CN214847427U - Engineering cost progress management device - Google Patents
Engineering cost progress management device Download PDFInfo
- Publication number
- CN214847427U CN214847427U CN202121183175.2U CN202121183175U CN214847427U CN 214847427 U CN214847427 U CN 214847427U CN 202121183175 U CN202121183175 U CN 202121183175U CN 214847427 U CN214847427 U CN 214847427U
- Authority
- CN
- China
- Prior art keywords
- progress
- support frame
- groove
- board
- locking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000001125 extrusion Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 12
- 230000001737 promoting effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 3
- 125000006850 spacer group Chemical group 0.000 description 7
- 230000001174 ascending effect Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 210000000887 face Anatomy 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Landscapes
- Illuminated Signs And Luminous Advertising (AREA)
Abstract
The application relates to engineering cost's technical field especially relates to engineering cost progress management device, including the show case, be provided with the progress board on the show case, seted up the progress show groove on the progress board, sliding fit has the progress indicator board on the show case, and the progress indicator board sets up with the progress board is corresponding, has seted up the locking groove on the show case, is provided with on the progress indicator board to be used for with the locking device of locking groove extrusion locking. The method and the device have the advantages that the statistics of the project progress is more convenient, and the project progress can be displayed more visually.
Description
Technical Field
The application relates to the technical field of construction cost, in particular to a construction cost progress management device.
Background
The current construction cost refers to the construction cost expected or actually paid out during the construction period of a construction project, wherein the construction project comprises various stages of projects carried out in the surveying, designing, constructing and managing stages of the construction project. And project schedule management, namely determining project schedule by adopting a scientific method, compiling the schedule and a resource supply schedule, and further controlling the schedule to realize a project period target.
In the existing engineering cost progress management process, workers are generally required to count and conclude the engineering progress after reporting the project progress.
For the related technologies, the inventor thinks that the defects that the project progress is not convenient to count and can not be understood at a glance exist.
SUMMERY OF THE UTILITY MODEL
In order to make the statistics of engineering progress more convenient to make the show of engineering progress more directly perceived, this application provides engineering cost progress management device.
The engineering cost progress management device adopts the following technical scheme:
engineering cost progress management device, including the show case, be provided with the progress board on the show case, progress show groove has been seted up on the progress board, sliding fit has the progress indicator board on the show case, the progress indicator board corresponds the setting with the progress board, the locking groove has been seted up on the show case, be provided with on the progress indicator board and be used for with the locking device of locking groove extrusion locking.
Through adopting above-mentioned technical scheme, be provided with the progress board on the show box, progress indicator board and show box sliding fit slide the progress indicator board on the show box according to the engineering progress to make the progress indicator board slide to the progress show groove department back of corresponding position department, lock the progress indicator board through locking device, can make the show of engineering progress more directly perceived.
Optionally: the locking device comprises a locking rod arranged on the progress indicating plate in a penetrating mode and a locking block arranged on the locking rod, the locking block is abutted to the locking groove, and the locking block and the locking groove are arranged correspondingly.
Through adopting above-mentioned technical scheme, when moving the check lock lever to the locking groove, can drive the latch segment and insert the locking inslot, make latch segment and locking groove looks butt, increase the frictional force between progress indicator board and the show case, carry out spacing processing to the progress indicator board.
Optionally: the cover is equipped with the elastic component that resets that is used for promoting latch segment butt in the locking inslot on the check lock lever, the both ends of the elastic component that resets all are connected with progress indicator board and latch segment.
Through adopting above-mentioned technical scheme, through the setting of the elastic component that resets, make the latch segment insert the locking inslot after, the elastic component that resets drives the tight butt of latch segment in the locking inslot, make the butt between latch segment and the locking groove more stable.
Optionally: the display box is characterized in that a vertical containing groove is formed in the display box, a support frame is arranged in the containing groove in a sliding fit mode, and a limiting device used for limiting the sliding of the support frame is arranged on the display box.
Through adopting above-mentioned technical scheme, be provided with stop device on the show case, carry out the ascending slip of vertical side with the carriage in accomodating the inslot, after the sliding adjustment is accomplished, carry out spacing processing through stop device to support frame and show case, can realize the regulation to the height of show case, make things convenient for the user of different heights to use the show case.
Optionally: the limiting device comprises a connecting rope arranged on the display box and a limiting pin arranged in the connecting rope, a plurality of inserting holes are formed in the display box, limiting holes are formed in the supporting frame, and the display box is connected with the supporting frame after the limiting pin sequentially penetrates through the inserting holes and the limiting holes.
Through adopting above-mentioned technical scheme, with the carriage after sliding adjustment accomplishes in the show box, insert the spliced eye with the spacer pin in proper order and spacing downthehole, can carry out spacing processing with support frame and show box, realize the regulation to the height of show box, the simple operation.
Optionally: the support frame is provided with a mounting plate, and the mounting plate is provided with a movable wheel.
Through adopting above-mentioned technical scheme, through the setting of mounting panel, can realize the installation to removing the wheel, through the setting that removes the wheel, can conveniently remove the show case.
Optionally: the mounting panel normal running fit is on the support frame, and is provided with on the support frame and is used for carrying out spacing limiting plate to the rotation of mounting panel, the lower surface butt of mounting panel is on the limiting plate.
Through adopting above-mentioned technical scheme, the rotor plate normal running fit on the support frame, can make the rotor plate rotate to through accomodating the display box with the support frame in, conveniently carry the display box, through the setting of limiting plate, can make the mounting panel when needs are opened the use, the mounting panel can not rotate the below of support frame, and the use that makes the removal wheel is more convenient.
Optionally: the clamping device comprises a fixing plate arranged on the support frame, an elastic piece arranged on the fixing plate and a clamping block arranged on the elastic piece, a clamping groove is formed in the mounting plate, and the clamping block and the clamping groove are correspondingly arranged.
Through adopting above-mentioned technical scheme, through clamping device's setting, when making the mounting panel upwards rotate, the mounting panel extrudees grip block and elastic component, and after the mounting panel rotated vertical position, the elastic component drove the grip block and extrudees the mounting panel and presss from both sides tightly, can conveniently take in the display box with the mounting panel.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the progress indicating plate is arranged on the display box and is in sliding fit with the display box, the progress indicating plate slides on the display box according to the engineering progress, and after the progress indicating plate slides to the progress display groove at the corresponding position, the progress indicating plate is locked through the locking device, so that the engineering progress can be displayed more visually;
2. through being provided with stop device on the show case, carry out the ascending slip of vertical side with the carriage in accomodating the inslot, after the sliding adjustment is accomplished, carry out spacing processing through stop device to support frame and show case, can realize the regulation to the height of show case, make things convenient for the user of different heights to use the show case.
Drawings
FIG. 1 is a partial cross-sectional view of the present application;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
fig. 3 is a partially enlarged view at B in fig. 1.
Reference numerals: 1. a display box; 11. a locking groove; 12. a receiving groove; 13. inserting holes; 14. a rain shield; 15. a handle; 16. a label holding box; 17. a fixing pin; 2. a progress plate; 21. a progress display slot; 3. a progress indicator board; 4. a locking device; 41. a locking lever; 42. a locking block; 5. a restoring elastic member; 6. a support frame; 61. a limiting plate; 7. a limiting device; 71. connecting ropes; 72. a spacing pin; 8. mounting a plate; 81. a moving wheel; 82. a clamping groove; 9. a clamping device; 91. a fixing plate; 92. an elastic member; 93. and (4) clamping the block.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses engineering cost progress management device. Referring to fig. 1 and 2, the engineering cost progress management device comprises a display box 1, wherein the display box 1 is a vertical rectangular box, a rain baffle 14 is fixedly arranged at the top end of the display box 1, the rain baffle 14 is an arc-shaped plate, and a lifting handle 15 is fixedly arranged on the upper surface of the rain baffle 14. Fixed progress board 2 that is provided with on show case 1, progress board 2 are vertical rectangular plate, and progress board 2 is provided with threely along vertical decurrent orientation, has evenly seted up progress show groove 21 on progress board 2, and progress show groove 21 is the rectangular channel. The display box 1 is fixedly provided with a label placing box 16, the label placing box 16 is a vertical hollow rectangular box, the top end of the label placing box 16 is an opening end, and the bottom end of the label placing box is a sealing end. Sliding fit has progress indicator board 3 on show box 1, and progress indicator board 3 is "L" template, and the one end that progress indicator board 3 is close to show box 1 sets up to "T" type structure, offers "T" type spout with 3 looks adaptations of progress indicator board on the show box 1, and progress indicator board 3 sets up with progress board 2 is corresponding. When the project progress needs to be displayed, the progress indicating plate 3 slides on the display box 1, and the progress indicating plate 3 slides to the corresponding progress display groove 21 to display the project progress.
Referring to fig. 1 and 2, locking groove 11 has been seted up on the side of show case 1, locking groove 11 is the rectangular channel of seting up on the length direction along show case 1, be provided with on progress indicator plate 3 and be used for the locking device 4 with locking groove 11 extrusion locking, locking device 4 is including wearing to locate the check lock lever 41 on progress indicator plate 3 and the latch segment 42 that is close to locking groove 11 one end on check lock lever 41 with fixed mounting, check lock lever 41 is horizontally "T" type pole, latch segment 42 is vertical rectangular segment, latch segment 42 sets up with locking groove 11 is corresponding, and latch segment 42 butt in locking groove 11. The cover is equipped with on the check lock pole 41 and is used for promoting the elastic component 5 that resets of latch segment 42 butt in locking groove 11, and the elastic component 5 that resets can directly adopt reset spring to constitute, and the elastic component 5 level that resets sets up, and the both ends of the elastic component 5 that resets all with progress indicator 3 and latch segment 42 fixed connection. When the progress indicating plate 3 needs to be adjusted in a sliding mode, the locking rod 41 is pulled to the position far away from the display box 1, the locking block 42 is pulled, the reset elastic piece 5 is extruded, then the progress indicating plate 3 slides on the display box 1, after the adjustment is completed, the locking rod 41 is loosened, the reset elastic piece 5 drives the locking block 42 to be inserted into the locking groove 11, and the adjustment of the progress indicating plate 3 is completed.
Referring to fig. 1 and 3, vertical groove 12 of accomodating has been seted up in display box 1, accomodate groove 12 for the vertical rectangular channel that upwards offers of 1 lower surface of display box, it has support frame 6 to accomodate inslot 12 sliding fit, support frame 6 is for falling "concave" style of calligraphy structure, spacing hole has been seted up on the support frame 6, be provided with stop device 7 that is used for carrying out spacing processing to the slip of support frame 6 on the display box 1, stop device 7 includes connecting rope 71 and fixed mounting in connecting the spacer pin 72 of restricting 71 of fixed mounting on display box 1, spacer pin 72 is the cylinder structure, a plurality of spliced eyes 13 have been seted up on display box 1, a plurality of spliced eyes 13 are seted up along the even interval of vertical direction. When the height of the display box 1 needs to be adjusted, the limiting pin 72 is drawn out from the limiting hole and the inserting hole 13, then the display box 1 is adjusted in the vertical direction, after the adjustment is completed, the limiting pin 72 sequentially penetrates through the inserting hole 13 and the limiting hole, the display box 1 is connected with the support frame 6, and the adjustment of the height of the display box 1 is completed.
Referring to fig. 1 and 3, the support frame 6 is rotatably fitted with a mounting plate 8, the mounting plate 8 is a horizontal rectangular plate, two mounting plates 8 are provided on the support frame 6, and the mounting plate 8 is rotatably fitted with a moving wheel 81. Wear to be equipped with on the support frame 6 and be used for carrying out spacing fixed pin 17 of handling to the rotation of mounting panel 8, fixed pin 17 is the horizontally cylinder pole, fixedly on the support frame 6 being provided with and being used for carrying out spacing limiting plate 61 to the rotation of mounting panel 8, and limiting plate 61 is the horizontally rectangular plate, and the lower surface butt of mounting panel 8 is on limiting plate 61.
Referring to fig. 1 and 3, two clamping devices 9 are fixedly arranged on the support frame 6, the two clamping devices 9 are arranged oppositely, each clamping device 9 comprises a fixing plate 91 fixedly arranged on the support frame 6, an elastic member 92 fixedly arranged on the fixing plate 91 and a clamping block 93 fixedly arranged on the elastic member 92, the fixing plate 91 is a horizontal "T" shaped plate, the elastic member 92 can be formed by directly adopting a reset spring, the elastic member 92 is horizontally arranged, two elastic members 92 are arranged on one fixing plate 91, the clamping blocks 93 are vertical rectangular blocks, and the side faces, far away from the elastic member 92, of the clamping blocks 93 are provided with arc-shaped faces. The side surface of the mounting plate 8 is provided with a clamping groove 82, the clamping groove 82 is a rectangular groove, and the clamping block 93 is arranged corresponding to the clamping groove 82. When needing to carry show case 1, take fixed pin 17 out from mounting panel 8 earlier, upwards rotate mounting panel 8, mounting panel 8 rotates behind clamping block 93 department, mounting panel 8 extrudees clamping block 93 and elastic component 92, rotate behind vertical position department when mounting panel 8, elastic component 92 drives clamping block 93 and inserts in the centre gripping groove 82, take spacer pin 72 out from spliced eye 13 after that, and with support frame 6 income show case 1 back, carry out spacing processing with show case 1 and support frame 6 with spacer pin 72, carry show case 1.
The implementation principle of the engineering cost progress management device in the embodiment of the application is as follows: when needing to demonstrate the engineering progress, take spacer pin 72 out from jack hole 13, slide regulation in display box 1 with support frame 6 after that, adjust and carry out spacing processing between accomplishing back with support frame 6 and display box 1 through spacer pin 72, rotate mounting panel 8 afterwards, make mounting panel 8 rotate horizontal position play back, it is spacing with mounting panel 8 through fixed pin 17, then with locking device 4 no longer to locking groove 11 locking back, pulling progress indicator plate 3 slides on display box 1, slide to corresponding position department after, lock between progress indicator plate 3 and display box 1 through locking device 4, demonstrate the engineering progress.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. Engineering cost progress management device, its characterized in that: including show case (1), be provided with progress board (2) on show case (1), progress show groove (21) have been seted up on progress board (2), sliding fit has progress indicator board (3) on show case (1), progress indicator board (3) set up with progress board (2) are corresponding, locking groove (11) have been seted up on show case (1), be provided with on progress indicator board (3) and be used for with locking groove (11) extrusion locking device (4).
2. The project cost progress management apparatus according to claim 1, characterized in that: locking device (4) are including wearing to locate check lock lever (41) on progress indicator board (3) and installing latch segment (42) on check lock lever (41), latch segment (42) butt is in locking groove (11), latch segment (42) and locking groove (11) correspond the setting.
3. The construction cost progress management device according to claim 2, characterized in that: the cover is equipped with on check lock pole (41) and is used for promoting the elastic component (5) that resets of latch segment (42) butt in locking groove (11), the both ends of elastic component (5) that reset all are connected with progress indicator board (3) and latch segment (42).
4. The project cost progress management apparatus according to claim 1, characterized in that: vertical storage groove (12) are formed in display box (1), support frame (6) is arranged in storage groove (12) in sliding fit, and limiting device (7) used for limiting sliding of support frame (6) is arranged on display box (1).
5. The construction cost progress management device according to claim 4, characterized in that: the limiting device (7) comprises a connecting rope (71) arranged on the display box (1) and a limiting pin (72) arranged in the connecting rope (71), a plurality of inserting holes (13) are formed in the display box (1), a limiting hole is formed in the support frame (6), and the display box (1) is connected with the support frame (6) after the limiting pin (72) sequentially penetrates through the inserting holes (13) and the limiting hole.
6. The construction cost progress management device according to claim 4, characterized in that: the support frame (6) is provided with a mounting plate (8), and the mounting plate (8) is provided with a moving wheel (81).
7. The project cost progress management apparatus according to claim 6, characterized in that: mounting panel (8) normal running fit is on support frame (6), and is provided with on support frame (6) and is used for carrying out spacing limiting plate (61) to the rotation of mounting panel (8), the lower surface butt of mounting panel (8) is on limiting plate (61).
8. The construction cost progress management device according to claim 7, characterized in that: the clamping device (9) is arranged on the supporting frame (6), the clamping device (9) comprises a fixing plate (91) arranged on the supporting frame (6), an elastic piece (92) arranged on the fixing plate (91) and a clamping block (93) arranged on the elastic piece (92), a clamping groove (82) is formed in the mounting plate (8), and the clamping block (93) and the clamping groove (82) are correspondingly arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121183175.2U CN214847427U (en) | 2021-05-28 | 2021-05-28 | Engineering cost progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121183175.2U CN214847427U (en) | 2021-05-28 | 2021-05-28 | Engineering cost progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214847427U true CN214847427U (en) | 2021-11-23 |
Family
ID=78780961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121183175.2U Expired - Fee Related CN214847427U (en) | 2021-05-28 | 2021-05-28 | Engineering cost progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214847427U (en) |
-
2021
- 2021-05-28 CN CN202121183175.2U patent/CN214847427U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102345787B (en) | Flat panel television frame | |
CN212986669U (en) | A concatenation formula large-size screen for IPFS data show | |
CN214847427U (en) | Engineering cost progress management device | |
CN210983945U (en) | Experimental device for middle school physics lever experiments | |
CN217400295U (en) | High hanging flower basket of security for building engineering | |
CN213397093U (en) | Verticality detector | |
CN114962941A (en) | Portable material recording equipment for social practice of college students | |
CN210210828U (en) | Test block frame of concrete curing room | |
CN209761276U (en) | Adjustable landscape door and window flowerpot placing frame | |
CN211212320U (en) | Novel manage and show with construction flow device | |
CN211065629U (en) | Archives management storage facilities is used in work | |
CN209980547U (en) | Model comparison device for VI design training of visual system | |
CN221688985U (en) | Wisdom industry garden operation management device | |
CN114365900B (en) | Computer auxiliary device convenient to economic management information is typeeed | |
CN215680038U (en) | Data display device for enterprise management | |
CN212185649U (en) | Law enforcement collection workstation with automatic support structure adjustment function | |
CN221488127U (en) | Space-adjustable server cabinet | |
CN220280861U (en) | Screen frame push-pull structure of photovoltaic glass screen printer | |
CN218721127U (en) | Xenon flash lamp assembly | |
CN221031084U (en) | Metal wall plate | |
CN221327329U (en) | Training show shelf with quick expansion structure | |
CN218712345U (en) | Simple traffic sign board easy to replace | |
CN215987866U (en) | A propaganda device for university student's innovation entrepreneur | |
CN215776673U (en) | Drawing suspension device for construction site management | |
CN210467224U (en) | Manpower resource performance display device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211123 |