CN214706899U - Construction cable erection device - Google Patents

Construction cable erection device Download PDF

Info

Publication number
CN214706899U
CN214706899U CN202120334209.7U CN202120334209U CN214706899U CN 214706899 U CN214706899 U CN 214706899U CN 202120334209 U CN202120334209 U CN 202120334209U CN 214706899 U CN214706899 U CN 214706899U
Authority
CN
China
Prior art keywords
fixed
clamping plate
arc
movable
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120334209.7U
Other languages
Chinese (zh)
Inventor
李磊
孙鹏
刘永
刘鲁阳
宋吉东
韩振爱
吴百顺
陈俊德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202120334209.7U priority Critical patent/CN214706899U/en
Application granted granted Critical
Publication of CN214706899U publication Critical patent/CN214706899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model provides a construction cable erects device belongs to construction auxiliary assembly field. The technical scheme is as follows: the clamping mechanism comprises a fixed clamp plate and a movable clamp plate which are matched with each other, an auxiliary locking assembly is arranged between the fixed clamp plate and the movable clamp plate, a first arc-shaped groove is formed in one side, close to the movable clamp plate, of the fixed clamp plate, and a first buffer structure is arranged in the first arc-shaped groove; one side of the movable clamping plate, which is close to the fixed clamping plate, is provided with a second arc-shaped groove, a second buffering structure is arranged in the second arc-shaped groove, and the second buffering structure is the same as the first buffering structure in structure. The utility model has the advantages that: simple structure, convenient to use can press from both sides tight fixed to the cable to be convenient for erect too thick and lead to being difficult to bare-handed cable that pulls, convenient to use is convenient for operate, effect safe and reliable.

Description

Construction cable erection device
Technical Field
The utility model relates to a construction auxiliary assembly field especially relates to a construction cable handing equipment.
Background
Cables are generally rope-like cables made by stranding several or several groups of conductors (at least two in each group), each group being insulated from each other and usually twisted around a center, the whole being covered with a highly insulating covering, the cable being characterized by internal current conduction and external insulation.
In building electromechanical installation, need erect the cable, and present cable need artifical bare-handed cable to pull to lay wire when erectting usually, but discovery in actual operation, the cable thickness differs, to crossing thick cable, is difficult to bare-handed to pull, influences the workman and normally erects the cable.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure, convenient to use can press from both sides tight fixed to the cable to be convenient for erect the cable that is difficult to bare-handed pulling thick and lead to, convenient to use is convenient for operate, effect safe and reliable's construction cable handing equipment.
The utility model discloses a realize through following measure:
the building construction cable erection device is characterized by comprising a fixed seat, wherein a handle is arranged at the outer top of the fixed seat, a clamping mechanism is arranged on the fixed seat, the clamping mechanism comprises a fixed clamping plate and a movable clamping plate which are matched with each other, and an auxiliary locking assembly is arranged between the fixed clamping plate and the movable clamping plate;
the fixed clamping plate is arranged at the bottom of the fixed seat, a plurality of sliding rods are arranged at intervals along the horizontal direction at the outer top of the movable clamping plate, sliding sleeves which are in one-to-one correspondence with the sliding rods are arranged at the top of the fixed seat, the sliding rods movably penetrate through the corresponding sliding sleeves along the vertical direction, compression springs are sleeved on the sliding rods between the sliding sleeves and the movable clamping plate, and limiting blocks are arranged at the upper ends of the sliding rods;
a first arc-shaped groove is formed in one side, close to the movable clamping plate, of the fixed clamping plate, and a first buffer structure is arranged in the first arc-shaped groove; one side of the movable clamping plate, which is close to the fixed clamping plate, is provided with a second arc-shaped groove, a second buffering structure is arranged in the second arc-shaped groove, and the second buffering structure is identical to the first buffering structure in structure.
The utility model discloses a concrete characteristics have in addition:
the first buffer structure comprises an arc-shaped clamping block movably arranged in a first arc-shaped groove, and a plurality of connecting rods are arranged at the bottom of the arc-shaped clamping block in parallel at intervals; the mounting cavity is arranged in the fixed clamp plate, the movable plate is movably arranged in the mounting cavity, each connecting rod is fixedly connected with the movable plate, through holes matched with the connecting rods are formed in the fixed clamp plate, and buffer springs are arranged at the lower ends of the connecting rods.
The lower extreme of connecting rod is equipped with the mounting groove, buffer spring sets up in the mounting groove, is equipped with the montant at buffer spring's lower extreme, montant and mounting groove sliding connection and lower extreme are fixed in the installation cavity.
The auxiliary locking assembly comprises first connecting plates arranged on two sides of the fixed clamping plate, second connecting plates are arranged on two sides of the movable clamping plate, and locking bolts penetrate through the second connecting plates and the corresponding first connecting plates.
The handle is in an inverted U shape, and the anti-slip ring is arranged on the handle.
Through setting up fixture when erectting the cable, can place the cable on the solid fixed splint, then the activity splint pass through the slide bar the sliding sleeve with pressure spring's the downward movement of mutually supporting presss from both sides tightly the cable, simultaneously, through supplementary locking Assembly is right gu fixed splint with the activity splint lock, and then pass through gu fixed splint with the mutually supporting of activity splint is fixed the cable clamp fastening, thereby the accessible the handle pulls the cable, has avoided the cable too thick and has caused the phenomenon that the workman is difficult to bare-handed to pull, simple structure, compactness, convenient to use.
The utility model has the advantages that: simple structure, convenient to use can press from both sides tight fixed to the cable to be convenient for erect too thick and lead to being difficult to bare-handed cable that pulls, convenient to use is convenient for operate, effect safe and reliable.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
Wherein the reference numerals are: 1. a fixed seat; 2. a handle; 3. fixing the clamping plate; 4. a movable splint; 5. an auxiliary locking assembly; 501. a first connecting plate; 502. a second connecting plate; 503. locking the bolt; 6. a slide bar; 7. a sliding sleeve; 8. a compression spring; 9. a limiting block; 10. an anti-slip ring; 11. an arc-shaped clamping block; 12. a connecting rod; 13. a movable plate; 14. a buffer spring; 15. a vertical rod.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present solution is explained below by way of specific embodiments.
Referring to fig. 1 and 2, the building construction cable erection device comprises a fixed seat 1, wherein a handle 2 is arranged at the outer top of the fixed seat 1, a clamping mechanism is arranged on the fixed seat 1, the clamping mechanism comprises a fixed clamping plate 3 and a movable clamping plate 4 which are matched with each other, and an auxiliary locking assembly 5 is arranged between the fixed clamping plate 3 and the movable clamping plate 4;
the fixed clamp plate 3 is arranged at the bottom of the fixed seat 1, a plurality of sliding rods 6 are arranged at intervals along the horizontal direction at the outer top of the movable clamp plate 4, sliding sleeves 7 which are in one-to-one correspondence with the sliding rods 6 are arranged at the top of the fixed seat 1, the sliding rods 6 movably penetrate through the corresponding sliding sleeves 7 along the vertical direction, compression springs 8 are sleeved on the sliding rods 6 between the sliding sleeves 7 and the movable clamp plate 4, and limiting blocks 9 are arranged at the upper ends of the sliding rods 6;
a first arc-shaped groove is formed in one side, close to the movable clamping plate 4, of the fixed clamping plate 3, and a first buffer structure is arranged in the first arc-shaped groove; one side of the movable clamping plate 4 close to the fixed clamping plate 3 is provided with a second arc-shaped groove, a second buffering structure is arranged in the second arc-shaped groove, and the second buffering structure is the same as the first buffering structure in structure.
The first buffer structure comprises an arc-shaped clamping block 11 movably arranged in the first arc-shaped groove, and a plurality of connecting rods 12 are arranged at the bottom of the arc-shaped clamping block 11 in parallel at intervals; the fixed splint 3 is internally provided with an installation cavity, a movable plate 13 is movably arranged in the installation cavity, each connecting rod 12 is fixedly connected with the movable plate 13, the fixed splint 3 is provided with a through hole matched with each connecting rod 12, and the lower end of each connecting rod 12 is provided with a buffer spring 14.
The lower extreme of connecting rod 12 is equipped with the mounting groove, and buffer spring 14 sets up in the mounting groove, is equipped with montant 15 at buffer spring 14's lower extreme, and montant 15 is fixed in the installation intracavity with mounting groove sliding connection and lower extreme.
The auxiliary locking assembly 5 comprises first connecting plates 501 arranged at two sides of the fixed splint 3, second connecting plates 502 are arranged at two sides of the movable splint 4, and locking bolts 503 are arranged between each second connecting plate 502 and the corresponding first connecting plate 501 in a penetrating manner.
The handle 2 is in an inverted U shape, and an anti-skid ring 10 is arranged on the handle 2.
Through the fixture who sets up, when setting up the cable, can place the cable on solid fixed splint 3, then movable splint 4 passes through slide bar 6, sliding sleeve 7 and compression spring 8 mutually support the downstream, press from both sides tightly the cable, and simultaneously, lock solid fixed splint 3 and movable splint 4 through supplementary locking Assembly 5, and then mutually support through solid fixed splint 3 and movable splint 4 and decide the cable clamp fastening, thereby the accessible handle 2 pulls the cable, avoided the cable too thick and cause the phenomenon that the workman is difficult to bare-handed to pull, moreover, the steam generator is simple in structure, and is compact, and is convenient to use.
The technical features that the utility model has not been described can be realized through or adopt prior art, and no longer give unnecessary details here, and of course, the above-mentioned explanation is not right the utility model discloses a restriction, the utility model discloses also not only be limited to the above-mentioned example, ordinary skilled person in this technical field is in the utility model discloses a change, modification, interpolation or replacement made in the essential scope also should belong to the utility model discloses a protection scope.

Claims (5)

1. The building construction cable erection device is characterized by comprising a fixed seat, wherein a handle is arranged at the outer top of the fixed seat, a clamping mechanism is arranged on the fixed seat, the clamping mechanism comprises a fixed clamping plate and a movable clamping plate which are matched with each other, and an auxiliary locking assembly is arranged between the fixed clamping plate and the movable clamping plate;
the fixed clamping plate is arranged at the bottom of the fixed seat, a plurality of sliding rods are arranged at intervals along the horizontal direction at the outer top of the movable clamping plate, sliding sleeves which are in one-to-one correspondence with the sliding rods are arranged at the top of the fixed seat, the sliding rods movably penetrate through the corresponding sliding sleeves along the vertical direction, compression springs are sleeved on the sliding rods between the sliding sleeves and the movable clamping plate, and limiting blocks are arranged at the upper ends of the sliding rods;
a first arc-shaped groove is formed in one side, close to the movable clamping plate, of the fixed clamping plate, and a first buffer structure is arranged in the first arc-shaped groove; one side of the movable clamping plate, which is close to the fixed clamping plate, is provided with a second arc-shaped groove, a second buffering structure is arranged in the second arc-shaped groove, and the second buffering structure is identical to the first buffering structure in structure.
2. The construction cable erection device of claim 1, wherein the first buffer structure comprises an arc-shaped clamping block movably disposed in a first arc-shaped groove, and a plurality of connecting rods are disposed at intervals in parallel at the bottom of the arc-shaped clamping block; the mounting cavity is arranged in the fixed clamp plate, the movable plate is movably arranged in the mounting cavity, each connecting rod is fixedly connected with the movable plate, through holes matched with the connecting rods are formed in the fixed clamp plate, and buffer springs are arranged at the lower ends of the connecting rods.
3. The construction cable erecting device according to claim 2, wherein a mounting groove is formed at a lower end of the connecting rod, the buffer spring is disposed in the mounting groove, a vertical rod is disposed at a lower end of the buffer spring, the vertical rod is slidably connected with the mounting groove, and the lower end of the vertical rod is fixed in the mounting cavity.
4. The construction cable erection device of claim 3, wherein the auxiliary locking assembly comprises first connection plates disposed at both sides of the fixed splint, second connection plates disposed at both sides of the movable splint, and a locking bolt is inserted between each second connection plate and the corresponding first connection plate.
5. The construction cable erection device of claim 4, wherein the handle is in the shape of an inverted U, and an anti-slip ring is provided on the handle.
CN202120334209.7U 2021-02-05 2021-02-05 Construction cable erection device Active CN214706899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120334209.7U CN214706899U (en) 2021-02-05 2021-02-05 Construction cable erection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120334209.7U CN214706899U (en) 2021-02-05 2021-02-05 Construction cable erection device

Publications (1)

Publication Number Publication Date
CN214706899U true CN214706899U (en) 2021-11-12

Family

ID=78566909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120334209.7U Active CN214706899U (en) 2021-02-05 2021-02-05 Construction cable erection device

Country Status (1)

Country Link
CN (1) CN214706899U (en)

Similar Documents

Publication Publication Date Title
CN107706871B (en) Overhead distribution line
CN104505766A (en) Tool and method for live replacement of 500kV strain insulator strings in substations
CN206673533U (en) A kind of novel high-pressure transmission line of electricity angle pole mounting structure
CN214706899U (en) Construction cable erection device
CN209281938U (en) A kind of BBTRZ flexible mineral insulation cable being easily installed
CN105952235B (en) A kind of abnormal shape cross-arm and power transmission rod
CN115051304B (en) Electric power fitting with adjustable distance
CN202474755U (en) 720/50 conducting wire jumper wire structure of extra-high voltage DC line
CN202513494U (en) Electriferous replacing device of v-shaped single-string insulator used in 1000 kV ultra-high voltage transmission line
CN213093844U (en) Flexible distance-adjusting wire clamp
CN112103891A (en) Insulating cross arm for communication power
CN205822893U (en) A kind of special-shaped cross-arm and power transmission rod
CN205724785U (en) Insulating support and electrical-wire support structure
CN204793832U (en) Join in marriage electrified maintenance in many loop lines of net way and carry lineman's utensil
CN108462099B (en) Method for replacing double-connection double-hanging-point suspension string insulator of +/-800 kV extra-high voltage line
CN114498516A (en) Multipurpose damper for marine jacket platform
CN220585949U (en) High-voltage crossing low-voltage wire composite cross arm
CN207010156U (en) A kind of design structure for deformation of being expanded with heat and contract with cold using telescopic joint compensation bus
CN207339070U (en) Light tool for replacing insulator string
CN216287788U (en) High-voltage electrical insulation protection device
CN215009501U (en) Insulating compound high-voltage tube bus
CN216311472U (en) Novel stain-resistant rod insulator
CN213026917U (en) Vertical side outlet arrangement structure of three-phase conductor at end part of power distribution device
CN219412081U (en) 10kV electrified assemblage iron tower insulating cross arm
CN221079730U (en) Single-wire duplex tension-resistant composite insulator

Legal Events