CN214786150U - Light gauge steel gypsum board furred ceiling false keel interval control device - Google Patents

Light gauge steel gypsum board furred ceiling false keel interval control device Download PDF

Info

Publication number
CN214786150U
CN214786150U CN202120984693.8U CN202120984693U CN214786150U CN 214786150 U CN214786150 U CN 214786150U CN 202120984693 U CN202120984693 U CN 202120984693U CN 214786150 U CN214786150 U CN 214786150U
Authority
CN
China
Prior art keywords
false keel
rod
keel
false
stores pylon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120984693.8U
Other languages
Chinese (zh)
Inventor
王金鑫
张桂旺
郭宁
肖发鹏
梁瑞馨
王赟超
张利雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, China Construction Second Bureau Decoration Engineering Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120984693.8U priority Critical patent/CN214786150U/en
Application granted granted Critical
Publication of CN214786150U publication Critical patent/CN214786150U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a light gauge steel gypsum board furred ceiling false keel interval controlling means, including the stores pylon, stores pylon length is greater than false keel erection space, and its bottom surface is a smooth plane, and installs the gag lever post on its bottom surface, and the gag lever post sets up along stores pylon length direction, and its body of rod both ends are the vertical face with the outer facade looks adaptation of false keel, and its body of rod length equals with false keel erection space. The utility model discloses simple structure, it is easy to draw materials, and the preparation is convenient, realizes interim fixed through the stores pylon overlap joint on the false keel to realize waiting to install the accurate positioning of false keel through the gag lever post, change the measurement distance process that will relapse into simple slip joint operation, greatly reduced the operation degree of difficulty of false keel installation, improved the installation effectiveness.

Description

Light gauge steel gypsum board furred ceiling false keel interval control device
Technical Field
The utility model relates to a furred ceiling fossil fragments installation technical field, concretely relates to light gauge steel gypsum board furred ceiling false keel interval control device.
Background
Suspended ceilings are very common as the most conventional decoration method of interior decoration, and the installation of keels is an essential work in suspended ceiling engineering. When the existing ceiling decoration is constructed, the line is firstly laid out on the ceiling of a house according to the design scheme of the ceiling decoration, then the main keel and the main keel hanging piece are installed, and then the auxiliary keel is installed. When the false keel is installed, the distance between the false keel to be installed and the previous installed false keel is measured by a tape measure, so that the distance is controlled, and due to the fact that the number of the false keels is large, the distance is repeatedly measured when each false keel is installed by the method, working procedures are complex, and installation efficiency is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a light steel keel gypsum board furred ceiling false keel interval control device to solve in the background art technical problem.
In order to achieve the technical purpose, the utility model adopts the following technical scheme:
the device for controlling the spacing between the false keels of the light steel keel gypsum board suspended ceiling comprises a hanging frame, wherein the length of the hanging frame is greater than the mounting spacing between the false keels, the bottom surface of the hanging frame is a smooth plane, a limiting rod is mounted on the bottom surface of the hanging frame, the limiting rod is arranged along the length direction of the hanging frame, two ends of a rod body of the limiting rod are vertical surfaces matched with the outer vertical surfaces of the false keels, and the length of the rod body is equal to the mounting spacing between the false keels;
when the device is used for construction, firstly, the auxiliary keel to be installed is preliminarily installed in place, then the gap between the auxiliary keel to be installed and the adjacent installed auxiliary keel is filled in the top space of the auxiliary keel and is lapped on the top ends of the two auxiliary keels, at the moment, one end of the hanger is lapped on the auxiliary keel to be installed and is in sliding fit with the auxiliary keel, the other end of the hanger is lapped on the installed auxiliary keel adjacent to the auxiliary keel to be installed, the extending direction of the limiting rod is perpendicular to the extending direction of the auxiliary keel, one end, close to the installed auxiliary keel, of a rod body abuts against the outer vertical face of the installed auxiliary keel, at the moment, the auxiliary keel to be installed slides to one side of the limiting rod along the main keel and the hanger until the outer vertical face of the auxiliary keel slides to the end part of the limiting rod, and then the auxiliary keel is fixed.
Preferably, the stores pylon includes the peg that two intervals set up, and two pegs all set up along stores pylon length direction, and install two connecting rods on the two body of rod perpendicularly, the connecting rod links two pegs as an organic whole, the gag lever post is equipped with two, and two peg bottom surface middle parts are located respectively to two gag lever posts, and the two both ends terminal surface aligns each other.
Preferably, the limiting rod is detachably mounted on the bottom surface of the hanging rack through a bolt, so that the limiting rod which is not used is replaced according to different mounting intervals of the auxiliary keels.
Preferably, in order to prevent the end part of the hanging rod from being clamped on the vertical surface of the auxiliary keel when the hanging rod is installed, chamfers are arranged at the bottoms of the two ends of the hanging rod.
Preferably, the hanging rod, the connecting rod and the limiting rod are all made of wood beams or square steel tubes.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses simple structure, it is easy to draw materials, and the preparation is convenient, realizes interim fixed through the peg overlap joint on the false keel to realize waiting to install the accurate positioning of false keel through the gag lever post, change the measurement distance process that will relapse into simple slip joint operation, greatly reduced the operation degree of difficulty of false keel installation, improved the installation effectiveness.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the usage state of the present invention.
Reference numerals: 1-hanging rack, 101-hanging rod, 102-connecting rod, 2-limiting rod, 3-main keel and 4-auxiliary keel.
Detailed Description
Hereinafter, an embodiment of a light steel keel gypsum board suspended ceiling false keel interval control device of the present invention will be described with reference to the accompanying drawings. The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "top", "bottom", "inside", "outside", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
The principles and features of the present invention are described below in conjunction with the following drawings, the illustrated embodiments are provided to explain the present invention and not to limit the scope of the invention. The preferred embodiments of the present invention will be described in further detail below with reference to fig. 1-2:
as shown in fig. 1, the preferred device for controlling the distance between the false keels of the light steel keel gypsum board suspended ceiling of the present invention comprises a hanging rack 1, wherein the hanging rack 1 comprises two hanging rods 101 arranged at intervals, the two hanging rods 101 are arranged in parallel at the edge position of the hanging rack 1, the lengths of the two hanging rods are equal and greater than the installation distance between the false keels 4, the end portions of the two rod bodies are aligned, two connecting rods 102 are vertically arranged between the two rod bodies, the connecting rods 102 and the hanging rods 101 form an "ㅒ" type rack body, and the length of the connecting rods 102 is preferably 500 plus 700 mm;
the bottom surfaces of the two hanging rods 101 are smooth planes, the middle parts of the bottom surfaces of the two hanging rods are respectively provided with a limiting rod 2 with the length equal to the installation distance of the auxiliary keel 4 through bolts, the limiting rods 2 are arranged along the length direction of the hanging rack 1, the two ends of the rod body are vertical surfaces matched with the outer vertical surface of the auxiliary keel 4, the end surfaces of the two ends of the two limiting rods 2 are aligned with each other, and the distance between the end parts of the hanging rods 101 exceeding the end parts of the limiting rods 2 is preferably 100 mm;
in order to prevent the end part of the hanging rod 101 from being clamped on the vertical surface of the auxiliary keel 4 when the hanging rod 101 is installed, chamfers are arranged at the bottoms of the two ends of the hanging rod 101;
for getting materials conveniently, the hanging rod 101, the connecting rod 102 and the limiting rod 2 are all made of wood or square steel tubes which are arranged in the flat direction of 30 x 50 mm.
As shown in fig. 2, utilize the utility model discloses during the construction, will wait to install false keel 4 and tentatively install and take one's place earlier, then fill in false keel 4 headspace and overlap joint on two false keel 4 tops along waiting to install the gap between false keel 4 and the adjacent false keel 4 of installing behind the 1 lopsidedness of stores pylon, at this moment, peg 101 one end is set up and is waited to install on false keel 4 and sliding fit with it, the other end overlap joint with wait to install on the false keel 4 adjacent installed false keel 4, 2 extending direction of gag lever post and 4 extending direction mutually perpendicular of false keel, its body of rod are close to the one end of having installed false keel 4 and are supported and lean on the facade of having installed false keel 4, will wait to install false keel 4 this moment along main joist 3 and peg 101 to 2 one side slides of gag lever post, it can to fix after 2 tip of gag lever post to its facade slides.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (5)

1. The utility model provides a light gauge steel gypsum board furred ceiling false keel interval controlling means which characterized in that: including stores pylon (1), stores pylon (1) length is greater than false keel (4) erection space, and its bottom surface is a smooth plane, and installs gag lever post (2) on its bottom surface, gag lever post (2) set up along stores pylon (1) length direction, and its body of rod both ends are the vertical face with false keel (4) outer facade looks adaptation, and its body of rod length equals with false keel (4) erection space.
2. The device of claim 1 for controlling the spacing between the false ceiling joists of light steel keel gypsum board, wherein: stores pylon (1) includes peg (101) that two intervals set up, and two pegs (101) all set up along stores pylon (1) length direction, and installs two connecting rods (102) on the two body of rod perpendicularly, connecting rod (102) are even as an organic whole with two pegs (101), gag lever post (2) are equipped with two, and two peg (101) bottom surface middle parts are located respectively in two gag lever posts (2), and the two both ends terminal surface aligns each other.
3. The device of claim 1 for controlling the spacing between the false ceiling joists of light steel keel gypsum board, wherein: the limiting rod (2) is detachably mounted on the bottom surface of the hanging rack (1) through a bolt.
4. The device of claim 2 for controlling the spacing between the false ceiling furring with light steel joist, characterized in that: the bottoms of the two ends of the hanging rod (101) are provided with chamfers.
5. The device of claim 2 for controlling the spacing between the false ceiling furring with light steel joist, characterized in that: the hanging rod (101), the connecting rod (102) and the limiting rod (2) are all made of wood beams or square steel tubes.
CN202120984693.8U 2021-05-10 2021-05-10 Light gauge steel gypsum board furred ceiling false keel interval control device Active CN214786150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120984693.8U CN214786150U (en) 2021-05-10 2021-05-10 Light gauge steel gypsum board furred ceiling false keel interval control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120984693.8U CN214786150U (en) 2021-05-10 2021-05-10 Light gauge steel gypsum board furred ceiling false keel interval control device

Publications (1)

Publication Number Publication Date
CN214786150U true CN214786150U (en) 2021-11-19

Family

ID=78692753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120984693.8U Active CN214786150U (en) 2021-05-10 2021-05-10 Light gauge steel gypsum board furred ceiling false keel interval control device

Country Status (1)

Country Link
CN (1) CN214786150U (en)

Similar Documents

Publication Publication Date Title
CN101575892B (en) Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof
JP6172632B2 (en) Main beam structure for work scaffold in boiler furnace, main beam transfer device for work scaffold, and installation method of work scaffold
CN103510715B (en) A kind of method and caliberating device demarcating concrete prefabricated wallboard installation construction datum
CN214786150U (en) Light gauge steel gypsum board furred ceiling false keel interval control device
CN205557941U (en) Outer wall perforation aluminum curtain wall
CN102926554A (en) Steel hanging seat template supports and construction method thereof
CN105587058A (en) Perforated aluminum plate curtain wall of external wall
CN210857641U (en) External wall connecting device
CN210216875U (en) Steel keel frame for overhanging suspended ceiling
CN210423968U (en) Assembled support and hanger and building using same
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN211736349U (en) Cast-in-place floor support system for steel structure building
CN208594635U (en) A kind of connection structure of assembling type steel structure building exterior wall panel and girder steel
CN106760045B (en) A kind of form of construction work for building wall system
CN210947376U (en) Suspended ceiling suspender reinforcing structure
CN220592060U (en) Bridge bracket arm mounting die
CN213329623U (en) Three-dimensional adjustable point structure of assembled furred ceiling and steel construction main part
CN214747938U (en) Concrete prefabricated component installation straightness detection device that hangs down
CN213115463U (en) Reinforcing device of hanging basket suspension mechanism
CN216474467U (en) Device for quickly fixing prestressed corrugated pipe
CN216690019U (en) Suspended ceiling structure for reflecting plate
CN215252352U (en) Prefabricated web steel bar binding rack
CN216157006U (en) System is decorated to assembled of outdoor stone material package post
CN212295216U (en) Pull rod type steel frame structure point type glass curtain wall
CN211526366U (en) Ceiling lamp light trough connecting piece for indoor ceiling decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant