CN214740038U CN202120867838.6U CN202120867838U CN214740038U CN 214740038 U CN214740038 U CN 214740038U CN 202120867838 U CN202120867838 U CN 202120867838U CN 214740038 U CN214740038 U CN 214740038U
Authority
CN
China
Prior art keywords
pmkd
footboard
operation platform
board
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120867838.6U
Other languages
Chinese (zh)
Inventor
吴子泽
汪慧子
吴霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shuangfeng Steel Structure Engineering Co ltd
Original Assignee
Anhui Shuangfeng Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shuangfeng Steel Structure Engineering Co ltd filed Critical Anhui Shuangfeng Steel Structure Engineering Co ltd
Priority to CN202120867838.6U priority Critical patent/CN214740038U/en
Application granted granted Critical
Publication of CN214740038U publication Critical patent/CN214740038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an installation operation platform for housing construction relates to the relevant field of housing construction, for solving the problem that can't realize the high fine setting of platform after the platform is fixed to be accomplished among the prior art. The inside of mobile station is provided with the footboard, the footboard sets up to rectangular plate-like, is that footboard and mobile station set up to the laminating, the lower extreme of footboard is provided with hydraulic push rod, hydraulic push rod is provided with a plurality ofly, hydraulic push rod and footboard fixed connection, one side of hydraulic push rod is provided with damping spring, damping spring is provided with a plurality ofly, damping spring's inside is provided with the buffer beam, the buffer beam is provided with the multiunit, every group of buffer beam is provided with two, buffer beam and damping spring fixed connection, one side of mobile station is provided with the connecting strip, the connecting strip is provided with two, the connecting strip sets up to the rectangle strip, one side of connecting strip is provided with electric sliding block.

Description

Installation operation platform for housing construction
Technical Field
The utility model relates to a housing construction field of being correlated with specifically is an installation operation platform for housing construction.
Background
With the progress of society, the living standard of people is continuously improved, wherein the living in the clothes and eating habits can be regarded as important, and in the prior art, when a house is built, an installation operation platform is often needed to be used for assisting the operation of workers working in high altitude.
When the existing installation and operation platform for the house building is used, the existing installation and operation platform is usually a simple rectangular platform, and the height of the existing installation and operation platform is often difficult to adjust after fixation is completed, so that an ascending device needs to be additionally built on the platform, and the life safety of a user is easily influenced; therefore, the market urgently needs to develop an installation and operation platform for house construction to help people solve the existing problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation operation platform for housing construction to the problem of the fixed back of accomplishing of platform that can't realize the high fine setting of platform that provides in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a housing construction is with installation operation platform, includes the mobile station, the inside of mobile station is provided with the footboard, the footboard sets up to rectangular plate-like, is footboard and mobile station setting to the laminating, the lower extreme of footboard is provided with hydraulic push rod, hydraulic push rod is provided with a plurality ofly, hydraulic push rod and footboard fixed connection, one side of hydraulic push rod is provided with damping spring, damping spring is provided with a plurality ofly, damping spring's inside is provided with the buffer beam, the buffer beam is provided with the multiunit, every group of buffer beam is provided with two, buffer beam and damping spring fixed connection.
Preferably, one side of mobile station is provided with the connecting strip, the connecting strip is provided with two, the connecting strip sets up to the rectangle strip, one side of connecting strip is provided with electronic slider, electronic slider is provided with two, electronic slider and connecting strip fixed connection, one side of electronic slider is provided with electronic slide, electronic slide is provided with two, electronic slide sets up to electric connection with electronic slider.
Preferably, the lower extreme of electronic slide is provided with PMKD, PMKD sets up to rectangular plate-like, PMKD and electronic slide fixed connection, PMKD's upper end is provided with the landing slab, the landing slab sets up to the rectangle frame form, the landing slab is connected through manual electric arc welding with PMKD.
Preferably, PMKD's front end is provided with the linking arm, the linking arm is provided with two, the linking arm sets up to the rectangle column, the linking arm sets up to the unity with PMKD, be provided with the mounting panel on the linking arm, the mounting panel is provided with a plurality ofly, the mounting panel sets up to the rectangular plate form, the mounting panel is connected through manual arc welding with the linking arm, be provided with first mounting hole on the mounting panel, and the degree of depth and the mounting plate thickness of first mounting hole set up to unanimity.
Preferably, PMKD's lower extreme is provided with the board of preventing collapsing, prevent collapsing board and PMKD fixed connection, the board of preventing collapsing is provided with two, be provided with the second mounting hole on the board of preventing collapsing, and the degree of depth of second mounting hole sets up to unanimous with the thickness of preventing collapsing, be provided with the fretwork groove on the platform board, the fretwork groove sets up to isosceles trapezoid shape, the degree of depth and the thickness of platform board in fretwork groove set up to unanimous.
Preferably, the front end in fretwork groove is provided with the anticreep board, the anticreep board sets up to rectangular plate shape, be provided with the dwang on the anticreep board, the dwang sets up to round bar shape, the dwang sets up to the integument with the anticreep board, be provided with the fixed block on the dwang, the fixed block is provided with two, the fixed block sets up to rectangular block shape, the fixed block sets up to rotate with the dwang and is connected.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the utility model, through the arrangement of the hydraulic push rod, the buffer rod and the damping spring, when a user uses the installation operation platform, the user can drive the pedal to move through the hydraulic push rod, so that the platform can be finely adjusted in height after the platform is fixed, and meanwhile, through the mutual cooperation of the buffer rod and the damping spring, the stability of the platform during lifting can be ensured when the hydraulic push rod finely adjusts the platform in height;
2. the utility model discloses a through the setting of electronic slide and electronic slider, the user is using this installation operation platform's in-process, and the user can make whole mobile station can carry out the regulation of horizontal direction to the mobile station after installation operation platform installation is accomplished through electric connection's electronic slide and electronic slider, and then improvement whole installation operation platform's that can be by a wide margin operation suitability.
Drawings
Fig. 1 is a structural diagram of an installation operation platform for building construction according to the present invention;
fig. 2 is a bottom view structural diagram of the installation operation platform for building construction of the present invention;
fig. 3 is a sectional structure view of the installation operation platform for building construction of the present invention.
In the figure: 1. fixing the bottom plate; 2. a connecting arm; 3. mounting a plate; 4. an anti-collapse plate; 5. a platform plate; 6. a fixed block; 7. rotating the rod; 8. an anti-drop plate; 9. engraving grooves; 10. an electric slideway; 11. an electric slider; 12. a connecting strip; 13. a mobile station; 14. a damping spring; 15. a buffer rod; 16. a hydraulic push rod; 17. a pedal.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides a housing construction is with installation operation platform, including mobile station 13, the inside of mobile station 13 is provided with footboard 17, footboard 17 sets up to rectangular plate, it is the laminating to be footboard 17 and mobile station 13, the lower extreme of footboard 17 is provided with hydraulic push rod 16, hydraulic push rod 16 is provided with a plurality ofly, hydraulic push rod 16 and footboard 17 fixed connection, one side of hydraulic push rod 16 is provided with damping spring 14, damping spring 14 is provided with a plurality ofly, damping spring 14's inside is provided with buffer beam 15, buffer beam 15 is provided with the multiunit, 15 every groups of buffer beam are provided with two, buffer beam 15 and damping spring 14 fixed connection, can be through the setting of each structure, solve and to realize the problem to the high fine setting of platform after the platform is fixed to be accomplished.
Further, one side of mobile station 13 is provided with connecting strip 12, and connecting strip 12 is provided with two, and connecting strip 12 sets up to rectangular strip, and one side of connecting strip 12 is provided with electronic slider 11, and electronic slider 11 is provided with two, and electronic slider 11 and connecting strip 12 fixed connection, one side of electronic slider 11 are provided with electronic slide 10, and electronic slide 10 is provided with two, and electronic slide 10 sets up to electric connection with electronic slider 11.
Further, the lower extreme of electronic slide 10 is provided with PMKD 1, and PMKD 1 sets up to rectangular plate shape, PMKD 1 and electronic slide 10 fixed connection, and PMKD 1's upper end is provided with landing slab 5, and landing slab 5 sets up to the rectangle frame form, and landing slab 5 is connected through manual electric arc welding with PMKD 1.
Further, the front end of the fixed base plate 1 is provided with two connecting arms 2, the connecting arms 2 are arranged in a rectangular column shape, the connecting arms 2 and the fixed base plate 1 are arranged in a whole shape, the connecting arms 2 are provided with the mounting plates 3, the mounting plates 3 are arranged in a plurality of shapes, the mounting plates 3 are arranged in a rectangular plate shape, the mounting plates 3 are connected with the connecting arms 2 through manual electric arc welding, the mounting plates 3 are provided with first mounting holes, and the depth of the first mounting holes is consistent with the thickness of the mounting plates 3.
Further, PMKD 1's lower extreme is provided with prevents board 4 that collapses, prevents collapsing board 4 and PMKD 1 fixed connection, prevents collapsing board 4 and is provided with two, prevents being provided with the second mounting hole on the board 4 that collapses, and the degree of depth of second mounting hole sets up to unanimous with the thickness of preventing collapsing board 4, is provided with fretwork groove 9 on the landing slab 5, and fretwork groove 9 sets up to the isosceles trapezoid shape, and the degree of depth of fretwork groove 9 sets up to unanimous with the thickness of landing slab 5.
Further, the front end of fretwork groove 9 is provided with anticreep board 8, and anticreep board 8 sets up to rectangular plate shape, is provided with dwang 7 on the anticreep board 8, and dwang 7 sets up to round rod shape, and dwang 7 sets up to the integral form with anticreep board 8, is provided with fixed block 6 on the dwang 7, and fixed block 6 is provided with two, and fixed block 6 sets up to rectangular block shape, and fixed block 6 sets up to rotate with dwang 7 and is connected.
The working principle is as follows: when in use, the whole installation operation platform is firstly checked, after a user confirms that the check is correct, the user can start to use the installation operation platform, the user can realize the installation and fixation of the whole installation operation platform through the arrangement of the installation plate 3 and the anti-collapse plate 4, after the installation is confirmed, the user can enter the interior of the mobile station 13 to carry out the installation operation, when the user uses the installation operation platform, the pedal 17 can be driven by the hydraulic push rod 16 to move, so that the fine adjustment of the height of the platform can be realized after the platform is fixed, meanwhile, the buffer rod 15 is matched with the damping spring 14, the stability of the platform when the platform is lifted can be ensured when the hydraulic push rod 16 finely adjusts the height of the platform, and simultaneously, the electric slide way 10 and the electric slide block 11 which are electrically connected can ensure that the whole mobile station 13 can be installed after the installation operation platform is completed, the mobile station 13 is adjusted in the horizontal direction, so that the operation applicability of the whole installation operation platform can be greatly improved.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. An installation and operation platform for building construction, comprising a mobile station (13), characterized in that: the inside of mobile station (13) is provided with footboard (17), footboard (17) set up to rectangular plate form, is footboard (17) and mobile station (13) and sets up to the laminating, the lower extreme of footboard (17) is provided with hydraulic push rod (16), hydraulic push rod (16) are provided with a plurality ofly, hydraulic push rod (16) and footboard (17) fixed connection, one side of hydraulic push rod (16) is provided with damping spring (14), damping spring (14) are provided with a plurality ofly, the inside of damping spring (14) is provided with buffer beam (15), buffer beam (15) are provided with the multiunit, buffer beam (15) every group is provided with two, buffer beam (15) and damping spring (14) fixed connection.
2. The installation and operation platform for house building according to claim 1, wherein: one side of mobile station (13) is provided with connecting strip (12), connecting strip (12) are provided with two, connecting strip (12) set up to the rectangle strip, one side of connecting strip (12) is provided with electronic slider (11), electronic slider (11) are provided with two, electronic slider (11) and connecting strip (12) fixed connection, one side of electronic slider (11) is provided with electronic slide (10), electronic slide (10) are provided with two, electronic slide (10) set up to electric connection with electronic slider (11).
3. The installation and operation platform for house building according to claim 2, wherein: the lower extreme of electric slide (10) is provided with PMKD (1), PMKD (1) sets up to rectangular plate-like, PMKD (1) and electric slide (10) fixed connection, the upper end of PMKD (1) is provided with landing slab (5), landing slab (5) set up to the rectangle frame form, landing slab (5) are connected through manual electric arc welding with PMKD (1).
4. The installation and operation platform for house building according to claim 3, wherein: the front end of PMKD (1) is provided with linking arm (2), linking arm (2) are provided with two, linking arm (2) set up to the rectangle column, linking arm (2) set up to the unity with PMKD (1), be provided with mounting panel (3) on linking arm (2), mounting panel (3) are provided with a plurality ofly, mounting panel (3) set up to the rectangle platelike, mounting panel (3) are connected through manual electric arc welding with linking arm (2), be provided with first mounting hole on mounting panel (3), and the degree of depth of first mounting hole sets up to unanimously with the thickness of mounting panel (3).
5. The installation and operation platform for house building according to claim 3, wherein: the lower extreme of PMKD (1) is provided with prevents board (4) that collapses, prevent board (4) and PMKD (1) fixed connection that collapses, prevent that board (4) that collapses is provided with two, prevent being provided with the second mounting hole on board (4) that collapses, and the degree of depth of second mounting hole sets up to unanimous with the thickness of preventing board (4) that collapses, be provided with fretwork groove (9) on landing slab (5), fretwork groove (9) set up to the isosceles trapezoid shape, the degree of depth of fretwork groove (9) sets up to unanimously with the thickness of landing slab (5).
6. The installation and operation platform for house building according to claim 5, wherein: the front end in fretwork groove (9) is provided with anticreep board (8), anticreep board (8) set up to rectangular plate shape, be provided with dwang (7) on anticreep board (8), dwang (7) set up to round bar shape, dwang (7) set up to the integument with anticreep board (8), be provided with fixed block (6) on dwang (7), fixed block (6) are provided with two, fixed block (6) set up to the rectangle cubic, fixed block (6) set up to rotate with dwang (7) and are connected.
CN202120867838.6U 2021-04-26 2021-04-26 Installation operation platform for housing construction Active CN214740038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120867838.6U CN214740038U (en) 2021-04-26 2021-04-26 Installation operation platform for housing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120867838.6U CN214740038U (en) 2021-04-26 2021-04-26 Installation operation platform for housing construction

Publications (1)

Publication Number Publication Date
CN214740038U true CN214740038U (en) 2021-11-16

Family

ID=78613419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120867838.6U Active CN214740038U (en) 2021-04-26 2021-04-26 Installation operation platform for housing construction

Country Status (1)

Country Link
CN (1) CN214740038U (en)

Similar Documents

Publication Publication Date Title
CN213654149U (en) Aluminum climbing frame with adjustable height
CN214740038U (en) Installation operation platform for housing construction
CN115191797A (en) Scientific and technological achievement auxiliary assembly for analysis with interactive structure of taste
CN212873832U (en) Intelligent home display model with central control demonstration function
CN215166942U (en) Six-direction positioning regulator for anti-seismic curtain wall
CN213807007U (en) Safety protective guard for civil construction
CN218225318U (en) Positioning tool for welding vehicle body
CN221179762U (en) Practical training platform convenient to remove
CN217537911U (en) Concrete placement workstation is built in room
CN213469189U (en) Fixed block bending and stamping mechanism
CN210930169U (en) Multifunctional teacher's desk
CN216259064U (en) Platform device
CN216249878U (en) Lifting warning board for road construction
CN212840502U (en) Screen-projection and reverse-control intelligent all-in-one machine
CN216098772U (en) Multifunctional workbench
CN212273510U (en) Data center computer lab equipment support bracket
CN212878451U (en) Multifunctional portable dining chair
CN212453546U (en) Indoor scaffold of adjustable height stability type for construction
CN221221952U (en) Construction progress model for hydraulic engineering management
CN211747813U (en) Drawing platform for planar design
CN215107090U (en) Intelligent frame convenient for building heightening
CN215837677U (en) Digital media design platform based on computer technology
CN217126137U (en) Jacking positioning device
CN216822221U (en) Office table foot rest
CN218076139U (en) Main body support structure of body-building apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant