platform of the cantilever structure layer of the high-rise building as claimed in claim 1, wherein the support plate (5) is provided with connecting sliding grooves (4) at both sides thereof, the inner walls of the connecting sliding grooves (4) are slidably connected with the outer walls of the connecting sliding blocks (306), and the top of the support plate (5) is fixedly connected with a fence (1).
3. The construction platform of the cantilever structure layer of the high-rise building as claimed in claim 1, wherein a connecting through hole (207) is opened at one end of the top of the right-angle connecting rod (201) and the fixing rod (205), a first fixing bolt (206) is connected to the inner wall of the connecting through hole (207) in a threaded manner, and the top of the first fixing bolt (206) passes through the connecting through hole (207) to be fixedly connected with the bottom of the supporting plate (5).
4. The construction platform of the cantilever structure layer of the high-rise building as claimed in claim 1, wherein a second protection net (203) is fixedly connected to the corner side of the right-angle connecting rods (201), a first protection net (202) is fixedly connected between the right-angle connecting rods (201), and a third protection net (204) is fixedly connected between the right-angle connecting rods (201) and the fixing rods (205).
5. The construction platform of the cantilever structure layer of the high-rise building as claimed in claim 1, wherein both ends of the U-shaped connecting rod (301) are respectively clamped with a first fixing seat (302), the U-shaped connecting rod (301) at the front side of the first fixing seat (302) is clamped with a limiting rod (305), and the U-shaped connecting rod (301) at the front side of the limiting rod (305) is clamped with a second fixing seat (304).
6. The construction platform of the cantilever structure layer of the high-rise building as claimed in claim 5, wherein the first fixing seat (302) and the second fixing seat (304) are respectively screwed with a second fixing bolt (303), and the number of the second fixing bolts (303) is sixteen.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121066001.8U CN214885355U (en) | 2021-05-18 | 2021-05-18 | Construction platform for high-rise building overhanging structural layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121066001.8U CN214885355U (en) | 2021-05-18 | 2021-05-18 | Construction platform for high-rise building overhanging structural layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214885355U true CN214885355U (en) | 2021-11-26 |
Family
ID=78891381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121066001.8U Active CN214885355U (en) | 2021-05-18 | 2021-05-18 | Construction platform for high-rise building overhanging structural layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214885355U (en) |
-
2021
- 2021-05-18 CN CN202121066001.8U patent/CN214885355U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214885355U (en) | Construction platform for high-rise building overhanging structural layer | |
CN112575919A (en) | Maintainable buckling-restrained energy-dissipation supporting device | |
CN210950401U (en) | Anti-seismic support | |
CN113982302A (en) | Undisturbed replacement construction method for existing seismic isolation building seismic isolation support | |
CN212613236U (en) | Fixed connection structure for building curtain wall engineering | |
CN211396562U (en) | Anti-falling device for building construction | |
CN213174718U (en) | Steel pipe tower is as doing platform | |
CN212427545U (en) | Steel construction antidetonation support | |
Wang et al. | Design methods of reinforce-concrete frame structure to resist progressive collapse in civil engineering | |
CN105178618A (en) | Protecting frame for construction of prefabricated external wall board with bay window | |
CN219587290U (en) | Temporary building convenient to dismouting | |
CN110847352A (en) | Bolt ball net rack purline assembling construction method | |
CN211079892U (en) | Safety protection blocking net for bridge | |
CN217232837U (en) | Safety anti-falling device for building | |
CN205400023U (en) | Scaffold base in elevartor shaft | |
CN210286559U (en) | Anti-climbing device for tower crane | |
Bai et al. | Study on the application of attached lifting scaffolding in the construction of large projects | |
CN220225880U (en) | Steel construction building body and ceiling thereof | |
CN214531253U (en) | Maintainable buckling-restrained energy-dissipation supporting device | |
CN221682555U (en) | Building construction protector | |
CN210888249U (en) | Novel anti-seismic energy-saving steel structure mobile house | |
CN215254448U (en) | Double-deck protection frame top fixing device | |
CN212154075U (en) | Construction platform that stability can be good | |
CN219621945U (en) | Assembled building beam column steel structure connecting piece | |
CN219931583U (en) | House building construction platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |