CN214744665U - Spirit level is used in construction of secondary structure is built in room - Google Patents

Spirit level is used in construction of secondary structure is built in room Download PDF

Info

Publication number
CN214744665U
CN214744665U CN202120234512.XU CN202120234512U CN214744665U CN 214744665 U CN214744665 U CN 214744665U CN 202120234512 U CN202120234512 U CN 202120234512U CN 214744665 U CN214744665 U CN 214744665U
Authority
CN
China
Prior art keywords
spring
slot
secondary structure
groove
spirit level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120234512.XU
Other languages
Chinese (zh)
Inventor
纪春明
王亚坤
倪健
李蕾
卢加新
马桂宁
李烨
冯善中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202120234512.XU priority Critical patent/CN214744665U/en
Application granted granted Critical
Publication of CN214744665U publication Critical patent/CN214744665U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Level Indicators Using A Float (AREA)

Abstract

The utility model discloses a spirit level for building secondary structure construction, which comprises a spirit level main body, wherein the bottom of the spirit level main body is provided with a connecting seat, the bottom of the connecting seat is hinged with a supporting rod, the bottom of the supporting rod is provided with a slot, the inside of the slot is provided with an inserted bar, the top of the inserted bar is provided with a first spring, the surfaces of the two sides of the slot are both provided with a clamping groove, the two sides of the inserted bar are both provided with a holding groove, one side surface of the holding groove is provided with a second spring, one end of the second spring is provided with a connecting rod, and the two ends of the connecting rod are respectively provided with a clamping block and a pressing block; has the advantages that: the device is through pressing the briquetting for the second spring receives the compression, and then the fixture block breaks away from the draw-in groove and removes to holding tank direction, and the regulation that the inserted bar carries out length downwards again loosens after length adjustment and presses the briquetting, realizes the fixed to the inserted bar under the elastic deformation's of second spring effect, makes things convenient for the spirit level to build the higher position of in-process of secondary structure construction in the room and measures.

Description

Spirit level is used in construction of secondary structure is built in room
Technical Field
The utility model relates to a technical field of secondary structure construction is built in room specifically is a spirit level is used in secondary structure construction is built in room.
Background
The secondary structure of building refers to some non-bearing structures, constructional columns, lintels and other parts needing to be finished before decoration in the frame, shear wall and frame shear engineering. In the building process, multiple tools are needed, wherein the level gauge is generally an instrument for detecting the wall surface of a house, and the laser level gauge is widely applied to the building.
Current spirit level includes spirit level main part and support frame, because the length of the support frame of spirit level is limited to the measurement of building the higher position of in-process of secondary structure construction to the room has no way to realize, and the spirit level of longer support frame is difficult to carry, for this the utility model provides a secondary structure construction is built in room and is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a level gauge is used in secondary structure construction is built in room to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a secondary structure construction is built in room uses spirit level, includes the spirit level main part, the bottom of spirit level main part is provided with the connecting seat, the bottom of connecting seat articulates there is the bracing piece, the slot has been seted up to the bottom of bracing piece, the inside of slot is provided with the inserted bar, the top of inserted bar is provided with first spring, the draw-in groove has all been seted up on the both sides surface of slot, the holding tank has all been seted up to the both sides of inserted bar, a side surface of holding tank is provided with the second spring, the one end of second spring is provided with the connecting rod, the both ends of connecting rod are provided with fixture block and briquetting respectively, top one side of fixture block is rotated through the pivot and is connected with first ball, bottom one side of briquetting is rotated through the pivot and is connected with the second ball.
Preferably, the bracing piece is provided with threely, and encircles the equal angular distribution of the central line of connecting seat, and is three articulated respectively between the bracing piece has the horizontal pole.
Preferably, one end of the first spring is fixedly connected to the inside of the supporting rod, and the inserted rod is connected with the slot in a sliding mode through a pulley.
Preferably, the draw-in groove is annular circular arc groove structure, the draw-in groove is provided with a plurality ofly, and distributes along the both sides of slot equidistance from top to bottom on the surface, the holding tank is "Contraband" type structure, the second spring is provided with a plurality ofly, and distributes along the surperficial equidistance from top to bottom of holding tank.
Preferably, the clamping blocks are matched with the clamping grooves, the cross section of the pressing block is of a right-angled trapezoid structure, and anti-skid grains are arranged on the outer side close to the inserted rod.
Preferably, the first ball and the second ball are provided with a plurality of balls and are respectively clung to the surface of the clamping groove and the bottom surface of the accommodating groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device is characterized in that a connecting seat is arranged at the bottom of a level main body, a supporting rod is hinged at the bottom of the connecting seat, a slot is formed in the bottom of the supporting rod, an inserting rod is arranged inside the slot, a first spring is arranged at the top of the inserting rod, clamping grooves are formed in the surfaces of the two sides of the slot, accommodating grooves are formed in the two sides of the inserting rod, a second spring is arranged on the surface of one side of the accommodating groove, a connecting rod is arranged at one end of the second spring, a clamping block and a pressing block are respectively arranged at the two ends of the connecting rod, a first ball is rotatably connected to one side of the top of the clamping block through a rotating shaft, a second ball is rotatably connected to one side of the bottom of the pressing block through a rotating shaft, the inserting rod is inserted into the slot in the supporting rod, the second spring is compressed under the action of external force by pressing the pressing block, the clamping block is separated from the clamping grooves and moves towards the accommodating grooves, and then the inserting rod is pulled downwards to adjust the length, loosen after length adjustment and press the briquetting, the fixture block joint is on the draw-in groove under the elastic deformation's of second spring effect, realizes the fixed of inserted bar, makes things convenient for the spirit level to build the higher position of in-process of secondary structure construction in the room and measures, and the inserted bar of spirit level can contract to the slot in simultaneously, makes things convenient for carrying of spirit level.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1;
fig. 3 is an enlarged schematic structural diagram of the point B in fig. 1 according to the present invention.
In the figure: a level 1; a connecting seat 2; a support rod 3; a cross bar 31; a slot 4; a card slot 41; an insert rod 5; a first spring 51; an accommodating tank 6; a second spring 61; a connecting rod 62; a latch 63; a briquette 64; a first ball 65; and a second ball 66.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a secondary structure is built in room and is used spirit level is under construction, includes spirit level main part 1, and the welding of the bottom of spirit level main part 1 has connecting seat 2, and the bottom of connecting seat 2 articulates there is bracing piece 3, and bracing piece 3 is provided with threely, and encircles the angular distribution such as central line of connecting seat 2, through articulated convenient folding to the spirit level, articulated respectively between the three bracing piece 3 have horizontal pole 31 for spirit level main part 1 supports more stably.
The bottom of the supporting rod 3 is provided with a slot 4, an inserting rod 5 is arranged inside the slot 4, the top of the inserting rod 5 is fixedly connected with a first spring 51, one end of the first spring 51 is fixedly connected inside the supporting rod 3, the inserting rod 5 is slidably connected with the slot 4 through a pulley, the two side surfaces of the slot 4 are respectively provided with a clamping groove 41, the clamping grooves 41 are in an annular arc groove structure, a plurality of clamping grooves 41 are arranged and are distributed along the two side surfaces of the slot 4 at equal intervals up and down, the two sides of the inserting rod 5 are respectively provided with a containing groove 6, the containing groove 6 is in an Contraband type structure, one side surface of the containing groove 6 is fixedly connected with a second spring 61, a plurality of second springs 61 are arranged and are distributed at equal intervals up and down along the surface of the containing groove 6, one end of the second spring 61 is fixedly connected with a connecting rod 62, two ends of the connecting rod 62 are respectively welded with a clamping block 63 and a pressing block 64, the clamping blocks 63 are matched with the clamping grooves 41, the cross-section of briquetting 64 is the right trapezoid structure, and is provided with anti-skidding line near the outside of inserted bar 5, and top one side of fixture block 63 is rotated through the pivot and is connected with first ball 65, and bottom one side of briquetting 64 is rotated through the pivot and is connected with second ball 66, and first ball 65 and second ball 66 all are provided with a plurality ofly, and hug closely the surface at draw-in groove 41 and the bottom surface of holding tank 6 respectively.
The working principle is as follows: in practical use, the device is provided with a connecting seat 2 through the bottom of a level main body 1, the bottom of the connecting seat 2 is hinged with a support rod 3, the bottom of the support rod 3 is provided with a slot 4, the inside of the slot 4 is provided with an inserted rod 5, the top of the inserted rod 5 is provided with a first spring 51, the two side surfaces of the slot 4 are provided with clamping grooves 41, the two sides of the inserted rod 5 are provided with accommodating grooves 6, one side surface of the accommodating groove 6 is provided with a second spring 61, one end of the second spring 61 is provided with a connecting rod 62, the two ends of the connecting rod 62 are respectively provided with a clamping block 63 and a pressing block 64, one side of the top of the clamping block 63 is rotatably connected with a first ball 65 through a rotating shaft, one side of the bottom of the pressing block 64 is rotatably connected with a second ball 66 through a rotating shaft, the inserted rod 5 is inserted into the slot 4 on the support rod 3, the pressing block 64 is pressed, and then fixture block 63 breaks away from draw-in groove 41 and removes to 6 directions of holding tank, stimulate inserted bar 5 downwards again and carry out the regulation of length, loosen after length adjustment and press down briquetting 64, fixture block 63 joint is on draw-in groove 41 under the elastic deformation's of second spring 61 effect, the realization is fixed inserted bar 5, make things convenient for the spirit level to build the higher position of in-process of secondary structure construction in the room and measure, the inserted bar 5 of spirit level can contract to the slot 4 in simultaneously, make things convenient for the carrying of spirit level.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a spirit level is used in secondary structure construction is built in room, includes spirit level main part (1), its characterized in that: a connecting seat (2) is arranged at the bottom of the level main body (1), a supporting rod (3) is hinged at the bottom of the connecting seat (2), the bottom of the supporting rod (3) is provided with a slot (4), an inserting rod (5) is arranged inside the slot (4), the top of the inserted bar (5) is provided with a first spring (51), the surfaces of the two sides of the slot (4) are both provided with a clamping groove (41), both sides of the inserted bar (5) are provided with accommodating grooves (6), one side surface of each accommodating groove (6) is provided with a second spring (61), one end of the second spring (61) is provided with a connecting rod (62), two ends of the connecting rod (62) are respectively provided with a clamping block (63) and a pressing block (64), one side of the top of the clamping block (63) is rotationally connected with a first ball (65) through a rotating shaft, one side of the bottom of the pressing block (64) is rotatably connected with a second ball (66) through a rotating shaft.
2. The level gauge for building secondary structure construction according to claim 1, wherein: the bracing piece (3) are provided with threely, and encircle the central line equiangular distribution of connecting seat (2), and are three articulated respectively between bracing piece (3) have horizontal pole (31).
3. The level gauge for building secondary structure construction according to claim 1, wherein: one end of the first spring (51) is fixedly connected inside the supporting rod (3), and the inserted rod (5) is connected with the slot (4) in a sliding mode through a pulley.
4. The level gauge for building secondary structure construction according to claim 1, wherein: draw-in groove (41) are annular circular arc groove structure, draw-in groove (41) are provided with a plurality ofly, and along the upper and lower equidistance distribution in the both sides surface of slot (4), holding tank (6) are "Contraband" type structure, second spring (61) are provided with a plurality ofly, and along the surperficial upper and lower equidistance distribution of holding tank (6).
5. The level gauge for building secondary structure construction according to claim 1, wherein: the clamping blocks (63) are matched with the clamping grooves (41), the cross section of the pressing block (64) is of a right-angled trapezoid structure, and anti-skid grains are arranged on the outer side close to the inserting rod (5).
6. The level gauge for building secondary structure construction according to claim 1, wherein: the first ball (65) and the second ball (66) are provided with a plurality of balls and are respectively clung to the surface of the clamping groove (41) and the bottom surface of the accommodating groove (6).
CN202120234512.XU 2021-01-28 2021-01-28 Spirit level is used in construction of secondary structure is built in room Active CN214744665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120234512.XU CN214744665U (en) 2021-01-28 2021-01-28 Spirit level is used in construction of secondary structure is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120234512.XU CN214744665U (en) 2021-01-28 2021-01-28 Spirit level is used in construction of secondary structure is built in room

Publications (1)

Publication Number Publication Date
CN214744665U true CN214744665U (en) 2021-11-16

Family

ID=78642092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120234512.XU Active CN214744665U (en) 2021-01-28 2021-01-28 Spirit level is used in construction of secondary structure is built in room

Country Status (1)

Country Link
CN (1) CN214744665U (en)

Similar Documents

Publication Publication Date Title
CN208604761U (en) A kind of safety type steel structure node component
CN207027016U (en) A kind of clamping device of electrokinetic cell aluminum hull processing
CN210756658U (en) Positioner is used in I-steel cutting
CN214744665U (en) Spirit level is used in construction of secondary structure is built in room
CN109202583B (en) Pipe fitting double-end grinding device
CN207211747U (en) A kind of civil engineering building template link
CN106122196A (en) The fixing device that a kind of serviceability is strong
CN217859672U (en) Construction steel bar welding device
CN202010751U (en) Bending machine for rebars
CN215759626U (en) Wind-resistant bearing structure of building structure design
CN212056129U (en) Fixed device that holds that adds of hydraulic engineering construction pipeline
CN209717441U (en) Stationary fixture is used in a kind of production of NB-IOT communicator
CN210209232U (en) Assembled steel structure high altitude construction is with interim fixing device before full weld
CN210253672U (en) Part shape correction tool
CN210819110U (en) Workpiece clamping hanger of high-speed roller grinder
CN210614700U (en) Simple steel pipe straightening device for construction site
CN207787339U (en) A kind of portable autoroute backplate trimmer
CN214866329U (en) Hydraulic plate bending machine capable of adjusting bending radius
CN208162523U (en) A kind of thread roller of steel bar chuck
CN112045099A (en) Bending device for building material reinforcing steel bar
CN211136355U (en) Loading jig for opening hole on top wall of shell
CN212822320U (en) Reinforcing bar equipment of buckling that construction used
CN218692751U (en) Steel part straightening machine
CN212454523U (en) Dust removal device for coal mine safety production
CN214310977U (en) Optical cable fusion auxiliary fixing clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant