CN214819512U - Movable concrete curing room - Google Patents
Movable concrete curing room Download PDFInfo
- Publication number
- CN214819512U CN214819512U CN202120918043.3U CN202120918043U CN214819512U CN 214819512 U CN214819512 U CN 214819512U CN 202120918043 U CN202120918043 U CN 202120918043U CN 214819512 U CN214819512 U CN 214819512U
- Authority
- CN
- China
- Prior art keywords
- temperature
- hot water
- cavity
- heat preservation
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to a movable concrete curing room relates to concrete curing technical field, and it is provided with the maintenance pond including the cavity that is used for carrying out concrete curing in the cavity, is provided with the temperature regulator who is used for controlled temperature in the cavity, is provided with the heat preservation subassembly that is used for heat preservation on the cavity inner wall, is provided with the heating member that is used for the intensification in the maintenance pond. This application heats the water in the maintenance pond through the heating member, and rethread temperature regulator makes the constancy of temperature in the chamber, carries out the separation to heat-conduction through the subassembly that keeps warm at last, has ensured the invariant of concrete test block maintenance temperature, reduces the influence of external air temperature to the inside temperature of maintenance room, reduces thermal loss, has green's effect.
Description
Technical Field
The application relates to the technical field of concrete curing, in particular to a movable concrete curing room.
Background
The concrete standard curing room is a room with specific temperature and humidity and used for standard curing of concrete test blocks and cement test blocks at constant temperature and humidity, the outside of the concrete standard curing room needs certain environmental conditions such as humidity and temperature in order to ensure good hydration and hardening of concrete, and the movable concrete curing room is frequently used in the market at present, has small area, is convenient to move and is suitable for being used near construction sites.
To the correlation technique among the above-mentioned, the inventor thinks because movable concrete curing room needs often to place and use on open-air spacious place, and external air temperature can exert an influence to the inside ambient temperature of curing room, and then influences the curing temperature of concrete test block, is unfavorable for the test of concrete test block, leads to the great error of test result appearance.
SUMMERY OF THE UTILITY MODEL
In order to improve the problem that external air temperature produced the influence to concrete test block curing temperature, this application provides a movable concrete curing room.
The application provides a movable concrete curing room adopts following technical scheme:
the utility model provides a movable concrete curing room, is including the cavity that is used for carrying out the concrete curing, be provided with the maintenance pond in the cavity, be provided with the temperature regulator who is used for controlled temperature in the cavity, be provided with the heat preservation subassembly that is used for heat preservation on the cavity inner wall, be provided with the heating member that is used for the intensification in the maintenance pond.
Through adopting above-mentioned technical scheme, place the concrete test block in the maintenance pond in the cavity, start the heating member, the water of heating member in to the maintenance pond is heated to specific temperature, then start temperature regulator, temperature to specific temperature in the temperature regulator regulation cavity, heat-insulating component on the cavity inner wall can reduce the heat-conduction that the cavity is inside to go on with the external world, make the constancy of temperature in the cavity, above-mentioned structural design's movable concrete maintenance room heats the water in the maintenance pond through the heating member, rethread temperature regulator makes the constancy of temperature in the cavity, at last, carry out the separation to heat-conduction through heat-insulating component, the constancy of concrete test block maintenance temperature has been ensured, reduce the influence of external air temperature to the inside temperature of maintenance room, reduce thermal loss, green's effect has.
Optionally, the heating member sets up to the heating strip, the heating strip is provided with a plurality ofly, maintenance pond one side is removable to be provided with the fishplate bar, the equipartition has a plurality ofly to be used for articulating the string post of heating strip on the fishplate bar, be provided with on the maintenance pond and be used for fixing the butt piece of fishplate bar.
Through adopting above-mentioned technical scheme, when heating the water in the maintenance pond, only need with a plurality of heating strips even interval articulate on the peg on the hitch plate, a plurality of heating strips can heat everywhere water in the maintenance pond for the temperature of water in the maintenance pond reaches the specific temperature of maintenance concrete test block can, the setting up of heating strip can reduce the influence of external air current to temperature in the maintenance pond, has ensured the invariant of concrete test block maintenance temperature.
Optionally, the heat preservation assembly comprises a plurality of heat preservation cottons and a plurality of waterproof boards, the heat preservation cottons are respectively fixed on the peripheral wall and the top wall of the inner side of the chamber, and the waterproof boards are fixed on the end faces, far away from the inner wall of the chamber, of the heat preservation cottons.
Through adopting above-mentioned technical scheme, because the temperature in the cavity is different with ambient temperature, so the cavity inner wall easily carries out heat-conduction with the external world, and the cotton heat preservation can reduce cavity inner wall and external heat-conduction, reduces the influence of external air temperature to the inside temperature of curing chamber, reduces thermal loss, has green's effect, and the reducible heat preservation of waterproof board is cotton absorbs the steam in the cavity, has ensured the invariant of indoor humidity.
Optionally, adjacent two be fixed with the sealing strip between the waterproof board, the sealing strip is along adjacent two the length direction extension setting of waterproof board laminating department.
Through adopting above-mentioned technical scheme, all be fixed with heat preservation cotton and waterproof board on inboard perisporium of cavity and the roof, there is the fit-up gap between two adjacent waterproof boards, lead to heat and steam to run off from the clearance easily, the sealing strip can be clogged the clearance, has reduced the loss of heat and steam in the cavity, has ensured the invariant of indoor temperature and humidity, has green's effect, also reduces the influence of external air temperature to the inside temperature of curing chamber simultaneously.
Optionally, the periphery wall of the chamber bottom plate is provided with four supporting legs, and the four supporting legs are uniformly distributed at four corners of the chamber bottom plate.
Through adopting above-mentioned technical scheme, the supporting legs can wholly support the cavity, reduces the area of contact of cavity bottom plate and ground, reduces because of the heat-conduction that cavity bottom plate and ground produced because of area of contact is too big, reduces the influence of external air current temperature to the curing chamber internal temperature.
Optionally, the butt piece sets up to the butt pole, the longitudinal section of butt pole sets up to L shape, the one end of butt pole with the hitch plate butt, the other end joint of butt pole has the joint piece, the joint piece with maintenance pond lateral wall joint is fixed.
Through adopting above-mentioned technical scheme, the fishplate bar is placed on the maintenance pond is close to the up end of cavity inner wall one side, and when the hookup had the heating strip on the fishplate bar, the fishplate bar produced easily under the action of gravity of heating strip and emptys, so will the butt pole take and put on the up end of maintenance pond both sides, the one end and the inseparable butt of fishplate bar of butt pole, the joint piece is fixed the other end joint of butt pole on the maintenance pond lateral wall, and the fishplate bar can be stably fixed on the maintenance pond this moment.
Optionally, the heating member sets up to hot water pipe, hot water pipe is around fixing the periphery in maintenance pond, the one end in maintenance pond is provided with the hot water tank, the hot water tank internal fixation has the electric heat net, the both ends of hot water pipe all with the hot water tank intercommunication sets up.
Through adopting above-mentioned technical scheme, water injection in the hot-water tank, the electric heat net heats the water in the hot-water tank, and the hot water in the hot-water tank heats maintenance pond perisporium along laying of hot water piping for the water temperature in the maintenance pond risees and reaches the specific temperature of maintenance concrete test block, and the hot water of pouring into in the hot water piping can reduce the influence of external air current to temperature in the maintenance pond, has ensured the invariant of concrete test block maintenance temperature.
Optionally, the upper end of the hot water tank is opened and closed with a heat preservation cover for heat preservation in a sliding manner.
Through adopting above-mentioned technical scheme, the lid that keeps warm can carry out effectual heat preservation to hot water in the hot-water tank, reduces the heat loss in the hot-water tank, has green's effect, and the setting of sliding of lid that keeps warm is convenient for easily open and close the hot-water tank.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the heating strips can directly heat water in the curing pool, so that the curing temperature of the concrete test block is constant all the time, and meanwhile, the temperature regulator can regulate the temperature in the cavity, so that the temperature in the cavity is at a specific temperature, the heat insulation cotton and the waterproof board can reduce the heat conduction between the inner wall of the cavity and the outside, reduce the influence of the outside airflow temperature on the temperature in the curing room, reduce the heat loss and ensure the constancy of the temperature and the humidity in the cavity;
2. the hot water in the hot water pipeline heats the circumferential wall of the curing pool along the arrangement of the hot water pipeline, so that the water temperature in the curing pool rises and reaches the specific temperature of the cured concrete test block, the hot water in the hot water pipeline can be recycled, the effect of green environmental protection is achieved, and meanwhile, the hot water flowing in the hot water pipeline also enables the heat distribution in the curing pool to be more uniform.
Drawings
FIG. 1 is a schematic structural diagram of the whole in the embodiment of the present application;
FIG. 2 is a schematic structural diagram of a chamber, a curing pool, a temperature regulator, a heat preservation assembly, a heating strip, a hanging plate, a sealing strip, a supporting leg, a butt rod and a clamping block in the first embodiment of the present application;
FIG. 3 is a schematic structural diagram of a maintenance pond, a hanging plate, a hanging post, an abutting rod and a clamping block in the first embodiment of the present application;
FIG. 4 is a schematic structural diagram of a curing pool, a hot water pipeline, a hot water tank, an electric heating net and a heat preservation cover in the second embodiment of the present application.
Reference numerals: 1. a chamber; 2. a maintenance pool; 3. a temperature regulator; 4. a heat preservation assembly; 41. heat preservation cotton; 42. a waterproof sheet; 5. heating the strip; 6. a hanging plate; 7. hanging a column; 8. a sealing strip; 9. supporting legs; 10. a butting rod; 11. a clamping block; 12. a hot water pipe; 13. a hot water tank; 14. an electric heating net; 15. a heat preservation cover; 16. hanging parts; 17. a first clamping groove; 18. a second clamping groove; 19. a water pump; 20. t-shaped rail.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
Example one
The embodiment of the application discloses a movable concrete curing room. Referring to fig. 1 and 2, the portable concrete curing room includes a chamber 1, a curing bath 2, and a temperature regulator 3.
Cavity 1 is the hollow cavity of the cuboid form that encloses to close by six mutual welding of steel sheet, welded fastening has the steel pendant 16 of four L shapes on the periphery wall of cavity 1 roof, four pendant 16 equipartitions are at four edges of cavity 1 roof, set up the connecting hole of being convenient for hoist and mount on the pendant 16, be provided with four supporting legs 9 on the periphery wall of cavity 1 bottom plate, four supporting legs 9 equipartitions are at four edges of cavity 1 bottom plate, supporting legs 9 are connected for the screw with cavity 1's connected mode, welded fastening … …, supporting legs 9 can wholly support cavity 1, reduce because of cavity 1 bottom plate and ground heat-conduction because of area of contact is too big, it has the door of being convenient for business turn over cavity 1 to articulate through the hinge on cavity 1's the terminal surface.
The inner wall of the cavity 1 is provided with a heat insulation component 4 for heat insulation, the heat insulation component 4 comprises a plurality of heat insulation cotton 41 and a plurality of waterproof boards 42, the heat insulation cotton 41 is respectively fixed on the peripheral wall and the top wall of the inner side of the cavity 1 through heat insulation nails, the heat insulation cotton 41 completely covers the peripheral wall and the top wall of the cavity 1, the heat insulation cotton 41 can reduce the heat conduction of the inner wall of the cavity 1 and the outside, the influence of the outside air temperature on the internal temperature of the curing room is reduced, the waterproof boards 42 are fixed on the end surface of the heat insulation cotton 41 far away from the inner wall of the cavity 1 through screws, the waterproof boards 42 can reduce the absorption of the heat insulation cotton 41 on the water vapor in the cavity 1, the constancy of the humidity in the cavity 1 is ensured, a sealing strip 8 is fixed between two adjacent waterproof boards 42, the sealing strip 8 is made of rubber material, the sealing strip 8 is fixed on the waterproof board 42 through waterproof adhesive bonding, the sealing strip 8 extends along the length direction of the joint of the two adjacent waterproof boards 42, the sealing strip 8 can be stuffed in the assembly gap between two adjacent waterproof boards 42, so that the loss of heat and water vapor in the cavity 1 is reduced, and the constancy of temperature and humidity in the cavity 1 and the curing pool 2 is guaranteed.
Referring to fig. 2 and 3, maintenance pond 2 is made by steel, and maintenance pond 2 sets up for hollow intermediate layer, maintenance pond 2 level is placed on the bottom plate of cavity 1, maintenance pond 2's opening sets up, temperature regulation ware 3 is located cavity 1, temperature regulation ware 3 sets up to the air conditioner in this embodiment, temperature regulation ware 3 sets up to the air heater in other embodiments, warm logical equipment … …, the air conditioner passes through the screw and articulates on the cavity 1 inner wall of maintenance pond 2 top, the air conditioner can carry out temperature regulation to the temperature in the cavity 1, make the temperature in the cavity 1 be in the constant state, the stability of concrete test block maintenance temperature has been ensured.
A heating element for heating is arranged in the curing pool 2, the heating element is set to be a heating strip 5, a plurality of heating strips 5 are arranged, one side of the curing pool 2 close to the inner wall of the cavity 1 is detachably provided with a hanging plate 6, the hanging plate 6 is set to be a cuboid, the hanging plate 6 is placed on the upper end surface of one side of the curing pool 2 along the length dimension direction of the curing pool 2, a plurality of hanging columns 7 are uniformly distributed on the side surface of the hanging plate 6 close to the curing pool 2 along the length dimension direction of the curing pool 2, the hanging columns 7 are set to be screws, the hanging columns 7 are locked and fixed on the hanging plate 6 through threaded connection, the plurality of heating strips 5 are in one-to-one correspondence with the plurality of hanging columns 7, hanging holes (not marked in the figure) hung with the hanging columns 7 are arranged on the side wall of one end of the heating strips 5, one end of the heating strips 5 far away from the hanging columns 7 extends into the curing pool 2, the plurality of heating strips 5 can heat water at each position in the curing pool 2, make the temperature of the interior water of maintenance pond 2 reach the specific temperature of maintenance concrete test block can, be provided with the butt piece that is used for fixed fishplate bar 6 on the maintenance pond 2.
Referring to fig. 2 and 3, the abutting member is a abutting rod 10, the longitudinal section of the abutting rod 10 is L-shaped, the abutting rod 10 is arranged perpendicular to the direction of the hanging plate 6, one bent end surface of the abutting rod 10 is stably pressed with the upper end surface of the maintenance pool 2, the other bent end surface of the abutting rod 10 is vertically upwards arranged, one end of the abutting rod 10 is tightly abutted against the end surface of the hanging plate 6 provided with the hanging post 7, the other end of the abutting rod 10 is clamped with a clamping block 11, the clamping block 11 is made of foam, the lower end surface of the clamping block 11 is provided with a first clamping groove 17 for clamping and fixing the abutting rod 10 along the length dimension direction of the abutting rod 10, the vertically upwards bent end surface of the clamping block 11 is clamped and fixed in the first clamping groove 17, the lower end surface of the clamping block 11 is provided with a second clamping groove 18 for clamping and fixing with the side wall of the maintenance pool 2 along the length dimension direction of the maintenance pool 2, the first clamping groove 17 is vertically communicated with the second clamping groove 18, hang fishplate bar 6 and can stably place on maintenance pond 2 through the interact of joint piece 11 with butt pole 10 for heating strip 5 can stably hang on hang fishplate bar 6 and carry out heat treatment to the water in the maintenance pond 2.
Example two
Referring to fig. 4, the difference between the second embodiment and the first embodiment is that the heating element is a hot water pipe 12, the hot water pipe 12 is fixed on the inner wall of the hollow interlayer of the maintenance pool 2 in a surrounding manner by welding, one end of the hot water pipe 12 is a water inlet, the other end of the hot water pipe 12 is a water outlet, one end of the maintenance pool 2 is provided with a hot water tank 13, the hot water tank 13 is horizontally placed on the bottom plate of the chamber 1, the upper end of the hot water tank 13 is provided with an opening, and the water inlet and the water outlet of the hot water pipe 12 are both communicated and welded with the end face of the hot water tank 13 close to the maintenance pool 2.
A water pump 19 for draining water is fixedly welded at a water outlet of the hot water pipeline 12, the water pump 19 is communicated between the maintenance pool 2 and the hot water tank 13, the water pump 19 can accelerate the flow of hot water in the hot water pipeline 12, the heating effect of the hot water in the hot water pipeline 12 on water in the maintenance pool 2 is improved, an electric heating net 14 for controlling water temperature is fixed in the hot water tank 13 through screws, the hot water in the hot water tank 13 enters the hot water pipeline 12 from the water outlet under the driving of the water pump 19 after being heated by the electric heating net 14, the peripheral wall of the maintenance pool 2 is heated along the arrangement of the hot water pipeline 12, the water temperature in the maintenance pool 2 is increased and reaches the specific temperature of the maintenance concrete test block, the influence of external air flow on the water temperature in the maintenance pool 2 can be reduced by the hot water in the hot water pipeline 12, and the maintenance temperature constancy of the concrete test block is guaranteed.
Referring to fig. 4, the opening part of hot water tank 13 upper end slides and opens and shuts and have heat preservation lid 15, heat preservation lid 15 is made by the heat preservation material, it has T rail 20 to follow the sliding direction welded fastening of heat preservation lid 15 on the inner wall of hot water tank 13 opening part, heat preservation lid 15 is close to and offers the T groove (not marked in the figure) with T rail 20 joint adaptation that slides on the terminal surface of T rail 20, heat preservation lid 15 can carry out effectual heat preservation to hot water in hot water tank 13, reduce the heat loss in the hot water tank 13, green's effect has, the setting of sliding of heat preservation lid 15, be convenient for easily open and close hot water tank 13.
The implementation principle of a movable concrete curing room in this application embodiment one does: the method comprises the steps of injecting water for curing concrete test blocks into a curing pool 2, placing a hanging plate 6 on the upper end face of one side, close to the inner wall of a cavity 1, of the curing pool 2 along the length dimension direction of the curing pool 2, tightly abutting one end of an abutting rod 10 on the hanging plate 6, fixedly clamping the other end of the abutting rod 10 and the side wall of the curing pool 2 through a clamping block 11, enabling the hanging plate 6 to be stably placed on the curing pool 2 through the interaction of the clamping block 11 and the abutting rod 10, then hanging a heating strip 5 on a hanging column 7 on the hanging plate 6, starting the heating strip 5, heating the water in the curing pool 2 through the heating strip 5, then starting a temperature regulator 3, regulating the temperature in the cavity 1 to a specific temperature through the temperature regulator 3, then placing the concrete test blocks into the curing pool 2 for curing, and maintaining the temperature and humidity at the periphery of the curing pool 2 in a heat-preserving cotton 41, a waterproof plate 42 and a waterproof plate 5, Being in invariable state under the heat preservation sealed effect of sealing strip 8, reducing the influence of external air temperature to the inside temperature of curing chamber, reducing thermal loss, ensured the invariant of temperature and humidity in the cavity 1.
In the second embodiment of the present application, an implementation principle of a movable concrete curing room is as follows: the heat preservation cover 15 is moved along the upper end of the hot water tank 13, the hot water tank 13 is opened, water is injected into the hot water tank 13, the electric heating net 14 is started, the electric heating net 14 heats the water in the hot water tank 13, the hot water in the hot water tank 13 enters the hot water pipeline 12 from the water outlet under the driving of the water pump 19, and the circumferential wall of the curing pool 2 is heated along the arrangement of the hot water pipeline 12, so that the water temperature in the curing pool 2 is raised and reaches the specific temperature for curing the concrete test block, the hot water in the hot water pipeline 12 can reduce the influence of the external air flow on the water temperature in the curing pool 2, the constant curing temperature of the concrete test block is ensured, then adjust the heat preservation through temperature regulator 3, heat preservation cotton 41, waterproof board 42 and sealing strip 8 to the temperature in the cavity 1, reduce the influence of external air temperature to the inside temperature of curing room, reduce thermal loss, ensured the invariant of temperature and humidity in the cavity 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a movable concrete curing room, includes cavity (1) that is used for carrying out the concrete curing, be provided with curing pool (2) in cavity (1), its characterized in that: the heat preservation device is characterized in that a temperature regulator (3) used for controlling the temperature is arranged in the cavity (1), a heat preservation assembly (4) used for preserving heat is arranged on the inner wall of the cavity (1), and a heating element used for heating is arranged in the maintenance pool (2).
2. The portable concrete curing room of claim 1, wherein: the heating member sets up to heating strip (5), heating strip (5) are provided with a plurality ofly, maintenance pond (2) one side is removable to be provided with fishplate bar (6), the equipartition has a plurality ofly to be used for articulating on fishplate bar (6) hang post (7) of heating strip (5), be provided with on maintenance pond (2) and be used for fixing the butt piece of fishplate bar (6).
3. The portable concrete curing room of claim 1, wherein: the heat preservation assembly (4) comprises a plurality of heat preservation cottons (41) and a plurality of waterproof boards (42), the heat preservation cottons (41) are fixed on the peripheral wall and the top wall of the inner side of the chamber (1) respectively, and the waterproof boards (42) are fixed on the end faces, far away from the inner wall of the chamber (1), of the heat preservation cottons (41).
4. A portable concrete curing room as defined in claim 3, wherein: adjacent two be fixed with sealing strip (8) between waterproof board (42), sealing strip (8) are adjacent two along the length direction extension setting of waterproof board (42) laminating department.
5. The portable concrete curing room of claim 1, wherein: supporting legs (9) are arranged on the peripheral wall of the bottom plate of the chamber (1), the supporting legs (9) are four, and the supporting legs are uniformly distributed at four corners of the bottom plate of the chamber (1).
6. A portable concrete curing room as defined in claim 2, wherein: the butt piece sets up to butt pole (10), the longitudinal section of butt pole (10) sets up to L shape, the one end of butt pole (10) with hitch plate (6) butt, the other end joint of butt pole (10) has joint piece (11), joint piece (11) with maintenance pond (2) lateral wall joint is fixed.
7. The portable concrete curing room of claim 1, wherein: the heating member sets up to hot water pipeline (12), hot water pipeline (12) are around fixing the periphery of maintenance pond (2), the one end of maintenance pond (2) is provided with hot water tank (13), hot water tank (13) internal fixation has electric heat net (14), the both ends of hot water pipeline (12) all with hot water tank (13) intercommunication sets up.
8. The portable concrete curing room of claim 7, wherein: the upper end of the hot water tank (13) is slidably opened and closed with a heat preservation cover (15) for heat preservation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120918043.3U CN214819512U (en) | 2021-04-29 | 2021-04-29 | Movable concrete curing room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120918043.3U CN214819512U (en) | 2021-04-29 | 2021-04-29 | Movable concrete curing room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214819512U true CN214819512U (en) | 2021-11-23 |
Family
ID=78771286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120918043.3U Active CN214819512U (en) | 2021-04-29 | 2021-04-29 | Movable concrete curing room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214819512U (en) |
-
2021
- 2021-04-29 CN CN202120918043.3U patent/CN214819512U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209910901U (en) | Waterproof testing arrangement is used in heated board production | |
CN214819512U (en) | Movable concrete curing room | |
CN102346158B (en) | Damp heat aging test device | |
CN207729757U (en) | A kind of roofing automatic spray heat sink | |
CN107655815A (en) | A kind of wall deterioration test device | |
CN107288376A (en) | A kind of container house | |
CN204191261U (en) | A kind of greenhouse possessing double-open type skylight | |
CN209066958U (en) | A kind of swimming pool can heating and thermal insulation platform | |
CN204217649U (en) | For the manipulator that animal automatic bathing is dried | |
CN210248161U (en) | Spraying fermentation box | |
CN216906122U (en) | Agricultural flowing water energy storage greenhouse | |
CN206385636U (en) | Passive type house | |
CN211434866U (en) | Anti-freezing device for fire-fighting water system | |
CN205458206U (en) | Full -automatic heat preservation hot water bathing pool | |
CN220972771U (en) | Constant temperature and humidity curing box for preparing mortar | |
CN214406502U (en) | Water paint heating equipment | |
CN217958003U (en) | Laminated slab maintenance greenhouse | |
CN218910851U (en) | Composite spunlaced laminated felt ironing machine with corner fixing function | |
CN217269633U (en) | Energy-concerving and environment-protective passive form building exterior window structure | |
CN216139143U (en) | Intelligent curing means of thing networking recycled concrete preparation | |
CN203347012U (en) | Movable board house with heating function | |
CN210500763U (en) | Concrete prefabricated component is with maintenance room that keeps warm | |
CN110242061A (en) | A kind of temperature-adjusting device poured and its application method | |
CN205521852U (en) | Board production machine warms up high strong type cement | |
CN219138517U (en) | Integrated shower room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |