CN214772913U - Steel bar connecting structure of assembled prefabricated part - Google Patents

Steel bar connecting structure of assembled prefabricated part Download PDF

Info

Publication number
CN214772913U
CN214772913U CN202120196444.2U CN202120196444U CN214772913U CN 214772913 U CN214772913 U CN 214772913U CN 202120196444 U CN202120196444 U CN 202120196444U CN 214772913 U CN214772913 U CN 214772913U
Authority
CN
China
Prior art keywords
conversion
steel
conversion connecting
prefabricated
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202120196444.2U
Other languages
Chinese (zh)
Inventor
方燎原
马贵红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202120196444.2U priority Critical patent/CN214772913U/en
Application granted granted Critical
Publication of CN214772913U publication Critical patent/CN214772913U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembled prefabricated component's steel bar connection structure has solved the low and poor technical problem of load transmission reliability of current assembled prefabricated component steel bar connection efficiency of construction. The steel bar connecting structure of the prefabricated components comprises a conversion connecting plate, and two sides of the conversion connecting plate are respectively welded with the extension steel bars of the adjacent prefabricated components. The steel bar connecting structure of the prefabricated assembly comprises two different structure conversion connecting plates. When the prefabricated components are processed in a factory mode, the lengthened steel bars are welded to the conversion connecting steel plates, during field construction, the conversion connecting steel plates at the end portions of the lengthened steel bars are aligned with the existing steel bar end portion conversion connecting steel plates needing lengthening, the two conversion connecting steel plates are welded into a whole, and therefore conversion and transmission of stress steel bar loads are completed through the conversion connecting steel plates.

Description

Steel bar connecting structure of assembled prefabricated part
Technical Field
The utility model relates to a technical field of assembled prefabricated component construction especially indicates an assembled prefabricated component's steel bar connection structure.
Background
The connection and extension of the steel bars in the construction of the building engineering are very important links, and play an important role in the safety of the reinforced concrete structure. The existing cast-in-place construction method has a plurality of reliable connection methods, but with the development of industrial buildings, particularly the popularization of prefabricated components, the original reinforcing steel bar lengthening and connecting method cannot meet the requirements of the industrial buildings, and a new connecting method is urgently needed to be found to adapt to the requirements of the industrial development.
The current "technical code for prefabricated concrete structures" specifies that: in the assembly type structure, the longitudinal steel bar connection at the joints and the seams is realized by adopting the connection modes of mechanical connection, sleeve grouting connection, slurry anchor lap joint connection, welding connection, binding lap joint connection and the like according to the requirements of joint stress, construction process and the like. The welding connection is more by adopting the binding bar welding, butt welding and other methods in the cast-in-place construction, and because the cast-in-place construction adopts the on-site binding and forming mode of a single reinforcing steel bar, the joint is arranged at the position with an operation space, and the on-site alignment and welding construction of the head of the reinforcing steel bar needing to be lengthened is more convenient. However, on the premise of industrial construction, the steel bar mesh or the steel bar cage which is processed in factory, especially the steel bars which need to be lengthened on site in the prefabricated part, needs to align the head of each steel bar and then perform welding construction, and the difficulty is very high or even difficult to complete.
Through retrieval, the invention patent application with the prior application publication date of 2019.03.08 and the application publication number of CN109441017A discloses a dry type steel bar connector for an assembly type building and a using method thereof, the dry type steel bar connector comprises vertical plates arranged along the vertical direction, a plurality of groups of first transverse plates fixed on the left sides of the vertical plates, and second transverse plates fixed on the right sides of the vertical plates and corresponding to each group of first transverse plates, wherein the first transverse plates are positioned in a prefabricating area of the dry type steel bar connector, the second transverse plates are positioned in a back supplement area of the dry type steel bar connector, through holes are respectively formed in the first transverse plates and the second transverse plates, steel bars of prefabricated components in the prefabricating area penetrate through the through holes of the first transverse plates, and steel bars of prefabricated components in the back supplement area penetrate through the through holes of the second transverse plates and are fastened through nuts.
Although the technical scheme of above-mentioned patent application is comparatively convenient for traditional grout muffjoint, nevertheless has the shortcoming. Firstly, because the number of the steel bars in the prefabricated parts is large, the steel bars of the upper and lower adjacent prefabricated parts need to be aligned with the through holes of the prefabricated parts in a threaded connection mode, and the method can be realized in an ideal state, but the steel bars need to be accurately hoisted in the actual construction process, and the construction requirement is high. Secondly, in the process of prefabrication, transportation and construction in a factory, the extension steel bars of the prefabricated parts can deflect under external force, the deflection of individual steel bars can cause that the whole row of steel bars cannot penetrate through the preset position of the through hole, and the purpose of connection can be achieved only by rectifying the deviation of the steel bars. Secondly, rectify the reinforcing bar in the installation of lifting by crane of prefabricated component, not only seriously influence the efficiency of construction, increased construction equipment live time and cost of labor, there is the potential safety hazard moreover. In addition, in the above patent application, the adjacent prefabricated components are not in the same straight line, and the steel bar has poor stress load transmission reliability, especially for high-rise buildings. In addition, in the above patent application, the dry type reinforcing bar connector has many parts, and each pair of reinforcing bar connection requires a plurality of nuts and a plurality of washers, which not only complicates the operation steps and reduces the efficiency, but also requires a sufficient operation space to fasten the reinforcing bar connection.
Disclosure of Invention
Not enough to among the above-mentioned background art, the utility model provides an assembled prefabricated component's steel bar connection structure has solved the low and poor technical problem of load transmission reliability of current assembled prefabricated component steel bar connection efficiency of construction.
The technical scheme of the utility model is realized like this: the utility model provides an assembled prefabricated component's steel bar connection structure, includes the conversion connecting plate, the both sides of conversion connecting plate respectively with adjacent assembled prefabricated component's extension rebar welding, the conversion connecting plate includes that a plurality of shape is the linkage unit of H shape, and the recess and the conversion connecting plate welding at linkage unit both ends are passed through to the extension rebar, perhaps the conversion connecting plate includes first minute board and second minute board, first minute board and second minute board respectively with adjacent assembled prefabricated component's extension rebar welding, first minute board, second minute board are independent each other when prefabricating, and first minute board, second minute board deviate from one side welded connection of extension rebar when the assembly.
The extension steel bars of the prefabricated components on one side are welded with the conversion connecting plate during prefabrication, and the extension steel bars of the prefabricated components on the other side are welded with the conversion connecting plate during assembly.
The conversion connecting plate is provided with a groove, and the extension steel bar is welded with the conversion connecting plate through the groove.
The first branch plate and the second branch plate respectively comprise a plurality of concave connecting blocks, and the lengthening steel bars are welded with the conversion connecting plates through grooves of the connecting blocks.
The conversion connecting plate is a steel plate, and the extension reinforcing steel bars are stress reinforcing steel bars of the prefabricated wall.
The outer side wall of the groove of the connecting block or the connecting unit is of a vertical structure or is inclined to gather to the lengthening steel bar.
When the conversion connecting plate is a split structure comprising a first sub plate and a second sub plate: when prefabricated components are prefabricated, the elongated steel bars of each prefabricated component are welded with the first or second split plates; when the prefabricated components are assembled on site, the first sub-plate and the second sub-plate which are adjacent to each other are spliced and welded to each other; when the conversion connection plate is a monolithic structure comprising several connection units shaped as H: when prefabricated components are prefabricated, the elongated steel bar of one prefabricated component in the adjacent prefabricated components is welded in the groove on one side of the conversion connecting plate; when the prefabricated components are assembled on site, the elongated steel bars of the other prefabricated component in the adjacent prefabricated components are welded in the grooves on the other side of the conversion connecting plate.
The utility model discloses a conversion connecting steel plate, during batch production processing assembled prefabricated component, will connect the extension reinforcing bar to weld on conversion connecting steel plate, during site operation, will connect the conversion connecting steel plate of extension reinforcing bar tip and have had the reinforcing bar tip conversion connecting steel plate that needs to connect the extension to align, thereby weld two conversion connecting steel plates into whole, accomplish the conversion transmission of atress reinforcing bar load through conversion connecting steel plate. Adopt the utility model discloses a conversion connected mode, under the batch production condition, can imbed the opening part and the firm welding of conversion connecting plate in proper order with single extension reinforcing bar smoothly, form the level and smooth terminal surface similar to the steel member, the work of assembling on the spot then simplifies to once only can accomplish the accurate counterpoint that whole piece reinforcing bar net need extend the reinforcing bar. The welding between the conversion connection steel plates is also a horizontal welding line which is convenient to operate, the required operation space is small, and the method is particularly suitable for lengthening the stress steel bars of the prefabricated components. Although one welding procedure is additionally arranged between the conversion connecting steel plates, the difficult problem of field extension of the stressed steel bar of the prefabricated component is effectively solved in a space as small as possible, so that the field extension part of the stressed steel bar is simple and clear in load transfer path, visual and visible in operation process, convenient in quality detection and safe and reliable in whole.
Drawings
In order to illustrate the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and that other drawings can be obtained by those skilled in the art without inventive work.
Fig. 1 is a schematic view of a configuration of a conversion connection plate in embodiment 1;
FIG. 2 is a second schematic view showing a structure of a conversion connecting plate according to embodiment 1;
FIG. 3 is a structural view of a connecting unit of a switch connecting plate in embodiment 1;
FIG. 4 is a structural view of the connection unit and the elongated reinforcing bar in the welding of embodiment 1;
FIG. 5 is a schematic view of a first step of the construction using the conversion connection plate of FIG. 1;
FIG. 6 is a schematic diagram of a second step of construction using the conversion connecting plate in FIG. 1;
FIG. 7 is a schematic view of a first step of the construction using the conversion connection plate of FIG. 2;
FIG. 8 is a schematic view of a second step of construction using the conversion connection plate of FIG. 2;
FIG. 9 is a third schematic view showing a configuration of a conversion connecting plate according to embodiment 2;
FIG. 10 is a fourth schematic view showing a configuration of a switch connecting plate according to embodiment 2;
fig. 11 is a structural view of a connection block of a switch connection plate in embodiment 2;
fig. 12 is a structural view of the connecting block after being welded to the elongated steel bar in embodiment 2;
FIG. 13 is a schematic view of a step of construction using the transition joint plate of FIG. 9;
FIG. 14 is a schematic view of a second step of the construction process using the conversion connection plate of FIG. 9;
FIG. 15 is a schematic view of a step of construction using the transfer connector plate of FIG. 10;
FIG. 16 is a schematic view of a second step of the construction using the conversion connecting plate of FIG. 10;
fig. 17 is a schematic view showing the connection of the mesh reinforcement of the prefabricated units with the conversion connection plate;
in the figure: 1-a connection unit, 101-a first board, 102-a second board; 2-groove, 3-lengthening steel bar, 4-welding line, 5-connecting block and 6-horizontal welding line.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
Embodiment 1, a reinforcing bar coupling structure of prefabricated parts, as shown in fig. 1 to 4, includes a conversion coupling plate, both sides of which are welded to elongated reinforcing bars 3 of adjacent prefabricated parts, respectively. The lengthening steel bar 3 of the prefabricated part on one side is welded with the conversion connecting plate during prefabrication, and the lengthening steel bar 3 of the prefabricated part on the other side is welded with the conversion connecting plate during assembly. Be provided with recess 2 on the conversion connecting plate, extension reinforcing bar 3 passes through recess 2 and conversion connecting plate welding.
The conversion connecting plate comprises a plurality of structural forms, wherein one structural form is shown in figure 1, and the other structural form is shown in figure 2. The first structural form comprises two connecting units 1 in H shapes, the second structural form comprises four connecting units 1 in H shapes, and the structure of each connecting unit 1 is shown in figure 3.
The quantity of the connecting units 1 can be reasonably selected according to specific construction requirements, the connecting units 1 are integrally connected or detachably connected through connecting plates, the extension steel bars 3 are welded with the conversion connecting plates through the grooves 2 at the two ends of the connecting units 1, the end parts of the extension steel bars 3 are welded in the grooves 2, and welding seams 4 are arranged on the adjacent surfaces of the extension steel bars 3 and the grooves 2. The outer side wall of the groove 2 can be vertical or obliquely gathered towards the elongated reinforcing steel bar 3.
Embodiment 2, a reinforcing bar coupling structure of prefabricated parts, as shown in fig. 9 to 12, comprises a conversion coupling plate, both sides of which are welded to elongated reinforcing bars 3 of adjacent prefabricated parts, respectively. Be provided with recess 2 on the conversion connecting plate, extension reinforcing bar 3 passes through recess 2 and conversion connecting plate welding.
The conversion connecting plate comprises a plurality of structural forms, the structural form III is shown in fig. 9, the structural form IV is shown in fig. 10, the structural form III and the structural form IV both comprise a first section plate 101 and a second section plate 102, the first section plate 101 and the second section plate 102 are respectively welded with the elongated steel bars 3 of adjacent prefabricated components, the first section plate 101 and the second section plate 102 are independent from each other during prefabrication, and the sides of the first section plate 101 and the second section plate 102, which face away from the elongated steel bars 3 during assembly, are welded and connected through a horizontal welding seam 6.
The first and second plates 101 and 102 respectively comprise a plurality of concave connecting blocks 5, the connecting blocks 5 are integrally connected or detachably connected through connecting plates, the lengthening steel bars 3 are welded with the conversion connecting plates through grooves 2 of the connecting blocks 5, and welding seams 4 are arranged on the adjacent surfaces of the lengthening steel bars 3 and the grooves 2. The outer side wall of the groove 2 can be vertical or obliquely gathered towards the elongated reinforcing steel bar 3.
Further, the conversion connecting plate is a steel plate, and the extension steel bars 3 are stress steel bars of the prefabricated wall.
A construction method of a reinforcing bar coupling structure of prefabricated parts, as shown in fig. 5 to 8, when a conversion coupling plate is a unitary structure including a plurality of coupling units 1 having an H-shape: when prefabricated components are prefabricated, the elongated steel bar 3 of one prefabricated component in the adjacent prefabricated components is welded in the groove 2 on one side of the conversion connecting plate; when the prefabricated components are assembled on site, the elongated steel bars of the other prefabricated component in the adjacent prefabricated components are welded in the grooves 2 on the other side of the conversion connecting plate.
As shown in fig. 13-17, when the conversion connector board is a split structure including a first splitter board 101 and a second splitter board 102: when prefabricated components are prefabricated, the elongated steel bars 3 of each prefabricated component are welded with the first or second split plates 101 or 102; when the prefabricated components are assembled on site, splicing and welding adjacent first and second split plates 101 and 102 of the adjacent prefabricated components;
furthermore, more than two elongated steel bars 3 in the prefabricated components form a group.
Further, the extension bars 3 comprise vertical bars and transverse bars, and when the prefabricated components are prefabricated, the vertical bars and the transverse bars are connected with a reinforcing mesh or a reinforcing cage, and then concrete is poured.
The structure of the switch connection plate in this embodiment is the same as that corresponding to embodiments 1 and 2.
The present invention is not exhaustive and is well known to those skilled in the art.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an assembled prefabricated component's steel bar connection structure which characterized in that: including the conversion connecting plate, the both sides of conversion connecting plate are respectively with extension reinforcing bar (3) welding of adjacent assembled prefabricated component, the conversion connecting plate includes that a plurality of shape is the linkage unit (1) of H shape, and extension reinforcing bar (3) pass through the recess and the conversion connecting plate welding at linkage unit (1) both ends, perhaps the conversion connecting plate includes first minute board (101) and second minute board (102), and first minute board (101) and second minute board (102) are respectively with extension reinforcing bar (3) welding of adjacent assembled prefabricated component, and first minute board (101), second minute board (102) are independent each other when prefabricating, and first minute board (101), second minute board (102) deviate from one side welded connection who connects extension reinforcing bar (3) when the assembly.
2. The reinforcing bar connecting structure of prefabricated parts according to claim 1, wherein: the lengthening steel bar (3) of the prefabricated component on one side is welded with the conversion connecting plate during prefabrication, and the lengthening steel bar (3) of the prefabricated component on the other side is welded with the conversion connecting plate during assembly.
3. The reinforcing bar connecting structure of prefabricated parts according to claim 1 or 2, wherein: the first sub-plate (101) and the second sub-plate (102) respectively comprise a plurality of concave connecting blocks (5), and the extension steel bars (3) are welded with the conversion connecting plates through grooves of the connecting blocks (5).
4. The reinforcing bar connection structure of fabricated prefabricated parts according to claim 3, wherein: the conversion connecting plate is a steel plate, and the extension reinforcing steel bars (3) are stress reinforcing steel bars of the prefabricated wall.
5. The reinforcing bar connection structure of fabricated prefabricated parts according to claim 4, wherein: the outer side wall of the groove of the connecting block (5) or the connecting unit is of a vertical structure or is obliquely gathered to the lengthening steel bar (3).
CN202120196444.2U 2021-01-25 2021-01-25 Steel bar connecting structure of assembled prefabricated part Withdrawn - After Issue CN214772913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120196444.2U CN214772913U (en) 2021-01-25 2021-01-25 Steel bar connecting structure of assembled prefabricated part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120196444.2U CN214772913U (en) 2021-01-25 2021-01-25 Steel bar connecting structure of assembled prefabricated part

Publications (1)

Publication Number Publication Date
CN214772913U true CN214772913U (en) 2021-11-19

Family

ID=78749508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120196444.2U Withdrawn - After Issue CN214772913U (en) 2021-01-25 2021-01-25 Steel bar connecting structure of assembled prefabricated part

Country Status (1)

Country Link
CN (1) CN214772913U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112659357A (en) * 2021-01-25 2021-04-16 中国建筑第七工程局有限公司 Steel bar connecting structure of prefabricated part and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112659357A (en) * 2021-01-25 2021-04-16 中国建筑第七工程局有限公司 Steel bar connecting structure of prefabricated part and construction method thereof
CN112659357B (en) * 2021-01-25 2022-06-14 中国建筑第七工程局有限公司 Steel bar connecting structure of prefabricated part and construction method thereof

Similar Documents

Publication Publication Date Title
CN109914216B (en) Assembled large-span ultra-high-performance concrete box girder combined node and connecting method thereof
CN214772913U (en) Steel bar connecting structure of assembled prefabricated part
CN107724528A (en) One kind is used for the prefabricated overall beam column construction of " dry type " assembling concrete frame structure
CN211368347U (en) Bridge deck and steel-concrete composite beam
CN109356286B (en) Assembly type reinforced concrete frame structure node unit decomposition and assembly method
CN210067139U (en) Assembled building wall component
CN112659357B (en) Steel bar connecting structure of prefabricated part and construction method thereof
CN110424534B (en) Prefabricated assembled type reinforced-free concrete frame and construction method thereof
CN216156813U (en) Connection structure of assembled concrete shear wall and coupling beam
CN207419695U (en) One kind assembles the prefabricated whole beam column construction of concrete frame structure for " dry type "
CN214061942U (en) Assembled beam column connection structure
CN217870942U (en) Beam column connecting structure
CN211368387U (en) Novel shear force component combination beam
CN210975497U (en) Shear connector
CN211114074U (en) Prefabricated assembled post connecting device
CN113026989A (en) Assembled structure of side wall
CN210508035U (en) Assembly type combination beam secondary beam structure
CN215406709U (en) Assembled structure of side wall
CN110145070A (en) A kind of prefabricated column assembly and its construction method
CN219653505U (en) Prefabricated assembly bridge deck
CN110130502B (en) Integral connection system of reinforced concrete assembly type building
CN220644877U (en) Centralized integrated reinforcement cage for construction
CN220619828U (en) Land table assembly
CN213359097U (en) Steel construction assembled wallboard
CN220724851U (en) Connecting structure for assembled bridge pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20211119

Effective date of abandoning: 20220614

AV01 Patent right actively abandoned

Granted publication date: 20211119

Effective date of abandoning: 20220614

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned