CN214743763U - Water conservancy construction pipeline fixing device - Google Patents

Water conservancy construction pipeline fixing device Download PDF

Info

Publication number
CN214743763U
CN214743763U CN202120516274.1U CN202120516274U CN214743763U CN 214743763 U CN214743763 U CN 214743763U CN 202120516274 U CN202120516274 U CN 202120516274U CN 214743763 U CN214743763 U CN 214743763U
Authority
CN
China
Prior art keywords
threaded rod
fixing device
water conservancy
pipeline
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120516274.1U
Other languages
Chinese (zh)
Inventor
刘国霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120516274.1U priority Critical patent/CN214743763U/en
Application granted granted Critical
Publication of CN214743763U publication Critical patent/CN214743763U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model belongs to the technical field of pipeline fixing, in particular to a water conservancy construction pipeline fixing device, which comprises an adjusting box, wherein a bidirectional threaded rod is rotatably connected to the inner side of the adjusting box, a rotary handle is fixedly connected to the left end of the bidirectional threaded rod, and a sliding block is spirally connected to the outer side of the bidirectional threaded rod; the operating personnel uses rag bolt to fix the base at the workplace, hoist and mount the pipeline at the bearing frame inboard through hoisting equipment afterwards, the pipeline automatically rolls the inboard central position department of bearing frame under the effect of gravity, the regulating box moves down under the effect of gravity and drives the connecting block downstream this moment, the connecting block moves down and drives the slide bar downstream, the slide bar downstream drives the spring shrink, the gravity that brings the pipeline under the spring action of spring cushions, the stopper through setting up is injectd the biggest pop-out distance of spring, prevent that the slide bar from deviating from the cover intraductal, the convenience is to large-scale or fragile pipeline place the buffering.

Description

Water conservancy construction pipeline fixing device
Technical Field
The utility model belongs to the technical field of the pipeline is fixed, concretely relates to water conservancy construction pipeline fixing device.
Background
The water conservancy project is a project constructed for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, water is a valuable resource essential for human production and life, but the natural state does not completely meet the requirements of human beings, and the water flow can be controlled only by building water conservancy projects to prevent flood disasters, and the water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production, during the construction of hydraulic engineering, the laid pipeline is often required to be fixed, and when the traditional pipeline fixing device is used, due to the lack of buffer capacity to the pipeline, the fragile or large-sized pipeline is easy to crack, which causes unnecessary economic loss, and traditional pipeline fixing device has the unicity to the pipeline size of fixing, lacks the adaptability, is difficult to satisfy the fixed operation to different bore pipelines.
The prior art has the following problems:
1. when the traditional pipeline fixing device is used, due to the lack of buffer capacity of the pipeline, the pipeline which is fragile or large-sized is easy to crack, and unnecessary economic loss is caused;
2. the traditional pipeline fixing device has unicity on the size of a fixed pipeline, lacks adaptability and is difficult to meet the fixing operation of pipelines with different calibers.
In order to solve the problem, the application provides a water conservancy construction pipeline fixing device.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a water conservancy construction pipeline fixing device has the convenience and to the installation of placing of large-scale or fragile pipeline, and the convenient fixed operation's to the pipeline of different bores size characteristics.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water conservancy construction pipeline fixing device, includes the regulating box, the regulating box inboard is rotated and is connected with the two-way threaded rod, two-way threaded rod left end fixedly connected with twist grip, two-way threaded rod outside screw connection has the slider, slider top fixedly connected with splint, regulating box top fixedly connected with bearing frame, regulating box bottom fixedly connected with connecting block, connecting block bottom fixedly connected with slide bar, slide bar outside sliding connection has the spring, slide bar outside sliding connection has the sleeve pipe, slide bar outside fixedly connected with stopper, sleeve pipe bottom fixed connection and base.
As the utility model relates to a water conservancy construction pipeline fixing device is preferred, the rotation hole has been seted up to regulating box left end face inboard, the rotation downthehole side of regulating box pass through the bearing with the two-way threaded rod rotates to be connected, the turn trough has been seted up to regulating box right-hand member face inboard, the turn trough inboard bearing of regulating box with the two-way threaded rod rotates to be connected.
As the utility model relates to a water conservancy construction pipeline fixing device is preferred, the quantity of slider is two, two the slider is bilateral symmetry and sets up the two-way threaded rod outside, the quantity of splint is two.
As the utility model relates to a water conservancy construction pipeline fixing device is preferred, the bearing frame is incurved "H" font setting, the bearing frame inboard with splint sliding connection.
As the utility model relates to a water conservancy construction pipeline fixing device is preferred, the slide opening has been seted up to the sleeve pipe inboard, sheathed tube slide opening inboard with slide bar sliding connection, spacing hole has been seted up to the sleeve pipe inboard, the spacing downthehole side of sleeve pipe inboard with stopper sliding connection.
As the utility model relates to a water conservancy construction pipeline fixing device is preferred, spring one end with connecting block fixed connection, the spring other end with sleeve pipe fixed connection.
As the utility model relates to a water conservancy construction pipeline fixing device is preferred, the fixed orifices has been seted up to the base inboard, the quantity of the fixed orifices of base is four.
Compared with the prior art, the beneficial effects of the utility model are that:
1. operating personnel uses rag bolt to fix the base at the workplace, hoist and mount the pipeline at the bearing frame inboard through hoisting equipment afterwards, the pipeline is automatic to be rolled to the inboard central position department of bearing frame under the effect of gravity, the regulating box moves down under the effect of gravity and drives the connecting block downstream this moment, the connecting block moves down and drives the slide bar downstream, the slide bar moves down and drives the spring shrink, cushion the gravity that brings the pipeline under the spring action of spring, the stopper through setting is injectd the biggest pop-out distance of spring, prevent that the slide bar from deviating from the cover intraductal, the convenience is to the buffering of placing of large-scale or fragile pipeline, prevent that the pipeline outer wall from causing the offend damage.
2. An operator rotates the rotary handle, the rotary handle rotates to drive the bidirectional threaded rod to rotate, the bidirectional threaded rod rotates to drive the two sliding blocks to move in opposite directions, and the two sliding blocks drive the two clamping plates to move in opposite directions in the bearing frame, so that the operator can conveniently use the device to fix pipelines with different calibers, and the application range of the device is effectively enlarged.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the base structure of the present invention;
fig. 3 is a schematic structural view of a bearing frame of the present invention;
fig. 4 is an enlarged view of the structure at a in fig. 1 according to the present invention;
in the figure: 1. an adjusting box; 2. a bidirectional threaded rod; 3. rotating the handle; 4. a slider; 5. a splint; 6. a bearing frame; 7. connecting blocks; 8. a slide bar; 9. a spring; 10. a limiting block; 11. a sleeve; 12. a base.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a water conservancy construction pipeline fixing device, including regulating box 1, 1 inboard rotations of regulating box are connected with two-way threaded rod 2, 2 left end fixedly connected with rotating handle 3 of two-way threaded rod, 2 outside threaded connection of two-way threaded rod has slider 4, 4 top fixedly connected with splint 5 of slider, 1 top fixedly connected with bearing frame 6 of regulating box, 1 bottom fixedly connected with connecting block 7 of regulating box, 7 bottom fixedly connected with slide bar 8 of connecting block, 8 outside sliding connection of slide bar have spring 9, 8 outside sliding connection of slide bar have sleeve pipe 11, 8 outside fixedly connected with stoppers 10 of slide bar, 11 bottom fixed connection of sleeve pipe and base 12.
In this embodiment: when operating personnel hoisted the pipeline in bearing frame 6 top, the convenience rolled inboard central point department of bearing frame 6 under the effect of gravity, the impulsive force that brings the pipeline through spring 9 cushions simultaneously, the convenience is laid the buffering of large-scale pipeline, the rotatory handle 3 of operating personnel, the rotatory two-way threaded rod 2 of rotatory drive of handle 3 is rotatory, the two sliders 4 of the rotatory drive of two-way threaded rod 2 are gone in opposite directions, two sliders 4 are gone in opposite directions and are driven two splint 5 and go in opposite directions in bearing frame 6, thereby make things convenient for operating personnel to use the fixed operation of the device to different bore size pipelines.
In an optional embodiment, a rotation hole is formed in the inner side of the left end face of the adjusting box 1, the inner side of the rotation hole of the adjusting box 1 is rotatably connected with the bidirectional threaded rod 2 through a bearing, a rotation groove is formed in the inner side of the right end face of the adjusting box 1, and a bearing in the inner side of the rotation groove of the adjusting box 1 is rotatably connected with the bidirectional threaded rod 2.
In this embodiment: through this design, conveniently rotate two-way threaded rod 2 and install inside regulating box 1, increase two-way threaded rod 2's transmission stability.
In an alternative embodiment, the number of the sliding blocks 4 is two, the two sliding blocks 4 are symmetrically arranged at the outer side of the bidirectional threaded rod 2, and the number of the clamping plates 5 is two.
In this embodiment: through this design, the convenience reason two splint 5 press from both sides the left and right sides of pipeline tightly fixedly.
In an alternative embodiment, the bearing frame 6 is arranged in an inward bent H shape, and the inner side of the bearing frame 6 is connected with the clamping plate 5 in a sliding way.
In this embodiment: through this design, conveniently guide the pipeline to the central point department of bearing frame 6 under the effect of gravity to avoid the pipeline to take place crooked, influence the fixed operation of device to the pipeline.
In an alternative embodiment, a sliding hole is formed in the inner side of the sleeve 11, the inner side of the sliding hole of the sleeve 11 is slidably connected with the sliding rod 8, a limiting hole is formed in the inner side of the sleeve 11, and the inner side of the limiting hole in the inner side of the sleeve 11 is slidably connected with the limiting block 10.
In this embodiment: the maximum spring-out distance of the spring 9 is limited by the arranged limit block 10, so that the slide rod 8 is prevented from being pulled out of the sleeve 11.
In an alternative embodiment, one end of the spring 9 is fixedly connected with the connecting block 7, and the other end of the spring 9 is fixedly connected with the sleeve 11.
In this embodiment: through this design, conveniently utilize the elasticity of spring 9 to carry out gravity buffering to the large-scale pipeline of placing.
In an alternative embodiment, the inner side of the base 12 is provided with four fixing holes, and the number of the fixing holes of the base 12 is four.
In this embodiment: through this design, make things convenient for operating personnel to use rag bolt to pass the fixed orifices of base 12 to fix base 12 at the workplace.
The utility model discloses a theory of operation and use flow: when the device is used, an operator fixes a base 12 at a working place by using foundation bolts, then hoists a pipeline on the inner side of a bearing frame 6 by hoisting equipment, the pipeline automatically rolls to the central position of the inner side of the bearing frame 6 under the action of gravity, at the moment, an adjusting box 1 moves downwards under the action of gravity to drive a connecting block 7 to move downwards, the connecting block 7 moves downwards to drive a sliding rod 8 to move downwards, the sliding rod 8 moves downwards to drive a spring 9 to contract, the gravity brought by the pipeline is buffered under the action of the elasticity of the spring 9, the maximum ejection distance of the spring 9 is limited by a set limiting block 10, the sliding rod 8 is prevented from being separated from a sleeve 11, the buffer for placing large or fragile pipelines is facilitated, the outer wall of the pipeline is prevented from being collided and damaged, the operator rotates a rotary handle 3, the rotary handle 3 rotates to drive a bidirectional threaded rod 2 to rotate, the two-way threaded rod 2 rotates to drive the two sliding blocks 4 to move in opposite directions, and the two sliding blocks 4 drive the two clamping plates 5 to move in opposite directions in the bearing frame 6, so that an operator can conveniently fix pipelines with different calibers, and the application range of the device is effectively enlarged.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a water conservancy construction pipeline fixing device, includes regulating box (1), its characterized in that: adjusting box (1) inboard is rotated and is connected with two-way threaded rod (2), two-way threaded rod (2) left end fixedly connected with twist grip (3), two-way threaded rod (2) outside screwed connection has slider (4), slider (4) top fixedly connected with splint (5), adjusting box (1) top fixedly connected with bearing frame (6), adjusting box (1) bottom fixedly connected with connecting block (7), connecting block (7) bottom fixedly connected with slide bar (8), slide bar (8) outside sliding connection has spring (9), slide bar (8) outside sliding connection has sleeve pipe (11), slide bar (8) outside fixedly connected with stopper (10), sleeve pipe (11) bottom fixed connection and base (12).
2. The water conservancy construction pipeline fixing device of claim 1, characterized in that: the adjusting box is characterized in that a rotating hole is formed in the inner side of the left end face of the adjusting box (1), the inner side of the rotating hole of the adjusting box (1) is connected with the bidirectional threaded rod (2) in a rotating mode through a bearing, a rotating groove is formed in the inner side of the right end face of the adjusting box (1), and a bearing in the inner side of the rotating groove of the adjusting box (1) is connected with the bidirectional threaded rod (2) in a rotating mode.
3. The water conservancy construction pipeline fixing device of claim 1, characterized in that: the quantity of slider (4) is two, two slider (4) are bilateral symmetry and set up two-way threaded rod (2) outside, the quantity of splint (5) is two.
4. The water conservancy construction pipeline fixing device of claim 1, characterized in that: the bearing frame (6) is arranged in an inward bending H shape, and the inner side of the bearing frame (6) is connected with the clamping plate (5) in a sliding manner.
5. The water conservancy construction pipeline fixing device of claim 1, characterized in that: the inner side of the sleeve (11) is provided with a sliding hole, the inner side of the sliding hole of the sleeve (11) is in sliding connection with the sliding rod (8), the inner side of the sleeve (11) is provided with a limiting hole, and the inner side of the limiting hole of the sleeve (11) is in sliding connection with the limiting block (10).
6. The water conservancy construction pipeline fixing device of claim 1, characterized in that: one end of the spring (9) is fixedly connected with the connecting block (7), and the other end of the spring (9) is fixedly connected with the sleeve (11).
7. The water conservancy construction pipeline fixing device of claim 1, characterized in that: the inner side of the base (12) is provided with four fixing holes, and the number of the fixing holes of the base (12) is four.
CN202120516274.1U 2021-03-11 2021-03-11 Water conservancy construction pipeline fixing device Active CN214743763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120516274.1U CN214743763U (en) 2021-03-11 2021-03-11 Water conservancy construction pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120516274.1U CN214743763U (en) 2021-03-11 2021-03-11 Water conservancy construction pipeline fixing device

Publications (1)

Publication Number Publication Date
CN214743763U true CN214743763U (en) 2021-11-16

Family

ID=78593471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120516274.1U Active CN214743763U (en) 2021-03-11 2021-03-11 Water conservancy construction pipeline fixing device

Country Status (1)

Country Link
CN (1) CN214743763U (en)

Similar Documents

Publication Publication Date Title
CN214743763U (en) Water conservancy construction pipeline fixing device
CN208617223U (en) A kind of hanging apparatus for metal drum
CN117602496A (en) Concrete pipeline hoisting clamp
CN219315727U (en) Pile body fixing device for foundation pile construction
CN213233374U (en) Pour workstation with being convenient for fixed mounting under water
CN216598882U (en) Water conservancy construction pipe laying thread fixing device
CN212863788U (en) Hoisting accessory is used in installation of oil field pipeline laying
CN215101506U (en) Hoist device that intelligence building was used
CN211998452U (en) Hoist and mount clamping device for building engineering
CN214008499U (en) Pipeline protector for hydraulic engineering
CN211813041U (en) Municipal administration blowdown iron pipe hangs gets fixing device
CN112623935A (en) Building engineering clamping device for hoisting various pipes
CN206590765U (en) A kind of steel hanging apparatus of building yard
CN217264356U (en) Gate installation device for water conservancy construction
CN210572946U (en) Temporary support for communication construction
CN214611262U (en) Multifunctional pipeline installation elevator
CN221823457U (en) Building engineering bearing structure
CN216737320U (en) Fixing mechanism of tower crane counterweight block
CN219990925U (en) Pipe grabbing device
CN211496595U (en) Pipeline installation hoisting device for building installation engineering
CN217578057U (en) Lifting device for constructional engineering
CN220906942U (en) Hydraulic and hydroelectric engineering construction handling equipment
CN221800791U (en) Water conservancy construction pipeline fixing device
CN212717485U (en) Mechanical hydraulic oil cylinder body
CN114104963B (en) Assembled wallboard hoist and mount fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant