CN214835042U - Basement top plate operation reinforcing structure for heavy crawler crane - Google Patents

Basement top plate operation reinforcing structure for heavy crawler crane Download PDF

Info

Publication number
CN214835042U
CN214835042U CN202121455589.6U CN202121455589U CN214835042U CN 214835042 U CN214835042 U CN 214835042U CN 202121455589 U CN202121455589 U CN 202121455589U CN 214835042 U CN214835042 U CN 214835042U
Authority
CN
China
Prior art keywords
original
crawler crane
steel pipe
pipe scaffold
cross braces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121455589.6U
Other languages
Chinese (zh)
Inventor
郑文涛
王伟
沈腾
陈磊丰
马良夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202121455589.6U priority Critical patent/CN214835042U/en
Application granted granted Critical
Publication of CN214835042U publication Critical patent/CN214835042U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a basement roof operation reinforced structure for heavy crawler crane belongs to the construction field of building, including original roof, newly-built beam slab, increase the concrete column of cross-section, back a roof support body and temporary road, this structure is through newly-built beam slab between original adjacent beam slab, carries out the cross-section to original concrete column and consolidates to improve original structure concrete intensity, improve the bearing capacity of original roof. Through carrying out the reinforcement of returning the top to original roof, improve the bearing capacity of structure, reduce the influence of crawler crane to the structure. In addition, yellow sand and a roadbed box are paved on the original top plate, so that the load of the crawler crane on the structure is reduced.

Description

Basement top plate operation reinforcing structure for heavy crawler crane
Technical Field
The utility model belongs to the building construction field specifically is a basement roof operation reinforced structure for heavy crawler crane.
Background
In the construction process of large buildings, a heavy crawler crane is needed to carry out lifting operation on the slippage of a project steel structure, and the crawler crane is mainly responsible for installing a main truss. Because the single truss of the main truss is heavy, the roof steel structure is also heavy, and the crawler crane is heavy in self weight, the load generated on the basement roof when the truss is installed on the basement roof is too large, and certain potential safety hazards exist, the basement roof needs to be reinforced, and the crawler crane needs to be subjected to load conversion.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a basement roof operation reinforced structure for heavy crawler crane to solve above-mentioned technical problem.
Therefore, the utility model provides a basement roof operation reinforced structure for heavy crawler crane, include:
an original top plate;
newly building beam plates which are arranged between the original adjacent beam plates;
the concrete column with the enlarged section is arranged around the original concrete column;
the back-jacking support frame body is arranged at the bottom of the original top plate and comprises a steel pipe scaffold, a vertical cross brace and a horizontal cross brace;
the temporary road comprises yellow sand paved on the top of an original top plate and a roadbed box paved on the top of the yellow sand.
Preferably, the columns of the steel pipe scaffolding of each level are aligned one above the other.
Preferably, the vertical cross braces are arranged at the outer side of the steel pipe scaffold and at the inner side of the steel pipe scaffold.
Preferably, the vertical cross braces inside the steel pipe scaffold are arranged at intervals.
Preferably, the horizontal cross braces are arranged on a plane formed by the top of the vertical cross brace and the top horizontal rod of the steel pipe scaffold, and a plane formed by the bottom of the vertical cross brace and the bottom horizontal rod of the steel pipe scaffold.
Preferably, the bottom of the vertical rod of the steel pipe scaffold is provided with a wood plywood cushion block.
Preferably, the adjustable bracket is arranged at the top of the vertical rod of the steel pipe scaffold and is in contact with the bottom of the original top plate.
Preferably, battens are further arranged in the yellow sand at intervals.
Compared with the prior art, the utility model discloses a characteristics and beneficial effect do: the utility model discloses a newly-built beam slab between original adjacent beam slab carries out the cross-section to original concrete column and consolidates to improve former structure concrete strength, improve the bearing capacity of original roof. Through carrying out the reinforcement of returning the top to original roof, improve the bearing capacity of structure, reduce the influence of crawler crane to the structure. In addition, yellow sand and a roadbed box are paved on the original top plate, so that the load of the crawler crane on the structure is reduced.
Drawings
Fig. 1 is a schematic view of a back-up support frame.
Fig. 2 is a schematic view of a temporary road.
The attached drawings are marked as follows: 1-steel pipe scaffold, 2-vertical scissor supports, 3-horizontal scissor supports, 4-yellow sand, 5-roadbed box, 6-wood plywood cushion block, 7-adjustable bracket and 8-batten.
Detailed Description
In order to make the technical means, innovative features, objectives and functions realized by the present invention easy to understand, the present invention will be further described below.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-2, the basement roof operation reinforcing structure for the heavy crawler crane comprises an original roof, newly-built beam plates, concrete columns with enlarged sections, a back-up support frame body and a temporary road.
Newly-built roof beam board sets up between original adjacent roof beam board to encrypt original roof beam board. The concrete column with the enlarged section is arranged around the original concrete column. The original concrete column has a cross section of 600mm × 600mm, and the column has an enlarged cross section of 1000mm × 800 mm. Through encrypting original beam slab to increase concrete column cross-section, can improve the intensity of original roof, improve the bearing capacity of original roof.
The back-propping support body is arranged at the bottom of the original top plate and comprises a steel pipe scaffold 1, a vertical cross brace 2 and a horizontal cross brace 3. The transverse and longitudinal spacing of the vertical rods of the steel pipe scaffold 1 is 500mm multiplied by 500mm, and the vertical columns of the steel pipe scaffold 1 at each layer are aligned up and down. The bottom of the vertical rod of the steel pipe scaffold 1 is provided with a wood plywood cushion block 6. The adjustable bracket 7 is arranged at the top of the vertical rod of the steel pipe scaffold 1, and the adjustable bracket 7 is in contact with the bottom of the original top plate. The vertical cross braces 2 are arranged on the outer side of the steel pipe scaffold 1 and inside the steel pipe scaffold 1. The vertical cross braces 2 inside the steel pipe scaffold 1 are arranged at intervals. The width of the vertical cross brace 2 is 3 m-3.2 m. The horizontal cross braces 3 are arranged on a plane formed by the tops of the vertical cross braces 2 and the top horizontal rods of the steel pipe scaffold 1 and a plane formed by the bottoms of the vertical cross braces 2 and the bottom horizontal rods of the steel pipe scaffold 1. The width of the horizontal cross brace 3 is 3 m-5 m.
The temporary road comprises yellow sand 4 laid on top of the original roof and a roadbed box 5 laid on top of the yellow sand 4. And battens 8 are arranged in the yellow sand 4 at intervals. The load of the crawler crane can be converted through the mode, and the damage of the crawler crane to the top plate is effectively reduced.
The above embodiments are merely illustrative of the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the spirit of the present invention should fall within the protection scope defined by the claims.

Claims (8)

1. The utility model provides a basement roof operation reinforced structure for heavy crawler crane which characterized in that includes:
an original top plate;
newly building beam plates which are arranged between the original adjacent beam plates;
the concrete column with the enlarged section is arranged around the original concrete column;
the back-jacking support frame body is arranged at the bottom of the original top plate and comprises a steel pipe scaffold (1), vertical cross braces (2) and horizontal cross braces (3);
the temporary road comprises yellow sand (4) paved on the top of an original roof and a roadbed box (5) paved on the top of the yellow sand (4).
2. The basement roof work strengthening structure for a heavy crawler crane according to claim 1, wherein: the upright posts of the steel pipe scaffold (1) at each layer are aligned up and down.
3. The basement roof work strengthening structure for a heavy crawler crane according to claim 1, wherein: the vertical cross braces (2) are arranged on the outer side of the steel pipe scaffold (1) and inside the steel pipe scaffold (1).
4. The basement roof work strengthening structure for a heavy crawler crane according to claim 3, wherein: the vertical cross braces (2) inside the steel pipe scaffold (1) are arranged at intervals.
5. The basement roof work strengthening structure for a heavy crawler crane according to claim 1, wherein: the horizontal cross braces (3) are arranged on a plane formed by the tops of the vertical cross braces (2) and the top horizontal rods of the steel pipe scaffold (1) and a plane formed by the bottoms of the vertical cross braces (2) and the bottom horizontal rods of the steel pipe scaffold (1).
6. The basement roof work strengthening structure for a heavy crawler crane according to claim 1, wherein: the bottom of the vertical rod of the steel pipe scaffold (1) is provided with a wood plywood cushion block (6).
7. The basement roof work strengthening structure for a heavy crawler crane according to claim 1, wherein: the adjustable supporting seat (7) is arranged at the top of the vertical rod of the steel pipe scaffold (1), and the adjustable supporting seat (7) is in contact with the bottom of the original top plate.
8. The basement roof work strengthening structure for a heavy crawler crane according to claim 1, wherein: battens (8) are arranged in the yellow sand (4) at intervals.
CN202121455589.6U 2021-06-29 2021-06-29 Basement top plate operation reinforcing structure for heavy crawler crane Active CN214835042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121455589.6U CN214835042U (en) 2021-06-29 2021-06-29 Basement top plate operation reinforcing structure for heavy crawler crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121455589.6U CN214835042U (en) 2021-06-29 2021-06-29 Basement top plate operation reinforcing structure for heavy crawler crane

Publications (1)

Publication Number Publication Date
CN214835042U true CN214835042U (en) 2021-11-23

Family

ID=78811142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121455589.6U Active CN214835042U (en) 2021-06-29 2021-06-29 Basement top plate operation reinforcing structure for heavy crawler crane

Country Status (1)

Country Link
CN (1) CN214835042U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562129A (en) * 2022-04-06 2022-05-31 中建八局第四建设有限公司 Trinity reinforcing method for basement roof on crawler crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562129A (en) * 2022-04-06 2022-05-31 中建八局第四建设有限公司 Trinity reinforcing method for basement roof on crawler crane

Similar Documents

Publication Publication Date Title
CN112663501B (en) Upper-span existing line steel box girder structure and construction method
CN106087746A (en) A kind of cast-in-situ box girder falsework construction method and bridge
CN103866696A (en) Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge
CN214835042U (en) Basement top plate operation reinforcing structure for heavy crawler crane
CN111560837A (en) Lifting type river-crossing bridge structure and using method thereof
CN205662832U (en) Under hold formula beiLei beam steel suspension bridge
CN107881924A (en) A kind of bent cap support
CN206538768U (en) A kind of assembled combines inner supporting structure
CN111809654A (en) Assembled tower crane foundation structure
CN204163104U (en) External elevator steel beam foundation constructs
CN217149897U (en) Cast-in-place support of steel pipe bailey beam bridge
CN204401464U (en) A kind of construction of cast-in-place box girders construction bracket system
CN212316686U (en) Net piece folding type combined safety hanging basket
CN211285076U (en) Railway track overhead reinforcing structure
JP4005899B2 (en) Rapid construction method and jig in steel plate winding reinforcement work of multi-layered ramen viaduct
CN210395394U (en) Steel structure foundation for long-distance construction of large modular structure
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN112726416A (en) Support structure meeting field construction security and construction method
CN101914990B (en) Beam-type transition layer cast-in-situ crossbeam construction formwork supporting system
CN217500995U (en) Anti-tilting device for building side column protection platform
JP2004150123A6 (en) Rapid construction method and jig in steel plate reinforcement work of multi-layered ramen viaduct
CN220565079U (en) Movable box culvert hoop operation platform device
CN206800204U (en) A kind of highway bridge bent cap reinforcement cage mold
CN217948784U (en) Portable operation platform device of bridge deck pavement layer construction
CN217758296U (en) Temporary steel trestle for deep foundation pit transportation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant