CN214791877U - Air conditioner pipeline fixing device - Google Patents
Air conditioner pipeline fixing device Download PDFInfo
- Publication number
- CN214791877U CN214791877U CN202120376864.9U CN202120376864U CN214791877U CN 214791877 U CN214791877 U CN 214791877U CN 202120376864 U CN202120376864 U CN 202120376864U CN 214791877 U CN214791877 U CN 214791877U
- Authority
- CN
- China
- Prior art keywords
- air conditioner
- pipeline
- arc
- plate
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 13
- 238000004378 air conditioning Methods 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 8
- 238000003466 welding Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
Abstract
The utility model relates to an air conditioner pipeline fixing device belongs to pipeline installation technical field, including a horizontal pole, respectively be equipped with a montant on the both ends about the horizontal pole, the welding of montant upper end is equipped with a folded plate, be equipped with pipeline supporting mechanism on the horizontal pole, pipeline supporting mechanism includes an upper arc and a lower arc, the both sides of upper arc are equipped with the upper junction plate, the both sides of lower arc are equipped with lower connecting plate, the upper junction plate that corresponds about passing is equipped with a spinal branch vaulting pole with lower connecting plate, upper end of the support bar is screw thread portion, the lower extreme of screw thread portion is equipped with spacing arch, the bottom of bracing piece is connected on the horizontal pole, the nut is installed and is fixed the air conditioner pipeline in screw thread portion, be equipped with three gyro wheel frame on the inboard face of lower arc, install the gyro wheel on the gyro wheel frame. Use the utility model discloses the air conditioner pipeline is fixed in the installation, and the air conditioner pipeline can rely on the gyro wheel to remove in the arc under, installs labour saving and time saving more.
Description
Technical Field
The utility model relates to an air conditioner pipeline fixing device belongs to pipeline installation technical field.
Background
The central air conditioner is an air conditioner which controls different rooms to achieve the purpose of indoor air conditioning by a host machine in a mode of passing air through an air duct or connecting a hot cold water pipe with a plurality of tail ends, the host machine can control a plurality of unused rooms and introduce fresh air by adopting an air pipe air supply mode, the indoor air quality is effectively improved, pipelines of the central air conditioner are divided into a refrigerant pipe, a condensate pipe and a wire pipe, and the installation of the pipeline of the central air conditioner is an important link in the construction process of the central air conditioner.
In the prior art, when a pipeline of a central air conditioner is installed, the pipeline is usually hung on a ceiling by using a pipe hoop, so that the installation is very time-consuming and labor-consuming, a plurality of persons are required to cooperate and operate, and the position of the air conditioner pipeline needs to be adjusted back and forth.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve exist among the prior art not enough, provide an installation air conditioner pipeline labour saving and time saving's air conditioner pipeline fixing device.
The utility model discloses a realize through following technical scheme:
the utility model provides an air conditioner pipeline fixing device, including a horizontal pole, respectively be equipped with a montant on the both ends about the horizontal pole, the welding of montant upper end is equipped with a folded plate, be equipped with pipeline supporting mechanism on the horizontal pole, pipeline supporting mechanism includes an upper arc and a lower arc, the both sides of upper arc are equipped with the upper junction plate, the both sides of lower arc are equipped with lower connecting plate, the upper junction plate and the lower connecting plate that correspond about passing are equipped with a bracing piece, upper end of the support bar is screw thread portion, the lower extreme of screw thread portion is equipped with spacing arch, the bottom of bracing piece is connected on the horizontal pole, the nut is installed and is fixed air conditioner pipeline in screw thread portion, be equipped with three gyro wheel frame on the inboard side of lower arc, install the gyro wheel on the gyro wheel frame.
Use the utility model discloses the air conditioner pipeline is fixed in the installation, and the air conditioner pipeline can rely on the gyro wheel to remove in the arc under, installs labour saving and time saving more.
Further preferably, a plurality of pipeline supporting mechanisms with different sizes can be installed on the cross rod according to needs, a plurality of different pipelines can be installed at the same time, and the diameters of the pipelines are different.
Further preferably, the folded plate is provided with a mounting hole, and the folded plate can be mounted on a ceiling through expansion screws, so that the mounting mode is convenient.
Further preferably, the bottom end of the support rod is directly welded on the upper end face of the cross rod.
Compared with the prior art, the utility model discloses the beneficial effect who has is:
use the utility model discloses the air conditioner pipeline is fixed in the installation, and the air conditioner pipeline can rely on the gyro wheel to remove in the arc under, installs labour saving and time saving more.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a partial side view of fig. 1.
In the figure: 1. a cross bar; 2. a vertical rod; 3. folding the plate; 4. a pipe support mechanism; 5. a lower arc-shaped plate; 6. an upper arc plate; 7. a support bar; 8. a limiting bulge; 9. a threaded portion; 10. a lower connecting plate; 11. an upper connecting plate; 12. a nut; 13. a roller frame; 14. a roller; 15. an air conditioning duct.
Detailed Description
The following describes the embodiments of the present invention in further detail with reference to the accompanying drawings.
As shown in fig. 1 and 2, the air conditioner pipeline fixing device comprises a cross rod 1, a vertical rod 2 is arranged at each of the left end and the right end of the cross rod 1, a folded plate 3 is welded at the upper end of the vertical rod 2, a pipeline supporting mechanism 4 is arranged on the cross rod 1, the pipeline supporting mechanism 4 comprises an upper arc-shaped plate 6 and a lower arc-shaped plate 5, an upper connecting plate 11 is arranged on each of the two sides of the upper arc-shaped plate 6, a lower connecting plate 10 is arranged on each of the two sides of the lower arc-shaped plate 5, a supporting rod 7 is arranged on the upper end of the supporting rod 7 and penetrates through the upper connecting plate 11 and the lower connecting plate 10 which correspond to each other up and down, a threaded portion 9 is arranged at the upper end of the supporting rod 7, a limiting protrusion 8 is arranged at the lower end of the threaded portion 9, a nut 12 is arranged on the threaded portion 9 to fix an air conditioner pipeline 15, three roller frames 13 are arranged on the inner side surface of the lower arc-shaped plate 5, and rollers 14 are arranged on the roller frames 13.
A plurality of pipe support mechanisms 4 of different sizes can be installed on the cross bar 1 as required.
The folded plate 3 is provided with a mounting hole, and the folded plate 3 can be mounted on a ceiling through expansion screws.
The bottom end of the support rod 7 is directly welded on the upper end surface of the cross rod 1.
The working process is as follows:
will through the inflation screw the utility model discloses install on the ceiling, can install the different pipeline supporting mechanism of a plurality of sizes according to specific needs on the horizontal pole, but the air conditioner pipeline of mountable unidimensional and other pipelines like this, and the pipeline can rely on the gyro wheel to remove in the arc under.
In the description of the present invention, the terms "inside", "outside", "up", "down", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for convenience of description of the present invention and does not require the present invention to be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Claims (4)
1. The utility model provides an air conditioner pipeline fixing device which characterized in that: comprises a cross rod (1), a vertical rod (2) is respectively arranged at the left end and the right end of the cross rod (1), a folded plate (3) is welded at the upper end of the vertical rod (2), a pipeline supporting mechanism (4) is arranged on the cross rod (1), the pipeline supporting mechanism (4) comprises an upper arc-shaped plate (6) and a lower arc-shaped plate (5), an upper connecting plate (11) is arranged at the two sides of the upper arc-shaped plate (6), a lower connecting plate (10) is arranged at the two sides of the lower arc-shaped plate (5), a supporting rod (7) is arranged by penetrating through the upper connecting plate (11) and the lower connecting plate (10) which correspond to each other up and down, the upper end of the supporting rod (7) is a threaded part (9), a limit bulge (8) is arranged at the lower end of the threaded part (9), the bottom end of the supporting rod (7) is connected to the cross rod (1), a nut (12) is arranged on the threaded part (9) to fix an air-conditioning pipeline (15), three roller frames (13) are arranged on the inner side surface of the lower arc-shaped plate (5), the roller frame (13) is provided with a roller (14).
2. An air conditioner duct fixing device as claimed in claim 1, wherein: a plurality of pipeline supporting mechanisms (4) with different sizes can be installed on the cross rod (1) according to requirements.
3. An air conditioner duct fixing device as claimed in claim 1 or 2, wherein: the folding plate (3) is provided with a mounting hole, and the folding plate (3) can be mounted on a ceiling through expansion screws.
4. An air conditioner duct fixing device as claimed in claim 3, wherein: the bottom end of the supporting rod (7) is directly welded on the upper end face of the cross rod (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120376864.9U CN214791877U (en) | 2021-02-19 | 2021-02-19 | Air conditioner pipeline fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120376864.9U CN214791877U (en) | 2021-02-19 | 2021-02-19 | Air conditioner pipeline fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214791877U true CN214791877U (en) | 2021-11-19 |
Family
ID=78753554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120376864.9U Expired - Fee Related CN214791877U (en) | 2021-02-19 | 2021-02-19 | Air conditioner pipeline fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214791877U (en) |
-
2021
- 2021-02-19 CN CN202120376864.9U patent/CN214791877U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103423850B (en) | For the air-inlet grille of indoor apparatus of air conditioner and air intake support and indoor apparatus of air conditioner | |
CN201396863Y (en) | Suspended and embedded type air conditioner | |
CN107131583B (en) | A kind of air conditioner support convenient to use | |
CN214791877U (en) | Air conditioner pipeline fixing device | |
CN102777975A (en) | Suspended direct-air-blowing unit type air conditioning unit | |
CN201262445Y (en) | Air conditioner and its installation apparatus | |
CN111853971B (en) | Heating ventilation air conditioner installing support | |
CN106123263A (en) | Ceiling type air conditioner and exhaust apparatus thereof | |
CN209197003U (en) | Low noise efficient ultrathin type fan coil | |
CN109654298B (en) | Adjustable central air conditioner pipeline mounting bracket convenient to hoist and mount | |
CN207299474U (en) | It is capable of the mounting bracket of the indoor apparatus of air conditioner of Fast Installation | |
CN219103172U (en) | Dehumidifying fan coil | |
CN208382420U (en) | The air cleaning unit being mounted between return air inlet and central air conditioner end air machine coil pipe | |
CN213334910U (en) | Combined air conditioning unit convenient to install and fix fast | |
CN217209765U (en) | Air conditioner ornamental strip of convenient dismantlement and installation | |
CN217595583U (en) | Condenser of outdoor unit of air conditioner | |
CN206531242U (en) | Intelligent air conditioner | |
CN216308156U (en) | Central air conditioning pipeline installing support | |
CN216716554U (en) | Heating ventilation air conditioner fixing device | |
CN215637897U (en) | Central air conditioning pipeline installation strutting arrangement | |
CN210197664U (en) | Air return passageway vertical dry coil pipe mounting structure of clean room | |
CN217540945U (en) | Furred ceiling air-cooler | |
CN212987525U (en) | Central air-conditioning equipment for office building | |
CN215513158U (en) | Air inlet assembly of air conditioner refrigerating system easy to disassemble | |
CN220302963U (en) | Hoisting equipment for air conditioner water pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211119 |
|
CF01 | Termination of patent right due to non-payment of annual fee |