CN214783062U - Novel silicon PU finish paint structure - Google Patents

Novel silicon PU finish paint structure Download PDF

Info

Publication number
CN214783062U
CN214783062U CN202023236256.2U CN202023236256U CN214783062U CN 214783062 U CN214783062 U CN 214783062U CN 202023236256 U CN202023236256 U CN 202023236256U CN 214783062 U CN214783062 U CN 214783062U
Authority
CN
China
Prior art keywords
layer
fixedly connected
elastic
basic unit
base layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023236256.2U
Other languages
Chinese (zh)
Inventor
王芝锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shurui Sports Facilities Development Co ltd
Original Assignee
Guangzhou Shurui Sports Facilities Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shurui Sports Facilities Development Co ltd filed Critical Guangzhou Shurui Sports Facilities Development Co ltd
Priority to CN202023236256.2U priority Critical patent/CN214783062U/en
Application granted granted Critical
Publication of CN214783062U publication Critical patent/CN214783062U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a silicon PU finish paint technical field specifically is a novel silicon PU finish paint structure, including the basic unit, one side fixedly connected with stabilizing mean of basic unit, stabilizing mean includes fixed bed, arch, recess and rivet, one side fixedly connected with of fixed bed is protruding, the recess has been seted up to the inside of fixed bed, the inside fixedly connected with rivet of recess, one side fixedly connected with elasticity basic unit of stabilizing mean, one side fixedly connected with elastic layer of elasticity basic unit. The utility model has the advantages that: through setting up stabilizing mean, when the construction, at first lay stabilizing mean on the basic unit through the rivet, then scribble the adhesive on the stabilizing mean again, then lay elastic base layer on stabilizing mean again, the last arch that is provided with of stabilizing mean, the arch can increase the bonding area between stabilizing mean and the elastic base layer, is equivalent to the bonding area between basic unit and the elastic base layer that has increased, promotes the stability of bonding.

Description

Novel silicon PU finish paint structure
Technical Field
The utility model relates to a silicon PU finish paint technical field, especially a novel silicon PU finish paint structure.
Background
The silicon PU is a healthy professional elastic synthetic ball field surface layer material system which accords with the human engineering principle and meets the requirements of sports physical characteristics, has the structural characteristics of upper hardness and lower elasticity, and can be directly constructed on the basis of cement or asphalt, a buffering resilience structure is formed by single-component organic silicon modified polyurethane, and double-component modified acrylic acid is used as a wear-resistant surface layer. Generally as basketball court, sport areas such as badminton court, silicon PU has good cushion nature and ductility, the bonding force is strong, there is certain cure function to the basis, can make level automatically, the construction is simple, the ageing resistance is outstanding, construction back chemical behavior is stable, difficult bubble that produces, when the construction, lay waterproof bonding layer after subaerial, lay silicon PU elasticity basic unit subaerial, then lay silicon PU elasticity layer and finish paint layer in proper order again, fixed relying on the adhesive more between silicon PU elasticity basic unit and the ground, the area on ground is certain, bonding area between silicon PU elasticity basic unit and the ground is less, it is not firm easily to lead to the bonding, be not convenient for in-service use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a novel silicon PU finish paint structure.
The purpose of the utility model is realized through the following technical scheme: a novel silicon PU finishing paint structure comprises a base layer, wherein one side of the base layer is fixedly connected with a stabilizing mechanism, the stabilizing mechanism comprises a fixing layer, a protrusion, a groove and a rivet, one side of the fixing layer is fixedly connected with the protrusion, the inside of the fixing layer is provided with the groove, and the inside of the groove is fixedly connected with the rivet;
one side fixedly connected with elasticity basic unit of firm mechanism, one side fixedly connected with elastic layer of elasticity basic unit, one side fixedly connected with finish paint layer of elastic layer.
Optionally, the basic unit is the concrete-based layer, the fixed bed is the PVC material, fixed bed fixed connection is at the top of basic unit, and the fixed bed passes through the fix with rivet at the top of basic unit.
Optionally, the rivet is fixedly connected to the inside of the base layer, and the stabilizing mechanism is fixedly connected to the top of the base layer through the rivet.
Optionally, the number of the protrusions is a plurality, the protrusions are fixedly connected to the top of the fixing layer, the materials of the protrusions are the same as those of the fixing layer, and the protrusions are spherical protrusions.
Optionally, elastic basic unit and elastic layer are silicon PU material, elastic layer fixed connection is at elastic basic unit's top, finish paint layer fixed connection is at elastic layer's top.
Optionally, the protrusion is fixedly connected to the inside of the elastic base layer, and the elastic base layer is fixedly connected to the fixing layer through the protrusion.
The utility model has the advantages of it is following:
by arranging the stabilizing mechanism, one side of the base layer is fixedly connected with the stabilizing mechanism, the stabilizing mechanism comprises a fixed layer, a bulge, a groove and a rivet, one side of the fixed layer is fixedly connected with the bulge, the inside of the fixed layer is provided with the groove, the inside of the groove is fixedly connected with the rivet, when in construction, the stabilizing mechanism is firstly paved on the base layer through the rivet, then the stabilizing mechanism is coated with adhesive, then the elastic base layer is paved on the stabilizing mechanism, the bulge is arranged on the stabilizing mechanism, the bonding area between the stabilizing mechanism and the elastic base layer can be increased through the bulge, the bonding area between the base layer and the elastic base layer is equivalently increased, the bonding stability is improved, the groove is arranged on the fixed layer, the diameter of the rivet is smaller than that of the groove, the elastic base layer can permeate into the groove when being paved, the bonding area is further increased, so that the bonding stability is improved, and the elastic base layer is made of silicon PU material, the silicon PU material can make level by oneself, prevents to appear unevenness because protruding and recess lead to the surface.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic cross-sectional view of a first view of the present invention;
fig. 3 is a schematic cross-sectional view of a second perspective of the present invention;
fig. 4 is a schematic structural view of the fixing mechanism of the present invention.
In the figure: 1-base layer, 2-stabilizing mechanism, 201-fixing layer, 202-protrusion, 203-groove, 204-rivet, 3-elastic base layer, 4-elastic layer and 5-finishing paint layer.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-4, a novel silicon PU finish structure includes a base layer 1, a stabilizing mechanism 2 is fixedly connected to one side of the base layer 1, the stabilizing mechanism 2 includes a fixing layer 201, a protrusion 202, a groove 203 and a rivet 204, the protrusion 202 is fixedly connected to one side of the fixing layer 201, the protrusion 202 can increase the bonding area between the stabilizing mechanism 2 and an elastic base layer 3, which is equivalent to increase the bonding area between the base layer 1 and the elastic base layer 3, thereby improving the bonding stability, the fixing layer 201 is internally provided with the groove 203, the groove 203 is fixedly connected with the rivet 204, the diameter of the rivet 204 is smaller than that of the groove 203, so that the elastic base layer 3 can penetrate into the groove 203 when being laid, and the bonding area is further increased, thereby improving the stability;
one side fixedly connected with elasticity basic unit 3 of firm mechanism 2, one side fixedly connected with elastic layer 4 of elasticity basic unit 3, one side fixedly connected with finish paint layer 5 of elastic layer 4.
As an optimal technical solution of the utility model: basic unit 1 is the concrete-based layer, fixed bed 201 is the PVC material, fixed bed 201 fixed connection is at the top of basic unit 1, rivet 204 fixed connection is in the inside of basic unit 1, firm mechanism 2 passes through rivet 204 fixed connection at the top of basic unit 1, the quantity of arch 202 is a plurality of, arch 202 fixed connection is at the top of fixed bed 201, the material of arch 202 is the same with the material of fixed bed 201, elastic base layer 3 and elastic layer 4 are silicon PU material, 4 fixed connection at elastic base layer 3's top on elastic layer, 5 fixed connection at elastic layer 4's top on finish paint layer, arch 202 fixed connection is in elastic base layer 3's inside, elastic base layer 3 is through protruding 202 and fixed bed 201 fixed connection.
The working process of the utility model is as follows: during construction, the fixing mechanism 2 is firstly paved on the base layer 1 through the rivet 204, then the fixing mechanism 2 is coated with the adhesive, then the elastic base layer 3 is paved on the fixing mechanism 2, and then the elastic layer 4 and the finishing paint layer 5 are sequentially paved.
To sum up, a novel silicon PU finish paint structure, when in use, by arranging a stabilizing mechanism 2, one side of a base layer 1 is fixedly connected with the stabilizing mechanism 2, the stabilizing mechanism 2 comprises a fixed layer 201, a protrusion 202, a groove 203 and a rivet 204, one side of the fixed layer 201 is fixedly connected with the protrusion 202, the inside of the fixed layer 201 is provided with the groove 203, the inside of the groove 203 is fixedly connected with the rivet 204, when in construction, the stabilizing mechanism 2 is firstly laid on the base layer 1 through the rivet 204, then the stabilizing mechanism 2 is coated with an adhesive, then an elastic base layer 3 is laid on the stabilizing mechanism 2, the stabilizing mechanism 2 is provided with the protrusion 202, the protrusion 202 can increase the bonding area between the stabilizing mechanism 2 and the elastic base layer 3, which is equivalent to increase the bonding area between the base layer 1 and the elastic base layer 3, the bonding stability is improved, and the fixed layer 201 is provided with the groove 203, the diameter of rivet 204 is less than the diameter of recess 203, makes elastic basic unit 3 when laying in can the infiltration recess 203, thereby further increases bonding area and promotes stability to elastic basic unit 3 is the silicon PU material, and the silicon PU material can make level by oneself, prevents because arch 202 and recess 203 lead to the phenomenon of unevenness to appear in the surface.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A novel silicon PU finish paint structure is characterized in that: the fixing device comprises a base layer (1), wherein a fixing mechanism (2) is fixedly connected to one side of the base layer (1), the fixing mechanism (2) comprises a fixing layer (201), a protrusion (202), a groove (203) and a rivet (204), the protrusion (202) is fixedly connected to one side of the fixing layer (201), the groove (203) is formed in the fixing layer (201), and the rivet (204) is fixedly connected to the inside of the groove (203);
one side fixedly connected with elasticity basic unit (3) of firm mechanism (2), one side fixedly connected with elastic layer (4) of elasticity basic unit (3), one side fixedly connected with finish paint layer (5) of elastic layer (4).
2. The novel silicon PU topcoat structure of claim 1, wherein: the base course (1) is the concrete base course, fixed bed (201) are the PVC material, fixed bed (201) fixed connection is at the top of base course (1).
3. The novel silicon PU topcoat structure of claim 1, wherein: the rivet (204) is fixedly connected in the base layer (1), and the stabilizing mechanism (2) is fixedly connected to the top of the base layer (1) through the rivet (204).
4. The novel silicon PU topcoat structure of claim 1, wherein: the number of the bulges (202) is a plurality, the bulges (202) are fixedly connected to the top of the fixed layer (201), and the bulges (202) are made of the same material as the fixed layer (201).
5. The novel silicon PU topcoat structure of claim 1, wherein: elastic basic unit (3) and elastic layer (4) are silicon PU material, elastic layer (4) fixed connection is at the top of elastic basic unit (3), finish paint layer (5) fixed connection is at the top of elastic layer (4).
6. The novel silicon PU topcoat structure of claim 1, wherein: the bulges (202) are fixedly connected inside the elastic base layer (3), and the elastic base layer (3) is fixedly connected with the fixed layer (201) through the bulges (202).
CN202023236256.2U 2020-12-29 2020-12-29 Novel silicon PU finish paint structure Active CN214783062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023236256.2U CN214783062U (en) 2020-12-29 2020-12-29 Novel silicon PU finish paint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023236256.2U CN214783062U (en) 2020-12-29 2020-12-29 Novel silicon PU finish paint structure

Publications (1)

Publication Number Publication Date
CN214783062U true CN214783062U (en) 2021-11-19

Family

ID=78722199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023236256.2U Active CN214783062U (en) 2020-12-29 2020-12-29 Novel silicon PU finish paint structure

Country Status (1)

Country Link
CN (1) CN214783062U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960344A (en) * 2022-06-17 2022-08-30 广东高捷体育产业有限公司 Sports ground structure and scratch-resistant anti-skid ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960344A (en) * 2022-06-17 2022-08-30 广东高捷体育产业有限公司 Sports ground structure and scratch-resistant anti-skid ground

Similar Documents

Publication Publication Date Title
CN214783062U (en) Novel silicon PU finish paint structure
KR100975984B1 (en) Assemble type of field flooring and fabricating method the same
NO145044B (en) COVER FOR SPORTS, SPECIAL TENNIS COURSES.
TWI410263B (en) Bunker mat for golf practice
CN203890833U (en) Rigid-foundation polyurethane plastic track
CN203583311U (en) Terrace structure of court
CN203890834U (en) Water-permeable polyurethane plastic track
US20070101669A1 (en) Building material anchor
CN205062608U (en) Court composite pad
CN211772565U (en) Rubber coiled material elastic court
CN215714379U (en) Playground track
CN105233490A (en) Lineation device for simple ball park
CN215252099U (en) Silicon PU court material surface course structure
CN211547165U (en) High-elastic anti-slip silicon PU court
CN212000468U (en) Self-knotting course with wavy lines
CN201265134Y (en) Polyurethane surfacing material
CN205206220U (en) Add muscle sports flooring
CN208941635U (en) A kind of bathroom rubber antiskid pad
CN214061125U (en) Hydrophobic anti-skid polyurethane material layer for plastic track
CN214783059U (en) Wear-resistant silicon PU (polyurethane) playground
CN211199970U (en) Elastic silicon PU capable of preventing bulging
CN217948656U (en) Silicon PU finish paint ground of scraping-resistant
CN213447950U (en) Novel silicon Pu plastic structure
CN217324827U (en) Runway structure of laying fast
CN205934653U (en) Garden art step moving walkways board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant