CN214744601U - Fixed bolster of geological disaster monitoring early warning device - Google Patents
Fixed bolster of geological disaster monitoring early warning device Download PDFInfo
- Publication number
- CN214744601U CN214744601U CN202120794147.8U CN202120794147U CN214744601U CN 214744601 U CN214744601 U CN 214744601U CN 202120794147 U CN202120794147 U CN 202120794147U CN 214744601 U CN214744601 U CN 214744601U
- Authority
- CN
- China
- Prior art keywords
- rod
- early warning
- warning device
- geological disaster
- disaster monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Alarm Devices (AREA)
Abstract
The application relates to a fixed support of a geological disaster monitoring and early warning device, which comprises a base, an installation rod, an installation frame, a connecting piece and a plurality of locking pieces, wherein the bottom of the installation rod is connected with a base bolt; the locking piece is used for fixing the mounting frame and the early warning device. This application has the effect of being convenient for carry out early warning device's installation.
Description
Technical Field
The application relates to the field of geological disaster monitoring technology, in particular to a fixed support of a geological disaster monitoring and early warning device.
Background
Geological disasters can cause huge losses to human life safety and property safety, such as earthquakes, debris flows, floods and the like, and people use the geological disaster monitoring and early warning device to detect water volume, humidity and the like so as to reduce the losses of people. Generally, the geological disaster early warning device is fixed at a detection position through a bracket.
The application number is CN 202011118885.7's patent discloses a three gorges reservoir area geological disasters monitoring and early warning device, including base, supporting component and monitoring subassembly, supporting component's measuring stick and base rotate to be connected, and dead lever and measuring stick threaded connection install the one end that is close to the base at the measuring stick, and the packing ring is located between nut and the base, monitoring component's guard shield and base fixed connection, and control circuit, humidity transducer, rain gauge all are located the guard shield.
In view of the above-mentioned related technologies, the inventor considers that the base structure of the warning device is complex to assemble and is inconvenient to install.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the installation of carrying out early warning device, this application provides a geological disaster monitoring early warning device's fixed bolster.
The application provides a geological disaster monitoring and early warning device's fixed bolster adopts following technical scheme:
a fixed support of a geological disaster monitoring and early warning device comprises a base, mounting rods, a mounting frame, a connecting piece and a plurality of locking pieces, wherein the bottom of each mounting rod is connected with a base bolt; the locking piece is used for fixing the mounting frame and the early warning device.
Through adopting above-mentioned technical scheme, the installation frame can be connected and support early warning device, and the connecting piece can realize being connected of installation frame and erection rod, and the locking piece can lock early warning device, can reduce the phenomenon that early warning device takes place to rock to early warning device's connection stability has been promoted. During the installation, lean on early warning device into the installation frame to use the locking piece to fix can, thereby be convenient for carry out early warning device's installation.
Optionally, the connecting piece comprises a mounting plate and a connecting piece, one side of the mounting plate is welded with the horizontal rod, and the other side of the mounting plate is connected with the connecting piece; the connecting sheet is provided with a connecting hole, and the connecting hole is used for penetrating through a connecting bolt.
Through adopting above-mentioned technical scheme, connecting bolt can realize the connection of connection piece and installation pole to realize the level bar and be connected of installation pole.
Optionally, the mounting rod is provided with a connecting groove, and the connecting piece is clamped with the connecting groove.
Through adopting above-mentioned technical scheme, the spread groove can be fixed a position the connection piece, is convenient for carry out the connection of connection piece and installation pole.
Optionally, a sliding groove is formed in the horizontal rod, a positioning rod is arranged on one side, close to the horizontal rod, of the vertical rod, the positioning rod penetrates through the sliding groove and extends out of the sliding groove, and a positioning piece is connected to one end, extending out of the positioning rod.
Through adopting above-mentioned technical scheme, the spout is convenient for the locating lever to slide, and the locating lever removes, drives vertical pole and removes, can adjust the position between two vertical poles, has increased the flexibility of vertical pole.
Optionally, the locking member includes a first locking portion and a second locking portion, the first locking portion is disposed between two adjacent vertical rods, and the first locking portion is made of an elastic material.
Through adopting above-mentioned technical scheme, vertical pole can be strengthened to first locking part to early warning device's connection, is convenient for promote early warning device's connection stability.
Optionally, one side of the connecting rod, which is close to the vertical rod, is provided with a limiting rod, the vertical rod is provided with a limiting groove, the limiting rod penetrates through the limiting groove and extends out of the limiting groove, and a fixing part is arranged at one end of the limiting rod, which extends out of the limiting groove.
Through adopting above-mentioned technical scheme, the spacing groove can fix a position the gag lever post, is convenient for adjust the position of vertical pole, and the mounting can be fixed the position of gag lever post.
Optionally, a second locking portion is disposed between two adjacent connecting rods, and the second locking portion is made of an elastic material.
Through adopting above-mentioned technical scheme, the second sticking department that elastic material made can press from both sides the early warning device by oneself, further strengthens early warning device and connecting rod's stability of being connected, is convenient for carry out early warning device's installation.
Optionally, one side of the connecting rod, which is far away from the vertical rod, is provided with a positioning sheet, and the positioning sheet is detachably connected with the connecting rod.
By adopting the technical scheme, the positioning sheet can further fix the early warning device, and the shaking of the early warning device is reduced. The detachable locating plate is convenient for the disassembly and assembly of the early warning device.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the mounting frame and the locking piece are arranged, so that the early warning device can be connected and supported, the phenomenon that the early warning device shakes can be reduced, the connection stability of the early warning device is improved, and the early warning device is convenient to mount;
2. the connecting sheet can be positioned by arranging the connecting groove, so that the connecting sheet is conveniently connected with the mounting rod;
3. by arranging the detachable positioning sheet, the early warning device can be further fixed, and the shaking of the early warning device is reduced; still be convenient for personnel carry out early warning device's dismouting.
Drawings
Fig. 1 is an overall structure schematic diagram of a fixing bracket of a geological disaster monitoring and early warning device according to an embodiment of the present application.
Fig. 2 is an enlarged view at a in fig. 1.
Fig. 3 is a schematic structural diagram of a connecting piece of a fixing bracket of a geological disaster monitoring and early warning device according to an embodiment of the present application.
Reference numerals: 1. a base; 2. mounting a rod; 3. a mounting frame; 301. a horizontal bar; 302. a vertical rod; 303. a connecting rod; 4. a connecting member; 401. mounting a plate; 402. connecting sheets; 5. a locking member; 501. a first locking section; 502. a second locking portion; 6. connecting holes; 7. a connecting bolt; 8. connecting grooves; 9. a chute; 10. positioning a rod; 11. a positioning member; 12. a limiting rod; 13. a limiting groove; 14. a fixing member; 15. and (6) a positioning sheet.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses geological disaster monitoring and early warning device's fixed bolster. Referring to fig. 1 and 2, the fixing bracket of the geological disaster monitoring and early warning device comprises a base 1, a mounting rod 2, a mounting frame 3, a connecting piece 4 and a plurality of locking pieces 5, wherein the bottom of the mounting rod 2 is connected with the base 1 through bolts; the mounting frame 3 is used for placing the early warning device, and the mounting frame 3 includes two horizontal poles 301, two vertical poles 302 and four connecting rods 303, and the horizontal poles 301 are connected with the mounting rods 2 through connecting pieces 4.
Referring to fig. 3, the connector 4 includes a mounting plate 401 and a connecting piece 402, and one side of the mounting plate 401 is welded to the horizontal bar 301 and the other side is welded to the connecting piece 402. Connecting holes 6 are formed in the connecting sheet 402, connecting bolts 7 penetrate through the connecting holes 6, and the connecting sheet 402 and the mounting rod 2 can be connected through the connecting bolts 7, so that the horizontal rod 301 can be connected with the mounting rod 2. In order to facilitate the connection between the connecting piece 402 and the mounting rod 2, the mounting rod 2 is provided with a connecting groove 8, the connecting piece 402 is clamped with the connecting groove 8, and the connecting groove 8 can position the connecting piece 402.
Referring to fig. 2, a vertical rod 302 is connected between two horizontal rods 301, the vertical rod 302 and the horizontal rods 301 are located on the same plane, a connecting rod 303 is perpendicular to the vertical rod 302, a sliding groove 9 is formed in the horizontal rod 301, an integrally formed positioning rod 10 is arranged on one side of the vertical rod 302 close to the horizontal rod 301, and the positioning rod 10 penetrates through the sliding groove 9 and extends out of the sliding groove 9. The chute 9 is convenient for the positioning rod 10 to slide, and the positioning rod 10 moves to drive the vertical rods 302 to move, so that the position between the two vertical rods 302 can be adjusted. One end of the positioning rod 10 extending out is connected with a positioning piece 11 through threads, and the locking piece 5 is used for fixing the mounting frame 3 and the early warning device.
One side of the connecting rod 303 close to the vertical rod 302 is provided with an integrally formed limiting rod 12, the vertical rod 302 is provided with a limiting groove 13, the limiting rod 12 penetrates through the limiting groove 13 and extends out of the limiting groove 13, and one end of the limiting rod 12 extending out is in threaded connection with a fixing part 14. The limiting groove 13 can position the limiting rod 12, so that the position of the vertical rod 302 can be conveniently adjusted, and the fixing part 14 can fix the position of the limiting rod 12.
Referring to fig. 2, in order to improve the connection stability of the early warning device, a locking member 5 is further disposed on the mounting frame 3, the locking member 5 includes a first locking portion 501 and a second locking portion 502, the first locking portion 501 is welded between two adjacent vertical rods 302, the second locking portion 502 is welded between two adjacent connecting rods 303, the first locking portion 501 and the second locking portion 502 are both made of elastic materials, and in this embodiment, the first locking portion 501 and the second locking portion 502 are both springs. The first locking portion 501 can strengthen the connection of the vertical rod 302 to the early warning device, and the second locking portion 502 can clamp the early warning device by itself, so that the connection stability of the early warning device and the connecting rod 303 is further strengthened, and the installation of the early warning device is facilitated.
Referring to fig. 1, for further fixed early warning device, one side that vertical pole 302 was kept away from to connecting rod 303 is equipped with spacer 15, and spacer 15 can be dismantled with connecting rod 303 and be connected, joint or bolted connection can, and spacer 15 can carry out further fixed to early warning device, reduces rocking of early warning device. The detachable positioning piece 15 is for facilitating the detachment of the warning device.
The implementation principle of this application embodiment geological disasters monitoring and early warning device's fixed bolster is: during installation, the connecting piece 402 is close to the connecting groove 8 on the installation rod 2, then the connecting screw is used for penetrating the connecting hole 6, and the connecting bolt 7 is rotated, so that the connection between the connecting piece 402 and the installation rod 2 is realized.
Thereafter, the horizontal rod 301 and the mounting plate 401 are welded, and the positioning rod 10 of the vertical rod 302 is inserted through the chute 9, and the positioning piece 11 is connected to the extended end. The limiting rod 12 of the connecting rod 303 penetrates through the limiting groove 13 and is connected with the fixing piece 14 at the extending end, so that the mounting frame 3 is connected. Subsequently, the early warning device is close to the mounting frame 3, the early warning frame is located between the connecting rods 303, the vertical rods 302 clamp the early warning device under the action of the first locking portions 501, and the connecting rods 303 clamp the early warning device under the action of the second locking portions 502, so that the shaking of the early warning device is reduced. Subsequently, the positioning member 11 and the fixing member 14 are rotated, respectively, for further fixing. Finally, the positioning plate 15 is connected with the connecting rod 303 by using a bolt, so that the early warning device is installed. The fixed bolster of this application embodiment geological disasters monitoring and early warning device has the effect of being convenient for carry out early warning device's installation.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. A fixed support of a geological disaster monitoring and early warning device is characterized by comprising a base (1), a mounting rod (2), a mounting frame (3), a connecting piece (4) and a plurality of locking pieces (5), the bottom of the mounting rod (2) is connected with the base (1) through a bolt, the mounting frame (3) is used for placing the early warning device, the mounting frame (3) comprises two horizontal rods (301), two vertical rods (302) and four connecting rods (303), the connecting piece (4) is positioned between the horizontal rod (301) and the mounting rod (2), the horizontal rods (301) are connected with the mounting rod (2), the vertical rod (302) is connected between the two horizontal rods (301), the vertical rod (302) and the horizontal rod (301) are positioned on the same plane, the connecting rod (303) is perpendicular to the vertical rod (302), and the connecting rod (303) is connected with the vertical rod (302); the locking piece (5) is used for fixing the mounting frame (3) and the early warning device.
2. The fixing bracket of the geological disaster monitoring and early warning device as claimed in claim 1, wherein the connecting piece (4) comprises a mounting plate (401) and a connecting piece (402), one side of the mounting plate (401) is welded with the horizontal rod (301), and the other side is connected with the connecting piece (402); the connecting piece (402) is provided with a connecting hole (6), and the connecting hole (6) is used for penetrating a connecting bolt (7).
3. The fixing bracket of the geological disaster monitoring and early warning device as claimed in claim 2, wherein the mounting rod (2) is provided with a connecting groove (8), and the horizontal rod (301) is connected with the connecting groove (8) in a clamping manner.
4. The fixing bracket for the geological disaster monitoring and early warning device as claimed in claim 1, wherein a sliding groove (9) is formed in the horizontal rod (301), a positioning rod (10) is arranged on one side of the vertical rod (302) close to the horizontal rod (301), the positioning rod (10) penetrates through the sliding groove (9) and extends out of the sliding groove (9), and a positioning piece (11) is connected to the extending end of the positioning rod (10).
5. A fixing bracket for a geological disaster monitoring and early warning device as claimed in claim 1, wherein said locking member (5) comprises a first locking portion (501) and a second locking portion (502), a first locking portion (501) is provided between two adjacent vertical rods (302), and said first locking portion (501) is made of elastic material.
6. The fixing bracket for the geological disaster monitoring and early warning device as claimed in claim 5, wherein a limiting rod (12) is arranged on one side of the connecting rod (303) close to the vertical rod (302), the vertical rod (302) is provided with a limiting groove (13), the limiting rod (12) penetrates through the limiting groove (13) and extends out of the limiting groove (13), and a fixing part (14) is arranged at the end of the limiting rod (12) extending out.
7. The fixing bracket for the geological disaster monitoring and early warning device as claimed in claim 6, wherein a second locking part (502) is provided between two adjacent connecting rods (303), and the second locking part (502) is made of elastic material.
8. The fixing bracket for the geological disaster monitoring and early warning device as claimed in claim 1, wherein a positioning plate (15) is arranged on one side of the connecting rod (303) far away from the vertical rod (302), and the positioning plate (15) is detachably connected with the connecting rod (303).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120794147.8U CN214744601U (en) | 2021-04-17 | 2021-04-17 | Fixed bolster of geological disaster monitoring early warning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120794147.8U CN214744601U (en) | 2021-04-17 | 2021-04-17 | Fixed bolster of geological disaster monitoring early warning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214744601U true CN214744601U (en) | 2021-11-16 |
Family
ID=78604272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120794147.8U Active CN214744601U (en) | 2021-04-17 | 2021-04-17 | Fixed bolster of geological disaster monitoring early warning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214744601U (en) |
-
2021
- 2021-04-17 CN CN202120794147.8U patent/CN214744601U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212248064U (en) | Protector for hydraulic engineering | |
CN214744601U (en) | Fixed bolster of geological disaster monitoring early warning device | |
CN211289418U (en) | Block chain environment detection-based device alarm support convenient to detach | |
CN217183215U (en) | Photovoltaic support convenient to disassemble | |
CN209874658U (en) | Rail guard is used in bridge construction | |
CN213361343U (en) | Novel anti-seismic hanging bracket applying C-shaped channel steel | |
CN214116534U (en) | Water conservancy is rubbish intercepting device for river sluice gate | |
CN209722779U (en) | A kind of novel traffic engineering construction wind-proof dust-suppression net | |
CN216285203U (en) | Device for detecting fipronil colloid in eggs | |
CN216157328U (en) | Outdoor rail convenient to installation | |
CN215255118U (en) | Anti-deformation guardrail | |
CN213366292U (en) | Rear-connected arrester for lightning protection of power supply equipment | |
CN221567987U (en) | Building anti-seismic device | |
CN213774771U (en) | Fabricated building construction protective structure | |
CN213955683U (en) | Water carrier heat pump | |
CN212722400U (en) | Civil engineering concrete structure intensity detection device | |
CN214150252U (en) | Concrete strength detection device for hydraulic engineering | |
CN213634790U (en) | Ground disaster monitoring device suitable for special environment | |
CN221837610U (en) | Mountain anti-tilting supporting device for geological disaster treatment | |
CN220730462U (en) | Rainfall monitoring device for rainfall induced geological disasters | |
CN216385598U (en) | Detection early warning device for slope deformation | |
CN218815644U (en) | Energy-conserving enclosure of assembled building | |
CN217742476U (en) | Green house reinforced structure | |
CN221145914U (en) | Indoor air monitoring equipment easy to install | |
CN211202022U (en) | Tunnel section is with segmentation strutting arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |