CN214861998U - Tail gas treatment device of plaster production - Google Patents

Tail gas treatment device of plaster production Download PDF

Info

Publication number
CN214861998U
CN214861998U CN202120549684.6U CN202120549684U CN214861998U CN 214861998 U CN214861998 U CN 214861998U CN 202120549684 U CN202120549684 U CN 202120549684U CN 214861998 U CN214861998 U CN 214861998U
Authority
CN
China
Prior art keywords
tail gas
gas treatment
fixedly connected
treatment box
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120549684.6U
Other languages
Chinese (zh)
Inventor
杜超
王春帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Daohe Medical Biotechnology Co ltd
Original Assignee
Zhengzhou Daohe Medical Biotechnology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Daohe Medical Biotechnology Co ltd filed Critical Zhengzhou Daohe Medical Biotechnology Co ltd
Priority to CN202120549684.6U priority Critical patent/CN214861998U/en
Application granted granted Critical
Publication of CN214861998U publication Critical patent/CN214861998U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermotherapy And Cooling Therapy Devices (AREA)

Abstract

The utility model relates to the technical field of tail gas treatment, in particular to a tail gas treatment device for plaster production, which comprises a tail gas treatment box, a telescopic pipe and an air inlet pipe, wherein the lower side of the right end surface of the tail gas treatment box is fixedly connected with a water outlet, the lower end of the inner side of the right end surface of the tail gas treatment box is provided with a dissolving solution, the middle of the right end surface of the tail gas treatment box is provided with an air outlet, the lower end of the left end surface of the tail gas treatment box is fixedly connected with a communicating vessel, the middle of the left end surface of the tail gas treatment box is fixedly connected with a water inlet, the middle of the inner side of the tail gas treatment box is fixedly connected with a guide pipe, and the middle of the inner side of the tail gas treatment box is fixedly connected with a first fan. Has good convenience.

Description

Tail gas treatment device of plaster production
Technical Field
The utility model relates to a tail gas treatment technical field specifically is a tail gas processing apparatus of plaster production.
Background
The plaster therapy of plaster through skin is one of the commonly used external treatment methods in clinical traditional Chinese medicine, it follows the principle of the dialectical treatment of traditional Chinese medicine and the efficacy, main treatment and meridian tropism of traditional Chinese medicine, fully mobilize the efficiency that the medicament coordinates as using each other, make up the compound of many medicaments, in order to exert the good effect of the medicament, because the plaster is applied to the body surface directly, and the medicament making the plaster is mostly thick in smell, add the pungent and fragrant and walk the extremely strong channel-inducing medicament, through permeating into the skin, internal transmission main and collateral channels, viscera, play a role in regulating qi and blood, dredging main and collateral channels, dispel cold-dampness, eliminating the gall, etc., the application to the tail gas treatment device of a plaster production is increasingly extensive, therefore, the demand for the tail gas treatment device of a plaster production is increasing day by day.
Most tail gas treatment devices for plaster production in the market do not have the arrangement for adjusting the distance between a plaster production position and the treatment device in the using process, and the situation that gas generated in the plaster production process cannot be completely absorbed by the tail gas treatment device can occur in the using process of the devices, so that the tail gas treatment device for plaster production is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tail gas processing apparatus of plaster production to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a tail gas treatment device for plaster production comprises a tail gas treatment box, a telescopic pipe and an air inlet pipe, wherein a water outlet is fixedly connected to the lower side of the right end face of the tail gas treatment box, a dissolving liquid is arranged at the lower end of the inner side of the right end face of the tail gas treatment box, an air outlet is arranged in the middle of the right end face of the tail gas treatment box, a communicating vessel is fixedly connected to the lower end of the left end face of the tail gas treatment box, a water inlet is fixedly connected to the middle of the left end face of the tail gas treatment box, a guide pipe is fixedly connected to the middle of the inner side of the tail gas treatment box, a first fan is fixedly connected to the middle of the inner side of the tail gas treatment box, a condensing pipe is arranged at the left end of the air outlet, a plastic buckle is fixedly connected to the upper side of the right end face of the tail gas treatment box, a filter screen is fixedly connected to the inner side of the plastic buckle, a guide groove is slidably connected to the outer side of the left end of the tail gas treatment box, a telescopic pipe is fixedly connected to the tail gas treatment box through a connecting screw and a sealing washer, the telescopic fan is characterized in that the lower end of the telescopic pipe is fixedly connected with an air inlet pipe through a sealing washer and a connecting screw, the upper end of the left side of the air inlet pipe is fixedly connected with a telescopic guide rod, the upper end of the right side of the air inlet pipe is fixedly connected with an electric telescopic rod, and the middle inner side of the air inlet pipe is fixedly connected with a second fan through a fixed support.
Preferably, flexible guide bar and electric telescopic handle set up the position between tail gas treatment box and intake pipe, be parallel setting between flexible guide bar and the electric telescopic handle.
Preferably, the telescopic pipe is fixedly connected with the lower end face of the tail gas treatment box and the upper end face of the air inlet pipe through a connecting screw and a sealing washer, and the telescopic pipe and the air inlet pipe are vertically arranged.
Preferably, the first fan, the second fan and the condensation pipe are electrically connected.
Preferably, the filter screen passes through plastics buckle fixed connection in the inboard position of tail gas treatment case, be the vertically setting between filter screen and the tail gas treatment case.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, the air inlet pipe and the tail gas treatment box can be tightly connected together through the telescopic guide rod, the electric telescopic rod, the telescopic pipe and the sealing washer, and the distance between the air inlet pipe and the plaster production can be adjusted according to actual requirements when the device is used, so that the device has good convenience;
2. the utility model discloses in, through filter screen, plastics buckle, guide way and the condenser pipe that sets up, be convenient for change the inside filter screen of device, can effectually prevent simultaneously that solution from following the gas flow and taking place in the outside condition of tail gas treatment case, have good practicality, be worth carrying on extensive using widely.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural diagram of a portion a in fig. 1 according to the present invention.
In the figure: 1-tail gas treatment box, 2-communicating vessel, 3-water inlet, 4-filter screen, 5-guide groove, 6-plastic buckle, 7-first fan, 8-air outlet, 9-condenser pipe, 10-guide pipe, 11-solution, 12-water outlet, 13-telescopic guide rod, 14-fixed support, 15-second fan, 16-connecting screw, 17-electric telescopic rod, 18-telescopic pipe, 19-sealing washer and 20-air inlet pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution:
a tail gas treatment device for plaster production comprises a tail gas treatment box 1, a telescopic pipe 18 and an air inlet pipe 20, wherein the lower side of the right end face of the tail gas treatment box 1 is fixedly connected with a water outlet 12, the lower end of the inner side of the right end face of the tail gas treatment box 1 is provided with a dissolving liquid 11, the middle of the right end face of the tail gas treatment box 1 is provided with an air outlet 8, the lower end of the left end face of the tail gas treatment box 1 is fixedly connected with a communicating vessel 2, the middle of the left end face of the tail gas treatment box 1 is fixedly connected with a water inlet 3, the middle of the inner side of the tail gas treatment box 1 is fixedly connected with a guide pipe 10, the middle of the inner side of the tail gas treatment box 1 is fixedly connected with a first fan 7, the left end of the air outlet 8 is provided with a condenser pipe 9, the upper side of the right end face of the tail gas treatment box 1 is fixedly connected with a plastic buckle 6, the inner side of the plastic buckle 6 is fixedly connected with a filter screen 4, the outer side of the left end of the filter screen 4 is slidably connected with a guide groove 5, the lower side of the left end of the upper side of the tail gas treatment box 1 is fixedly connected with the telescopic pipe 18 through a connecting screw 16 and a sealing washer 19, the lower end of the telescopic pipe 18 is fixedly connected with an air inlet pipe 20 through a sealing washer 19 and a connecting screw 16, the upper end of the left side of the air inlet pipe 20 is fixedly connected with a telescopic guide rod 13, the upper end of the right side of the air inlet pipe 20 is fixedly connected with an electric telescopic rod 17, and the middle inner side of the air inlet pipe 20 is fixedly connected with a second fan 15 through a fixed support 14.
The telescopic guide rod 13 and the electric telescopic rod 17 are arranged between the tail gas treatment box 1 and the gas inlet pipe 20, and the telescopic guide rod 13 and the electric telescopic rod 17 are arranged in parallel, so that the connection stability of the devices is improved; the telescopic pipe 18 is fixedly connected with the lower end face of the tail gas treatment box 1 and the upper end face of the air inlet pipe 20 through a connecting screw 16 and a sealing washer 19 respectively, and the telescopic pipe 18 and the air inlet pipe 20 are vertically arranged, so that the connection tightness between the devices is improved; the first fan 7, the second fan 15 and the condensation pipe 9 are electrically connected, so that the stability is improved; filter screen 4 is the vertically setting through 6 fixed connection of plastics buckle in the inboard position of tail gas treatment case 1 between filter screen 4 and the tail gas treatment case 1, is convenient for change filter screen 4.
The working process is as follows: when the tail gas treatment device for plaster production needs to be used, firstly, a worker needs to move the tail gas treatment box 1 to the plaster production position, then moves the gas inlet pipe 20 to the position above the production position, then controls the electric telescopic rod 17 to drive the gas inlet pipe 20 to move downwards, the gas inlet pipe 20 stops moving when moving to the position 30cm above plaster processing, the worker energizes the whole device after adjustment is completed, so that gas generated in the plaster production process can be sucked into the tail gas treatment box 1, the gas entering the tail gas treatment box 1 firstly removes impurities in the gas through the filter screen 4, then the gas is in full contact with the solution 11 through the guide pipe 10, the gas generated in the plaster production process is discharged out of the tail gas treatment box 1 through the gas outlet 8 after being in contact with the solution 11, the condensing pipe 9 arranged at the left end of the gas outlet 8 can liquefy the gas in contact with the water vapor of the solution 11, such an arrangement can effectively prevent the solution 11 from flowing into the outside of the exhaust gas treatment tank 1 with the gas during use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a tail gas processing apparatus of plaster production, includes tail gas treatment case (1), flexible pipe (18) and intake pipe (20), its characterized in that: the tail gas treatment box comprises a tail gas treatment box (1), a water outlet (12) is fixedly connected to the lower side of the right end face of the tail gas treatment box (1), a dissolving liquid (11) is arranged at the lower end of the inner side of the right end face of the tail gas treatment box (1), a gas outlet (8) is formed in the middle of the right end face of the tail gas treatment box (1), a communicating vessel (2) is fixedly connected to the lower end of the left end face of the tail gas treatment box (1), a water inlet (3) is fixedly connected to the middle of the left end face of the tail gas treatment box (1), a guide pipe (10) is fixedly connected to the middle of the inner side of the tail gas treatment box (1), a first fan (7) is fixedly connected to the middle of the inner side of the tail gas treatment box (1), a condensing pipe (9) is arranged at the left end of the gas outlet (8), a plastic buckle (6) is fixedly connected to the upper side of the right end face of the tail gas treatment box (1), a filter screen (4) is fixedly connected to the inner side of the plastic buckle (6), a guide groove (5) is slidably connected to the outer side of the left end of the filter screen (4), tail gas treatment case (1) upside left end downside passes through connecting screw (16) and seal ring (19) fixedly connected with flexible pipe (18), flexible pipe (18) lower extreme passes through seal ring (19) and connecting screw (16) fixedly connected with intake pipe (20), intake pipe (20) left side upper end fixedly connected with telescopic guide bar (13), intake pipe (20) right side upper end fixedly connected with electric telescopic handle (17), inboard is through fixed bolster (14) fixedly connected with second fan (15) in the middle of intake pipe (20).
2. A tail gas processing apparatus of plaster production according to claim 1, characterized in that: the tail gas treatment device is characterized in that the telescopic guide rod (13) and the electric telescopic rod (17) are arranged at positions between the tail gas treatment box (1) and the gas inlet pipe (20), and the telescopic guide rod (13) and the electric telescopic rod (17) are arranged in parallel.
3. A tail gas processing apparatus of plaster production according to claim 1, characterized in that: the telescopic pipe (18) is fixedly connected with the lower end face of the tail gas treatment box (1) and the upper end face of the air inlet pipe (20) through a connecting screw (16) and a sealing washer (19), and the telescopic pipe (18) and the air inlet pipe (20) are vertically arranged.
4. A tail gas processing apparatus of plaster production according to claim 1, characterized in that: the first fan (7), the second fan (15) and the condensation pipe (9) are electrically connected.
5. A tail gas processing apparatus of plaster production according to claim 1, characterized in that: filter screen (4) are through plastics buckle (6) fixed connection in the inboard position of tail gas treatment case (1), be the vertically setting between filter screen (4) and the tail gas treatment case (1).
CN202120549684.6U 2021-03-17 2021-03-17 Tail gas treatment device of plaster production Active CN214861998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120549684.6U CN214861998U (en) 2021-03-17 2021-03-17 Tail gas treatment device of plaster production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120549684.6U CN214861998U (en) 2021-03-17 2021-03-17 Tail gas treatment device of plaster production

Publications (1)

Publication Number Publication Date
CN214861998U true CN214861998U (en) 2021-11-26

Family

ID=79036990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120549684.6U Active CN214861998U (en) 2021-03-17 2021-03-17 Tail gas treatment device of plaster production

Country Status (1)

Country Link
CN (1) CN214861998U (en)

Similar Documents

Publication Publication Date Title
CN107583114A (en) A kind of Emergence fast and safely sputum aspirator
CN214861998U (en) Tail gas treatment device of plaster production
CN109364312B (en) Stifled drainage device is prevented to thoracic surgery
CN208591694U (en) A kind of hydrogen chloride tail gas processing unit
CN209092328U (en) Neurosurgery drainage device
CN208959593U (en) A kind of environment-friendly type industrial waste-gas purifier
CN107050538A (en) A kind of Thyroid Surgery drainage system
CN208582853U (en) A kind of Gastroenterology dept.'s explosive-feeding processing device
CN214261294U (en) Thermal failure waste gas collection device
CN207041696U (en) The depression drainage device of pressure adjustable
CN208838101U (en) A kind of operation nursing abdominocentesis drainage device
CN206837591U (en) A kind of new duplex strainer
CN206381425U (en) A kind of medical negative pressure bottle accessory and the negative pressure bottle using the accessory
CN216537568U (en) Integrated treatment equipment for waste gas of sewage station
CN206121440U (en) Remove formaldehyde device
CN201643086U (en) Special connecting pipe for blood perfusion use
CN213012015U (en) Energy-saving air-stripping circulation type sewage treatment device
CN205042309U (en) Preprocessing device for industrial waste gas
CN207627648U (en) Suction sputum bottle
CN205308109U (en) Waste gas energy saving and emission reduction processing apparatus
CN205687705U (en) A kind of wastewater zero discharge processes integration apparatus
CN211864519U (en) Desulfurizing tower
CN204709478U (en) A kind of Digestive system filters refluxing device
CN215584973U (en) Aspirator connecting pipe
CN218249486U (en) Waste gas washing tower for industrial waste gas treatment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant