CN214832852U - Long service life's pile foundation structure for building engineering - Google Patents

Long service life's pile foundation structure for building engineering Download PDF

Info

Publication number
CN214832852U
CN214832852U CN202120300770.3U CN202120300770U CN214832852U CN 214832852 U CN214832852 U CN 214832852U CN 202120300770 U CN202120300770 U CN 202120300770U CN 214832852 U CN214832852 U CN 214832852U
Authority
CN
China
Prior art keywords
plate
pile
foundation structure
pile foundation
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120300770.3U
Other languages
Chinese (zh)
Inventor
李娟�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Guli Construction Engineering Co ltd
Original Assignee
Hangzhou Guli Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Guli Construction Engineering Co ltd filed Critical Hangzhou Guli Construction Engineering Co ltd
Priority to CN202120300770.3U priority Critical patent/CN214832852U/en
Application granted granted Critical
Publication of CN214832852U publication Critical patent/CN214832852U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a long service life's pile foundation structure for building engineering relates to pile foundation structure technical field, including the cushion cap, the last fixed surface of cushion cap is connected with reinforcing apparatus, the lower fixed surface of cushion cap is connected with the connecting plate, the bottom fixedly connected with reinforcement stake of connecting plate, the cushion cap includes the cushion cap body. The utility model discloses an go up the backup pad and support with the reinforcement of bottom suspension fagging to the cushion cap body, the cushioning effect of cooperation buffer board, increase structural stability, recycle the cooperation of gusset plate and bearing plate, increase the intensity of structure, avoided in the construction of building engineering, when using to the pile foundation structure, the pile foundation structure easily because external vibrations or wind-force corrode the reason, and the phenomenon of structure main part fracture damage appears, the life that leads to the pile foundation structure reduces, the problem that engineering cost increases, thereby improved pile foundation structure life has been reached, reduce engineering cost's effect.

Description

Long service life's pile foundation structure for building engineering
Technical Field
The utility model relates to a pile foundation structure relates to pile foundation structure technical field, concretely relates to long service life's pile foundation structure for building engineering.
Background
The pile foundation refers to a deep foundation consisting of piles and pile bearing platforms connected with the pile tops or a single-pile foundation connected with the pile foundation through columns, the pile foundation is an ancient foundation type, and the number and arrangement of the piles in the pile foundation are determined according to the upper structure and the load condition.
The following problems exist in the prior art:
1. in the construction of building engineering, when the pile foundation structure is used, the pile foundation structure is easy to crack and damage due to external vibration or wind erosion, so that the service life of the pile foundation structure is shortened, and the engineering cost is increased;
2. pile foundation structure generally pours once through the concrete and forms among the building engineering, and it pours work comparatively troublesome, receives environmental impact great, and the pile foundation structure of pouring receives the damage easily, leads to the progress of engineering to slow down, the problem of extravagant workman's time.
SUMMERY OF THE UTILITY MODEL
The utility model provides a long service life pile foundation structure for building engineering, one of which aims to have the shock absorption capability and solve the problems that when the pile foundation structure is used, the pile foundation structure is easy to crack and damage due to external vibration or wind erosion, the service life of the pile foundation structure is reduced and the engineering cost is increased; wherein another kind of purpose is that the work of pouring in order to solve the pile foundation structure is comparatively troublesome, receives environmental impact great, and the pile foundation structure of pouring and forming receives the damage easily, leads to the progress of engineering to slow down, the problem of extravagant workman's time to reach the effect of accelerating the engineering progress, saving workman's time.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a long service life's pile foundation structure for building engineering, includes the cushion cap, the last fixed surface of cushion cap is connected with reinforcing apparatus, the lower fixed surface of cushion cap is connected with the connecting plate, the bottom fixedly connected with reinforcement stake of connecting plate, the cushion cap includes the cushion cap body, the backup pad is gone up to the top fixedly connected with of cushion cap body, the bottom fixedly connected with lower backup pad of cushion cap body, fixed surface is connected on the lower surface of lower backup pad and the connecting plate, the connecting plate includes the gusset plate, the upper surface of gusset plate is connected with the lower fixed surface of lower backup pad, the bottom fixedly connected with buffer board of gusset plate, the bottom fixedly connected with bearing plate of buffer board.
The utility model discloses technical scheme's further improvement lies in: the reinforcing apparatus's front and the back all seted up the connecting hole, the upper surface of cushion cap is seted up flutedly, the top swing joint of cushion cap has the foundation pile, foundation pile and recess joint, the front and the back of foundation pile all set up threaded hole, swing joint has the threaded rod on the connecting hole, threaded rod and screw hole threaded connection.
The utility model discloses technical scheme's further improvement lies in: the bottom fixedly connected with shock attenuation post of foundation pile, the quantity of shock attenuation post is a plurality of, a plurality of shock attenuation post evenly distributed is on the lower surface of foundation pile, the bottom surface fixed mounting of recess has the shock pad, the cover groove has been seted up at the top of shock pad, cover groove and shock attenuation post joint.
The utility model discloses technical scheme's further improvement lies in: the number of the reinforcing piles is four, the reinforcing piles are fixedly installed at four corners of the bottom surface of the bearing plate, and one end of each reinforcing pile is fixedly connected with a pile head.
The utility model discloses technical scheme's further improvement lies in: the quantity of screw hole is four, four the screw hole divide into two sets ofly, two sets of the screw hole all sets up about the central line symmetry of foundation pile.
The utility model discloses technical scheme's further improvement lies in: the reinforcing plate and the bearing plate are made of reinforced concrete materials, the buffer plate, the shock absorption columns and the shock absorption pads are made of elastic materials, and anti-corrosion coatings are coated on the outer surfaces of the upper supporting plate and the lower supporting plate.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a long service life's pile foundation structure for building engineering, adopt the cushion cap body, go up the backup pad, the bottom suspension fagging, the gusset plate, the cooperation of buffer board and bearing plate, support through last backup pad and the reinforcement of bottom suspension fagging to the cushion cap body, the cushioning effect of cooperation buffer board, increase structural stability, recycle the cooperation of gusset plate and bearing plate, increase the intensity of structure, avoided in the building engineering construction, when using the pile foundation structure, the pile foundation structure is easy because external vibrations or wind-force corrode the reason, and the phenomenon that the structure main part fracture damaged appears, the life that leads to the pile foundation structure reduces, the problem that engineering cost increases, thereby reached and improved pile foundation structure life, the effect of reduction engineering cost.
2. The utility model provides a long service life's pile foundation structure for building engineering, adopt the recess, the foundation pile, the screw hole, the shock absorber post, the cooperation of connecting hole and trepanning, swing joint through foundation pile and recess, the joint of cooperation screw hole and trepanning, the threaded rod that sets up on the recycling connecting hole is connected with the shock absorber post, install pile foundation structure, the concrete placement work of having avoided pile foundation structure is comparatively troublesome, it is great to receive the environmental impact, and the pile foundation structure of pouring forms receives the damage easily, lead to the progress of engineering to slow down, the problem of extravagant workman's time, thereby the engineering progress has been reached and accelerated, the effect of saving workman's time.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural section of the present invention;
FIG. 3 is a perspective view of the present invention;
fig. 4 is a schematic view of the structural shock pad of the present invention.
In the figure: 1. a bearing platform; 11. a cushion cap body; 12. an upper support plate; 13. a lower support plate; 14. a groove; 2. foundation piles; 21. a threaded hole; 22. a shock-absorbing post; 3. a reinforcement device; 31. connecting holes; 4. a connecting plate; 41. a reinforcing plate; 42. a buffer plate; 43. a bearing plate; 5. reinforcing piles; 51. pile head; 6. a shock pad; 61. and (5) sleeving a groove.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a long service life's pile foundation structure for building engineering, including cushion cap 1, the last fixed surface of cushion cap 1 is connected with reinforcing apparatus 3, the lower fixed surface of cushion cap 1 is connected with connecting plate 4, the bottom fixedly connected with reinforced pile 5 of connecting plate 4, cushion cap 1 includes cushion cap body 11, backup pad 12 is gone up to the top fixedly connected with of cushion cap body 11, the bottom fixedly connected with lower backup pad 13 of cushion cap body 11, the lower surface of lower backup pad 13 is connected with fixed surface on connecting plate 4, connecting plate 4 includes gusset plate 41, the upper surface of gusset plate 41 is connected with the lower fixed surface of lower backup pad 13, the bottom fixedly connected with buffer plate 42 of gusset plate 41, the bottom fixedly connected with bearing plate 43 of buffer plate 42.
In this embodiment, adopt cushion cap body 11, go up backup pad 12, lower support plate 13, gusset plate 41, the cooperation of buffer board 42 and bearing plate 43, support the reinforcement of cushion cap body 11 through last backup pad 12 and lower support plate 13, the cushioning effect of cooperation buffer board 42, increase structural stability, recycle gusset plate 41 and bearing plate 43's cooperation, increase the intensity of structure, avoided in the building engineering construction, when using the pile foundation structure, the pile foundation structure is easy because external vibrations or wind-force corrode the reason, and the phenomenon that the structure subject fracture damaged appears, the life that leads to the pile foundation structure reduces, the problem that engineering cost increases, thereby reached and improved pile foundation structure life, reduce engineering cost's effect.
As shown in fig. 1 to 4, in this embodiment, it is preferable that the number of the reinforcing piles 5 is four, four reinforcing piles 5 are fixedly installed at four corners of the bottom surface of the bearing plate 43, and one end of each reinforcing pile 5 is fixedly connected with a pile head 51, so as to provide a supporting force for the pile foundation structure and disperse the pressure of the upper layer of the pile foundation structure, thereby greatly improving the stability of the pile foundation structure.
As shown in fig. 1-4, preferably, the front and back of the reinforcing apparatus 3 are both provided with a connecting hole 31, the upper surface of the bearing platform 1 is provided with a groove 14, the top of the bearing platform 1 is movably connected with a foundation pile 2, the foundation pile 2 is clamped with the groove 14, the front and back of the foundation pile 2 are both provided with a threaded hole 21, the connecting hole 31 is movably connected with a threaded rod, the threaded rod is in threaded connection with the threaded hole 21, the bottom of the foundation pile 2 is fixedly connected with a plurality of shock-absorbing columns 22, the shock-absorbing columns 22 are uniformly distributed on the lower surface of the foundation pile 2, the bottom of the groove 14 is fixedly provided with a shock-absorbing pad 6, the top of the shock-absorbing pad 6 is provided with a sleeve groove 61, the sleeve groove 61 is clamped with the shock-absorbing columns 22, the groove 14, the foundation pile 2, the threaded hole 21, the shock-absorbing columns 22, the connecting hole 31 and the sleeve groove 61 are matched, the movable connection between the foundation pile 2 and the groove 14 is matched with the sleeve groove 61, the threaded rod that sets up on recycling connecting hole 31 is connected with shock absorber column 22, installs the pile foundation structure, and the concrete placement work of having avoided the pile foundation structure is comparatively troublesome, receives environmental impact great, and the pile foundation structure of pouring and forming receives the damage easily, leads to the progress of engineering to slow down, the problem of extravagant workman's time to reach the effect of accelerating the engineering progress, saving workman's time.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the quantity of screw hole 21 is four, and four screw holes 21 divide into two sets ofly, and two sets of screw holes 21 all set up about the central line symmetry of foundation pile 2, through the design of four screw holes 21 for when threaded rod is connected with screw hole 21 on the connecting hole 31, intensity is higher, and then improves the stability when foundation pile 2 is connected with cushion cap 1.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, gusset plate 41 and bearing plate 43 adopt reinforced concrete material to make, buffer plate 42, shock attenuation post 22 and shock pad 6 all adopt elastic material to make, the surface of going up backup pad 12 and bottom suspension fagging 13 has all been smeared anticorrosive paint, design through gusset plate 41 and bearing plate 43, improve the intensity of connecting plate 4 greatly, make the pile foundation structure more firm, the effectual life who improves the pile foundation structure, through buffer plate 42, shock attenuation post 22 and shock pad 6's design, the produced power of external vibrations of effective absorption, make vibrations weakened the destructive power of pile foundation structure greatly.
The working principle of the long-life pile foundation structure for construction engineering is described in detail below.
As shown in fig. 1-4, when the pile foundation structure is installed and used, firstly, the reinforcing pile 5 and the pile head 51 are driven into the ground, then the bearing platform body 11, the lower supporting plate 13 and the connecting plate 4 are buried under the ground, the ground raised part is covered by the upper supporting plate 12, the integral flatness of the pile foundation structure is not affected, then the foundation pile 2 is inserted into the groove 14 and is connected with the sleeve groove 61 through the shock absorption column 22, so that the connection between the bearing platform 1 and the foundation pile 2 is buffered, then the threaded rod is inserted into the connecting hole 31 and is in threaded connection with the threaded hole 21, and after the four threaded rods are installed, the installation of the pile foundation structure is completed.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (6)

1. The utility model provides a long service life's pile foundation structure for building engineering, includes cushion cap (1), its characterized in that: the upper surface of the bearing platform (1) is fixedly connected with a reinforcing device (3), the lower surface of the bearing platform (1) is fixedly connected with a connecting plate (4), the bottom of the connecting plate (4) is fixedly connected with a reinforcing pile (5), the bearing platform (1) comprises a bearing platform body (11), the top of the bearing platform body (11) is fixedly connected with an upper supporting plate (12), the bottom of the bearing platform body (11) is fixedly connected with a lower supporting plate (13), the lower surface of the lower supporting plate (13) is fixedly connected with the upper surface of the connecting plate (4), the connecting plate (4) comprises a reinforcing plate (41), the upper surface of the reinforcing plate (41) is fixedly connected with the lower surface of the lower supporting plate (13), the bottom fixedly connected with buffer plate (42) of gusset plate (41), the bottom fixedly connected with bearing plate (43) of buffer plate (42).
2. The pile foundation structure for construction engineering with a long service life according to claim 1, wherein: connecting hole (31) have all been seted up in the front and the back of reinforcing apparatus (3), the upper surface of cushion cap (1) is seted up flutedly (14), the top swing joint of cushion cap (1) has foundation pile (2), foundation pile (2) and recess (14) joint, threaded hole (21) have all been seted up in the front and the back of foundation pile (2), swing joint has the threaded rod on connecting hole (31), threaded rod and threaded hole (21) threaded connection.
3. The pile foundation structure for construction engineering with a long service life according to claim 2, wherein: the bottom fixedly connected with shock attenuation post (22) of foundation pile (2), the quantity of shock attenuation post (22) is a plurality of, a plurality of shock attenuation post (22) evenly distributed is on the lower surface of foundation pile (2), the bottom surface fixed mounting of recess (14) has shock pad (6), cover groove (61) have been seted up at the top of shock pad (6), cover groove (61) and shock attenuation post (22) joint.
4. The pile foundation structure for construction engineering with a long service life according to claim 1, wherein: the number of the reinforcing piles (5) is four, the reinforcing piles (5) are fixedly installed at four corners of the bottom surface of the bearing plate (43), and pile heads (51) are fixedly connected to one ends of the reinforcing piles (5).
5. The pile foundation structure for construction engineering with a long service life according to claim 2, wherein: the number of the threaded holes (21) is four, the four threaded holes (21) are divided into two groups, and the two groups of threaded holes (21) are symmetrically arranged around the center line of the foundation pile (2).
6. The pile foundation structure for construction engineering with a long service life according to claim 3, wherein: the reinforced concrete shock absorption and protection plate is characterized in that the reinforcing plate (41) and the bearing plate (43) are made of reinforced concrete materials, the buffer plate (42), the shock absorption columns (22) and the shock absorption pads (6) are made of elastic materials, and anti-corrosion coatings are coated on the outer surfaces of the upper supporting plate (12) and the lower supporting plate (13).
CN202120300770.3U 2021-02-02 2021-02-02 Long service life's pile foundation structure for building engineering Active CN214832852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120300770.3U CN214832852U (en) 2021-02-02 2021-02-02 Long service life's pile foundation structure for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120300770.3U CN214832852U (en) 2021-02-02 2021-02-02 Long service life's pile foundation structure for building engineering

Publications (1)

Publication Number Publication Date
CN214832852U true CN214832852U (en) 2021-11-23

Family

ID=80005207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120300770.3U Active CN214832852U (en) 2021-02-02 2021-02-02 Long service life's pile foundation structure for building engineering

Country Status (1)

Country Link
CN (1) CN214832852U (en)

Similar Documents

Publication Publication Date Title
CN110258316A (en) A kind of bridge buffering pedestal
CN211228909U (en) A assembled supporting seat for among building engineering
CN214832852U (en) Long service life's pile foundation structure for building engineering
CN210263111U (en) Hollow pile body for civil engineering construction
CN210031899U (en) Base of turbonator
CN214942617U (en) Positioning structure of shock insulation support
CN111501535B (en) Assembled road and bridge pier stud structure
CN212406048U (en) Attached jacking mechanism of super high-rise jacking platform
CN211873394U (en) Steel antidetonation support that stability is high
CN211036678U (en) Anti-seismic device for highway bridge
CN218970313U (en) Building shock insulation rubber support
CN203007945U (en) Anti-seismic ground anchor device capable of absorbing seismic waves
CN107642046B (en) Steel-pipe pile support device of unloading
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN108385908B (en) Connecting device of assembled stair, assembled stair and installation method of assembled stair
CN207633197U (en) Damping bridge pier
CN215294105U (en) Vertical concrete pump pipe shock absorber frame system
CN214695135U (en) Shock attenuation bridge beam supports convenient to height-adjusting
CN111549779A (en) Method for pulling out I-shaped stiff core of stiff core curtain pile and retaining wall pile anchor combined support
CN209854564U (en) Strutting arrangement for bridge construction
CN219470937U (en) Prefabricated pile cap of solid square pile
CN212223935U (en) Pile for engineering construction
CN214162933U (en) Precast beam stacking device with damping function
CN218291569U (en) Damping device for bridge support
CN218147761U (en) Assembled concrete pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant