CN214842910U - Water conservancy construction earthwork thickness detection ruler - Google Patents

Water conservancy construction earthwork thickness detection ruler Download PDF

Info

Publication number
CN214842910U
CN214842910U CN202120284715.XU CN202120284715U CN214842910U CN 214842910 U CN214842910 U CN 214842910U CN 202120284715 U CN202120284715 U CN 202120284715U CN 214842910 U CN214842910 U CN 214842910U
Authority
CN
China
Prior art keywords
fixture block
device base
water conservancy
lifting
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202120284715.XU
Other languages
Chinese (zh)
Inventor
徐皇星
于鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huashuo Engineering Management Co ltd
Original Assignee
Beijing Huashuo Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Huashuo Engineering Management Co ltd filed Critical Beijing Huashuo Engineering Management Co ltd
Priority to CN202120284715.XU priority Critical patent/CN214842910U/en
Application granted granted Critical
Publication of CN214842910U publication Critical patent/CN214842910U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an earthwork technical field just discloses a water conservancy construction earthwork thickness detection chi, including the device base, the bottom fixed mounting of device base has the spud pile, and the top fixed mounting of device base has the guide ring, the top fixed mounting of device base has the spliced pole, the top fixed mounting of spliced pole has the elevating platform, the top fixed mounting of elevating platform has the back shaft, the top of back shaft is rotated and is installed the support frame. The utility model discloses can drive the fixture block frame through pulling the handle from top to bottom and reciprocate to in will boring soil and impressing earth through lift fixture block and lift draw-in groove joint, because the slope structure of lift fixture block, can take in inside the fixture block frame when the rebound, only need rotate 180 with the fixture block frame when needs will bore soil pole and extract from the earthwork, make the incline direction of lift fixture block opposite, thereby can relax will bore the soil pole and insert in the earthwork and extract.

Description

Water conservancy construction earthwork thickness detection ruler
Technical Field
The utility model relates to an earthwork engineering technical field especially relates to a water conservancy construction earthwork thickness detection ruler.
Background
Earthwork engineering is one of the main engineering in construction engineering, including the aspects of all earthwork lashing, filling, transportation, drainage, precipitation and the like.
The prior art patent (publication number: CN206740039U) discloses an earth thickness detecting device. The device includes that the surface has the test tube of scale, the one end of test tube is the blind end, be provided with the opening on the blind end. The utility model discloses an earthwork thickness detection device simple structure through at the intraductal movable rod of installation of measuring, can clear away the intraductal soil of measuring, simultaneously, when examining measuring, the movable rod can rise along with the entering of measuring tube, sees the approximate thickness of earthwork indirectly, and the running-board can conveniently exert pressure to the measuring tube to the earthwork of impressing the measuring tube can become the handle when not using again, conveniently extracts and carries. The following problems in the prior art are found in the process of realizing the scheme, and the problems are not well solved: 1. the device manually presses the detection tube into the earthwork, and is labor-consuming when the detection tube is inserted into deeper earthwork; 2. the device detects that pipe length is fixed, is difficult to be applicable to the earthwork of the different degree of depth.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, if the device through manual during the earthwork of impressing the detecting tube, comparatively hard when inserting darker earthwork, the device detecting tube length is fixed, is difficult to be applicable to the problem of the earthwork of the different degree of depth, and a water conservancy construction earthwork thickness measuring tape that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a water conservancy construction earthwork thickness detection ruler comprises a device base, wherein a fixed pile is fixedly installed at the bottom of the device base, a guide ring is fixedly installed at the top of the device base, a connecting column is fixedly installed at the top of the device base, a lifting table is fixedly installed at the top of the connecting column, a supporting shaft is fixedly installed at the top of the lifting table, a supporting frame is rotatably installed at the top of the supporting shaft, a handle is fixedly connected to the left side of the supporting frame, a clamping block outer frame is rotatably installed at the right side of the supporting frame, a clamping block spring is fixedly installed inside the clamping block outer frame, a lifting clamping block is fixedly connected to the inner side of the clamping block spring, the outer part of the lifting clamping block is clamped with the inner part of the clamping block outer frame, a soil drilling rod is slidably installed inside the guide ring, a connecting groove is formed in the top of the soil drilling rod, and a fixed stop rod is rotatably installed inside the connecting groove, and a connecting clamping block is inserted in the connecting groove, an extension rod is fixedly connected to the top of the connecting clamping block, and lifting clamping grooves are formed in the outer portions of the extension rod and the soil drilling rod.
Preferably, the guide ring is fixedly installed at the center of the top of the device base, and the inner part of the guide ring is attached to the outer part of the soil drilling rod.
Preferably, the joint of the support frame and the support shaft is located on the right side of the support frame, and the length of the left side of the support frame is 1.5 times of the length of the right side of the support frame.
Preferably, the lifting clamping block is slidably mounted inside the outer frame of the clamping block through a clamping block spring, and the inner side of the lifting clamping block is clamped with the lifting clamping groove.
Preferably, the bottom of the extension rod is clamped with a connecting groove at the top of the soil drilling rod through a connecting clamping block.
Preferably, the extension rod has a diameter equal to that of the earth boring rod, and the top structure of the extension rod is the same as that of the earth boring rod.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses can drive the fixture block frame through pulling the handle from top to bottom and reciprocate to in will boring soil and impressing earth through lift fixture block and lift draw-in groove joint, because the slope structure of lift fixture block, can take in inside the fixture block frame when the rebound, only need rotate 180 with the fixture block frame when needs will bore soil pole and extract from the earthwork, make the incline direction of lift fixture block opposite, thereby can relax will bore the soil pole and insert in the earthwork and extract.
(2) The utility model discloses can insert the spread groove through the connection fixture block with the extension rod bottom to make the left side perk of fixed shelves pole, flatten fixed shelves pole again when extension rod bottom and bore the contact of soil rod top, prevent to connect the fixture block and come to drop from the spread groove in, thereby can prolong boring the soil rod according to the demand, come to measure the earthwork of the different degree of depth.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a side sectional view of the fixture block housing of the present invention;
fig. 3 is a sectional view of the connecting groove of the present invention.
In the figure: 1. a device base; 2. fixing the pile; 3. a guide ring; 4. connecting columns; 5. a lifting platform; 6. A support shaft; 7. a support frame; 8. a grip; 9. a fixture block outer frame; 10. a fixture block spring; 11. a lifting fixture block; 12. drilling a soil rod; 13. connecting grooves; 14. fixing a gear lever; 15. connecting a clamping block; 16. an extension pole; 17. and a lifting clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a water conservancy construction earthwork thickness detection ruler comprises a device base 1, a fixed pile 2 is fixedly installed at the bottom of the device base 1, a guide ring 3 is fixedly installed at the top of the device base 1, a connecting column 4 is fixedly installed at the top of the device base 1, a lifting table 5 is fixedly installed at the top of the connecting column 4, a supporting shaft 6 is fixedly installed at the top of the lifting table 5, a supporting frame 7 is rotatably installed at the top of the supporting shaft 6, the joint of the supporting frame 7 and the supporting shaft 6 is located on the right side of the supporting frame 7, the left side of the supporting frame 7 is 1.5 times as long as the right side of the supporting frame 7, the force required for pressing down the left end of the supporting frame 7 can be saved, a handle 8 is fixedly connected to the left side of the supporting frame 7, a fixture block outer frame 9 is rotatably installed on the right side of the supporting frame 7, a fixture block spring 10 is fixedly installed inside the fixture block outer frame 9, and a lifting fixture block 11 is fixedly connected to the inner side of the fixture spring 10, the outer part of a lifting fixture block 11 is clamped with the inner part of a fixture block outer frame 9, a soil drilling rod 12 is slidably mounted inside a guide ring 3, the guide ring 3 is fixedly mounted at the center of the top of a device base 1, the inner part of the guide ring 3 is attached to the outer part of the soil drilling rod 12, the soil drilling rod 12 can be prevented from shifting in the descending process, a connecting groove 13 is formed in the top of the soil drilling rod 12, a fixed stop rod 14 is rotatably mounted inside the connecting groove 13, a connecting fixture block 15 is inserted into the connecting groove 13, an extension rod 16 is fixedly connected to the top of the connecting fixture block 15, the bottom of the extension rod 16 is clamped with the connecting groove 13 in the top of the soil drilling rod 12 through the connecting fixture block 15, the diameter of the extension rod 16 is equal to that of the soil drilling rod 12, the top structure of the extension rod 16 is the same as that of the soil drilling rod 12, the soil can be suitable for different depths of earthwork, lifting fixture grooves 17 are formed in the outer parts of the extension rod 16 and the soil drilling rod 12, the lifting fixture block 11 is slidably mounted inside the fixture block outer frame 9 through a fixture block spring 10, the inner side of the lifting fixture block 11 is clamped with the lifting clamp slot 17, and the soil drilling rod 12 can be driven to move up and down through the fixture block outer frame 9.
The working principle is as follows: when the device is used, firstly, the earthwork of a measuring point is leveled, then the device is horizontally placed on the earthwork, a fixing pile 2 is inserted into the earthwork, then, a handle 8 is pulled up and down to drive a fixture block outer frame 9 to move up and down, so that a soil drilling rod 12 is pressed into the soil through the connection of a lifting fixture block 11 and a lifting fixture groove 17, due to the inclined structure of the lifting fixture block 11, the soil drilling rod can be taken into the fixture block outer frame 9 when moving up, a connecting fixture block 15 at the bottom of an extension rod 16 can be inserted into a connecting groove 13 when the length of the soil drilling rod 12 is insufficient, so that the left side of a fixed stop rod 14 is raised, the fixed stop rod 14 is pressed flat when the bottom of the extension rod 16 is contacted with the top of the soil drilling rod 12, the connecting fixture block 15 is prevented from falling out of the connecting groove 13, thereby, the earthwork of different depths can be measured, when the soil drilling rod 12 needs to be pulled out of the earthwork outer frame, the fixture block 9 only needs to be rotated by 180 degrees, the inclination directions of the lifting clamping blocks 11 are opposite, so that the soil drilling rod 12 can be pulled out from the earthwork, and the concrete working principle of the water conservancy construction earthwork thickness measuring ruler is the above.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.

Claims (6)

1. The utility model provides a water conservancy construction earthwork thickness detection chi, includes device base (1), its characterized in that: the device comprises a device base (1), a fixing pile (2) is fixedly mounted at the bottom of the device base (1), a guide ring (3) is fixedly mounted at the top of the device base (1), a connecting column (4) is fixedly mounted at the top of the connecting column (4), a lifting table (5) is fixedly mounted at the top of the lifting table (5), a supporting shaft (6) is fixedly mounted at the top of the lifting table (5), a supporting frame (7) is rotatably mounted at the top of the supporting shaft (6), a handle (8) is fixedly connected to the left side of the supporting frame (7), a fixture block outer frame (9) is rotatably mounted at the right side of the supporting frame (7), a fixture block spring (10) is fixedly mounted inside the fixture block outer frame (9), a lifting fixture block (11) is fixedly connected to the inner side of the fixture block spring (10), and the outer part of the lifting fixture block (11) is clamped with the inner part of the fixture block outer frame (9), the inside slidable mounting of uide ring (3) has and bores native pole (12), the connecting groove (13) have been seted up at the top of boring native pole (12), fixed shelves pole (14) are installed in the inside rotation of connecting groove (13), and the inside grafting of connecting groove (13) has connection fixture block (15), the top fixedly connected with extension rod (16) of connection fixture block (15), lift draw-in groove (17) have all been seted up to extension rod (16) and the outside of boring native pole (12).
2. The water conservancy construction earthwork thickness detection ruler of claim 1, wherein the guide ring (3) is fixedly installed at the center of the top of the device base (1), and the inside of the guide ring (3) is attached to the outside of the earth drilling rod (12).
3. The water conservancy construction earthwork thickness detection ruler of claim 1, wherein the joint of the support frame (7) and the support shaft (6) is positioned on the right side of the support frame (7), and the length of the left side of the support frame (7) is 1.5 times of the length of the right side of the support frame (7).
4. The water conservancy construction earthwork thickness detection ruler according to claim 1, wherein the lifting fixture block (11) is slidably mounted inside the fixture block outer frame (9) through a fixture block spring (10), and the inner side of the lifting fixture block (11) is clamped with the lifting clamp groove (17).
5. The water conservancy construction earthwork thickness detection ruler of claim 1, wherein the bottom of the extension rod (16) is clamped with a connecting groove (13) at the top of the earth drilling rod (12) through a connecting clamping block (15).
6. The water conservancy construction earthwork thickness measuring ruler of claim 1, wherein the diameter of the extension rod (16) is equal to that of the earth drilling rod (12), and the top structure of the extension rod (16) is the same as that of the earth drilling rod (12).
CN202120284715.XU 2021-02-01 2021-02-01 Water conservancy construction earthwork thickness detection ruler Withdrawn - After Issue CN214842910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120284715.XU CN214842910U (en) 2021-02-01 2021-02-01 Water conservancy construction earthwork thickness detection ruler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120284715.XU CN214842910U (en) 2021-02-01 2021-02-01 Water conservancy construction earthwork thickness detection ruler

Publications (1)

Publication Number Publication Date
CN214842910U true CN214842910U (en) 2021-11-23

Family

ID=80004994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120284715.XU Withdrawn - After Issue CN214842910U (en) 2021-02-01 2021-02-01 Water conservancy construction earthwork thickness detection ruler

Country Status (1)

Country Link
CN (1) CN214842910U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114593657A (en) * 2022-03-01 2022-06-07 惠州建恺建设工程质量检测有限公司 Nondestructive testing device for concrete thickness

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114593657A (en) * 2022-03-01 2022-06-07 惠州建恺建设工程质量检测有限公司 Nondestructive testing device for concrete thickness

Similar Documents

Publication Publication Date Title
CN214842910U (en) Water conservancy construction earthwork thickness detection ruler
CN216433586U (en) Geological disaster prevention and control monitoring soil sampling device
CN214584164U (en) A soil sampling device for geological survey
CN211334039U (en) Be applicable to stone material ceramic tile glass instrument of punching
CN114878247B (en) Hydrogeology reconnaissance water source sampling test device
CN215767985U (en) Rock strength index detects with mechanism of exerting pressure
CN113832946B (en) Compactness check out test set that foundation ditch was backfilled for building engineering
CN213933447U (en) A sample detection device for civil engineering material
CN114323764A (en) Monitoring device and method for mine geological environment
CN115370882A (en) Equipment fixing structure for monitoring hydraulic ring geological environment
CN214993692U (en) Automatic probe rod clamping device
JPH06272235A (en) Measuring device for ground intrusion resistance
CN219319782U (en) Soil moisture survey sampling device
CN215715190U (en) Foundation detection device for hydraulic engineering
CN217325524U (en) Pressure detection device of building pile foundation
CN219453513U (en) Auxiliary matching device for foundation pit drilling
CN217304449U (en) Concrete mixing tank stratified sampling device
CN215595567U (en) Pressure relief drilling depth inspection device
CN214199941U (en) Be used for pipe laying degree of depth measuring device
CN218036262U (en) Concrete penetration resistance appearance
CN218600441U (en) Earthwork thickness rapid detection device
CN218823279U (en) Detection device for soil remediation
CN213957095U (en) Permeameter for detecting quality of building engineering
CN113945455B (en) Quick assembly type concrete connection quality detection device
CN209927499U (en) Soil humiture and conductivity detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20211123

Effective date of abandoning: 20211207

AV01 Patent right actively abandoned

Granted publication date: 20211123

Effective date of abandoning: 20211207

AV01 Patent right actively abandoned