CN214714202U - Comprehensive simulation climbing tower - Google Patents

Comprehensive simulation climbing tower Download PDF

Info

Publication number
CN214714202U
CN214714202U CN202023056833.XU CN202023056833U CN214714202U CN 214714202 U CN214714202 U CN 214714202U CN 202023056833 U CN202023056833 U CN 202023056833U CN 214714202 U CN214714202 U CN 214714202U
Authority
CN
China
Prior art keywords
climbing
slope
fixedly connected
rope
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023056833.XU
Other languages
Chinese (zh)
Inventor
吴应斌
宋映松
陈金东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Shengmin New Material Equipment Science And Technology Co ltd
Original Assignee
Xiamen Shengmin New Material Equipment Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Shengmin New Material Equipment Science And Technology Co ltd filed Critical Xiamen Shengmin New Material Equipment Science And Technology Co ltd
Priority to CN202023056833.XU priority Critical patent/CN214714202U/en
Application granted granted Critical
Publication of CN214714202U publication Critical patent/CN214714202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a belong to climbing amusement equipment technical field, specifically be a comprehensive simulation climbing tower, including walking platform, climbing slope, rope slope, climbing wall and buffer pool, walking platform fixedly connected with climbing slope, the back end fixedly connected with high platform of climbing slope, both ends fixedly equal fixedly connected with a climbing slope around the high platform, the bottom connection of climbing slope is provided with buffer pool, the left end fixedly connected with climbing wall of high platform, the front end surface connection of climbing wall is provided with a plurality of grab handles, the lateral wall of climbing slope, flexible slope and climbing wall all connects and is provided with the grab handle, this comprehensive simulation climbing tower combines the rock climbing of ground, the project of climbing, rope climbing with the hydroplaning project, experiences the thrill of rock climbing and climbing on water, and is interesting strong, when reaching the amusement, the safety of the tourists can be guaranteed, and the experience degree of the tourists is improved.

Description

Comprehensive simulation climbing tower
Technical Field
The utility model discloses a climbing amusement equipment technical field specifically is a comprehensive simulation climbing tower.
Background
With the development of society and economy, people begin to pay attention to cultural entertainment life after solving the problem of satiety. Many parents often take children to play in amusement parks, and experience the stimulation of falling from high altitude, the stimulation brought by collision, and the like. Many tourists begin to visit the water amusement park in hot summer, the existing water amusement park is only provided with the common aquatic amusement equipment, such as a slide way, a drift and the like, the common entertainment items are played for a long time, and the tourists lose freshness, so that the comprehensive amusement equipment with strong comprehensiveness is needed to fill the project of the water amusement park, and a comprehensive simulation climbing tower is provided in the prior art to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a comprehensive simulation climbing tower to solve the problem of proposing among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: including walking platform, high platform, climbing, rope slope, climbing wall and buffer pool, walking platform fixedly connected with climbing, climbing's back end fixedly connected with high platform, rope slope of fixed equal fixedly connected with in both ends around the high platform, the bottom on rope slope is connected and is provided with the buffer pool, the left end fixedly connected with climbing wall of high platform, the front end surface connection of climbing wall is provided with a plurality of grips, the lateral wall of climbing, rope slope and climbing wall all is connected and is provided with the grip.
Preferably, a plurality of climbing feet are fixedly connected to the slope surface of the climbing slope, and the climbing feet are arranged in 6 rows in a neat and level manner.
Preferably, be provided with into a plurality of protruding bag strips on the domatic of rope slope, the top fixedly connected with embolus of high platform, fixedly connected with climbing rope on the embolus, and this climbing rope places on the domatic of rope slope, be provided with a plurality of anti-skidding knots on the climbing rope.
Preferably, one end of the rope slope of the buffer pool principle is connected with a blocking air bag wall.
Preferably, the axes of the left end and the right end of the grasping handle are fixedly connected with a piece of nylon cloth, the other ends of the two pieces of nylon cloth are fixedly connected with a rotating shaft, and the two rotating shafts are movably connected with the protruding block.
Compared with the prior art, the beneficial effects of the utility model are that: this comprehensive simulation climbing tower, with the rock climbing on ground, the climbing, the project and the water skiing diving project combination of rope climbing, experience the thrill of rock climbing and climbing on water, the diving activity can be carried out on the high platform simultaneously, eliminate the tired out that rock climbing and climbing motion brought, increase interestingly, the rope slope can regard as the slide to use simultaneously, satisfy the enjoyment of visitor climbing and water skiing, the buffer pool can effectively protect people to rush out, when reaching the amusement, guarantee visitor's security.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the present invention will be described in detail with reference to the accompanying drawings and detailed embodiments, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor. Wherein:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
fig. 3 is a schematic view of the structure of the grasping handle of the present invention.
In the figure: 1 walking platform, 2 climbing, 21 climbing feet, 3 rope slopes, 31 climbing ropes, 32 anti-skid knots, 4 rock climbing walls, 41 grab handles, 411 convex blocks, 412 rotating shafts, 413 nylon cloth, 5 buffer pools, 51 blocking air bag walls, 6 high platforms and 61 studs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a comprehensive simulation climbing tower, this comprehensive simulation climbing tower, with the rock climbing on ground, the climbing, the project of rope climbing combines with the water skiing diving project, experience the thrill of rock climbing and climbing on water, can carry out the diving activity simultaneously on the high platform, eliminate the tired out that rock climbing and climbing motion brought, increase the interest, the rope slope can be regarded as the slide use simultaneously, satisfy the happy of visitor climbing and water skiing, the buffer pool can effectively protect people to rush out, when reaching the amusement, guarantee visitor's security. Referring to fig. 1-2, the device comprises a walking platform 1, a high platform 6, a climbing slope 2, a rope slope 3, a rock climbing wall 4 and a buffer pool 5;
referring to fig. 1-2-3, the comprehensive simulation climbing tower combines the items of rock climbing, climbing and rope climbing on the ground with the items of water skiing and diving, experiences the stimulation of rock climbing and climbing on water, can perform diving activities on a high platform 6, eliminates fatigue caused by rock climbing and climbing motions, increases interestingness, simultaneously, a rope slope 3 can be used as a slide way to meet the pleasure of climbing and water skiing for tourists, a buffer pool 5 can effectively protect people from rushing out, ensures the safety of the tourists while achieving entertainment, specifically, a climbing slope 2 is fixedly connected to a walking platform 1, a high platform 6 is fixedly connected to the back end of the climbing slope 2, a rope slope 3 is fixedly connected to both the front end and the back end of the high platform 6, a buffer pool 5 is connected to the bottom end of the rope slope 3, a rock climbing wall 4 is fixedly connected to the left end of the high platform 6, the front end surface of the climbing wall 4 is connected with a plurality of grasping handles 41, the climbing slope 2, the rope slope 3 and the side wall of the climbing wall 4 are all connected with the grasping handles 41, the slope surface of the climbing slope 2 is fixedly connected with a plurality of climbing feet 21, and 6 rows of climbing feet 21 are horizontally and orderly arranged, a plurality of convex bag strips are arranged on the slope surface of the rope slope 3, the top end of the high platform 6 is fixedly connected with a stud 61, the stud 61 is fixedly connected with a climbing rope 31, the climbing rope 31 is placed on the slope surface of the rope slope 3, a plurality of anti-skidding knots 32 are arranged on the climbing rope 31, one end of the rope slope 3 is connected with a blocking air bag wall 51 according to the principle of the buffer pool 5, the axes of the left end and the right end of the grasping handle 41 are fixedly connected with a piece of nylon cloth 413, the other ends of the two pieces of nylon cloth 413 are fixedly connected with a rotating shaft 412, and a convex block 411 is movably connected between the two rotating shafts 412;
in the concrete use, this comprehensive simulation climbing tower, with the rock climbing on ground, the climbing, the project and the water skiing diving project combination of rope climbing, experience the thrill of rock climbing and climbing on water, simultaneously can carry out the diving activity on high platform 6, eliminate the tired out that rock climbing and climbing motion brought, increase interestingly, rope slope 3 can regard as the slide to use simultaneously, satisfy the happy of visitor climbing and water skiing, buffer pool 5 can effectively protect people to rush out, climbing slope 2, the grab handle 41 that sets up is all connected to the lateral wall of rope slope 3 and climbing wall 4, the visitor's of being convenient for aquatic gripping, have a rest, when reaching the amusement, guarantee visitor's security.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features of the disclosed embodiments of the present invention can be used in any combination with each other, and the description of such combinations is not exhaustive in the present specification only for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (5)

1. The utility model provides a comprehensive simulation climbing tower, includes walking platform (1), high platform (6), climbing slope (2), rope slope (3), climbing wall (4) and buffer pool (5), its characterized in that: walking platform (1) fixedly connected with climbing (2), back end fixedly connected with high platform (6) of climbing (2), rope slope (3) of the fixed equal fixedly connected with in both ends around high platform (6), the bottom of rope slope (3) is connected and is provided with buffer pool (5), the left end fixedly connected with climbing wall (4) of high platform (6), the front end surface connection of climbing wall (4) is provided with a plurality of grab handles (41), the lateral wall of climbing (2), rope slope (3) and climbing wall (4) all is connected and is provided with grab handle (41).
2. A comprehensive simulated climbing tower according to claim 1, wherein: a plurality of climbing feet (21) are fixedly connected to the slope surface of the climbing slope (2), and 6 rows of the climbing feet (21) are horizontally and orderly arranged.
3. A comprehensive simulated climbing tower according to claim 1, wherein: be provided with into a plurality of protruding bag strips on the domatic of rope slope (3), the top fixedly connected with embolus (61) of high platform (6), fixedly connected with climbing rope (31) on embolus (61), and should climb rope (31) and place on the domatic of rope slope (3), be provided with a plurality of anti-skidding knots (32) on climbing rope (31).
4. A comprehensive simulated climbing tower according to claim 1, wherein: one end of the rope slope (3) of the buffer pool (5) is provided with a blocking air bag wall (51) in a connecting mode.
5. A comprehensive simulated climbing tower according to claim 1, wherein: the left end and the right end of the grasping handle (41) are respectively and fixedly connected with a piece of nylon cloth (413), the other ends of the two pieces of nylon cloth (413) are respectively and fixedly connected with a rotating shaft (412), and a convex block (411) is movably connected between the two rotating shafts (412).
CN202023056833.XU 2020-12-17 2020-12-17 Comprehensive simulation climbing tower Active CN214714202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023056833.XU CN214714202U (en) 2020-12-17 2020-12-17 Comprehensive simulation climbing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023056833.XU CN214714202U (en) 2020-12-17 2020-12-17 Comprehensive simulation climbing tower

Publications (1)

Publication Number Publication Date
CN214714202U true CN214714202U (en) 2021-11-16

Family

ID=78632370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023056833.XU Active CN214714202U (en) 2020-12-17 2020-12-17 Comprehensive simulation climbing tower

Country Status (1)

Country Link
CN (1) CN214714202U (en)

Similar Documents

Publication Publication Date Title
CN214714202U (en) Comprehensive simulation climbing tower
CN215025949U (en) Outdoor recreation facility for children
CN212700237U (en) Wall turns over
CN212166524U (en) Game castle
Wardle Are we taking play out of playgrounds?
CN211328131U (en) Double-tower recreation facility
CN210543302U (en) Many people of jungle magic net structure group leisure amusement equipment
CN211724656U (en) Little bear theme facility of travelling
CN216222901U (en) Robot amusement facility
CN207055796U (en) A kind of abrupt slope spurt recreational facilities
CN2130103Y (en) Multifunction playing device
Sherman Better bouldering
CN218685991U (en) Ride-through and challenge type combined amusement device
CN207324064U (en) A kind of high-altitude lowering rope device
CN211611605U (en) Castle amusement facility
CN214714295U (en) Bow runway with inner pull belt
CN201959547U (en) Intelligence-developing building-block jigsaw-puzzle toy
CN212067567U (en) Novel extend training combination device
Beal Bouldering: Movement, Tactics, and Problem Solving
CN218165946U (en) Tunnel type children amusement facility
CN215084565U (en) Amusement equipment star river space station
CN215136828U (en) Climbing amusement facility with rock-climbing subject rope net
CN212308874U (en) Children's amusement fairy tale cabin
CN106492403A (en) Children climb recreational facilities
CN216653360U (en) Safe amusement park is with children combination slide on water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant