CN214784537U - Water delivery corridor template supporting construction - Google Patents

Water delivery corridor template supporting construction Download PDF

Info

Publication number
CN214784537U
CN214784537U CN202121301602.2U CN202121301602U CN214784537U CN 214784537 U CN214784537 U CN 214784537U CN 202121301602 U CN202121301602 U CN 202121301602U CN 214784537 U CN214784537 U CN 214784537U
Authority
CN
China
Prior art keywords
scale
conflict
base
water delivery
corridor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121301602.2U
Other languages
Chinese (zh)
Inventor
孙丽曼
陈玉彬
任建华
史小梅
赵婷
陈立超
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tongchengda Water Construction Co ltd
Original Assignee
Beijing Tongchengda Water Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tongchengda Water Construction Co ltd filed Critical Beijing Tongchengda Water Construction Co ltd
Priority to CN202121301602.2U priority Critical patent/CN214784537U/en
Application granted granted Critical
Publication of CN214784537U publication Critical patent/CN214784537U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a hydraulic engineering equipment field especially relates to a water delivery corridor template supporting construction, and it includes the base and sets up centering mechanism on the base, centering mechanism includes scale and conflict frame, the vertical setting of scale, the scale surface is provided with the scale mark, conflict frame sliding connection in the scale, the scale with be provided with the spring between the conflict frame support, conflict frame top is used for conflicting the corridor. This application has the effect that improves the stability of corridor work of pouring.

Description

Water delivery corridor template supporting construction
Technical Field
The application relates to the field of hydraulic engineering equipment, in particular to a template supporting structure of a water delivery gallery.
Background
A corridor refers to an elongated zone distinct from the two-sided substrate. Galleries are linear, long and narrow landscape elements, different from the two-sided substrate, with the dual function of passage and obstruction. All landscapes are divided by galleries and are connected together by the galleries, and the structural characteristics of the landscapes have strong influence on the ecological process of one landscape.
Traditional water delivery corridor is symmetrical structure, and the up end is the circular-arc setting of upwards protruding, and water delivery corridor often adopts concrete placement to form, and in the construction process of carrying out the water delivery corridor, can adopt supporting construction to strut the corridor template to guarantee the stability of corridor template, nevertheless in the supporting work process, often appear because supporting construction is not in corridor central point department, and the unstable condition of corridor template appears, has influenced the stability of corridor pouring work, awaits improving.
SUMMERY OF THE UTILITY MODEL
In order to improve the stability of corridor pouring work, the application provides a water delivery corridor template supporting construction.
The application provides a water delivery corridor template supporting construction adopts following technical scheme:
the utility model provides a water delivery corridor template supporting construction, it includes the base and sets up centering mechanism on the base, centering mechanism includes scale and conflict frame, the vertical setting of scale, the scale surface is provided with the scale mark, conflict frame sliding connection in the scale, the scale with conflict and be provided with the spring between the frame support, conflict frame top is used for conflicting the corridor.
Through adopting above-mentioned technical scheme, before strutting the work, move the base to the corridor inside, the top conflict corridor inner wall of conflict frame this moment, remove the base about afterwards, the conflict frame is at the effect of spring corridor inner wall of laminating all the time, thereby make the interval in conflict frame and the scale support constantly change, when numerical value on the scale is the maximum value, the middle part of corridor inner wall is aimed at to the conflict frame, support the work again afterwards, can guarantee that supporting construction applies force to the corridor relatively evenly, the stability of the work of pouring of corridor has been improved.
Optionally, the base is detachably connected with a fixing seat through a bolt, the scale is hinged to the fixing seat, a limiting mechanism is arranged on the fixing seat, and the limiting mechanism can enhance the stability of the scale in a vertical state.
Through adopting above-mentioned technical scheme, when need not carrying out centering during operation, move the scale to the horizontality, avoid the scale to receive external force and damage, improved the security of integrated device to consolidate the scale of vertical state through stop gear, improved the stability of scale when being in vertical state. And the fixing seat can be separated from the base by unscrewing the bolt on the fixing seat, so that the centering mechanism can be quickly maintained and replaced.
Optionally, the scale articulates one side of fixing base, stop gear includes first conflict board and second and supports the touch panel, first conflict board is fixed in the fixing base up end, when the scale is in vertical state, the scale supports tightly first support the touch panel, the second support the touch panel with the fixing base is articulated mutually, works as the scale with when first conflict board is contradicted, the second conflict board can with first conflict board centre gripping the scale, just be provided with on the fixing base and be used for fixing the locking device of second support the touch panel.
Through adopting above-mentioned technical scheme, when the scale is in vertical state, the first touch panel of scale conflict rotates the second touch panel afterwards, makes second touch panel and first touch panel centre gripping scale to fix the second touch panel through locking device, avoid the scale to take place to empty when centering work goes on, thereby improved centering mechanism's stability.
Optionally, the fixing seat is located at one end of the base in the length direction, and the length of the centering mechanism is smaller than that of the base.
Through adopting above-mentioned technical scheme, because the length of centering mechanism is less than the length of base to with the fixing base setting in the one end of base, when the scale is in the horizontality, scale and conflict frame all are located the base up end, have reduced the occupation space of integrated device, avoid conflicting the frame and cause the influence to the staff.
Optionally, locking device includes fixed connection and is in lockplate on the second conflict board, it has the locking hole to run through on the lockplate, the connecting hole has been seted up on the fixing base, works as the second conflict board with first conflict board centre gripping during the scale, the lockplate supports tightly the fixing base, just the locking hole with the connecting hole is linked together.
Through adopting above-mentioned technical scheme, when second touch panel and first conflict board centre gripping scale, lockplate and fixed seat are laminated mutually, and the locking hole is linked together with the connecting hole this moment, inserts a pin in locking hole and the connecting hole, can realize the relatively fixed to fixing base and lockplate to realize the reciprocal anchorage of second touch panel and fixing base, simple structure, convenient operation.
Optionally, a mechanism groove is formed in the upper end face of the base, the fixing seat is located in the mechanism groove, and when the scale moves to a horizontal state, the scale and the touch plate are located in the mechanism groove.
Through adopting above-mentioned technical scheme, when the scale moved to the horizontality, scale and conflict frame all were located the mechanism inslot completely to accomodate scale and conflict frame through the mechanism groove, avoided centering mechanism to receive the damage, improved the practicality of integrated device.
Optionally, be provided with the rubber pad on the frame of contradicting, when the scale is in the horizontality, the rubber pad contradicts mechanism groove diapire.
Through adopting above-mentioned technical scheme, at the in-process that the frame of contradicting emptys downwards, the rubber pad can further provide certain buffering effect for conflict frame and mechanism tank bottom wall, and the interaction force when reducing the two contact to the noise reduction has improved the practicality of integrated device.
Optionally, one end of the abutting frame, which deviates from the scale, is provided with a roller.
Through adopting above-mentioned technical scheme, when the base in-process of moving about, the gyro wheel can become rolling friction with the sliding friction of conflict frame and corridor to reduce the coefficient of friction between conflict frame and the corridor, facilitate for the staff drives the base side-to-side movement.
In summary, the present application includes at least one of the following beneficial technical effects:
by arranging the centering mechanism consisting of the scale and the abutting frame and arranging the spring between the scale and the abutting frame, before supporting work is carried out, the distance between the abutting frame and the scale is changed by moving the base leftwards and rightwards, so that the numerical value on the scale is changed, and whether the base is positioned at the center of the gallery can be further determined, so that the supporting structure can be ensured to uniformly apply acting force to the gallery, and the stability of the gallery is improved;
the quick replacement of the scale is realized by arranging the mechanism groove and the fixing seat fixed in the mechanism groove through the bolt, and the scale is hinged with the fixing seat, so that the quick storage of the scale is realized, and the practicability of the whole device is improved;
through setting up the gyro wheel, become the sliding friction of conflict frame and corridor into rolling friction to reduce the coefficient of friction between conflict frame and the corridor, facilitate for staff's drive base side-to-side movement.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a cross-sectional view of an embodiment of the present application.
Fig. 3 is a partially enlarged view of a portion a in fig. 1.
Description of reference numerals: 1. a base; 11. braking the universal wheel; 12. a mechanism groove; 2. a support device; 3. a fixed seat; 4. a centering mechanism; 41. a scale; 42. a collision frame; 421. a spring; 43. a roller; 5. a limiting mechanism; 51. a first touch panel; 52. a second touch panel; 6; a locking device; 61. a locking plate; 62. a locking hole.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses water delivery corridor template supporting construction, refer to fig. 1, fig. 2, including base 1 and fix the supporting device 2 on base 1, supporting device 2 includes a plurality of bracing pieces, and the one end sliding connection who keeps away from base 1 at the bracing piece has the extension rod, can make supporting device 2 be applied to the corridor of size difference through adjusting the interval between extension rod and the bracing piece. The brake universal wheels 11 are installed at four corners of the bottom end of the base 1, so that the whole device can be conveniently moved by workers.
Referring to fig. 1 and 2, a mechanism groove 12 is formed in the upper end surface of the base 1, and a fixing seat 3 is fixedly connected to the mechanism groove 12 through a bolt. The longitudinal direction of the mechanism groove 12 is the same as the longitudinal direction of the base 1. The fixed seat 3 is positioned at one end of the mechanism groove 12, and a centering mechanism 4 for ensuring that the supporting device 2 is positioned at the middle position inside the gallery is arranged on the fixed seat 3.
Referring to fig. 1 and 2, the centering mechanism 4 includes a scale 41 and an abutting bracket 42. Scale 41 has the scale mark for being round bar shape setting and surface forming, and 41 bottom ends of scale articulate on the fixing base 3 lateral wall, and can realize 41 levels of scale and vertical state's switching through swing scale 41. Conflict frame 42 sliding connection is provided with spring 421 between conflict frame 42 and the scale 41 in the top of scale 41, and spring 421 length direction is the same with the length direction of conflict frame 42, and spring 421 will provide the power of keeping away from the scale 41 direction to conflict frame 42 when compressing, and conflicts the frame 42 top and install gyro wheel 43.
Referring to fig. 1 and 3, when the scale 41 moves to the horizontal state, the scale 41 and the abutting bracket 42 are completely located in the mechanism groove 12, and the centering mechanism 4 is accommodated. In addition, a layer of rubber pad for directly contacting the mechanism groove 12 is fixedly connected to the outer wall of the abutting frame 42. When the scale 41 is in a vertical state, the distance between the abutting frame 42 and the scale 41 can be changed by moving the base 1 left and right, and the limiting mechanism 5 for improving the stability of the vertical state of the scale 41 is arranged on the fixed base 3.
Referring to fig. 1 and 3, the limiting mechanism 5 includes a first contact plate 51 and a second contact plate 52, the first contact plate 51 and the second contact plate 52 are both arc-shaped, and the first contact plate 51 and the second contact plate 52 improve the stability of the scale 41 in the vertical state through the clamping scale 41. First support touch panel 51 is vertical to be set up and fixed connection is at the up end of fixing base 3, and first support touch panel 51's concave surface is towards scale 41, and when scale 41 was in vertical state, scale 41 laminated with first support touch panel 51's concave surface mutually.
Referring to fig. 1 and 3, the second contact plate 52 is vertically disposed and hinged to a side surface of the fixing base 3, one side of the second contact plate 52 hinged to the fixing base 3 is a hinge side of the second contact plate 52, and the other side is a locking side of the second contact plate 52. When the scale 41 is in the vertical state, the second abutting plate 52 is rotated, when the locking side of the second abutting plate 52 is fitted with the side wall of the fixed seat 3, the first abutting plate 51 and the second abutting plate 52 clamp the scale 41 therein, and the locking device 6 for fixing the second abutting plate 52 and the fixed seat 3 is arranged on the locking side.
Referring to fig. 1 and 3, the locking device 6 includes a locking plate 61, the locking plate 61 is fixedly connected to the locking side, and when the locking side contacts the side wall of the fixing base 3, the locking plate 61 is abutted against the side wall of the fixing base 3. Locking hole 62 has run through to the level on lockplate 61, and connecting hole (not shown in the figure) has been seted up to the level on the fixing base 3 lateral wall, and when lockplate 61 and the laminating of fixing base 3 lateral wall, lockhole 62 and the laminating of connecting hole to the pin penetrates in locking hole 62 and the connecting hole, and the realization is to second lockplate 61 and fixing base 3's reciprocal anchorage.
The implementation principle of the embodiment of the application is as follows: when the gallery is supported, the scale 41 is firstly turned to be in a vertical state, and at the moment, the scale 41 is fixed through the first contact plate 51, the second contact plate 52 and the locking device 6. Then, one side of the base 1, which is close to the fixed seat 3, is pushed towards the inside of the gallery, so that the roller 43 on the abutting frame 42 abuts against the top wall of the gallery, then the base 1 is moved leftwards and rightwards, and the abutting frame 42 ensures that the roller 43 always abuts against the inner wall of the gallery under the action of the spring.
Because the corridor inner wall sets up for circular-arc symmetry, thereby make base 1 at the in-process that removes, the distance between conflict frame 42 and the scale 41 can change along with the difference of the inside height of corridor, and the numerical value on the scale 41 can change along with the change of conflict frame 42 position, when numerical value on the scale 41 is the biggest, central point that base 1 is located the corridor puts, strut the corridor inner wall through strutting arrangement 2 this moment, can effectual promotion strut effect.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a water delivery corridor template supporting construction which characterized in that: including base (1) and setting centering mechanism (4) on base (1), centering mechanism (4) include scale (41) and conflict frame (42), the vertical setting of scale (41), scale (41) surface is provided with the scale mark, conflict frame (42) sliding connection in scale (41), scale (41) with be provided with spring (421) between conflict frame (42) support, conflict frame (42) top is used for conflicting the corridor.
2. The water delivery corridor formwork support structure of claim 1, wherein: the base (1) is connected with a fixing seat (3) in a detachable mode through a bolt, the scale (41) is hinged to the fixing seat (3), a limiting mechanism (5) is arranged on the fixing seat (3), and the limiting mechanism (5) can enhance the stability of the scale (41) in a vertical state.
3. The water delivery gallery formwork support structure of claim 2, wherein: scale (41) articulate one side of fixing base (3), stop gear (5) are including first conflict board (51) and second conflict board (52), first conflict board (51) are fixed in fixing base (3) up end, when scale (41) are in vertical state, scale (41) support tightly first conflict board (51), second conflict board (52) with fixing base (3) are articulated mutually, work as scale (41) with when first conflict board (51) are inconsistent, second conflict board (52) can with first conflict board (51) centre gripping scale (41), and be provided with on fixing base (3) and be used for fixing locking device (6) of second conflict board (52).
4. The water delivery gallery formwork support structure of claim 2, wherein: the fixing seat (3) is located at one end of the base (1) in the length direction, and the length of the centering mechanism (4) is smaller than that of the base (1).
5. The water delivery corridor formwork support structure of claim 3, wherein: locking device (6) are including fixed connection lockplate (61) on second conflict board (52), it has locking hole (62) to run through on lockplate (61), the connecting hole has been seted up on fixing base (3), works as second conflict board (52) with first conflict board (51) centre gripping during scale (41), lockplate (61) support tightly fixing base (3), just locking hole (62) with the connecting hole is linked together.
6. The water delivery gallery formwork support structure of claim 2, wherein: base (1) up end sets up mechanism groove (12), fixing base (3) are located mechanism groove (12), work as when scale (41) move to the horizontality, scale (41) and conflict frame (42) are located mechanism groove (12).
7. The water delivery corridor formwork support structure of claim 6, wherein: the rubber pad is arranged on the abutting frame (42), and when the scale (41) is in a horizontal state, the rubber pad abuts against the bottom wall of the mechanism groove (12).
8. The water delivery corridor formwork support structure of claim 1, wherein: one end, deviating from the scale (41), of the abutting frame (42) is provided with a roller (43).
CN202121301602.2U 2021-06-09 2021-06-09 Water delivery corridor template supporting construction Active CN214784537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121301602.2U CN214784537U (en) 2021-06-09 2021-06-09 Water delivery corridor template supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121301602.2U CN214784537U (en) 2021-06-09 2021-06-09 Water delivery corridor template supporting construction

Publications (1)

Publication Number Publication Date
CN214784537U true CN214784537U (en) 2021-11-19

Family

ID=78712024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121301602.2U Active CN214784537U (en) 2021-06-09 2021-06-09 Water delivery corridor template supporting construction

Country Status (1)

Country Link
CN (1) CN214784537U (en)

Similar Documents

Publication Publication Date Title
CN211815621U (en) Template supporting device for concrete pouring of bridge
CN214784537U (en) Water delivery corridor template supporting construction
CN211899549U (en) Combined scaffold with stable structure for constructional engineering
CN112627588A (en) Stable form bearing structure for building steel structure
CN217175938U (en) Novel construction template is fixed device
CN215828180U (en) High stability single beam hangs gallows for hoist
CN115502946A (en) Support is prevented empting by panel that building engineering used
CN211232085U (en) Movable trolley frame
CN211851114U (en) Stereo garage's crisscross truss steel construction
CN220203472U (en) Steel plate concrete shear wall supporting structure
CN215589468U (en) Template for assembly type building construction
CN214531822U (en) Building scaffold capable of being moved in telescopic mode
CN212609320U (en) Lifting device for capital construction
CN212714522U (en) Bridge construction supporting equipment in field of bridge engineering
CN217556924U (en) Height-adjustable assembled chute
CN214569924U (en) Guide rail frame of building construction elevator
CN213806740U (en) Adjustable supporting structure of port concrete formwork
CN216305371U (en) Concrete cast-in-place board template fixed bolster
CN221915362U (en) Multifunctional movable treasure box
CN221219594U (en) Movable scaffold
CN212562369U (en) Building decoration moving platform
CN216464485U (en) Multi-dimensional lifting operation platform for liquid filling of composite fireproof glass
CN214291664U (en) Steel structure bridge support frame
CN113479766B (en) Double-hoist gantry crane with high stability
CN214267714U (en) Building cement transport vechicle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant