CN214789437U - Building drainage pipe strutting arrangement - Google Patents
Building drainage pipe strutting arrangement Download PDFInfo
- Publication number
- CN214789437U CN214789437U CN202120314965.3U CN202120314965U CN214789437U CN 214789437 U CN214789437 U CN 214789437U CN 202120314965 U CN202120314965 U CN 202120314965U CN 214789437 U CN214789437 U CN 214789437U
- Authority
- CN
- China
- Prior art keywords
- rod
- hoop
- drainage pipeline
- lower hoop
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model discloses a building drainage pipeline supporting device, which relates to the field of building drainage construction and comprises an upper hoop, a lower hoop and an adjusting mechanism; the upper hoop and the lower hoop are detachably connected through bolts, the upper hoop and the lower hoop are connected into a ring shape and used for limiting and fixing the drainage pipeline, and the bottom end of the lower hoop is connected with an adjusting mechanism; adjustment mechanism includes the connecting rod that movable rod and logical heart set up, the one end of movable rod with the bottom of hoop is fixed down, arranging in of the other end activity of movable rod in the connecting rod, the other end of connecting rod is connected with the connecting plate, wear to be equipped with the expansion bolts who is used for being connected with ground on the connecting plate, the connecting rod is kept away from the one end activity of connecting plate is worn to be equipped with and is used for right the movable rod carries out spacing stop screw. The device simple structure, the material is easy, and the cost is cheap to the device can the height-adjusting, uses under the environment of multiple different altitude differences, economical and practical.
Description
Technical Field
The utility model relates to a building drainage construction field specifically is a building drainage pipe strutting arrangement.
Background
In the drainage construction of buildings, drainage pipelines are often supported due to the height difference of the ground, so that the construction of the drainage pipelines is facilitated. On the construction site, a lot of constructors often support the drainage pipeline by using the existing bricks for convenience or material saving, so that when the drainage pipeline is connected or the pipelines at some positions are backfilled, the pipelines can be moved and dislocated due to no fixation, the drainage pipeline joint is moved and dislocated and is not firm, water leakage and the position of offset paying-off occur, and troubles are caused for subsequent backfilling construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building drainage pipe strutting arrangement, the device simple structure, the material is easy, and the cost is cheap to the device can height-adjusting, uses under the environment of multiple different altitudes, economical and practical.
The purpose of the utility model is realized through the following technical scheme:
a building drainage pipeline supporting device comprises an upper hoop, a lower hoop and an adjusting mechanism; the upper hoop and the lower hoop are detachably connected through bolts, the upper hoop and the lower hoop are connected into a ring shape and used for limiting and fixing the drainage pipeline, and the bottom end of the lower hoop is connected with an adjusting mechanism; adjustment mechanism includes the connecting rod that movable rod and logical heart set up, the one end of movable rod with the bottom of hoop is fixed down, arranging in of the other end activity of movable rod in the connecting rod, the other end of connecting rod is connected with the connecting plate, wear to be equipped with the expansion bolts who is used for being connected with ground on the connecting plate, the connecting rod is kept away from the one end activity of connecting plate is worn to be equipped with and is used for right the movable rod carries out spacing stop screw.
Preferably, two sides of the upper hoop are respectively connected with a first supporting plate, two sides of the lower hoop are respectively connected with a second supporting plate, and the first supporting plate and the second supporting plate are connected through bolts.
Preferably, the bottom of second backup pad is connected with the articulated seat of second respectively, the articulated seat of second is articulated through the round pin axle with the one end of telescopic link, the other end of telescopic link articulates through the round pin axle has the backing plate, the backing plate passes through expansion bolts and is connected with ground.
Preferably, the telescopic link includes outer pole and the interior pole of outer pole internalization, the one end of interior pole with the articulated seat of second is articulated, what the other end activity of interior pole was arranged in the outer pole, the other end of outer pole with the backing plate is articulated.
Preferably, one end of the outer rod, which is far away from the base plate, is provided with a fixing bolt, and the fixing bolt is movably arranged on the outer rod in a penetrating manner and used for fixing the inner rod.
Preferably, the joint of the movable rod and the lower hoop is provided with a reinforcing ring rib in a surrounding manner, and the joint of the connecting rod and the connecting plate is also provided with a reinforcing ring rib in a surrounding manner.
The utility model has the advantages that: the device is mainly used for construction of outdoor drainage pipelines and supporting and fixing the outdoor drainage pipelines. The device comprises an upper hoop, a lower hoop and an adjusting mechanism capable of adjusting the height; the upper hoop and the lower hoop of the device are detachably connected through bolts, the upper hoop and the lower hoop are connected into a ring shape and used for limiting and fixing the drainage pipeline, the drainage pipeline is clamped and fixed through the upper hoop and the lower hoop so as to avoid displacement during construction, the bottom end of the lower hoop is connected with an adjusting mechanism, the adjusting mechanism adjusts the height, and the lower hoop is supported and stabilized; the adjusting mechanism of the device comprises a movable rod and a connecting rod arranged through the center, one end of the movable rod is fixed with the bottom end of the lower hoop, the other end of the movable rod is movably arranged in the connecting rod, the other end of the connecting rod is connected with a connecting plate, and an expansion bolt used for being connected with the ground is arranged on the connecting plate in a penetrating mode; after last hoop and lower hoop are with the fixed centre gripping of drainage pipe, through adjusting the connecting rod, make the connecting plate and the ground contact that its bottom is connected, the expansion bolts who wears to establish on the reuse connecting plate is connected the connecting plate with ground fixedly, and the spacing screw that the reuse connecting rod top was worn to establish carries out spacing fixed to the movable rod afterwards for support and stable drainage pipe. The device simple structure, the material is easy, and the cost is cheap to the device can the height-adjusting, uses under the environment of multiple different altitude differences, economical and practical.
Drawings
FIG. 1 is a schematic structural view of a supporting device for a drainage pipeline of a building according to the present invention;
FIG. 2 is a schematic diagram of a part of an explosion of a supporting device for a drainage pipeline of a building according to the present invention;
in the figure, 1-upper hoop, 2-lower hoop, 3-movable rod, 4-connecting rod, 5-connecting plate, 6-telescopic rod, 7-backing plate, 11-first supporting plate, 21-second supporting plate, 22-second hinging seat, 41-limiting screw rod and 61-fixing bolt.
Detailed Description
The technical solution of the present invention is described in further detail below with reference to the accompanying drawings, but the scope of the present invention is not limited to the following description.
As shown in fig. 1 to 2, a building drainage pipeline supporting device comprises an upper hoop 1, a lower hoop 2 and an adjusting mechanism; the upper hoop 1 and the lower hoop 2 are detachably connected through bolts, the upper hoop 1 and the lower hoop 2 are connected into a ring shape and used for limiting and fixing the drainage pipeline, and the bottom end of the lower hoop 2 is connected with an adjusting mechanism; adjustment mechanism includes movable rod 3 and the connecting rod 4 that leads to the heart setting, and the one end of movable rod 3 is fixed with the bottom of hoop 2 down, and in the connecting rod 4 was arranged in to the other end activity of movable rod 3, the other end of connecting rod 4 was connected with connecting plate 5, wears to be equipped with the expansion bolts 51 that is used for being connected with ground on the connecting plate 5, and connecting rod 4 keeps away from the one end activity of connecting plate 5 and wears to be equipped with and is used for carrying out spacing stop screw 41 to movable rod 3. The device is mainly used for outdoor drainage pipeline construction, supports fixed outdoor drainage pipeline, and the device includes hoop 1, hoop 2 down and can height-adjusting's adjustment mechanism, and the device's hoop 1 and hoop 2 down are used for the fixed drainage pipeline of centre gripping, and adjustment mechanism then can realize the regulation of height for hoop 1 and hoop 2 down are stabilized in the support, support fixedly to this comes the pipeline.
Furthermore, when the device is used for drainage construction, the specific operation of supporting and fixing the outdoor drainage pipeline is as follows: when needs are fixed drainage pipe, when avoiding shifting, with the device be the cyclic annular setting of semicircle go up hoop 1 respectively with hoop 2 down with the drainage pipe centre gripping spacing at last hoop 1 with hoop 2 become cyclic annular cavity down, the device's last hoop 1's both sides are connected with first backup pad 11 respectively, hoop 2's both sides are connected with second backup pad 21 respectively down, first backup pad 11 and second backup pad 21 pass through bolted connection, it is spacing by last hoop 1 and the lower hoop 2 centre gripping of hoop through the bolt with the drainage pipe centre gripping, avoid becoming flexible the aversion. Subsequently, an adjusting mechanism is adjusted, a drainage pipeline is supported and stabilized, the preferable implementation structure of the adjusting mechanism can be that the adjusting mechanism comprises a movable rod 3 and a connecting rod 4 which is arranged through the center, one end of the movable rod 3 is fixed with the bottom end of a lower hoop 2, the other end of the movable rod 3 is movably arranged in the connecting rod 4, the other end of the connecting rod 4 is connected with a connecting plate 5, an expansion bolt 51 which is connected with the ground is arranged on the connecting plate 5 in a penetrating mode, a limit screw 41 which is used for limiting the movable rod 3 is movably arranged at one end, far away from the connecting plate 5, of the connecting rod 4, the connecting plate 5 connected with the bottom end of the connecting rod 4 is in contact with the ground by moving the connecting rod 4 towards the ground, then the connecting plate 5 is fixedly connected with the ground by the expansion bolt which is arranged on the connecting plate 5 in a penetrating mode, and the limit screw 41 which is arranged at the top end of the connecting rod 4 is used for limiting and fixing the movable rod 3 and supporting and stabilizing the drainage pipeline.
Furthermore, after the drainage pipeline is supported and stabilized, the device is prevented from collapsing due to large external force on the drainage pipeline, so that the device is also designed with a structure for strengthening the support. The bottom ends of second supporting plates 21 respectively fixed on two sides of a lower hoop of the device are respectively connected with second hinge seats 22, the second hinge seats 22 are hinged with one end of a telescopic rod 6 through a pin shaft, the other end of the telescopic rod 6 is hinged with a backing plate 7 through a pin shaft, and the backing plate 7 is connected with the ground through expansion bolts; simultaneously telescopic link 6 includes outer pole and the interior pole of activity in the outer pole, and the one end of interior pole is articulated with the articulated seat 22 of second, and in arranging the outer pole in of the other end activity of interior pole, the other end of outer pole is articulated with backing plate 7 to the one end that backing plate 7 was kept away from to the outer pole of telescopic link is equipped with fixing bolt 61, and fixing bolt 61 activity is worn to establish on the outer pole for it is fixed to interior pole. Through adjusting the outer pole of telescopic link 6, make its one end that is connected with backing plate 7 move towards the ground, until backing plate 7 and ground contact, reuse the expansion bolts who wears to establish on backing plate 7 with backing plate 7 in ground connection fixed to this strengthens supporting the drainage pipe that the centre gripping was fixed. The joint of the movable rod 3 and the lower hoop 2 is also provided with a reinforcing ring rib in a surrounding manner, and the joint of the connecting rod 4 and the connecting plate 5 is also provided with a reinforcing ring rib in a surrounding manner, so that the connecting structure of the device is reinforced, the using time limit of the device is increased, the aim of repeated use is fulfilled, and the capital cost is saved. The device simple structure, the material is easy, and the cost is cheap to the device can the height-adjusting, uses under the environment of multiple different altitude differences, economical and practical.
The foregoing is illustrative of the preferred embodiments of the present invention, and it is to be understood that the invention is not limited to the precise forms disclosed herein, and that various other combinations, modifications, and environments may be resorted to, falling within the scope of the invention as defined by the appended claims. But that modifications and variations may be effected by those skilled in the art without departing from the spirit and scope of the invention, which is to be limited only by the claims appended hereto.
Claims (6)
1. A building drainage pipeline supporting device is characterized by comprising an upper hoop (1), a lower hoop (2) and an adjusting mechanism;
the upper hoop (1) and the lower hoop (2) are detachably connected through bolts, the upper hoop (1) and the lower hoop (2) are connected into a ring shape and used for limiting and fixing a drainage pipeline, and the bottom end of the lower hoop (2) is connected with an adjusting mechanism;
adjustment mechanism includes movable rod (3) and connecting rod (4) that lead to the heart and set up, the one end of movable rod (3) with the bottom mounting of lower hoop (2), arranging in of the other end activity of movable rod (3) in connecting rod (4), the other end of connecting rod (4) is connected with connecting plate (5), wear to be equipped with expansion bolts (51) that are used for being connected with ground on connecting plate (5), keep away from connecting rod (4) the one end activity of connecting plate (5) is worn to be equipped with and is used for right movable rod (3) carry out spacing stop screw (41).
2. The support device for the drainage pipeline of the building as claimed in claim 1, wherein the upper hoop (1) is connected with a first support plate (11) at each side, the lower hoop (2) is connected with a second support plate (21) at each side, and the first support plate (11) and the second support plate (21) are connected through bolts.
3. The building drainage pipeline supporting device as claimed in claim 2, wherein the bottom ends of the second supporting plates (21) are respectively connected with second hinged seats (22), the second hinged seats (22) are hinged with one end of a telescopic rod (6) through a pin shaft, the other end of the telescopic rod (6) is hinged with a base plate (7) through a pin shaft, and the base plate (7) is connected with the ground through an expansion bolt.
4. The support device for the drainage pipeline of the building as claimed in claim 3, wherein the telescopic rod (6) comprises an outer rod and an inner rod movable in the outer rod, one end of the inner rod is hinged to the second hinged seat (22), the other end of the inner rod is movably arranged in the outer rod, and the other end of the outer rod is hinged to the base plate (7).
5. The support device for the drainage pipeline of the building as claimed in claim 4, wherein a fixing bolt (61) is arranged at one end of the outer rod, which is far away from the base plate (7), and the fixing bolt (61) is movably arranged on the outer rod in a penetrating manner and used for fixing the inner rod.
6. The support device for the drainage pipeline of the building as claimed in claim 1, wherein a reinforcing ring rib is arranged around the joint of the movable rod (3) and the lower hoop (2), and a reinforcing ring rib is also arranged around the joint of the connecting rod (4) and the connecting plate (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120314965.3U CN214789437U (en) | 2021-02-03 | 2021-02-03 | Building drainage pipe strutting arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120314965.3U CN214789437U (en) | 2021-02-03 | 2021-02-03 | Building drainage pipe strutting arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214789437U true CN214789437U (en) | 2021-11-19 |
Family
ID=78752141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120314965.3U Active CN214789437U (en) | 2021-02-03 | 2021-02-03 | Building drainage pipe strutting arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214789437U (en) |
-
2021
- 2021-02-03 CN CN202120314965.3U patent/CN214789437U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109056744B (en) | Fixing device of building foundation pit supporting mechanism and using method thereof | |
CN208749146U (en) | It is a kind of for assembled architecture superimposed sheet can folding type support frame | |
CN214789437U (en) | Building drainage pipe strutting arrangement | |
CN211647203U (en) | Scaffold for building construction | |
CN209856506U (en) | High-performance support and hanger support locking device | |
CN113915411B (en) | Auxiliary structure for underwater pipe burying | |
CN208182505U (en) | A kind of cantilever crane and the engineering machinery with the cantilever crane | |
CN208933828U (en) | A kind of municipal administration bridge construction support frame | |
CN212667960U (en) | Low-emissivity glass production is with transportation fixing device | |
CN209620047U (en) | Building foundation pit diagonal brace structure | |
CN110820818B (en) | Precast pile foundation of building reinforced (rfd) device that rectifies | |
CN209875183U (en) | Tunnel IV-level surrounding rock full-circle excavation inverted arch longitudinal water stop fixing device | |
CN208137495U (en) | A kind of steel building bracket | |
CN207260631U (en) | A kind of adjustable building support | |
CN211174299U (en) | Fixing device for fixing exhaust pipe of generator set | |
CN207097347U (en) | A kind of road construction warning board | |
CN210032852U (en) | Auxiliary device is fixed in installation of chemical tower ware | |
CN213952994U (en) | Template for building garden building house | |
CN213956472U (en) | Soil and water conservation monitoring devices convenient to installation | |
CN218205915U (en) | Steel structure supporting beam for building | |
CN218264005U (en) | Structure for steel support anti-falling device of building enclosure | |
CN220132960U (en) | Underground comprehensive pipe rack | |
CN215165664U (en) | Axial force and deformation adjustable combined steel pipe inclined throwing support | |
CN217157548U (en) | Warning device for building of preventing toppling over | |
CN217502823U (en) | Pipeline erecting device for natural gas exploitation transportation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |