CN214741071U - Top hammer type pipe following drilling propeller and drilling equipment - Google Patents

Top hammer type pipe following drilling propeller and drilling equipment Download PDF

Info

Publication number
CN214741071U
CN214741071U CN202120806031.1U CN202120806031U CN214741071U CN 214741071 U CN214741071 U CN 214741071U CN 202120806031 U CN202120806031 U CN 202120806031U CN 214741071 U CN214741071 U CN 214741071U
Authority
CN
China
Prior art keywords
additional
drill rod
main
drill
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120806031.1U
Other languages
Chinese (zh)
Inventor
刁建专
黄凯
刘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anbaituo Nanjing Construction Mining Equipment Co ltd
Anbaituo Trading Co ltd
Epiroc Nanjing Construction and Mining Equipment Ltd
Original Assignee
Anbaituo Nanjing Construction Mining Equipment Co ltd
Anbaituo Trading Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anbaituo Nanjing Construction Mining Equipment Co ltd, Anbaituo Trading Co ltd filed Critical Anbaituo Nanjing Construction Mining Equipment Co ltd
Priority to CN202120806031.1U priority Critical patent/CN214741071U/en
Application granted granted Critical
Publication of CN214741071U publication Critical patent/CN214741071U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a top hammer formula is with managing drilling propeller and is crept into equipment belongs to and creeps into the equipment field. The utility model discloses a top hammer type pipe following drilling propeller, which comprises a propelling beam, a top hammer type rock drill and a main pipe following component, wherein the propelling beam is provided with a drill rod clamping device at a position close to the front end, the top hammer type rock drill is arranged on the propelling beam in a sliding way, the main pipe following component comprises a main drilling rod and a main sleeve pipe sleeved on the main drilling rod, and the length of the main sleeve pipe is less than that of the main drilling rod; the first connecting end of the main drill rod is connected with the head of the main sleeve in a matching way, and the second connecting end of the main drill rod is connected with the top hammer type rock drill in a transmission way; the utility model discloses a hole that the pipe drilling propeller processing formed has higher stability with the top hammer formula, and is lower to the place space requirement, closes the construction of creeping into of short hole, straight hole, inclined hole in the complicated geological environment.

Description

Top hammer type pipe following drilling propeller and drilling equipment
Technical Field
The utility model relates to a drilling equipment technical field of soil, rock, more specifically say, relate to a top hammer formula is with managing drilling propeller and is crept into equipment.
Background
In the field of construction, the setting of the drilling depth is often a relatively strict requirement. When the drilling depth is deeper, the traditional reinforcing mode of drilling is that an open-air drilling machine is used for drilling downwards on the construction ground, then grouting is performed in the drilling hole, and the slurry is solidified to form a reinforcing structure. However, in the case of complex strata such as fractured zones and fractured zones, after the drill bit withdraws from the drilled hole, the hole wall of the drilled hole loses support, and the hole collapse phenomenon is easy to occur. In order to avoid the occurrence of hole collapse, the current commonly used hole protection mode is that after a drill rod exits from a drill hole, a steel casing is inserted into the drill hole, and then grouting is performed into the casing so as to stabilize the stratum.
However, due to the limitation of the length of the steel casing, the above hole protecting mode can only achieve the function of stabilizing the stratum at the part of the drill hole close to the top end, and the part of the drill hole where the steel casing cannot reach still has the risk of hole collapse, so that a great potential safety hazard exists.
In order to solve the problems, the pipe following drilling in the prior art is a feasible construction mode. Generally, the drilling tools for drilling along with the pipe include a concentric drilling tool and an eccentric drilling tool, such as the concentric drilling tool disclosed in chinese patent No. 2012102948866 and the eccentric drilling tool disclosed in the down-the-hole hammer disclosed in chinese patent No. 2003201152028. Meanwhile, in the pipe-following drilling in the prior art, the pipe-following drilling is usually realized by using a down-the-hole hammer drilling tool or a drill bit, such as a down-the-hole hammer pipe-following drill bit disclosed in chinese patent application No. 2014108498585, a down-the-hole concentric pipe-following reaming drilling tool disclosed in chinese patent application No. 2008200543648, and a down-the-hole hammer reverse circulation concentric pipe-following drilling tool disclosed in chinese patent application No. 2010102750305.
In general, in the field of construction, down-the-hole hammer drills are suitable for drilling of vertical piles or drilled holes requiring high performance, such as large-diameter and deep holes, and are often used for drilling of pre-buried holes/drilled holes perpendicular to the ground. However, in other fields, the down-the-hole hammer drill occupies a large space, has a heavy front part, has low drilling efficiency, and is not suitable for drilling construction of short holes, straight holes and inclined holes in complex geological environments.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome among the prior art down-the-hole hammer type and creep into the equipment and be not applicable to the not enough of the construction of creeping into of short hole, straight hole, inclined hole in the complicated geological environment, provide a top hammer type follow pipe and creep into the propeller to and dispose the equipment that creeps into of this top hammer type follow pipe drilling propeller, aim at improving the structural strength of the drilling efficiency and the drilling of short hole, straight hole, inclined hole in the complicated geological environment.
In order to achieve the above purpose, the utility model provides a technical scheme does:
the utility model relates to a top hammer type pipe following drilling propeller which comprises a propelling beam, a top hammer type rock drill and a main pipe following component,
the main and following pipe assembly comprises a main drill rod and a main sleeve sleeved on the main drill rod, and the length of the main sleeve is smaller than that of the main drill rod; the first connecting end of the main drill rod is connected with the head of the main sleeve in a matching way, namely, the first connecting end of the main drill rod passes through the drill bit and the head of the main sleeve and drives the head of the main sleeve to rotate relative to the pipe body of the main sleeve, so that pipe following drilling is realized; the second connecting end of the main drill rod is in transmission connection with the top hammer type rock drill, namely, the moving end of the top hammer type rock drill can transmit power to the second connecting end of the main drill rod, and the power comprises a rotary driving force for driving the main drill rod to rotate and an impact force for driving the main drill rod to advance, so that the main drill rod is driven to drill;
when the main drill rod and the main casing are drilled, the second connecting end of the main drill rod is directly connected with the moving end of the top hammer type rock drill, and the transmission connection is achieved. When the design length of the drill hole is greater than the length of the main drill rod and/or the length of the main casing, a connecting rod and/or a connecting pipe are required; at the moment, the drill rod clamping device is used for clamping the tail end of a drill rod, then the top hammer type rock drill moves away from the drill rod clamping device, a space for a connecting rod and/or a connecting pipe is reserved, after the connecting rod and/or the connecting pipe is completed, the top hammer type rock drill is connected with an additional drill rod, the top hammer type rock drill transmits power to a main drill rod through the additional drill rod, so that the main drill rod is in transmission connection with the top hammer type rock drill, and pipe following drilling is continued.
As a further optimization, a storage warehouse and a plurality of mechanical arms are arranged on the propulsion beam, a plurality of additional drill rods are arranged in the storage warehouse, and the mechanical arms are used for conveying the additional drill rods to the positions of the extension rods; therefore the utility model discloses a propeller has possessed the storage function of additional drilling rod, can improve to a great extent and connect pole efficiency, and then improve the efficiency that the heel tube creeps into.
In general, when the storage warehouse is arranged on the propulsion beam, the main drill rod and the drill rods in the storage warehouse can meet the requirement of drilling depth of the following pipe; in special cases, when the number of drill rods in the storage warehouse is not enough, some additional drill rods need to be prepared in advance at a construction site, so that the efficiency of the extension rod can be greatly improved.
Further, the repository includes,
the bracket is connected to the propelling beam;
the rotating shaft is rotatably connected with the support, at least two chucks are arranged on the rotating shaft, a plurality of bayonets are circumferentially arranged on the chucks, and bayonets at corresponding positions on different chucks form clamping positions for placing additional drill rods together;
the blocking part is arranged on the bracket, and a notch is formed in the blocking part;
the repository is configured to: and only when the rotating shaft drives the chuck to rotate so as to enable the additional drill rod positioned on the clamping position to rotate to the position corresponding to the notch, the manipulator conveys the additional drill rod positioned at the position corresponding to the notch to the position of the extension rod.
Furthermore, an additional casing is sleeved on the additional drill rod, and the length of the additional casing is smaller than that of the additional drill rod; when the additional drill rod is positioned on the clamping position, the additional sleeve is clamped between the two chucks; therefore the utility model discloses a propeller has possessed the storage function of additional sleeve, and can send synchronously between additional sleeve and the additional drilling rod and send to connecing pole position/takeover position, has further improved takeover efficiency and has connect the pole efficiency.
Further, the number of the manipulators is at least two, at least one of the at least two manipulators is located on one side of the additional casing, and the rest of the at least two manipulators is located on the other side of the additional casing.
Still further, a plug is provided between the additional casing and the additional drill rod, for preventing the additional casing from sliding axially on the additional drill rod.
Furthermore, the plug piece is arranged between one end, close to the front end of the push beam, of the additional sleeve and the additional drill rod and is made of flexible materials.
Preferably, the propelling beam is provided with a plurality of fixing pieces, the fixing pieces are of frame-shaped structures, and the fixing pieces and the propelling beam enclose an anti-falling structure for an additional drill rod.
Preferably, the propelling beam is provided with a winch and a pulley assembly, and the winch and the pulley assembly are arranged on the propelling beam and close to the rear end.
The utility model also provides a drilling equipment, it includes foretell top hammer formula pipe drilling propeller.
Adopt the technical scheme provided by the utility model, compare with prior art, have following beneficial effect:
(1) the thruster of the utility model utilizes the top hammer type rock drill to realize the top hammer type propulsion of the main drill rod, and simultaneously utilizes the main sleeve pipe arranged on the main drill rod to realize the pipe following drilling, so that the hole formed by the top hammer type pipe following drilling thruster has higher stability; meanwhile, the main drill rod is in transmission connection with the top hammer type rock drill, the drilling depth of the main drill rod can be prolonged by adding the additional drill rod, the high requirement on field space is not required like a down-the-hole hammer type drilling machine, the top hammer type rock drill is suitable for drilling construction of short holes, straight holes and inclined holes in a complex geological environment, and the drilling construction efficiency is high.
(2) The utility model discloses a propeller, be provided with the repository on it, this repository is used for storing the additional drilling rod with additional sleeve pipe, therefore when needs, can accomplish the extension bar of main drilling rod fast, in order to lengthen the drilling depth; the additional casing pipe is sleeved on the additional drill rod, so that after the extension rod of the main drill rod is completed, the additional casing pipe on the additional drill rod can be directly connected with the main casing pipe, the connection pipe of the main casing pipe is realized, and the integral drilling speed of the propeller can be improved.
(3) The length of the main sleeve of the propeller of the utility model is less than that of the main drill rod, so that the tail end of the main drill rod can be clamped by the drill rod clamping device after the main drill rod completes drilling; in addition, the length of the additional sleeve is smaller than that of the additional drill rod, after the connecting pipe and the connecting rod are completed, the total length of the sleeve is smaller than that of the drill rod, and the additional sleeve can be hoisted by using a winch and a pulley assembly arranged on the propelling beam, so that the connecting pipe efficiency can be improved.
Drawings
Fig. 1 is a schematic structural view of a propeller according to the present invention;
FIG. 2 is a schematic structural view of an additional heel tube assembly of the present invention;
fig. 3 is a schematic structural diagram of the plug member of the present invention.
Detailed Description
For a further understanding of the present invention, reference will be made to the following detailed description taken in conjunction with the accompanying drawings and examples.
The structure, ratio, size and the like shown in the drawings of the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention does not have the substantial significance in the technology, and any structure modification, ratio relationship change or size adjustment should still fall within the scope which can be covered by the technical content disclosed by the present invention without affecting the efficacy which can be produced by the present invention and the achievable purpose. In addition, the terms "upper", "lower", "left", "right" and "middle" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
In the field of building, down-the-hole hammer type pipe-following drilling equipment is common vertical drilling construction equipment, namely common construction equipment for drilling holes perpendicular to the ground. However, due to the structural limitation of the down-the-hole hammer type drill rod, the down-the-hole hammer type pipe following drilling equipment has high requirement on the height of the field space, and the drill bit part of the down-the-hole hammer type drill rod has heavy weight and large size, so that the drilling of the thin and short drill holes is difficult to realize, and therefore, the down-the-hole hammer type pipe following drilling equipment is particularly not suitable for drilling construction with complex geological environment and complex field environment.
For example, in the process of collapse prevention treatment in the subway construction process or in the process of treatment after the subway collapse is generated, excavation construction needs to be carried out after reinforcement is carried out on a crack zone, a broken zone and a collapse section of a foundation, but due to the influence of the structure of the underground hammer type pipe-following drilling equipment, the underground hammer type pipe-following drilling equipment cannot enter a construction site, and therefore the underground collapse prevention and treatment method is not suitable for the underground collapse prevention and treatment.
In the prior art, top hammer rock drills are the drilling drive of rock drilling equipment. When the top hammer type rock drill drives the drill rod to drill, the driving force of the top hammer type rock drill acts on the top end of the drill rod, namely, acts on one end of the drill rod connected with the moving end of the top hammer type rock drill, and the drilling mode is called top hammer type drilling in the embodiment mode.
The thruster provided by the embodiment adopts a top hammer type drilling mode, so that the overall size of the thruster is smaller, and the size of the drilling equipment provided with the embodiment can adapt to a complex field environment; simultaneously, this embodiment top hammer formula is followed pipe and is bored the propeller and can be when boring to the interior configuration sleeve pipe of drilling to prevent the hole phenomenon of collapsing of drilling, and then improve the stability of drilling structure.
Specifically, referring to fig. 1, the top-hammer type pipe-following drilling thruster of the present embodiment includes a top-hammer type rock drill 300, a main pipe-following assembly 600, a drill clamp 500, and a thrust beam 700. Wherein the top hammer rock drill 300 is slidably arranged on the feed beam 700 and is movable in a first direction, and the drill clamp 500 is arranged on the feed beam 700 near the front end. It should be noted that, in the present embodiment, the first direction refers to a length direction of the feed beam 700, for example, an x direction indicated in fig. 1, the second direction refers to a height direction of the feed beam 700, for example, a y direction indicated in fig. 1, and the third direction refers to a width direction of the feed beam 700, for example, a z direction indicated in fig. 1; the top hammer rock drill 300 described in the present embodiment moving in the first direction means that the top hammer rock drill 300 can advance and retreat in the first direction.
The main heel tube assembly 600 comprises a main drill rod and a main sleeve, wherein the main sleeve is sleeved on the main drill rod; the length of the main casing is less than the length of the main drill rod, so that the end of the main drill rod close to the top hammer rock drill 300 can be exposed out of the main casing, thereby facilitating the installation/extension of the main drill rod.
The first connecting end of the main drill rod is connected with the head of the main sleeve in a matching mode, namely, a drill bit is arranged on the first connecting end of the main drill rod, and when the main drill rod rotates, the drill bit is in transmission connection with the head of the main sleeve, so that the head of the main sleeve can be driven to rotate relative to the pipe body of the main sleeve, and meanwhile, the pipe body of the sleeve is arranged in a drilled hole under the traction of the head of the pipe body, and the pipe following drilling is achieved. The first connection end of the main drill rod and the matching connection structure of the head of the main casing can refer to the connection structure of the drill rod and the casing in the down-the-hole hammer type casing drilling equipment, such as, but not limited to, chinese patent document No. 2012102948866 and chinese patent document No. 2003201152028.
The second link of kelly is connected with top hammer rock drill 300 drivably, namely, the power of the motion end of top hammer rock drill 300 can be transmitted to the second link of kelly, and this power both includes the rotatory rotational drive power of drive kelly, has also included the impact force that drives the kelly and gos forward to realize top hammer rock drill 300 to the drive of creeping into of kelly. The second connecting end of the main drill rod is in transmission connection with the top hammer type rock drill 300, namely, the second connecting end can be directly connected with the moving end of the top hammer type rock drill 300 and can also be connected through a transmission piece; in some scenarios, the transmission may be an additional drill rod 110, thereby increasing the drilling depth of the drill of the present embodiment.
For example, in drilling construction, if the design depth of the drill hole is high and the length of the main drill pipe and/or the main casing is less than the design depth of the drill hole, extension rods and/or adapter pipes are generally required to achieve an extension of the drilling depth. Meanwhile, in the embodiment, because the length of the main casing is smaller than that of the main drill rod, the drilling depth is usually extended only in two ways, namely, only connecting pipes are used for connecting the main casing and the main drill rod, namely, the length of the casing is extended; the other is to perform extension rods and joints, i.e. to extend the length of the drill pipe and casing.
In the first mode, the top hammer type rock drill 300 drives the main heel tube assembly 600 to drill from the rear end of the push beam, after the tail end of the main casing passes through the drill clamp 500, the drill clamp 500 clamps the main drill rod, the main drill rod and the top hammer type rock drill 300 complete rod disassembly, the top hammer type rock drill 300 returns to the rear end of the push beam, then the additional casing is sleeved on the main drill rod, the tail of the main casing is connected with the head of the additional casing, and then the top hammer type rock drill 300 moves to the second connecting end of the main drill rod to be connected with the main drill rod connecting rod, and the main heel tube assembly 600 is continuously driven to drill.
As for the second mode, after the tail end of the main casing passes through the drill clamp 500, the drill clamp 500 clamps the main drill rod, the main drill rod and the top hammer type rock drill 300 complete rod disassembly, the top hammer type rock drill 300 retracts to the rear end of the push beam, then the additional drill rod 110 is conveyed to the pipe connecting position, the first connecting end 111 of the additional drill rod 110 is connected with the second connecting end of the main drill rod, then the sheathing of the additional casing is completed, the connection between the additional casing and the main casing is completed, and the top hammer type rock drill 300 is moved to the second connecting end 112 of the additional drill rod 110 to be connected with the additional drill rod 110. The extension rod position of the additional drill rod 110 means that the additional drill rod 110 is placed on the feed beam 700 with the first connector 111 capable of driving connection with the main drill rod and the second connector 112 capable of being connected with the top hammer rock drill 300.
Of course, in some situations, when the pipe connecting/pipe connecting operation is required to be performed several times according to the designed depth of the borehole, the specific operation process may refer to the two manners described above, that is, after the main casing/additional casing at the end in the first direction passes through the drill clamp 500, the main drill pipe/additional drill pipe is clamped by the drill clamp 500, and then the pipe connecting/pipe connecting operation is performed.
In the following, the following description is given,
in the present embodiment, as a further improvement, the storage magazine 200 and the robot 240 may be provided on the feed beam 700; the storage 200 may contain a plurality of additional drill rods 110, and the manipulator 240 is used to convey the additional drill rods 110 contained in the storage 200 to the connecting rod position, so that the additional drill rods 110 do not need to be hoisted by hoisting equipment and placed at the connecting rod position, the connecting rod time is greatly shortened, and the drilling efficiency by using the thruster of the present embodiment is further improved.
As one example of the storage magazine 200, the magazine 200 may include a bracket 201, a rotation shaft 212, and a blocking portion 230. Wherein the bracket 201 is attached to the feed beam 700 such that the storage magazine 200 is attached to the feed beam 700. The rotating shaft 212 is rotatably connected to the bracket 201, and the rotating shaft 212 can rotate relative to the push beam 700, and specifically can be driven to rotate by the driving member 211; the rotating shaft 212 is further provided with at least two chucks 220, the chucks 220 are circumferentially provided with a plurality of bayonets, the bayonets at corresponding positions on different chucks 220 form clamping positions together, and the additional drill rod 110 is clamped in the clamping positions and can rotate relative to the support 201 along with the rotating shaft 212.
A stop 230 is provided on the carriage 201, the stop 230 being adapted to stop the additional drill rod 110 in the stored condition from being removed from the magazine 200. The storage state refers to a state in which the additional drill rod 110 is accommodated in the magazine 200 when the extension rod is not needed. In addition, the stopping portion 230 is further provided with a notch 231 for allowing the additional drill rod 110 to be removed from the storage magazine 200, and when the rotating shaft 212 rotates relative to the push beam 700, the rotating shaft also rotates relative to the stopping portion 230; when the rotating shaft 212 is rotated to a specific position, one of the additional drill rods 110 clamped on the chuck 220 is located at a position corresponding to the notch 231, i.e., in a standby state, and the robot 240 can take out the additional drill rod 110 from the magazine 200 and transport it to the extension rod position. The standby state means a state in which the additional drill rod 110 can be transported to the position of the extension rod to extend the extension rod.
Referring to fig. 2, an additional casing 120 may be further provided on the additional drill rod 110, the additional drill rod 110 and the additional casing 120 together form an additional casing follower assembly 100, and the additional casing follower assembly 100 is accommodated in the magazine 200, so that the robot 240 can simultaneously complete the handling of the additional casing 120 while handling the additional drill rod 110, thereby improving the efficiency of the take-over and extension rod.
Both ends of the additional sleeve 120 are provided with a first connection part 121 and a second connection part 122, respectively. Wherein, the first connection part 121 is used to connect with the tail part of the main casing, and when a plurality of additional casings 120 are connected to the drill rod of the present embodiment, the additional casing 120 at the front end is connected with the first connection part 121 of the additional casing 120 at the rear end through the second connection part 122 to implement a connection pipe.
Specifically, the length of the additional casing 120 may be less than the length of the additional drill pipe 110, and the additional casing 120 may be captured between the two chucks 220 when the additional heel tube assembly 100 is received in the magazine 200. That is, of the at least two chucks 220 provided on the rotating shaft 212, the distance between the two chucks 220 is equal to or slightly greater than the length of the additional sleeve 120, and when the additional simultaneous tube assembly 100 is received in the magazine 200, both ends of the additional sleeve 120 are respectively engaged with the two chucks 220, thereby completing the fixing of the chucks 220 to the additional sleeve 120.
As a further optimization, the additional drill rod 110 and the additional casing 120 may be fixed by a detachable plug 130, so that the additional drill rod 110 and the additional casing 120 may move synchronously during the transportation process; after the transfer is complete, the plug 130 may be removed, at which point the additional drill pipe 110 may be extension jointed, and the additional casing 120 may be taken over, respectively. In addition, when the additional casing 120 is sleeved on the additional drill rod 110, since the outer diameter of the additional drill rod 110 needs to be smaller than the inner diameter of the additional casing 120, when the additional casing assembly 100 is in the process of being transported, the additional casing 120 slides along the axial direction of the additional drill rod 110 under the action of self gravity, even impacts the main casing, and damages are caused; accordingly, the plug 130 can fix the additional drill rod 110 and the additional casing 120, preventing the above phenomenon from occurring.
As a further optimization, the plug 130 may be made of a flexible material, such as a rubber material, a plastic material, a silicone material. Further, in most cases, the drilled hole is processed obliquely downward, or vertically downward, and thus the plug 130 may be provided only at one end of the additional sleeve 120 near the front end of the feed beam 700, thereby preventing the additional sleeve 120 from sliding toward the front end of the feed beam 700; of course, a plug 130 may be provided at both ends of the additional sleeve 120.
The robot 240 may be provided in number. When the additional casing 120 is disposed on the additional drill rod 110, and both ends of the additional drill rod 110 protrude from both ends of the additional casing 120, at least two manipulators 240 may be disposed, and at least two manipulators 240 may be disposed on different sides of the additional casing 120, that is, at least one manipulator 240 of the at least two manipulators 240 is disposed on one side of the additional casing 120, and the remaining manipulators 240 of the at least two manipulators 240 are disposed on the other side of the additional casing 120, so that the additional casing assembly 100 can be more conveniently and stably transported.
To further prevent the additional drill rods 110 in the stored state from being pulled out of the magazine 200, the feed beam 700 may be provided with a number of fasteners 701. The fixing part 701 may be a frame-shaped structure, and the fixing part 701 and the push beam 700 may enclose an anti-drop structure of the additional drill rod 110, that is, the additional drill rod 110 in the storage state is located between the frame-shaped structure of the fixing part 701 and the push beam 700, and the fixing part 701 and the push beam 700 can prevent the additional drill rod 110 from moving in the second direction and/or the third direction. In addition, when the additional casing 120 is sleeved on the additional drill pipe 110, the fixing member 701 and the push beam 700 may enclose an anti-slip structure of the additional heel tube assembly 100.
In the following, the following description is given,
in this embodiment, as a further improvement, a hoisting mechanism 400 may be disposed on the push beam 700, where the hoisting mechanism 400 includes a hoist 410 and a pulley assembly 420, and the hoist 410 and the pulley assembly 420 may be disposed on the push beam 700 at a position near the rear end. The hoist 410 and sheave assembly 420 are used to hoist and carry the additional drill pipe 110 and/or the additional casing 120, such as from a storage area at a construction site.
In the following, the following description is given,
the top hammer type pipe following drilling propeller of the embodiment is utilized for drilling construction, and the method specifically comprises the following steps:
step one, a top hammer type rock drill 300 is used for driving a main drill rod sleeved with a main sleeve to drill.
Specifically, the moving end of the top hammer type rock drill 300 may be first in transmission connection with the second connecting end of the main drill rod, specifically, the moving end of the top hammer type rock drill 300 is directly connected with the second connecting end of the main drill rod; then, the top hammer type rock drill 300 moves on the push beam 700 along the first direction, the main drill rod drills forwards, so that the drill bit on the first connecting end of the main drill rod drills forwards, the drill bit drives the head of the main sleeve to rotate relative to the pipe body of the main sleeve, and the head of the sleeve pulls the pipe body of the main sleeve to drill, so that pipe following drilling is achieved.
And step two, after the main casing pipe finishes drilling, detaching the rod from the top hammer type rock drill 300 and the main drill rod, retracting the top hammer type rock drill 300 to an initial position, and connecting an additional drill rod to the main drill rod detaching rod.
Specifically, the main casing completing drilling means that the main casing is already substantially in the borehole and the trailing end portion of the main casing is outside the borehole; at the moment, the second connecting end of the main drill rod is clamped by the drill rod clamping device, and the drill rod is disassembled; after the removal of the rods is completed, the top hammer rock drill 300 is retracted on the feed beam in the first direction to the initial position, after which the additional drill rods are transported to the rod extension position and the connection of the second connection end of the main drill rod to the first connection head 111 of the additional drill rod is completed.
Wherein, the hoisting equipment can be used for realizing the transportation of the additional drill rod, such as a crane; the hoisting mechanism 400 can also be used for realizing the transportation of the additional drill rod; when the magazine 200 is provided on the feed beam 700, the additional drill rods in the magazine 200 may be transferred to the extension bar position by the robot.
Step three, after the extension rod is completed, if an additional casing is sleeved on the additional drill rod, the connection pipe of the additional casing and the main casing is completed; otherwise, the additional casing is conveyed and sleeved on the additional drill rod, and then the connection pipe of the additional casing and the main casing is completed.
When the additional drill rod is sleeved with the additional casing, the plug part can be used for fixing the additional drill rod and the additional casing to prevent the additional casing from sliding along the axial direction of the additional drill rod; before the additional sleeve is taken over with the main sleeve, the plug may be removed and the tail of the main sleeve may be connected to the first connection 121 of the additional sleeve.
When the additional casing pipe is not sleeved on the additional drill pipe, the hoisting equipment can be used for conveying the additional casing pipe, and the hoisting mechanism 400 can also be used for conveying the additional casing pipe.
And step four, after the pipe connection is completed, the top hammer type rock drill 300 is connected with the additional drill rod, and the top hammer type rock drill 300 drives the main drill rod to continue drilling through the additional drill rod.
Specifically, after the main casing and the additional casing are jointed, the top-hammer type rock drill 300 advances on the feed beam in the first direction, and when the top-hammer type rock drill 300 moves to the vicinity of the second connector 112 of the additional drill rod, the moving end of the top-hammer type rock drill 300 is connected with the second connector 112; thereafter, the top hammer drill 300 continues to drive the main drill rod, i.e., the drill bit of the main drill rod, to drill.
And step five, after the additional casing pipe is drilled, or in the drilling process of the additional casing pipe, the drill bit is drilled to the designed depth, and the drilling is stopped. After the additional casing pipe finishes drilling, the drill bit still does not reach the designed depth, the top hammer type rock drill 300 and the additional drill rod are disassembled, and the top hammer type rock drill 300 retracts; then, if the length of the additional drill rod exposed out of the additional casing is smaller than that of the additional casing, the other additional drill rod can be conveyed to the position of the connecting rod for connecting the rod, and then the pipe connecting operation of the other additional casing is carried out; if the length of the additional drill pipe exposed out of the additional casing is larger than that of the additional casing, another additional casing can be conveyed and sleeved on the additional drill pipe, and then the pipe connecting operation of the additional casing is carried out.
And step six, after the pipe connection is completed, the top hammer type rock drill 300 is connected with the additional drill rod positioned at the rearmost end, and the top hammer type rock drill 300 drives the main drill rod to continue drilling through a plurality of additional drill rods.
And step seven, repeating the step five and the step six until drilling construction of the drilled hole is completed.
In addition, in the second step, if the length of the main drill rod exposed out of the main casing is greater than the length of the additional casing, the pipe connecting operation of the additional casing can be directly performed without performing the rod connecting operation. After the pipe connection is completed, the top hammer type rock drill 300 is connected to the main drill pipe and continues to drive the main drill pipe to drill.
This embodiment also provides a drilling apparatus equipped with the top hammer type simultaneous casing drilling thruster of this embodiment. The drilling apparatus may be a self-propelled drilling trolley, a surface drilling rig, or other drilling equipment commonly used in the related art. The top hammer type pipe-following drilling thruster is arranged on a drill boom of the drilling equipment, and the drilling equipment can be driven to move by an oil engine or a motor.
The drilling equipment of the embodiment is utilized to carry out drilling construction, collapse prevention treatment in the subway construction process or a treatment process after collapse is carried out, specifically, the drilling equipment is utilized to carry out drilling construction on a plurality of drill holes, and grouting is injected into the drill holes after the drilling construction; and (5) completing the reinforcement of the drill hole after grouting solidification.
The present invention and its embodiments have been described above schematically, and the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, without departing from the inventive spirit of the present invention, the person skilled in the art should also design the similar structural modes and embodiments without creativity to the technical solution, and all shall fall within the protection scope of the present invention.

Claims (10)

1. The utility model provides a top hammer formula is with pipe drilling propeller which characterized in that: comprises the steps of (a) preparing a mixture of a plurality of raw materials,
the drill rod clamping device comprises a propelling beam, a drill rod clamping device and a drill rod clamping device, wherein the propelling beam is provided with a drill rod clamping device at a position close to the front end; and the number of the first and second groups,
the top hammer type rock drill is arranged on the propelling beam in a sliding mode; and the number of the first and second groups,
the main heel pipe assembly comprises a main drill rod and a main sleeve sleeved on the main drill rod, and the length of the main sleeve is smaller than that of the main drill rod; the first connecting end of the main drill rod is connected with the head of the main sleeve in a matching mode, and the second connecting end of the main drill rod is connected with the top hammer type rock drill in a transmission mode.
2. The top-hammer type simultaneous drilling thruster of claim 1, wherein: the propelling beam is provided with a storage warehouse and a plurality of manipulators, a plurality of additional drill rods are arranged in the storage warehouse, and the manipulators are used for conveying the additional drill rods to the positions of the connecting rods.
3. The top-hammer type simultaneous drilling thruster of claim 2, wherein: the repository includes, in a first memory location,
the bracket is connected to the propelling beam;
the rotating shaft is rotatably connected with the support, at least two chucks are arranged on the rotating shaft, a plurality of bayonets are circumferentially arranged on the chucks, and bayonets at corresponding positions on different chucks form clamping positions for placing additional drill rods together;
the blocking part is arranged on the bracket, and a notch is formed in the blocking part;
the repository is configured to: and only when the rotating shaft drives the chuck to rotate so as to enable the additional drill rod positioned on the clamping position to rotate to the position corresponding to the notch, the manipulator conveys the additional drill rod positioned at the position corresponding to the notch to the position of the extension rod.
4. A top-hammer type simultaneous drilling thruster according to claim 3, wherein: an additional casing is sleeved on the additional drill rod, and the length of the additional casing is smaller than that of the additional drill rod; when the additional drill rod is positioned on the clamping position, the additional sleeve is clamped between the two chucks.
5. The top-hammer type simultaneous drilling thruster of claim 4, wherein: the number of the mechanical arms is at least two, at least one of the at least two mechanical arms is positioned on one side of the additional casing, and the rest of the at least two mechanical arms are positioned on the other side of the additional casing.
6. The top-hammer type simultaneous drilling thruster of claim 4, wherein: a plug is provided between the additional casing and the additional drill pipe for preventing the additional casing from sliding axially on the additional drill pipe.
7. The top-hammer type simultaneous drilling thruster of claim 6, wherein: the plug piece is arranged between one end, close to the front end of the push beam, of the additional sleeve and the additional drill rod and is made of flexible materials.
8. The top-hammer type simultaneous drilling thruster of claim 2, wherein: the drill rod anti-falling device is characterized in that a plurality of fixing pieces are arranged on the push beam, the fixing pieces are of frame-shaped structures, and the fixing pieces and the push beam are enclosed to form an anti-falling structure of an additional drill rod.
9. The top-hammer type simultaneous drilling thruster according to any one of claims 1 to 8, wherein: and the propelling beam is provided with a winch and a pulley assembly, and the winch and the pulley assembly are arranged at the position, close to the rear end, on the propelling beam.
10. A drilling apparatus, characterized by: a top hammer pipe-following drilling thruster comprising any one of claims 1 to 9.
CN202120806031.1U 2021-04-19 2021-04-19 Top hammer type pipe following drilling propeller and drilling equipment Active CN214741071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120806031.1U CN214741071U (en) 2021-04-19 2021-04-19 Top hammer type pipe following drilling propeller and drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120806031.1U CN214741071U (en) 2021-04-19 2021-04-19 Top hammer type pipe following drilling propeller and drilling equipment

Publications (1)

Publication Number Publication Date
CN214741071U true CN214741071U (en) 2021-11-16

Family

ID=78611172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120806031.1U Active CN214741071U (en) 2021-04-19 2021-04-19 Top hammer type pipe following drilling propeller and drilling equipment

Country Status (1)

Country Link
CN (1) CN214741071U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112855013A (en) * 2021-04-19 2021-05-28 安百拓贸易有限公司 Top hammer type pipe following drilling propeller and drilling equipment
CN117211691A (en) * 2023-11-09 2023-12-12 烟台兴业机械股份有限公司 Tight mechanism in drill jumbo boom rock drill top

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112855013A (en) * 2021-04-19 2021-05-28 安百拓贸易有限公司 Top hammer type pipe following drilling propeller and drilling equipment
CN117211691A (en) * 2023-11-09 2023-12-12 烟台兴业机械股份有限公司 Tight mechanism in drill jumbo boom rock drill top
CN117211691B (en) * 2023-11-09 2024-01-26 烟台兴业机械股份有限公司 Tight mechanism in drill jumbo boom rock drill top

Similar Documents

Publication Publication Date Title
CN109441443B (en) Hydraulic anchor rod trolley
CN214741071U (en) Top hammer type pipe following drilling propeller and drilling equipment
US6540443B2 (en) Apparatus for and a method of boring the ground
CN1280515C (en) Hole drilling equipment and method
CN111594211B (en) Hard rock cross-channel tunneling machine and construction method
CN108086905B (en) Combined drilling boom for drilling holes, installing anchor rods and rock drilling vehicle with the same
US8459750B2 (en) Anchoring device and method for fixation of a launching unit for highwall mining
US6497296B1 (en) Anchoring system for a directional drilling machine and methods of use
CN109441444B (en) Trolley anchor rod mechanism
CN206903582U (en) It may move double-arm rock bolting jumbo
RU2382165C2 (en) Method and arrangement of improved horizontal-inclined drilling assembly
CN104929517A (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN108119174B (en) Combined drilling boom for drilling holes and locking anchor rods and rock drilling vehicle with same
CN108150111B (en) Multifunctional drill boom and rock drilling vehicle with same
CN112855013A (en) Top hammer type pipe following drilling propeller and drilling equipment
US3174562A (en) Auger boring machine
CN112983256A (en) Drilling method based on top hammer type pipe following drilling and reinforcing method in construction process
CN108049901B (en) Drill boom for automatically installing locking anchor rod and rock drilling vehicle with drill boom
CN110552613A (en) rock drilling device for mining
CN214247369U (en) Pore-creating, grouting and anchoring integrated working device
JPS6135356B2 (en)
CN221400394U (en) Non-excavation directional core drilling machine
CN214118110U (en) Novel horizontal directional drilling machine
CN116733369B (en) Hole forming equipment for bored pile in narrow space of cavity and operation method thereof
CN212958494U (en) Core drilling machine for pile head breaking of cast-in-place pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant