CN214787156U - Anti-climbing structure of 5G signal tower - Google Patents

Anti-climbing structure of 5G signal tower Download PDF

Info

Publication number
CN214787156U
CN214787156U CN202120105044.6U CN202120105044U CN214787156U CN 214787156 U CN214787156 U CN 214787156U CN 202120105044 U CN202120105044 U CN 202120105044U CN 214787156 U CN214787156 U CN 214787156U
Authority
CN
China
Prior art keywords
climbing
tower
closing plate
rope
passageway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120105044.6U
Other languages
Chinese (zh)
Inventor
周剑平
郭广
王秀勇
赵波
郑莉莉
叶森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hehai Construction Co ltd
Original Assignee
Zhejiang Hehai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hehai Construction Co ltd filed Critical Zhejiang Hehai Construction Co ltd
Priority to CN202120105044.6U priority Critical patent/CN214787156U/en
Application granted granted Critical
Publication of CN214787156U publication Critical patent/CN214787156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application relates to an anti-climbing structure of a 5G signal tower, and belongs to the technical field of signal towers. It includes body of the tower and closing plate, be provided with a plurality of climbing ladders along the direction of height on the body of the tower, be provided with the anti-dropping subassembly on the body of the tower, the anti-dropping subassembly is by a plurality of edges the rail guard that sets up along the direction of height interval on the body of the tower is constituteed, the rail guard is U type and both ends and body of the tower is fixed, the anti-dropping subassembly with form the climbing passageway between the body of the tower, it is a plurality of the climbing ladder is located in the climbing passageway, the closing plate set up in climbing passageway lower extreme seals the climbing passageway, the closing plate with the connection can be dismantled to the rail guard. This application has the effect that can prevent non-professional climbing signal tower.

Description

Anti-climbing structure of 5G signal tower
Technical Field
The application relates to the field of signal towers, in particular to an anti-climbing structure of a 5G signal tower.
Background
The signal tower is a wireless signal transmitting device established by network operators, looks like a tower, and is called a signal tower. A common radio station, which is a radio transceiver station for information transmission between a mobile telephone terminal and a communication switching center in a certain radio coverage area, is now shifted from 4G to 5G signal transmission.
Current signal tower often can set up a plurality of climbing ladders along the body of the tower direction of height, supplies later maintenance personal to scramble to maintain the signal tower.
In view of the above-mentioned related art, the inventor believes that there are some people who, for curiosity or for other reasons, may climb the signal tower by climbing stairs, with great danger.
SUMMERY OF THE UTILITY MODEL
In order to prevent non-professionals from climbing the signal tower, the application provides an anti-climbing structure of 5G signal tower.
The application provides a 5G signal tower's anti-climb structure adopts following technical scheme:
the utility model provides a 5G signal tower's anti-climb structure, includes body of the tower and closing plate, be provided with a plurality of climbing ladders along the direction of height on the body of the tower, be provided with anti-falling subassembly on the body of the tower, anti-falling subassembly is by a plurality of edges the rail guard that sets up along the direction of height interval on the body of the tower is constituteed, the rail guard is U type and both ends and body of the tower fixed, anti-falling subassembly with form the climbing passageway between the body of the tower, it is a plurality of the climbing ladder is located in the climbing passageway, the closing plate set up in climbing passageway lower extreme seals the climbing passageway, the closing plate with the connection can be dismantled to the rail guard.
Through adopting above-mentioned technical scheme, the climbing ladder that sets up supplies the professional to scramble, when the signal tower need be maintained, climb the signal tower through the climbing ladder and maintain, the rail guard of setting plays the climbing guard action, restrict the climbing personnel in the climbing passageway, make the climbing personnel be difficult to the back and drop, seal the climbing passageway through the closure plate, thereby prevent irrelevant personnel's climbing, when the closure plate is dismantled and is not when sealing the climbing passageway, the professional can climb the signal tower through the climbing ladder and maintain.
Optionally, the protective guard includes a protective part and a connecting part, two ends of the protective part are bent towards the direction of the tower body and are fixed with the tower body, one side of the sealing plate is rotatably connected with one of the connecting parts, and the other side of the sealing plate is locked with the other connecting part through a chain component.
Through adopting above-mentioned technical scheme, closing plate one side is rotated with connecting portion and is connected for the closing plate can rotate around connecting portion, and the closing plate opposite side passes through the chain subassembly and locks the closing plate together with another connecting portion, makes the closing plate seal the climbing passageway, and chain subassembly simple structure is effective, and the back is opened to the chain subassembly, and the closing plate whereabouts, the climbing passageway is opened, and the closing plate still hangs under the rail guard, and the closing plate of being convenient for seals the climbing passageway once more.
Optionally, the closing plate orientation the face of climbing passageway is provided with spacing, spacing one end with the closing plate rotates to be connected and rotates on the face of closing plate, spacing one end butt the connecting portion of rail guard, the closing plate deviates from be provided with first connection arch on the face of spacing, the connecting portion of rail guard are provided with the second connection arch that is located first connection arch one side, first connection arch with first lockhole and the second lockhole that supplies the chain of chain subassembly to pass are seted up respectively to the one-to-one correspondence in the second connection arch.
Through adopting above-mentioned technical scheme, through spacing, make the closing plate can keep sealing the state of climbing the passageway, be favorable to the installation of chain subassembly and the locking to the closing plate, the first connection arch that sets up and the protruding chain unit mount that supplies of second connection, the iron chain of chain subassembly passes first lockhole and second lockhole in proper order, connect protruding locking together first connection arch and second connection, thereby realize the locking between closing plate and the connecting portion, make the chain unit mount more convenient.
Optionally, a retaining assembly is arranged on a side wall of the sealing plate, which faces away from the climbing channel, and includes a retaining rope and a hook, one end of the retaining rope is fixed to the sealing plate, and the hook is arranged at the other end of the retaining rope.
Through adopting above-mentioned technical scheme, because the closing plate can be to climbing passageway downside skew under the action of gravity, hinder the climbing, through keeping the rope to the closing plate to keeping away from the direction pulling of climbing ladder, the couple is established on the rail guard through hanging for the closing plate keeps keeping away from the state, thereby is convenient for scramble.
Optionally, the holding assembly further comprises a hooking piece, the hooking piece is fixed on the sealing plate, and a hanging hole for hooking the hook is formed in the hooking piece.
By adopting the technical scheme, the hook connecting piece on the sealing plate is used for hanging the hook, so that when the sealing plate keeps a closed state of the climbing channel, the hook can be hung on the hook connecting piece, and the hook can be conveniently taken at the back for use.
Optionally, the tower body lower part is provided with the supporting component of unblanking, the supporting component of unblanking includes supporting rope and rings, the supporting rope is located under the closing plate, rings are fixed in the tower body lower part just establishes separately the both sides of climbing ladder, the both ends one-to-one of supporting rope is fixed in two rings.
Through adopting above-mentioned technical scheme, through the supporting component of unblanking, support climbing personnel for climbing personnel can vacate both hands and untie the chain subassembly, the operation of unblanking of being convenient for.
Optionally, the unlocking supporting assembly further comprises two climbing buckles, and the two climbing buckles are respectively arranged at two ends of the supporting rope.
Through adopting above-mentioned technical scheme, connect rope both ends and set up the climbing and detain for it is more convenient to connect being connected and dismantling between rope and the rings.
Optionally, the unlocking support assembly further comprises a support protection pad, a through hole is formed in the support protection pad, and the support rope penetrates through the through hole.
By adopting the technical scheme, the contact area of the connecting rope and the human body is increased by the supporting protection pad, so that the human body is better supported, and the comfort level during supporting is better.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the climbing ladder is used for climbing by professionals, when the signal tower needs to be maintained, the signal tower is climbed through the climbing ladder for maintenance, the arranged guard rail plays a role in climbing protection, the climbing personnel is limited in the climbing channel, the climbing personnel is not easy to lean backwards and drop, the climbing channel is sealed through the sealing plate, so that the climbing of irrelevant personnel is prevented, and when the sealing plate is detached and is not in the sealing climbing channel, the professionals can climb the signal tower through the climbing ladder for maintenance;
2. the closed plate can keep the state of a closed climbing channel through the limiting strip, the installation of the chain component and the locking of the closed plate are facilitated, the first connecting protrusion and the second connecting protrusion are arranged for installing the chain component, an iron chain of the chain component sequentially penetrates through the first lock hole and the second lock hole, and the first connecting protrusion and the second connecting protrusion are locked together, so that the locking between the closed plate and the connecting part is realized, and the installation of the chain component is more convenient;
3. because the closing plate can be to climbing passageway downside skew under the action of gravity, hinder the climbing, through keeping the rope to the closing plate to keeping away from the direction pulling of climbing ladder, the couple is established on the rail guard through hanging for the closing plate keeps keeping away from the state, thereby is convenient for climb.
Drawings
FIG. 1 is a schematic structural diagram 1 of an embodiment of the present application;
FIG. 2 is an enlarged view at A in FIG. 1;
FIG. 3 is a schematic view of the construction of the closing plate;
FIG. 4 is a schematic structural diagram of an embodiment of the present application, FIG. 2;
fig. 5 is an enlarged view at B in fig. 4.
Description of reference numerals: 1. a tower body; 11. climbing stairs; 12. protecting the fence; 121. a protective part; 122. a connecting portion; 1221. a second connecting projection; 1222. a second lock hole; 13. climbing a channel; 2. a closing plate; 21. a first connecting projection; 211. a first lock hole; 3. rotating the connecting sleeve; 31. fixing a sleeve; 311. fixing the flanging; 32. disassembling the sleeve; 321. disassembling the flanging; 33. rotating the hole; 4. a limiting strip; 51. an iron chain; 52. a padlock; 61. keeping the hanging ring; 62. a holding rope; 63. hooking; 64. hooking the connecting piece; 641. hanging holes; 71. a support line; 72. a hoisting ring; 73. climbing buckles; 74. a support pad; 741. and (6) perforating.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses anti-climbing structure of 5G signal tower. Referring to fig. 1, anti-climb structure of 5G signal tower, including body of the tower 1, closing plate 2 and the supporting component that unblanks, be provided with a plurality of climbing ladders 11 along the direction of height on the body of the tower 1, a plurality of climbing ladders 11 set up along 1 direction of height interval of body of the tower, climbing ladder 11 is a metal pole and both ends and buckles towards 1 direction of the body of the tower and with 1 welded fastening of body of the tower.
Referring to fig. 1, be provided with the anti-falling subassembly on the body of the tower 1, the anti-falling subassembly comprises a plurality of rail guards 12 along the direction of height interval setting on the body of the tower 1, rail guard 12 also is the metal pole, rail guard 12 includes that protective part 121 and protective part 121 both ends are buckled towards the body of the tower 1 direction and are fixed with body of the tower 1 welded connection portion 122, make rail guard 12 be the U type, form a vertical climbing passageway 13 between a plurality of rail guards 12 and the body of the tower 1, a person that is located the bottommost in rail guard 12 can not prevent the people to get into climbing passageway 13, and climbing ladder 11 is mostly located climbing passageway 13, part in climbing ladder 11 is located climbing passageway 13 downside, be convenient for personnel's climbing, protect climbing personnel through rail guard 12, make climbing personnel be difficult to face upward the back and drop.
Referring to fig. 2 and 3, the closing plate 2 is disposed at the lower end of the climbing channel 13 and used for closing the climbing channel 13, a rotating connecting sleeve 3 is disposed on one side of the closing plate 2, the rotating connecting sleeve 3 includes a fixing sleeve 31 and a detaching sleeve 32, one side of the fixing sleeve 31 is integrally fixed to the closing plate 2, the other side of the fixing sleeve is provided with a fixing flange 311, one side of the detaching sleeve 32 is provided with a detaching flange 321, the fixing sleeve 31 and the detaching sleeve 32 are fixed by bolts through the fixing flange 311 and the detaching flange 321, the detaching sleeve 32 and the fixing sleeve 31 are fixed to form the rotating connecting sleeve 3, a rotating hole 33 is coaxially formed in the rotating connecting sleeve 3, one half of the rotating hole 33 is formed in the fixing sleeve 31, the other half of the rotating hole 33 is formed in the detaching sleeve 32, the rotating hole 33 is used for mounting the connecting portion 122 of the bottom-most guard rail 12, and the closing plate 2 can rotate around the connecting portion 122 of the bottom-most guard rail 12.
Referring to fig. 2 and 3, when the closing plate 2 is in a state of closing the climbing channel 13, the surface of the closing plate 2 facing the climbing channel 13 is provided with a limiting strip 4, one end of the limiting strip 4 is fixed to the closing plate 2 by a bolt, the limiting strip 4 can rotate around the bolt, and when the closing strip rotates to one end to overhang the closing plate 2, the limiting strip 4 abuts against the connecting portion 122 of the guard rail 12, so that the closing plate 2 is limited to be in a state of closing the climbing channel 13.
Referring to fig. 2 and 3, one side of the closing plate 2, which is far away from the rotating connecting sleeve 3, and the connecting portion 122, which is far away from the rotating connecting sleeve 3, of the guard rail 12 located at the bottommost position are locked by a chain assembly, the chain assembly includes an iron chain 51 and a padlock 52, a first connecting protrusion 21 is integrally fixed on one side, which is far away from the rotating connecting sleeve 3, of the plate surface of the closing plate 2, which is far away from the limiting strip 4, a second connecting protrusion 1221 is integrally fixed on the connecting portion 122, which is far away from the rotating connecting sleeve 3, of the guard rail 12, the first connecting protrusion 21 and the second connecting protrusion 1221 are adjacently arranged and spaced at a certain distance, first locking holes 211 and second locking holes 1222 are respectively formed in the first connecting protrusion 21 and the second connecting protrusion 1221 in a one-to-one correspondence manner, and one end of the iron chain 51 sequentially passes through the first locking holes 211 and the second locking holes 1222 and locks two ends of the iron chain 51 by the padlock 52.
Referring to fig. 4 and 5, a retaining assembly is disposed on a side wall of the closing plate 2 away from the climbing channel 13, the retaining assembly includes a retaining ring 61, a retaining rope 62, a hook 63 and a hooking member 64, the retaining ring 61 is fixed on the closing plate 2 by threads, one end of the retaining rope 62 is fixedly bound with the retaining ring 61, the other end of the retaining rope 62 is fixedly bound with the hook 63, the hooking member 64 is a convex block and is integrally fixed with the closing plate 2, the hooking member 64 is spaced from the retaining ring 61 by a certain distance, a hanging hole 641 for hooking and fixing the hook 63 is formed in the hooking member 64, and the hooking member 63 is hooked on the connecting portion 122 of the protective guard 12, so that the climbing channel 13 is kept in a fully opened state.
Referring to fig. 1 and 4, an unlocking support assembly is arranged at the lower part of the tower body 1 and used for supporting a climber and making the climber free hands, the unlocking support assembly comprises a support rope 71, two lifting rings 72, two climbing buckles 73 and a support pad 74, the two lifting rings 72 are respectively arranged at two sides of the guardrail 12 and are fixed with the tower body 1 through threads, the two climbing buckles 73 are respectively fixed at two ends of the support rope 71, two ends of the support rope 71 are fixed with the lifting rings 72 through the climbing buckles 73, the support rope 71 is hung under the closing plate 2, the support pad 74 is provided with a through hole 741, the support rope 71 firstly passes through the through hole 741 in the support pad 74 before being fixed with the climbing buckles 73, and the support pad 74 is fixed on the support rope 71.
The implementation principle of the anti-climbing structure of the 5G signal tower in the embodiment of the application is as follows: when the signal tower needs to be maintained, the padlock 52 is opened, the iron chain 51 is taken down, the closing plate 2 can be opened, after the closing plate 2 is opened, the signal tower climbs through the climbing ladder 11, and maintenance is carried out by climbing the signal tower, and when maintenance is not needed, the closing plate 2 and the protective guard 12 are fixed together through the iron chain 51 and the padlock 52, and therefore irrelevant personnel are prevented from approaching the climbing ladder 11.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a structure is climbed in anti-climb of 5G signal tower which characterized in that: including body of the tower (1) and closing plate (2), be provided with a plurality of climbing ladders (11) along the direction of height on body of the tower (1), be provided with the anti-dropping subassembly on body of the tower (1), the anti-dropping subassembly is by a plurality of edges rail guard (12) that set up along the direction of height interval on body of the tower (1) are constituteed, rail guard (12) are U type and both ends and body of the tower (1) fixed, the anti-dropping subassembly with form climbing passageway (13) between body of the tower (1), and are a plurality of climbing ladder (11) are located in climbing passageway (13), closing plate (2) set up in climbing passageway (13) lower extreme and seal climbing passageway (13), closing plate (2) with the connection can be dismantled to rail guard (12).
2. The anti-climbing structure of a 5G signal tower as claimed in claim 1, wherein: the protective guard (12) comprises a protective part (121) and a connecting part (122) which is bent towards the direction of the tower body (1) at two ends of the protective part (121) and fixed with the tower body (1), one side of the closing plate (2) is rotatably connected with one connecting part (122), and the other side of the closing plate (2) is locked with the other connecting part (122) through a chain component.
3. The anti-climbing structure of a 5G signal tower as claimed in claim 2, wherein: the face of closing plate (2) orientation climbing passageway (13) is provided with spacing (4), spacing (4) one end with closing plate (2) rotate to be connected and rotate on the face of closing plate (2), spacing (4) one end butt connecting portion (122) of rail guard (12), closing plate (2) deviate from be provided with first connecting protrusion (21) on the face of spacing (4), connecting portion (122) of rail guard (12) are provided with second connecting protrusion (1221) that are located first connecting protrusion (21) one side, first connecting protrusion (21) with first lockhole (211) and second lockhole (1222) that the chain that supplies the chain subassembly passed are seted up respectively to one-to-one correspondence on second connecting protrusion (1221).
4. The anti-climbing structure of a 5G signal tower as claimed in claim 3, wherein: the side wall of the closing plate (2) departing from the climbing channel (13) is provided with a holding assembly, the holding assembly comprises a holding rope (62) and a hook (63), one end of the holding rope (62) is fixed with the closing plate (2), and the hook (63) is arranged at the other end of the holding rope (62).
5. The anti-climbing structure of a 5G signal tower as claimed in claim 4, wherein: the holding assembly further comprises a hooking piece (64), the hooking piece (64) is fixed on the sealing plate (2), and a hanging hole (641) for hooking the hook (63) is formed in the hooking piece (64).
6. The anti-climbing structure of a 5G signal tower as claimed in claim 5, wherein: body of tower (1) lower part is provided with the supporting component of unblanking, the supporting component of unblanking includes supporting rope (71) and rings (72), supporting rope (71) are located under closing plate (2), rings (72) are fixed in body of tower (1) lower part just divides to establish the both sides of climbing ladder (11), the both ends one-to-one of supporting rope (71) is fixed in two rings (72).
7. The anti-climbing structure of a 5G signal tower as claimed in claim 6, wherein: the unlocking supporting assembly further comprises two climbing buckles (73), and the two climbing buckles (73) are respectively arranged at two ends of the supporting rope (71).
8. The anti-climbing structure of a 5G signal tower as claimed in claim 7, wherein: the unlocking support assembly further comprises a support protection pad (74), a through hole (741) is formed in the support protection pad (74), and the support rope (71) penetrates through the through hole (741).
CN202120105044.6U 2021-01-14 2021-01-14 Anti-climbing structure of 5G signal tower Active CN214787156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120105044.6U CN214787156U (en) 2021-01-14 2021-01-14 Anti-climbing structure of 5G signal tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120105044.6U CN214787156U (en) 2021-01-14 2021-01-14 Anti-climbing structure of 5G signal tower

Publications (1)

Publication Number Publication Date
CN214787156U true CN214787156U (en) 2021-11-19

Family

ID=78747409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120105044.6U Active CN214787156U (en) 2021-01-14 2021-01-14 Anti-climbing structure of 5G signal tower

Country Status (1)

Country Link
CN (1) CN214787156U (en)

Similar Documents

Publication Publication Date Title
CN206549022U (en) A kind of steel tower climbing fall device
CN204826839U (en) Communication tower convenient to climbing
CN214787156U (en) Anti-climbing structure of 5G signal tower
CN205626775U (en) Novel basic station cat ladder of preventing falling
CN214786438U (en) Anti-climbing 5G signal tower
CN210786036U (en) Self-locking device for climbing
CN209976450U (en) Climbing ladder for +/-500 kV converter substation transformer equipment
CN210460141U (en) Anti-climbing communication tower for electric power communication
CN214550720U (en) Communication tower safety device
CN211470608U (en) A protector for tower crane driver climbing
CN114100007B (en) Communication iron tower construction safety anti-falling combined device and use method thereof
CN216517766U (en) Anti-climbing base station
CN211530186U (en) Wireless base station outdoor antenna protector
CN107747422A (en) A kind of anti-climbing device of signal tower
CN211396859U (en) Climbing-preventing device for composite material tower
CN216840517U (en) A passageway platform of going up people that is used for super high-rise building creeping formwork to be connected with swing arm tower
CN210564330U (en) Iron tower safety ladder
CN213626895U (en) Prevent climbing communication tower
CN218407273U (en) Manual hole cat ladder and anti-falling integrated device of digging of deep basal pit
CN112824628A (en) Anti-climbing electric power communication tower convenient to maintenance
CN211143694U (en) Safe climbing platform of iron tower
CN212176763U (en) Anti-climbing electric power communication tower
CN212336872U (en) Communication tower convenient to maintenance signal device
CN220319234U (en) Combined steel structure communication tower
CN209817833U (en) Burglary-resisting window of quick escape conflagration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant