CN214738012U CN202120430532.4U CN202120430532U CN214738012U CN 214738012 U CN214738012 U CN 214738012U CN 202120430532 U CN202120430532 U CN 202120430532U CN 214738012 U CN214738012 U CN 214738012U
Authority
CN
China
Prior art keywords
spliced pole
bottom plate
civil engineering
plate
locating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120430532.4U
Other languages
Chinese (zh)
Inventor
谢纪辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120430532.4U priority Critical patent/CN214738012U/en
Application granted granted Critical
Publication of CN214738012U publication Critical patent/CN214738012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a civil engineering stake structure, comprising a base plate, the lower extreme of bottom plate be equipped with the grafting post, the last side of bottom plate on be equipped with the spliced pole, the vertical setting of spliced pole, the spliced pole setting be in the center of bottom plate, the side of spliced pole on be equipped with the locating plate, the locating plate be equipped with four, four locating plates are in the circumference evenly distributed of spliced pole, still include the body, the body cup joint the spliced pole on, the side of locating plate with the inner wall of body offset, the lower extreme and the bottom plate of body offset the cooperation, the body intussuseption be filled with the foamed rubber, one side of body be equipped with the spread groove of U-shaped, the opposite side of body be equipped with the connecting block.

Description

Civil engineering stake structure
Technical Field
The utility model relates to a civil engineering stake structure.
Background
At the edge of a river bank, in order to protect the river bank, piles are usually driven to protect the river bank, so as to avoid collapse of the river bank, and at present, timber piles are commonly used, but the timber piles are arranged at the edge of the river bank and are soaked by water, so that the timber piles are easy to decay and damage.
SUMMERY OF THE UTILITY MODEL
To the problem pointed out in the background art, the utility model provides a civil engineering stake structure.
The technical scheme of the utility model is realized like this:
the utility model provides a civil engineering stake structure, includes the bottom plate, the lower extreme of bottom plate be equipped with the plug column, the last side of bottom plate on be equipped with the spliced pole, the vertical setting of spliced pole, the spliced pole setting be in the center of bottom plate, the side of spliced pole on be equipped with the locating plate, the locating plate be equipped with four, four locating plates are in the circumference evenly distributed of spliced pole, still include the body, the body cup joint the spliced pole on, the side of locating plate with the inner wall of body offset, the lower extreme and the bottom plate of body counterbalance the cooperation, the body intussuseption be filled with the foamed rubber, one side of body be equipped with the spread groove of U-shaped, the opposite side of body be equipped with the connecting block.
The utility model discloses further set up to, the grafting post be equipped with a plurality ofly, the grafting post is including setting up at the main grafting post at bottom plate center and setting up the vice grafting post at the bottom plate edge, the lower extreme of main grafting post be less than the lower extreme setting of vice grafting post.
The utility model discloses further set up as, the body make by plastics.
The utility model discloses further set up to, the lateral wall of body on distribute and have a plurality of through-holes.
The utility model discloses further set up to, the bottom plate be circular structure.
The utility model discloses further set up to, bottom plate, grafting post, spliced pole, locating plate make by aluminum alloy material.
By adopting the technical scheme, the beneficial effects of the utility model are that:
the utility model provides a civil engineering stake structure, it is formed by a plurality of accessory combinations, and wholly is made by metal, plastics, foamed plastic, can set up in aqueous for a long time, can not corroded, long service life, and overall structure is simple, can cooperate between two adjacent stakes to link together, and the stake of being convenient for sets up in a row.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a second schematic structural view of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is the structure schematic diagram of the two pipe bodies of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The present invention is described below with reference to fig. 1-4:
the utility model provides a civil engineering stake structure, includes bottom plate 1, the lower extreme of bottom plate 1 be equipped with the grafting post, the side of bottom plate 1 on be equipped with spliced pole 3, the vertical setting of spliced pole 3, spliced pole 3 set up bottom plate 1's center, spliced pole 3 on be equipped with locating plate 4, locating plate 4 be equipped with four, four locating plates 4 are in spliced pole 3's circumference evenly distributed, still include body 5, body 5 cup joint spliced pole 3 on, locating plate 4 the side with the inner wall of body 5 offset, the lower extreme of body 5 offset the cooperation with bottom plate 1, body 5 intussuseption be filled with foam rubber 6, one side of body 5 be equipped with the spread groove 7 of U-shaped, the opposite side of body 5 be equipped with connecting block 8.
The inserting columns are multiple and comprise a main inserting column 9 arranged in the center of the bottom plate 1 and auxiliary inserting columns 10 arranged on the edges of the bottom plate 1, and the lower ends of the main inserting columns 9 are lower than the lower ends of the auxiliary inserting columns 10.
Wherein, the tube body 5 is made of plastic.
Wherein, a plurality of through holes are distributed on the side wall of the pipe body 5.
Wherein, the bottom plate 1 is of a circular structure.
The bottom plate 1, the inserting column, the connecting column 3 and the positioning plate 4 are all made of aluminum alloy materials.
By adopting the technical scheme, the beneficial effects of the utility model are that:
the utility model provides a civil engineering stake structure, it is formed by a plurality of accessory combinations, and wholly is made by metal, plastics, foamed plastic 6, can set up in aqueous for a long time, can not corroded, long service life, and overall structure is simple, can cooperate between two adjacent stakes to link together, and the stake of being convenient for sets up in a row.
The above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a civil engineering stake structure which characterized in that: the novel pipe joint comprises a base plate, the lower extreme of bottom plate be equipped with the plug column, the side of bottom plate on be equipped with the spliced pole, the vertical setting of spliced pole, the spliced pole setting be in the center of bottom plate, the side of spliced pole on be equipped with the locating plate, the locating plate be equipped with four, four locating plates are in the circumference evenly distributed of spliced pole, still include the body, the body cup joint the spliced pole on, the side of locating plate with the inner wall of body offset, the lower extreme and the bottom plate of body offset the cooperation, the body intussuseption be filled with the foamed cement, one side of body be equipped with the spread groove of U-shaped, the opposite side of body be equipped with the connecting block.
2. The civil engineering pile structure of claim 1, wherein: the plug columns are multiple and comprise main plug columns arranged at the center of the base plate and auxiliary plug columns arranged at the edges of the base plate, and the lower ends of the main plug columns are lower than the lower ends of the auxiliary plug columns.
3. The civil engineering pile structure of claim 1, wherein: the pipe body is made of plastic.
4. The civil engineering pile structure of claim 1, wherein: the side wall of the pipe body is distributed with a plurality of through holes.
5. The civil engineering pile structure of claim 1, wherein: the bottom plate is of a circular structure.
6. The civil engineering pile structure of claim 1, wherein: the bottom plate, the plug-in posts, the connecting posts and the positioning plate are all made of aluminum alloy materials.
CN202120430532.4U 2021-02-28 2021-02-28 Civil engineering stake structure Expired - Fee Related CN214738012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120430532.4U CN214738012U (en) 2021-02-28 2021-02-28 Civil engineering stake structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120430532.4U CN214738012U (en) 2021-02-28 2021-02-28 Civil engineering stake structure

Publications (1)

Publication Number Publication Date
CN214738012U true CN214738012U (en) 2021-11-16

Family

ID=78590241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120430532.4U Expired - Fee Related CN214738012U (en) 2021-02-28 2021-02-28 Civil engineering stake structure

Country Status (1)

Country Link
CN (1) CN214738012U (en)

Similar Documents

Publication Publication Date Title
CN206143709U (en) Movable anti -flood wall
CN205838691U (en) The biological floating bed of high and low position can be automatically adjusted
CN214738012U (en) Civil engineering stake structure
CN212612282U (en) Fixed hydraulic engineering bank protection of tractive
CN211671563U (en) Planting box for urban river treatment and ecological restoration
CN202644543U (en) Combined recyclable foundation pit supporting inner supporting upright column
CN209923938U (en) Assembled supporting construction of small-size rectangle foundation ditch
CN105756035B (en) A kind of anti-silting dumb-bell shape Demonstration for Ecological Sanitation plate of Quick drainage
CN206015511U (en) One implant post steel pipe column
CN210917416U (en) Detachable water conservancy construction cofferdam
CN214116460U (en) Ecological reinforced structure of old wall of river course gravity type
CN210562389U (en) Plastic module assembly for collecting and storing rainwater and water storage tank with same
CN218263804U (en) Prevent geotechnological check room of adjacent check room atress skew
CN210049237U (en) Prestressed reinforced concrete hollow support pile
CN211596658U (en) River bank protection for planting amorpha fruticosa
CN210766815U (en) Soft soil foundation side slope supporting construction
CN216475118U (en) Can dismantle piping lane foundation ditch water retaining device
CN210507409U (en) Ecological U-shaped sheet pile
CN216130163U (en) Anchorage type anti-floating foundation pile
CN210104860U (en) PP module is collected to rainwater with lateral part supporting role
CN114922210B (en) Island-building cofferdam construction platform structure
CN212025797U (en) Highway soft soil layer stake composite foundation
CN212742410U (en) Water conservancy construction slope protection structure
CN220571162U (en) Mangrove seedling planting device of lifting elevation
CN216075179U (en) Slope protection support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116

CF01 Termination of patent right due to non-payment of annual fee