CN214828581U - Efficient tower machine is dismantled in installation - Google Patents

Efficient tower machine is dismantled in installation Download PDF

Info

Publication number
CN214828581U
CN214828581U CN202121489809.7U CN202121489809U CN214828581U CN 214828581 U CN214828581 U CN 214828581U CN 202121489809 U CN202121489809 U CN 202121489809U CN 214828581 U CN214828581 U CN 214828581U
Authority
CN
China
Prior art keywords
rod
connector
installation
vertical rod
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121489809.7U
Other languages
Chinese (zh)
Inventor
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Pangyuan Construction Machinery Technology Co ltd
Original Assignee
Suzhou Pangyuan Construction Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Pangyuan Construction Machinery Technology Co ltd filed Critical Suzhou Pangyuan Construction Machinery Technology Co ltd
Priority to CN202121489809.7U priority Critical patent/CN214828581U/en
Application granted granted Critical
Publication of CN214828581U publication Critical patent/CN214828581U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an efficient tower crane for mounting and dismounting, wherein the inner sides of the upper end and the lower end of an outer plate are respectively provided with a mounting groove, an inner plate is connected in the mounting groove, a plurality of groups of first slots are equidistantly arranged on the inner plate, the lower end of a support rod is inserted into the first slots, two ends of the support rod are respectively provided with an insertion port, the outer plate and the inner plate are respectively provided with a positioning groove for connecting a positioning rod, and one end of the positioning rod is connected into the insertion port at the lower end of the support rod; the utility model discloses change the structure that current tower machine supported, be a set of structure through bracing piece, inner panel, planking, connect alright constitution tower machine's structure from top to bottom between this structure of a plurality of groups, be convenient for install and dismantle between whole, be convenient for fix a position, increase the stability of connecting, be convenient for use in combination, put into the pole and peg graft to the interface and make and form stable relation of connection between bracing piece, inner panel, the planking, strengthen the stability of connecting, install and dismantle efficient, convenient to use.

Description

Efficient tower machine is dismantled in installation
Technical Field
The utility model relates to an efficient tower machine technical field is dismantled in the installation, specifically is an efficient tower machine is dismantled in installation.
Background
The tower crane is the most common hoisting equipment on the construction site, is lengthened section by section and is used for hoisting construction raw materials such as reinforcing steel bars, wood ridges, concrete, steel pipes and the like for construction. The transmission to the tower body structure is directly carried out through the rotary table through the structural components of the rotary tower, the rotary table, the bearing seat and the like.
The existing tower body structure of the tower crane has the following problems: the disassembly and the fixation are very inconvenient, the operation is troublesome, time-consuming and labor-consuming.
Therefore, the tower crane with high efficiency in mounting and dismounting is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an efficient tower machine is dismantled in installation to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an efficient tower machine is dismantled in installation, includes bracing piece, inner panel, planking, the upper and lower end inboard of planking is equipped with the mounting groove respectively, the inner panel is connected in the mounting groove, it is equipped with the first slot of a plurality of groups to go back the equidistance on the inner panel, the lower extreme plug-in connection of bracing piece is in first slot, the both ends of bracing piece are equipped with the interface respectively, be equipped with the constant head tank that is used for the hookup location pole on planking, the inner panel respectively, the one end of locating pole is connected to in the interface of bracing piece lower extreme, the inboard of planking is still the equidistance and is equipped with a plurality of groups of second slots, one side of inner panel is connected with the second picture peg respectively, the second picture peg plug-in connection is to in the second slot.
As a further optimization of the technical scheme, the supporting rod comprises a first vertical rod and a second vertical rod, the first vertical rod and the second vertical rod are connected through a connecting lug and a screw, and the inserting ports are respectively arranged at one ends of the first vertical rod and the second vertical rod and are convenient to connect and detach.
As a further optimization of the technical scheme, the socket comprises a first connecting port, a second connecting port and a clamping groove, the first connecting port is located on one side of the second connecting port, the diameter of the first connecting port is larger than that of the second connecting port, the clamping groove is arranged on the outer side of the first connecting port, and the placing rod of the positioning rod is connected into the socket.
As a further optimization of this technical scheme, the locating lever includes the fixed plate, puts into pole, screw rod, fly leaf, round pin axle, open slot, it connects respectively at one side both ends of fixed plate for two sets of settings to put into the pole, the open slot sets up the middle section of putting into the pole, the fly leaf passes through the round pin hub connection in the open slot, the screw rod spiro union is in putting into the pole, and the stability of connection is good, is convenient for install fast and dismantle.
As a further optimization of the technical scheme, one end of the inner side of the embedded rod is provided with an internal thread, the length of the screw rod is larger than that of the embedded rod, and the connection is stable.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses change the structure that current tower machine supported, through the bracing piece, the inner panel, the planking is a set of structure, connect alright constitution tower machine's structure from top to bottom between this structure of a plurality of groups, be convenient for install and dismantle between the whole, be convenient for fix a position, lower extreme plug-in connection through the bracing piece is in first slot, increase the stability of connecting, be convenient for combined use, include first connector through the interface, the second connector, the draw-in groove, stability when increasing the connection, the locating lever includes the fixed plate, put into the pole, the screw rod, the fly leaf, the round pin axle, the open slot, it pegs graft to the interface and makes the bracing piece to put into the pole, the inner panel, form stable relation of connection between the planking, strengthen the stability of connecting, installation and dismantlement are efficient, convenient to use.
Drawings
FIG. 1 is a schematic view of the overlooking position relationship structure of the support rod, the inner plate and the outer plate of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic view of the structure of the support rod of the present invention;
fig. 4 is the schematic diagram of the positioning rod structure of the present invention.
In the figure: 1. a movable plate; 2. a pin shaft; 3. an open slot; 4. an outer plate; 5. positioning a groove; 6. a support bar; 61. a first vertical bar; 62. a second vertical bar; 63. connecting lugs; 64. a screw; 65. a card slot; 66. a second connection port; 67. a first connection port; 7. a first slot; 8. mounting grooves; 10. a screw; 11. an inner plate; 12. a second slot; 14. a second board plug; 15. positioning a rod; 16. placing the rod in; 17. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, unless otherwise specified, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", and the like, indicate orientations or state relationships based on the orientations or state relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that a designated mechanism or component must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a tower crane with high efficiency in installation and disassembly comprises a supporting rod 6, an inner plate 11 and an outer plate 4, wherein the inner sides of the upper end and the lower end of the outer plate 4 are respectively provided with a mounting groove 8, the inner plate 11 is connected in the mounting groove 8, a plurality of groups of first slots 7 are equidistantly arranged on the inner plate 11, the lower end of the supporting rod 6 is connected in the first slots 7 in an inserting way, the supporting rod 6 comprises a first vertical rod 61 and a second vertical rod 62, the first vertical rod 61 and the second vertical rod 62 are connected through a connecting lug 63 and a screw 64, the inserting ports are respectively arranged at one end of the first vertical rod 61 and one end of the second vertical rod 62, the two ends of the supporting rod 6 are respectively provided with an inserting port, each inserting port comprises a first connecting port 67, a second connecting port 66 and a clamping groove 65, the first connecting port 67 is positioned at one side of the second connecting port 66, the diameter of the first connecting port 67 is larger than that of the second connecting port 66, the clamping groove 65 is arranged at the outer side of the first connecting port 67, the outer plate 4 and the inner plate 11 are respectively provided with a positioning groove 5 for connecting a positioning rod 15, the positioning rod 15 comprises a fixed plate 17, an embedded rod 16, a screw rod 10, a movable plate 1, a pin shaft 2 and an open slot 3, the two groups of the imbedding rods 16 are respectively connected with the two ends of one side of the fixed plate 17, the open slot 3 is arranged at the middle section of the imbedding rod 16, the movable plate 1 is connected in the open slot 3 through a pin shaft 2, the screw 10 is screwed in the embedded rod 16, an inner thread is arranged at one end of the inner side of the embedded rod 16, the length of the screw rod 10 is larger than that of the embedded rod 16, one end of the positioning rod 15 is connected to the inserting port at the lower end of the supporting rod 6, a plurality of groups of second inserting grooves 12 are arranged at the inner side of the outer plate 4 at equal intervals, one side of the inner plate 11 is connected with a second inserting plate 14 respectively, and the second inserting plate 14 is inserted into the second inserting groove 12.
Specifically, when in use, the supporting rod 6, the inner plate 11 and the outer plate 4 are a group of structures, a plurality of groups of structures are connected to form a structure of the tower crane, the whole structure is convenient to install and disassemble, the outer plate 4 is provided with a mounting groove 8 for facilitating quick positioning connection of the upper inner plate 11 and the lower inner plate 11, the second inserting plate 14 is inserted into the second slot 12 for facilitating positioning, the lower end of the supporting rod 6 is inserted into the first slot 7 for enhancing the connection stability, the supporting rod 6 comprises a first vertical rod 61 and a second vertical rod 62, the first vertical rod 61 and the second vertical rod 62 are connected through a connecting lug 63 and a screw 64 for facilitating connection and disassembly, the inserting ports are respectively arranged at one ends of the first vertical rod 61 and the second vertical rod 62 for facilitating combined use, the inserting ports comprise a first connecting port 67, a second connecting port 66 and a clamping groove 65 for enhancing the connection stability, and the first connecting port 67 is positioned at one side of the second connecting port 66, the diameter of first interface 67 is greater than the diameter of second connector 66, planking 4, be equipped with the constant head tank 5 that is used for connecting locating lever 15 on the inner panel 11 respectively, locating lever 15 includes fixed plate 17, put into pole 16, the screw rod 10, fly leaf 1, round pin axle 2, open slot 3, put into pole 16 and connect respectively at one side both ends of fixed plate 17 for two sets of settings, it pegs graft to the interface to make the bracing piece 6 to put into pole 16, inner panel 11, form stable relation of connection between planking 4, and rotate screw rod 10 and make fly leaf 1 get into open slot 3, strengthen the stability of connecting.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides an efficient tower machine is dismantled in installation, includes bracing piece (6), inner panel (11), planking (4), its characterized in that: the utility model discloses a fixing device for a vehicle, including planking (4), inner panel (11), inboard groove (12), inboard, second, insert and connect to in second, slot (12), second, insert.
2. The tower crane with high efficiency in installation and disassembly as claimed in claim 1, wherein: the support rod (6) comprises a first vertical rod (61) and a second vertical rod (62), the first vertical rod (61) and the second vertical rod (62) are connected through a connecting lug (63) and a screw (64), and the inserting port is arranged at one end of the first vertical rod (61) and one end of the second vertical rod (62) respectively.
3. The tower crane with high efficiency in installation and disassembly as claimed in claim 1, wherein: the interface includes first connector (67), second connector (66), draw-in groove (65), first connector (67) is located one side of second connector (66), and the diameter of first connector (67) is greater than the diameter of second connector (66), draw-in groove (65) set up the outside at first connector (67).
4. The tower crane with high efficiency in installation and disassembly as claimed in claim 1, wherein: locating lever (15) include fixed plate (17), put into pole (16), screw rod (10), fly leaf (1), round pin axle (2), open slot (3), it connects respectively at one side both ends of fixed plate (17) for two sets of settings to put into pole (16), open slot (3) set up the middle section of putting into pole (16), fly leaf (1) is connected in open slot (3) through round pin axle (2), screw rod (10) spiro union is putting into pole (16).
5. The tower crane with high efficiency in installation and disassembly as claimed in claim 4, wherein: an internal thread is arranged at one end of the inner side of the embedding rod (16), and the length of the screw rod (10) is larger than that of the embedding rod (16).
CN202121489809.7U 2021-07-02 2021-07-02 Efficient tower machine is dismantled in installation Active CN214828581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121489809.7U CN214828581U (en) 2021-07-02 2021-07-02 Efficient tower machine is dismantled in installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121489809.7U CN214828581U (en) 2021-07-02 2021-07-02 Efficient tower machine is dismantled in installation

Publications (1)

Publication Number Publication Date
CN214828581U true CN214828581U (en) 2021-11-23

Family

ID=78811960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121489809.7U Active CN214828581U (en) 2021-07-02 2021-07-02 Efficient tower machine is dismantled in installation

Country Status (1)

Country Link
CN (1) CN214828581U (en)

Similar Documents

Publication Publication Date Title
CN214828581U (en) Efficient tower machine is dismantled in installation
CN210695210U (en) Greenhouse skeleton with strong bearing capacity
CN211320298U (en) Electronic communication antenna support
CN220061212U (en) Display device barrier dress back support frame subassembly
CN218813873U (en) Prefabricated formula utility tunnel
CN214618165U (en) Circular channel steel bracing
CN219451411U (en) Frame device is chosen in construction
CN217436559U (en) Placer is used in construction of city rain sewage pipe network
CN217325813U (en) Energy-saving building convenient to build dismouting temporarily
CN212128901U (en) I-steel protective shed frame for expressway slope emergency treatment project
CN220016688U (en) Rotating base of intelligent scanner
CN214891902U (en) Solar heating device easy to maintain
CN219509283U (en) Be used for rack to assemble standardized bearing structure
CN219754267U (en) Building construction division board
CN219344017U (en) Template support frame
CN220954928U (en) Be used for electric power pylon to stabilize bearing structure
CN215429161U (en) Intelligent laboratory tower crane centralized supply device
CN210841250U (en) Side-by-side detachable fishing rod rack
CN221001935U (en) Combined building template
CN215368355U (en) Stair handrail capable of being provided with indicator light strip
CN214192330U (en) Tower crane attachment frame convenient to detach
CN216382133U (en) Pipe fitting assembly convenient to dismouting
CN218991124U (en) Plug-in type guardrail
CN219930873U (en) River course foundation ditch construction supporting construction
CN215802782U (en) Protection machanism of easy dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant