- Publication number
- CN214738169U CN214738169U CN202120820376.2U CN202120820376U CN214738169U CN 214738169 U CN214738169 U CN 214738169U CN 202120820376 U CN202120820376 U CN 202120820376U CN 214738169 U CN214738169 U CN 214738169U
- Authority
- CN
- China
- Prior art keywords
- groove
- baffle
- wall
- water conservancy
- pipe laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a water conservancy construction pipe laying department waterproof construction, including the protection body of a plurality of mutual concatenations, every the protection body includes the bottom plate and turns over a baffle that articulates in the bottom plate, and the draw-in groove has been seted up to the baffle, the bottom plate has been seted up and has been accomodate the groove, and the inner wall of accomodating the groove articulates there is the support arm, and the tip activity card of support arm inlays in the draw-in groove, and the support arm is flexible arm, and the support arm is collapsible to be accomodate in accomodating the inslot. This application has the advantage that improves the convenience to waterproof construction transport.
Description
Technical Field
The application relates to water conservancy construction technical field especially relates to a water conservancy construction pipe laying department waterproof construction.
Background
The water conservancy project is a project built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, and only when the water conservancy project is built, water flow can be controlled to prevent flood disasters, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production.
During the construction process of hydraulic engineering, a buried pipe foundation pit is required to be excavated and a pipeline is filled, and a large amount of water flow is prevented from flowing into the buried pipe foundation pit during excavation, so that the normal installation of the pipeline is ensured. With respect to the related art among the above, the inventors consider that the following drawbacks exist: the existing waterproof structure is large in size, cannot be conveniently and fast carried to a position needing water proofing, and is inconvenient in the transportation process, so that the existing waterproof structure needs to be further improved.
SUMMERY OF THE UTILITY MODEL
In order to improve the convenience to the waterproof construction transport, this application provides a water conservancy construction pipe laying department waterproof construction.
The application provides a pair of water conservancy construction pipe laying department waterproof construction adopts following technical scheme:
the utility model provides a water conservancy construction pipe laying department waterproof construction, includes the protection body of a plurality of mutual concatenations, every the protection body includes the bottom plate and turns over a baffle that articulates in the bottom plate, and the draw-in groove has been seted up to the baffle, the bottom plate has been seted up and has been accomodate the groove, and the inner wall of accomodating the groove articulates there is the support arm, and the tip activity card of support arm inlays in the draw-in groove, and the support arm is flexible arm, and the support arm is collapsible to be accomodate in accomodating the inslot.
By adopting the technical scheme, the free end of the baffle is turned towards the direction close to the bottom plate, so that the volume of the baffle is reduced, the portability of the protection body is improved, the storage space is saved, and the protection body is convenient to carry and transport; in the use, the free end of baffle is towards keeping away from the upset of bottom plate direction for the protection body is the open mode, and inlay the free end card of support arm in the draw-in groove of baffle, realizes fixing the turned angle of baffle, thereby is convenient for follow-up pipe laying operation.
Preferably, the support arm includes that the tip articulates the support sleeve pipe and the slip of holding tank bottom inner wall and inserts the bracing piece of locating the support sleeve pipe, the other end of support sleeve pipe rotates and is connected with the nut cover, and the bracing piece is the threaded rod that the nut cover was worn to locate by the screw thread, and the tip activity of bracing piece is inserted and is located in the draw-in groove.
Through adopting above-mentioned technical scheme, realize adjusting the flexible volume of sliding of bracing piece through rotatory nut cover to adjust the length of support arm, when needs fix the baffle, then need the length of the support arm that increases, before need turning over the baffle, shorten the length of support arm and make it accomodate in the groove of accomodating of bottom plate.
Preferably, the inner wall of the clamping groove is provided with a positioning ring, and the outer wall of the end part of the supporting rod is convexly provided with a positioning column inserted into the positioning ring.
Through adopting above-mentioned technical scheme, thereby rotate the free end of support arm and make the reference column of support rod tip insert and locate the retaining ring in, realize the fixed to the baffle.
Preferably, the bottom plate is provided with first connecting portion, the baffle is provided with second connecting portion, the hinge groove has been seted up to first connecting portion, and the protrusion of second connecting portion is provided with the articulated shaft of rotation connection in hinge groove, the spacing groove has been seted up to the inner wall in hinge groove, and the spacing groove is provided with four and distributes around the axis in hinge groove, the protrusion of articulated shaft outer wall be provided with the activity scarf joint in the elasticity stopper of spacing groove, wherein two spacing grooves are in vertical direction, and two spacing grooves are in the horizontal direction in addition.
Through adopting above-mentioned technical scheme, be provided with spacing groove and elastic limiting block for certain damping has between articulated shaft and the articulated groove, need apply certain moment of torsion to the baffle just can make the baffle take place to rotate, the switching of the baffle horizontality and the vertical state of being convenient for, in addition, when removing the support effect of support arm to the baffle, avoid the baffle to take place to rotate under the dead weight effect, reduce the possibility that the staff takes place the incident.
Preferably, the two opposite side walls of the bottom plate are respectively provided with a first positioning block and a first positioning groove for embedding the first positioning block.
By adopting the technical scheme, when two adjacent protection bodies are spliced, the first positioning block of one bottom plate is inserted into the first positioning groove of the other bottom plate, so that the two adjacent bottom plates are connected to form a whole.
Preferably, the two opposite side walls of the baffle are respectively provided with a second positioning block and a second positioning groove for embedding the second positioning block.
By adopting the technical scheme, when two adjacent protective bodies are spliced, the second positioning block of the upper baffle of one of the protective bodies is inserted into the second positioning groove of the upper baffle of the other protective body, so that the two adjacent baffles are connected into a whole.
Preferably, the outer wall fixedly connected with mount pad of baffle, the mounting groove has been seted up to the mount pad, and the mounting groove rotates and is connected with the axis of rotation, and the outer wall protrusion of axis of rotation has a spacing screw rod, and adjacent baffle outer wall is provided with the joint seat, and the joint seat is seted up and is supplied the logical groove that the spacing screw rod slided and pass, and spacing screw rod threaded connection has stop nut, and stop nut's terminal surface is supported tightly in joint seat lateral wall.
Through adopting above-mentioned technical scheme, when splicing two adjacent protective bodies, through rotating spacing screw on one of them baffle, make it slide and pass the logical groove of the joint seat on another baffle, make stop nut's terminal surface support tightly in joint seat lateral wall through locking stop nut after that to effectively fix two adjacent protective bodies.
Preferably, the top outer wall of the baffle is convexly provided with a force application block.
Through adopting above-mentioned technical scheme, be provided with application of force piece, be convenient for turn over the operation of rolling over to the baffle, reduce and take place the possibility of pressing from both sides the wound at the in-process human hand that closes to the baffle.
To sum up, the utility model discloses following beneficial effect has:
1. the free end of the baffle is turned towards the direction close to the bottom plate, so that the volume of the baffle is reduced, the portability of the protection body is improved, the storage space is saved, and the protection body is convenient to carry and transport; in the use process, the free end of the baffle is turned towards the direction far away from the bottom plate, so that the protection body is in an open state, and the free end of the supporting arm is clamped and embedded in the clamping groove of the baffle, so that the rotation angle of the baffle is fixed, and the subsequent pipe burying operation is facilitated;
2. the sliding and stretching amount of the supporting rod is adjusted by rotating the nut sleeve, so that the length of the supporting arm is adjusted, when the baffle is required to be fixed, the length of the supporting arm is required to be increased, and before the baffle is required to be folded, the length of the supporting arm is shortened to be accommodated in the accommodating groove of the bottom plate;
3. be provided with spacing groove and elastic limiting block for certain damping has between articulated shaft and the articulated groove, need apply certain moment of torsion to the baffle and just can make the baffle take place to rotate, the switching of the baffle horizontality and the vertical state of being convenient for, in addition, when removing the support arm and acting on the support of baffle, avoid the baffle to take place to rotate under the dead weight effect, reduce the possibility that the staff takes place the incident.
Drawings
FIG. 1 is a schematic overall structure diagram of a water-proof structure at a water conservancy construction pipe burying position;
fig. 2 is a schematic view of a connection structure of a hinge groove and a hinge shaft;
FIG. 3 is a schematic view of the first and second detents;
FIG. 4 is an enlarged partial schematic view of FIG. 3 at A;
fig. 5 is a schematic structural view of the mounting seat and the clamping seat.
In the figure, 1, a bottom plate; 11. a receiving groove; 12. a first connection portion; 13. a hinge slot; 14. a limiting groove; 15. a first positioning block; 16. a first positioning groove; 2. a baffle plate; 21. a card slot; 22. a second connecting portion; 23. hinging a shaft; 24. an elastic limiting block; 25. a force application block; 26. a second positioning block; 27. a second positioning groove; 28. a positioning ring; 3. a support arm; 31. a support sleeve; 32. a support bar; 33. a nut sleeve; 34. a positioning column; 4. a clamping seat; 41. a through groove; 5. a mounting seat; 51. mounting grooves; 52. a rotating shaft; 53. a limit screw; 54. and a limiting nut.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses water conservancy construction pipe laying department waterproof construction, refer to fig. 1, including the protection body of a plurality of mutual concatenations, every protection body includes bottom plate 1 and turns over and hinge in baffle 2 of bottom plate 1.
Referring to fig. 1 and 2, a force application block 25 is arranged on the outer wall of the free end of the baffle 2, the bottom plate 1 is provided with a first connecting portion 12, the baffle 2 is provided with a second connecting portion 22, the first connecting portion 12 is provided with a hinge groove 13, and the second connecting portion 22 is convexly provided with a hinge shaft 23 rotatably connected to the hinge groove 13. The inner wall of the hinge groove 13 is provided with a limiting groove 14, the limiting groove 14 is provided with four axes which are distributed around the hinge groove 13, two limiting grooves 14 are in the vertical direction, the other two limiting grooves 14 are in the horizontal direction, and the outer wall of the hinge shaft 23 is convexly provided with an elastic limiting block 24 which is movably embedded in the limiting groove 14.
Referring to fig. 1, the baffle 2 is close to the lateral wall of bottom plate 1 and has been seted up draw-in groove 21, and bottom plate 1 has been seted up and has been accomodate groove 11, and the bottom inner wall of accomodating groove 11 articulates there is support arm 3, and support arm 3 includes that the tip articulates in the support sleeve 31 of accomodating the bottom inner wall of groove 11 and slides along support sleeve 31's axial and insert the bracing piece 32 of locating support sleeve 31. The free end of the support sleeve 31 is coaxially and rotatably connected with a nut sleeve 33, and the support rod 32 is a threaded rod with threads penetrating through the nut sleeve 33.
Referring to fig. 3 and 4, a positioning ring 28 is fixedly connected to the inner wall of the clamping groove 21, a positioning column 34 inserted into the positioning ring 28 is convexly arranged on the outer wall of the end portion of the supporting rod 32 far away from the supporting sleeve 31, and the supporting arm 3 can be retracted and accommodated in the accommodating groove 11.
Referring to fig. 1 and 3, two opposite side walls of the bottom plate 1 are respectively provided with a first positioning block 15 and a first positioning groove 16 for the first positioning block 15 to be embedded, and two opposite side walls of the baffle plate 2 are respectively provided with a second positioning block 26 and a second positioning groove 27 for the second positioning block 26 to be embedded.
Referring to fig. 5, outer wall fixedly connected with mount pad 5 of baffle 2, mounting groove 51 has been seted up to mount pad 5, and mounting groove 51 rotates and is connected with axis of rotation 52, and the outer wall protrusion of axis of rotation 52 has spacing screw 53, and 2 outer walls of adjacent baffle are provided with joint seat 4, and joint seat 4 sets up the logical groove 41 that supplies spacing screw 53 to slide and pass, and spacing screw 53 threaded connection has stop nut 54, and stop nut 54's terminal surface supports tightly in joint seat 4 lateral wall.
The implementation principle of the water conservancy construction pipe laying department waterproof construction of the embodiment of the application is as follows: the free end of the baffle 2 is turned towards the direction close to the bottom plate 1, so that the volume of the baffle is reduced, the portability of the protection body is improved, the storage space is saved, and the protection body is convenient to carry and transport; in the use, with the free end of baffle 2 towards keeping away from 1 direction upset of bottom plate for the protection body is open mode, and inlay the free end card of support arm 3 in the draw-in groove 21 of baffle 2, realize fixing the turned angle of baffle 2, thereby be convenient for follow-up pipe laying operation.
When two adjacent protection bodies are assembled, the first positioning block 15 of one bottom plate 1 is inserted into the first positioning groove 16 of the other bottom plate 1, the second positioning block 26 of the upper baffle plate 2 of one protection body is inserted into the second positioning groove 27 of the upper baffle plate 2 of the other protection body, the upper positioning screw 53 of one baffle plate 2 is rotated to enable the upper positioning screw to slide through the through groove 41 of the clamping seat 4 on the other baffle plate 2, then the end face of the limiting nut 54 is tightly abutted to the side wall of the clamping seat 4 through the locking limiting nut 54, and therefore the two adjacent protection bodies are effectively fixed, and the two adjacent protection bodies are connected to form a whole.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a water conservancy construction pipe laying department waterproof construction which characterized in that: including the protection body of a plurality of mutual concatenations, every the protection body includes bottom plate (1) and turns over a baffle (2) that articulate in bottom plate (1), and draw-in groove (21) have been seted up in baffle (2), bottom plate (1) has been seted up and has been accomodate groove (11), and the inner wall of accomodating groove (11) articulates there is support arm (3), and the tip activity card of support arm (3) inlays in draw-in groove (21), and support arm (3) are flexible arm, and support arm (3) are collapsible to be accomodate in accomodating groove (11).
2. The water conservancy construction pipe laying department waterproof construction according to claim 1, characterized in that: the supporting arm (3) comprises a supporting sleeve (31) with the end part hinged to the inner wall of the bottom of the accommodating groove (11) and a supporting rod (32) inserted in the supporting sleeve (31) in a sliding mode, the other end of the supporting sleeve (31) is rotatably connected with a nut sleeve (33), the supporting rod (32) is a threaded rod with threads penetrating through the nut sleeve (33), and the end part of the supporting rod (32) is movably inserted in the clamping groove (21).
3. The water conservancy construction pipe laying department waterproof construction according to claim 2, characterized in that: the inner wall of the clamping groove (21) is provided with a positioning ring (28), and the outer wall of the end part of the supporting rod (32) is convexly provided with a positioning column (34) inserted into the positioning ring (28).
4. The water conservancy construction pipe laying department waterproof construction according to claim 1, characterized in that: bottom plate (1) is provided with first connecting portion (12), baffle (2) are provided with second connecting portion (22), hinge groove (13) have been seted up in first connecting portion (12), and second connecting portion (22) protrusion is provided with and rotates articulated shaft (23) of connecting in hinge groove (13), spacing groove (14) have been seted up to the inner wall of hinge groove (13), and spacing groove (14) are provided with four and distribute around the axis of hinge groove (13), articulated shaft (23) outer wall protrusion be provided with the activity scarf joint in elasticity stopper (24) of spacing groove (14), wherein twice spacing groove (14) are in vertical direction, and twice spacing groove (14) are in the horizontal direction in addition.
5. The water conservancy construction pipe laying department waterproof construction according to claim 1, characterized in that: the two opposite side walls of the bottom plate (1) are respectively provided with a first positioning block (15) and a first positioning groove (16) for embedding the first positioning block (15).
6. The water conservancy construction pipe laying department waterproof construction according to claim 1, characterized in that: and the two opposite side walls of the baffle (2) are respectively provided with a second positioning block (26) and a second positioning groove (27) for embedding the second positioning block (26).
7. The water conservancy construction pipe laying department waterproof construction according to claim 1, characterized in that: the outer wall fixedly connected with mount pad (5) of baffle (2), mounting groove (51) have been seted up in mount pad (5), and mounting groove (51) are rotated and are connected with axis of rotation (52), and the outer wall protrusion of axis of rotation (52) has stop screw (53), and adjacent baffle (2) outer wall is provided with joint seat (4), and logical groove (41) that supply stop screw (53) to slide to pass are seted up in joint seat (4), and stop screw (53) threaded connection has stop nut (54), and the terminal surface of stop nut (54) is supported tightly in joint seat (4) lateral wall.
8. The water conservancy construction pipe laying department waterproof construction according to claim 1, characterized in that: and a force application block (25) is arranged on the outer wall of the top of the baffle (2) in a protruding manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120820376.2U CN214738169U (en) | 2021-04-20 | 2021-04-20 | Water conservancy construction pipe laying department waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120820376.2U CN214738169U (en) | 2021-04-20 | 2021-04-20 | Water conservancy construction pipe laying department waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214738169U true CN214738169U (en) | 2021-11-16 |
Family
ID=78611293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120820376.2U Active CN214738169U (en) | 2021-04-20 | 2021-04-20 | Water conservancy construction pipe laying department waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214738169U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162381A (en) * | 2022-07-28 | 2022-10-11 | 中交二航局第一工程有限公司 | Integrated pile cap hanging box and construction method |
-
2021
- 2021-04-20 CN CN202120820376.2U patent/CN214738169U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162381A (en) * | 2022-07-28 | 2022-10-11 | 中交二航局第一工程有限公司 | Integrated pile cap hanging box and construction method |
CN115162381B (en) * | 2022-07-28 | 2024-04-26 | 中交二航局第一工程有限公司 | Integrated pile cap hanging box and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214738169U (en) | Water conservancy construction pipe laying department waterproof construction | |
CN210440678U (en) | Hydraulic engineering pipeline supports connection structure | |
CN208412185U (en) | A kind of installation seat holding structure of unmanned plane shell | |
CN211981387U (en) | Support arrangement for municipal communication line pipeline with safeguard function | |
ATE319975T1 (en) | WEAPON STORAGE AIMING SYSTEM | |
CN207500635U (en) | A kind of urban water supply system water pipe fixing device | |
CN215568466U (en) | Hydraulic pipeline strutting arrangement for hydraulic engineering | |
CN212984367U (en) | Steel bar positioning fixture for reinforced concrete | |
CN211472778U (en) | Pipe network emergency drainage butt joint stabilizing seat | |
CN214946894U (en) | Municipal administration water supply and drainage pipeline fixing device | |
CN213145569U (en) | Rocky desertification area administers with irrigation pipe laying device | |
CN213452101U (en) | Convenient fixed pipeline strutting arrangement for hydraulic engineering construction | |
CN209866101U (en) | Multifunctional chemical experiment iron stand auxiliary device | |
CN210563454U (en) | Supporting device capable of being directionally and accurately converted for building floor slab pouring | |
CN217927559U (en) | Supporting and protecting structure for pipeline installation and fixation | |
CN212836247U (en) | Civil engineering frame roof beam reinforcing apparatus | |
CN217653615U (en) | Portable land surveying and mapping frame | |
CN210266520U (en) | Photoelectric support capable of being adjusted at all arbitrary angles | |
CN213425737U (en) | Fixing and clamping device for erecting power cable | |
CN216692868U (en) | Water suction pump for hydraulic engineering construction convenient to hose is spacing to be laid | |
CN220319207U (en) | Building support frame for high-rise building | |
CN216999542U (en) | Hydraulic and hydroelectric engineering side slope construction protector | |
CN214579322U (en) | Prevent extrudeing water conservancy drain pipe with wear-resisting function | |
CN215135740U (en) | Nasal cavity sponge with high-efficiency adsorption capacity | |
CN214883709U (en) | Corner supporting device for deep foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |