CN214701185U - Air port mounting structure - Google Patents

Air port mounting structure Download PDF

Info

Publication number
CN214701185U
CN214701185U CN202120031580.6U CN202120031580U CN214701185U CN 214701185 U CN214701185 U CN 214701185U CN 202120031580 U CN202120031580 U CN 202120031580U CN 214701185 U CN214701185 U CN 214701185U
Authority
CN
China
Prior art keywords
mounting structure
extension
extension part
tuyere
wind gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120031580.6U
Other languages
Chinese (zh)
Inventor
孙金才
王孟艳
黄秀峰
张洪博
孙朝元
林朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shunda air conditioning equipment Group Co.,Ltd.
Original Assignee
Shandong County Shunda Air Conditioning Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong County Shunda Air Conditioning Equipment Co ltd filed Critical Shandong County Shunda Air Conditioning Equipment Co ltd
Priority to CN202120031580.6U priority Critical patent/CN214701185U/en
Application granted granted Critical
Publication of CN214701185U publication Critical patent/CN214701185U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air-Flow Control Members (AREA)

Abstract

Wind gap mounting structure relates to air conditioner accessory technical field, and the wind gap includes panel portion and the neck somatic part as an organic whole even with panel portion, and the mounting hole can be passed to neck somatic part portion, and wind gap mounting structure includes: a plurality of torsion springs respectively arranged at the outer sides of the neck parts; the torsion spring comprises a spiral part, a first extension part and a second extension part, wherein the first extension part is arranged at one end of the spiral part, and the second extension part is arranged at the other end of the spiral part; the second extension part is connected with the air opening, and the first extension part can be pressed on the upper side of the ceiling and is used for providing elastic force for connecting the air opening to the ceiling; the tensioning assemblies correspond to the torsion springs one by one; one end of the tensioning assembly is connected with the first extension part, and the other end of the tensioning assembly is connected with the air opening. The utility model discloses a wind gap mounting structure has improved the efficiency of construction of wind gap installation.

Description

Air port mounting structure
Technical Field
The utility model relates to an air conditioner accessory technical field, concretely relates to wind gap mounting structure.
Background
The air diffuser is a common air supply outlet in an air conditioning system, has uniform air diffusion characteristic and simple and beautiful appearance, can be made into a square or a rectangle according to the use requirement, and can be matched with the decoration requirement of any ceiling. The device is suitable for broadcasting rooms, hospitals, theaters, classrooms, concert halls, libraries, entertainment halls, theater rest halls, general offices, shops, hotels, restaurants, sports halls and the like.
Most of air conditioner air outlets commonly seen in the market at present are fixedly installed on a ceiling through bolts penetrating through an air outlet frame, and the construction efficiency is low.
SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model provides a through providing a wind gap mounting structure, improved the efficiency of construction of wind gap installation.
An embodiment of the utility model provides a wind gap mounting structure for install the wind gap in the mounting hole of ceiling, the wind gap include the panel portion and with the panel portion neck body portion as an organic whole even, the neck body portion can pass the mounting hole, wind gap mounting structure includes:
the torsional springs are respectively arranged on the outer sides of the neck body parts; the torsion spring comprises a spiral part, a first extension part and a second extension part, wherein the first extension part is arranged at one end of the spiral part, and the second extension part is arranged at the other end of the spiral part; the second extension part is connected with the air opening, and the first extension part can be pressed on the upper side of the ceiling and is used for providing elastic force for connecting the air opening to the ceiling;
the tensioning assemblies correspond to the torsion springs one by one; one end of the tensioning assembly is connected with the first extending part, and the other end of the tensioning assembly is connected with the air port.
Preferably, the tightening assembly comprises a tightening body and a nut, the tightening body comprises a hook body and a screw, the hook body can be connected with the first extension part, and the screw passes through the tuyere and is connected with the nut.
Preferably, the free end of the first extending portion is bent to a side away from the panel portion to form a bent portion.
Preferably, the torsion spring further comprises a beam part, the beam part is fixedly connected with the bending part, and the extending direction of the beam part is parallel to the spiral part; the hook body can be connected with the beam portion.
Preferably, the tuyere further comprises an inclined portion, one end of which is connected with the panel portion and the other end of which is connected with the neck body portion; the upper side of the inclined part is provided with a reinforcing protrusion and a long groove penetrating through the inclined part and the reinforcing protrusion, and the screw rod penetrates through the long groove.
Preferably, a fixing member is provided at an upper side of the inclined portion, and the fixing member is used to fix the second extending portion to the inclined portion.
Preferably, the number of the torsion springs is four, and the four torsion springs are respectively arranged on two sides of the neck body part.
The embodiment of the utility model provides an in one or more technical scheme, following technological effect or advantage have at least: the utility model discloses an air port mounting structure upwards rotates the first extension of torsional spring, can put into the mounting hole with neck body portion, and first extension compresses tightly the upside surface at the ceiling after being released to it is fixed with the wind gap. The utility model discloses a tensioning assembly is connected first extension and wind gap, further improves the firm degree of wind gap installation, has ensured not emergence vibration of wind gap during operation.
Drawings
FIG. 1 is a schematic view of a tuyere mounting structure;
FIG. 2 is an enlarged view A of a portion of FIG. 1;
FIG. 3 is a schematic structural view of a torsion spring;
FIG. 4 is a schematic view of a fastener assembly;
fig. 5 is a schematic view of fig. 4 taken along direction C.
Description of the reference numerals
10-tuyere; 11-panel section; 12-a neck portion; 13-groove section; 14-a stent body; 15-an inclined portion; 151-reinforcing protrusions; 152-an elongated slot; 153-a fixture; 20-a ceiling; 21-mounting holes; 30-torsion spring; 311-a first extension; 312-a bending part; 313-a beam portion; 32-a helix; 33-a second extension; 40-a tensioning assembly, 41-a tensioning body; 411-screw rod; 412-a hook body; 42-a gasket; 43-nut.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and detailed description. It should be noted that the embodiments and features of the embodiments of the present invention may be combined with each other without conflict.
As shown in fig. 1 to 5, a tuyere mounting structure for mounting a tuyere 10 in a mounting hole 21 of a ceiling 20. The tuyere 10 includes a panel portion 11 and a neck portion 12 integrally connected to the panel portion 11, and the neck portion 12 can pass through the mounting hole 21. The tuyere mounting structure includes a plurality of torsion springs 30 and a plurality of tension members 40.
The torsion springs 30 are respectively provided outside the neck portion 12. In some embodiments, four torsion springs 30 are provided, one on each side of the neck portion 12.
The torsion spring 30 includes a spiral portion 32, a first extending portion 311, and a second extending portion 33, wherein the first extending portion 311 is provided at one end of the spiral portion 32, and the second extending portion 33 is provided at the other end of the spiral portion 32. The support body 14 is arranged on the tuyere 10, and the support frame 14 passes through the middle hole of the spiral part 32 to realize the fixation of the torsion spring 209.
The second extension 33 is connected with the tuyere 10, and the first extension 311 can be pressed against the upper side of the ceiling 20 for providing an elastic force for connecting the tuyere 10 to the ceiling 20. The tensioning assemblies 40 correspond one-to-one to the torsion springs 30; one end of the tension assembly 40 is connected to the first extension 311 and the other end is connected to the tuyere 10.
When mounting, the first extension 311 of the torsion spring 30 is rotated upward first, and then the neck body 12 can be put into the mounting hole 21, and the first extension 311 is released to be pressed against the upper side surface of the ceiling 20, thereby fixing the tuyere 10. To further enhance the installation firmness of the tuyere 10, the first extension 311 may be connected to the tuyere 10 by the tension assembly 40 to ensure that the tuyere 10 does not vibrate during operation.
In some embodiments, the outer side surface of the neck body portion 12 is provided with a recessed portion 13 into which the coiled portion 32 of the torsion spring 30 can be partially or fully seated.
In some embodiments, the tightening assembly 40 includes a tightening body 41 and a nut 43, the tightening body 41 includes a hook 412 and a screw 411, the hook 412 can be connected with the first extension 311, and the screw 411 passes through the tuyere 10 to be connected with the nut 43.
In some embodiments, the free end of the first extension 311 is bent away from the panel portion 11 to form a bent portion 312. The bent portion 312 can be attached to the upper surface of the ceiling 20 without generating an impression on the ceiling 20.
In some embodiments, the torsion spring 30 further includes a beam portion 313, the beam portion 313 is fixedly connected to the bending portion 312, and the beam portion 313 extends in parallel with the spiral portion 32; the hook 412 can be connected to the beam portion 313. The beam portion 313 and the bent portion 312 enclose a closed shape.
In some embodiments, the tuyere 10 further includes an inclined portion 15, one end of the inclined portion 15 being connected to the panel portion 11 and the other end being connected to the neck portion 12; a reinforcing protrusion 151 and a long groove 152 penetrating the inclined portion 15 and the reinforcing protrusion 151 are provided on the upper side of the inclined portion 15, and the screw 411 passes through the long groove 152. When the tightening assembly 40 is installed, the hook body 412 can be rotated to be matched with the extending direction of the long groove 152 and connected with the beam part 313 through the long groove 152, and the connection between the tuyere 10 and the screw 411 is realized through the washer 42 and the nut 43.
In some embodiments, the upper side of the inclined portion 15 is provided with a fixing member 153, and the fixing member 153 is used to fix the second extension portion 33 to the inclined portion 15. The fixing member 153 may be connected to the tuyere 10 by a screw, for example, a concave hole may be formed between the fixing member 153 and the upper surface of the inclined portion 15, and the second extending portion 33 may be fixed to the tuyere 10 by inserting the free end of the second extending portion 33 into the concave hole.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. Wind gap mounting structure for install the wind gap in the mounting hole of ceiling, the wind gap include the panel portion and with the panel portion neck body portion as an organic whole that links, neck body portion can pass the mounting hole, its characterized in that, wind gap mounting structure includes:
the torsional springs are respectively arranged on the outer sides of the neck body parts; the torsion spring comprises a spiral part, a first extension part and a second extension part, wherein the first extension part is arranged at one end of the spiral part, and the second extension part is arranged at the other end of the spiral part; the second extension part is connected with the air opening, and the first extension part can be pressed on the upper side of the ceiling and is used for providing elastic force for connecting the air opening to the ceiling;
the tensioning assemblies correspond to the torsion springs one by one; one end of the tensioning assembly is connected with the first extending part, and the other end of the tensioning assembly is connected with the air port.
2. The tuyere mounting structure of claim 1,
the tensioning assembly comprises a tensioning body and a nut, the tensioning body comprises a hook body and a screw rod, the hook body can be connected with the first extending portion, and the screw rod penetrates through the air port to be connected with the nut.
3. The tuyere mounting structure of claim 2,
the free end of the first extension part is bent to one side far away from the panel part to form a bent part.
4. The tuyere mounting structure of claim 3,
the torsion spring further comprises a beam part, the beam part is fixedly connected with the bending part, and the extending direction of the beam part is parallel to the spiral part; the hook body can be connected with the beam portion.
5. The tuyere mounting structure of claim 4,
the tuyere further comprises an inclined part, one end of the inclined part is connected with the panel part, and the other end of the inclined part is connected with the neck body part; the upper side of the inclined part is provided with a reinforcing protrusion and a long groove penetrating through the inclined part and the reinforcing protrusion, and the screw rod penetrates through the long groove.
6. The tuyere mounting structure of claim 5, wherein a fixing member for fixing the second extension portion to the inclined portion is provided at an upper side of the inclined portion.
7. The tuyere mounting structure according to any one of claims 1 to 6,
the four torsion springs are respectively arranged on two sides of the neck body part.
CN202120031580.6U 2021-01-07 2021-01-07 Air port mounting structure Active CN214701185U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120031580.6U CN214701185U (en) 2021-01-07 2021-01-07 Air port mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120031580.6U CN214701185U (en) 2021-01-07 2021-01-07 Air port mounting structure

Publications (1)

Publication Number Publication Date
CN214701185U true CN214701185U (en) 2021-11-12

Family

ID=78562194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120031580.6U Active CN214701185U (en) 2021-01-07 2021-01-07 Air port mounting structure

Country Status (1)

Country Link
CN (1) CN214701185U (en)

Similar Documents

Publication Publication Date Title
US7296699B2 (en) Structure of display rack
KR20090059283A (en) The partitions for desk
CA3172327C (en) Acoustic baffle assembly
CN214701185U (en) Air port mounting structure
JP2011503456A (en) Connection fixture and mounting configuration
US5507691A (en) Ventilator
US6595665B1 (en) Multi-shaped lamp shade assembly and method for making same
KR101765308B1 (en) Fixing device for ceiling panel
TWM601935U (en) Solar panel fixing base
US7161554B2 (en) System and method for securing an antenna
JP3475536B2 (en) Outdoor unit of air conditioner
US20050067545A1 (en) Ceiling fixture support with shallow housing
GB2431542A (en) Anchor structure for a fire-proof steel frame of a ceiling speaker
JP2022143707A (en) Sound diffuser
KR101941663B1 (en) Mode switching dual lighting fixtures
KR200176155Y1 (en) Supporting structure for built-up type shelf
US7694924B2 (en) Support assembly for work surface
CN220338318U (en) Panel light support
KR20090002519U (en) Air conditioning Dphyu it comes air frame configured structure
CN209116268U (en) A kind of line lamp fixation kit
JP7042460B1 (en) Anti-vibration bolt mounting bracket for hanging bolts
US11608853B2 (en) Pivot for a mounting device
CN213693064U (en) Quick fixed mounting structure of assembled indoor electric wire
CN217503173U (en) Support structure and display device
KR200339745Y1 (en) Piping connecting supporter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 253300 Luquantun Economic Development Zone, Wucheng County, De Zhou City, Shandong Province

Patentee after: Shunda air conditioning equipment Group Co.,Ltd.

Address before: 253300 Luquantun Economic Development Zone, Wucheng County, De Zhou City, Shandong Province

Patentee before: SHANDONG COUNTY SHUNDA AIR CONDITIONING EQUIPMENT CO.,LTD.

CP01 Change in the name or title of a patent holder